QA Sheet - Government Responses

View the file

Other files

File Type Posted
Attach_1_-_Revised_PWS.pdf PDF
Attach_11_-_ERPIMS_Data.xls XLS spreadsheet
RFP_19-R-0088_-_Amendment_1__-Signed.pdf PDF
Attach_4_-Tax_Liability.pdf PDF
Attach_7_-_Non-Disclosure_Agreement.pdf PDF
Attach_9_-Schedule_B.XLSX XLSX spreadsheet
Attach_6_-_Offeror_Reps_and_Certs.pdf PDF
RFP_FA8903-19-R-0088.pdf PDF
Attach_3_-_SCA_Wage_Determination.pdf PDF
Attach_8_-_Clause_52_212-5_and_Addl_Clauses.pdf PDF
Attach_2_-_Base_Support_Letter.pdf PDF
Attach_5_-Internal_Confidentiality_Agreements.pdf PDF
Exhibit_AB.pdf PDF
Attach_10_-QA_Sheet.xlsx XLSX spreadsheet
Attach_1_-_PWS.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Qstn # REFERENCE QUESTIONS ANSWERS

PWS ‐ 1.1 ‐

Introduction

The majority of the wells that are scheduled for abandonment have not been established in the

Texas database. As a result very little information is available in the current solicitation regarding the construction of the monitoring wells prior to 2001. Please provide the ERPIMS database (which will contain coordinates, well materials, etc.) for Goodfellow

Air Force Base so we can plan our field activities accordingly and refine our cost estimate.

See ERPIMS well report.

PWS ‐ 1.1 ‐

Introduction

The PWS states that a TCEQ letter dated 12

October 2018 approved no further action at

ST004 and requested submittal of a Response

Action Completion Report with proof of filing of deed notice within 60 days from the date of the letter.

Please provide the TCEQ final approval letter that indicates the deed notice is acceptable and ready for submission without modification.

Please provide a copy of the final deed notice and all necessary attachments.

A deed notice was not submitted. PWS states:

"A letter TCEQ dated 12 October 2018 approved no further action at ST004 and requested submittal of a Response Action

Completion Report with proof of filing of deed notice within 60 days from the date of the letter."

PWS ‐ 3.6.8 ‐

Permits

The PWS states that no permits are required for this project.

Goodfellow AFB does not require AF Form 103

Dig Permits for the well abandonment?

Yes, a dig permit is necessary.

PWS ‐ 4.2 ‐ Progress

Meetings

The PWS states that the contractor shall attend monthly progress meeting via teleconfernce with the installation and or AFCEC.

May we reduce the number of meetings to those during which planning or excution of activities are ongoing?

Yes.

5 PWS ‐ 4.4 ‐ Training

Does Goodfellow AFB require contractor training before work can be performed? If so, what is the level of effort for the training?

No.

PWS ‐ 4.11.1 ‐ Work

Plan

The PWS states that the contractor is to prepared an abbreviated Work Plan for the proposed work effort.

What does an "abbreviated" Work Plan mean?

Does this scope require the Work Plan to follow the Uniform Federal Policy‐Quality Assurance

Project Plan (UFP‐QAPP) format?

If analytical data are required, UFP‐QAPP requirements apply, including formatting.

PWS ‐ 4.12 ‐

EPRIMS Data

Management

The PWS states that ERPIMS Data Management‐

Not Applicable.

Previous well decommissioning projects required a submittal to ERPIMS; should this project have a similar requirement?

Yes, ERPIMS well decommisioning is required.

PWS ‐ 6.24 ‐ Facility

Demolition

What are the diameters of the groundwater monitoring wells?

2" diameter casings. See ERPIMS well report

FA8903‐18‐R‐0088

Attachment 10

RFP QUESTIONS / RESPONSES

RESPONSE ACTION COMPLETION REPORT AND WELL DECOMMISSIONING FOR SITE CLOSEOUT OF SITE ST004 AT GOODFELLOW AIR

FORCE BASE, TEXAS

17 June 2019

PWS ‐ 6.24 ‐ Facility

Demolition

Can the Government identify well pad sizes and thickness? Additionally, are any concrete or steel bollards associated with the groundwater monitoring wells to be abandoned?

See ERPIMS well report.

7 that have a 4'X4' pad, one with a 2'X2'. Five of the 4X4's have steel bollards.

There are bollards in these wells:

MW4‐10

MW4‐14

MW4‐20

MW4‐21

MW4‐28

These wells did not have bollards:

MW4‐57S

MW4‐58 (2’x2’ pad)

AOC5MW004

PWS ‐ 6.24 ‐ Facility

Demolition

Can the Government identify the surface material (and thickness) that these wells are located in? Does the ground surface need to be restored to the existing, surrounding ground surface?

See ERPIMS well report.

Most are limestone/gravel/caliche/clay/sand.

Ground surface needs to be restored to the existing surface conditions.

PWS ‐ 6.24 ‐ Facility

Demolition

A couple of the wells to be decommissioned

(specifically 53s and 56s) are "nested wells" with a deep well and shallow well within the same vault. Is the contractor required to decommission both the shallow and the deep wells?

Yes.

12 General What contract vehicle will be used to award this project?

This will be a stand‐alone firm‐fixed price (FFP) C‐ type contract.

13 General What are expectations for funding?

The Government cannot respond to that question.

14 General Is there a current contractor performing the RA for this site?

To the best of our knowledge, there is no RA being performed for this site.

General

Would this opportunity be considered part of the current AFICA solicitation for RAO‐LTM for

Goodfellow and other bases in Texas?

This is a separate requirement and not part of any other solicitations.

RFP ‐ 6.1

Paragraph 6.1 states that Offerors shall submit an electronic copy of the entire technical and cost proposal to the POCs in paragraph 14.

Paragraph 14 refers to FAR clauses and does not include the names of the POCs. Paragraph 15 does include the name and email addresses of the CO and CS for submittal of questions.

Would these be the POCs that should receive our proposal?

That reference is an error. The POCs for the submittal of proposals are the same individuals receiving the questions.

RFP ‐ 6.1

Paragraph 6.1 states: Offerors shall submit an electronic copy of the entire technical and cost proposal to the POCs in paragraph 14. The table in 6.5 indicates that an orginal and CD copy should be submitted for each volume. Please clarify whether Offerors should submit a hard copy (original) plus CD, as well as an electronic copy via email to the POCs?

Offerors shall only submit an Electronic copy (via email) of the proposal. No CS or hard copy required. Changes made in the RFP.