ATCH 9 - Revised Q&A: Responses to submitted Questions

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA8903-19-R-0020

ATTACHMENT 9

RFP QUESTIONS / RESPONSES

LONG TERM MANAGEMENT (LTM)

MULTIPLE SITES AT DOBBINS AIR RESERVE BASE, GEORGIA

19 FEBRUARY 2019

RFP REFERENCE
QUESTION
RESPONSE
1. Section 5.4.1
States “provide well survey with latitude and longitude of each well”. Can you provide the number of wells to be surveyed at each of the 9 sites and approximate acreage of each site?

Per 5.

LF001 is ~ 500ft x 500ft and has 5 wells;

FT002 is less than ½ acre and has 2 monitoring wells;

FT003 is less than ½ acre and has 5 wells;

DA011 is ~ 1 acre and has 7 monitoring wells;

OT004 is ~ 7 acres and has 7 monitoring wells;

DP005 has 8 wells size of site is unknown DP006 is ~ 1 acre and has 5 wells;

There are no wells for OT007 nor ST008.

Per section 5.4.2 of the PWS, the number of wells to be sampled at each of 5 sites (1.1) is fully described.

2.
Does the Combined Synopsis/Solicitation posted as solicitation number FA890319R0020 on FBO contain requirements similar to a existing contract or will this be a new requirement?
Requirements in this contract acquisition are similar to those of an existing contract.
3. Section 5.4.1
What reference point should be used for surveying (e.g. center of well or North edge of TOC).
Center of the well
4. Section 5.4.1
Do all wells on the nine inspection sites need surveyed, or only those to be sampled per Section 5.4.2?
All known wells need to be surveyed. Contractor needs to use data from previous LTM and 5-Yr Review docs, as well as draft final RI doc, to compile a list of wells that have existed (been sampled). There are no wells at sites ST008 and OT007.

2nd and 3rd year Five-Yr Review are available on the Air Force Administrative Record (AR#s 0201 and 0213).

Parts 1 and 2 of the previous 2017 LTM Report and the 2012 LTM Report are also available on the AR (AR#s 0211 and 099).

The Final RI document for newer wells installed under the Dobbins RI/FS will also be made uploaded to the AR by 15 Feb 2019 The link to the Air Force AR is below http://afcec.publicadmin-record.us.af.mil/

5. Section 5.4.1
If all wells on the nine sites need surveyed, could a list of the wells be provided?
There is no single list of all known wells.

The Contractor needs to use data from previous LTM and 5-Yr Review docs, as well as draft final RI doc, to compile a list of wells that have existed (been sampled). There are no wells at sites ST008 and OT007.

2nd and 3rd year Five-Yr Review are available on the Air Force Administrative Record (AR#s 0201 and 0213).

Parts 1 and 2 of the previous 2017 LTM Report and the 2012 LTM Report are also available on the AR (AR#s 0211 and 099).

The Final RI document for newer wells installed under the Dobbins RI/FS will also be made uploaded to the AR by 15 Feb 2019

The link to the Air Force AR is below http://afcec.publicadmin-record.us.af.mil/

6. Section 5.4.1
Please confirm that elevation data is not required by the survey.
The purpose of the survey is to create a single well list with all pertinent well data. Elevation data for known wells is found in existing public documents (previous Five-Yr Reviews, LTM Reports, etc.), but data missing will need to be obtained by the contractor.
7. PWS Section 3.6.5
Will any of the Sites contained within the scope of the RFP require special security badging or negotiated or special site access/agreements?
Two sites require a GOV escort for the contractor: FT002, and 1 well for FT003.
8. PWS Section 5.4.2
The PWS states the level 1 data validation is required for the 5 groundwater monitoring sites (PWS Section 5.4.2). Please confirm that the required level of data validation effort for this Task Order is in accordance with the DoD General Data Validation Guidelines (DoD, Feb 9, 2018) stage 1 data validation which includes review of sample results forms, COCs and supporting documents, laboratory receipt checklists, and field QC records. If not, what level of data validation is required?
Confirmed.
9. PWS Section 5.4.1
What level of accuracy is required for the well surveys (PWS Section 5.4.1)?
Accuracy to the 5th decimal place is required
10. PWS Section 5.4.1
Are there monitoring wells that should be surveyed at the 4 sites that only require LUC inspections (sites: FT003, DP006, OT007, and ST008)? If so, please provide applicable reports and/or figures showing the locations of all monitoring wells for these sites?
YES.

A well location map is provided in the appendices of the Second Five-Year Review Report available on the Air Force Administrative Record (AR# 0201)

Parts 1 and 2 of The Final 2017 LTM Report and the 2012 LTM Report are also available on the Air Force AR (AR#s 0211 and 099) The Final RI document for newer wells installed under the Dobbins RI/FS will also be made uploaded to the AR by 15 Feb 2019 The link to the Air Force AR is below http://afcec.publicadmin-record.us.af.mil/

11. PWS Section 5.4.2
Please provide reports and/or figures showing the locations of all monitoring wells to be sampled at sites LF001, FT002, DA011, DP005, and OT004?
Applicable reports and figures depicting well locations are available in the 2nd and 3rd year Five-Yr Review on the Air Force Administrative Record (AR#s 0201 and 0213).

Parts 1 and 2 of the previous 2017 LTM Report and the 2012 LTM Report are also available on the AR (AR#s 0211 and 099).

The Final RI document for newer wells installed under the Dobbins RI/FS will also be made uploaded to the AR by 15 Feb 2019

The link to the Air Force AR is below http://afcec.publicadmin-record.us.af.mil//

12. PWS Section 5.4.1
Please provide reports and/or figures describing or showing the types and locations of all LUCs to be inspected for the 9 sites?
Applicable reports and figures depicting well locations are available in the 2nd and 3rd year Five-Yr Review on the Air Force Administrative Record (AR#s 0201 and 0213).

Parts 1 and 2 of the previous 2017 LTM Report and the 2012 LTM Report are also available on the AR (AR#s 0211 and 099).

The Final RI document for newer wells installed under the Dobbins RI/FS will also be made uploaded to the AR by 15 Feb 2019

The link to the Air Force AR is below http://afcec.publicadmin-record.us.af.mil//

13. PWS Section 5.4.1
Historically (past 5 years) what types of LUC repairs have been required for the 9 sites.
No repairs have been required; signage is the only LUC that may require repair.
14. PWS Section 5.4.2
Please confirm that groundwater monitoring results should be compared only to the latest available Georgia In-Stream Water Quality Standards (GA IWQS) or U.S. Environmental Protection Agency (EPA) Maximum Contaminant Levels (MCLs), and that site-specific levels do not be calculated?
Confirmed. Contractor developed SAP will identify these standards, for approval by GaEPD.
15. PWS Section 5.4.2
What is meant by “Abbreviated monitoring report” for sites LF001 and FT002 (PWS Section 5.4.2)?
The term “abbreviated monitoring reports” has been removed from the PWS.
16. PWS Section 5.4.2
Can drummed investigative-derived waste (IDW) be temporarily staged in one centrally located accumulation point on Dobbins Air Reserve Base until pickup for offsite transport/disposal, or does the drummed IDW have to be temporarily stage at each site?
One centrally located accumulation point can be used unless the quantity of drums exceeds available space. The contractor will work with the on base personnel to determine the location of drums. If drums are not covered, they will need secondary containment. All drums generated must be disposed within 90 days of generation. If secondary containment is used, simple pallet-size secondary containment containers used with protective covering over the drums is sufficient.
17.
It is clear in the PWS that one annual GWS event will be completed. Are LUC inspections also limited to one annually, and if so, may the LUC inspections be completed concurrent with GWS?
Yes and yes
18.
1.0 Scope, 1.1 Introduction “Specifically, this PWS encompasses the full range of methods, technologies, and supporting activities necessary to perform: 1) long-term management of LUCs and groundwater monitoring wells, including performance of annual LUC inspections and repairs, well inspections, well repair, well redevelopment, well characterization, well abandonment.” The PWS is clear on the GWS activities, but not on the LUC inspections. Please provide an estimated number of wells that would need repaired, redeveloped, abandoned. Also, please provide additional information to allow for accurate costing of landfill CAP repair and signage repair/replacement.
Unknown since the Government has yet to receive the FY18 LTM Report. However, it is not anticipated that any signs are in need of repair, or any wells need redevelopment/repair. However, the contractor shall assume 1 sign will need to be replaced. The winning bidder will be informed of what sign needs to be replaced during the project kick-off meeting.
19.
Section 4.1 Post Award Meeting/Teleconference: Must the contractor be present at Dobbins for the kickoff meeting or will a remote teleconference be acceptable?
Teleconference is acceptable
20.
Section 4.2 Progress Meetings: If only 1 annual LUC inspection/GWS event is required, is there a need for 6 progress meetings?
Dobbins ARB would prefer monthly progress meetings be performed until the onsite work is completed. Progress meetings may be performed via teleconference. Therefore, the number of progress meetings proposed shall be based on the completion of field activities. The Contractor shall assume each progress meeting will be no longer than 30 minutes in length.

The PWS has been revised

21.
Section 4.7 CPSMR: If only 1 annual LUC inspection/GWS event is required, is there a need for 12 monthly CPSMRs?
The Period of Performance of this contract is 12 months. Therefore, preparation and submittal of monthly CPSMRs are required until the end of the project
22.
For past GWS events, was the IDW groundwater classified and disposed of as Non-Hazardous?
Analytical sampling of the IDW generated from past GWS events has resulted in IDW classification and disposal as NON HAZARDOUS WASTE. However, all IDW must be properly sampled and characterized prior to disposal.

23. Performance Work Statement

22 Jan 2019

Please provide copies of the most recent groundwater monitoring reports for all sites to be sampled in section 5.4 of the PWS.
The Air Force has yet to receive the 2018 LTM Report.

Parts 1 and 2 of the previous 2017 LTM Report and the 2012 LTM Report are also available on the AR (AR#s 0211 and 099).

The link to the Air Force AR is below http://afcec.publicadmin-record.us.af.mil/

24. Performance Work Statement 22 Jan 2019

Please provide a copy of the most recent Annual Long-Term Management Report covering the eight sites.
The Air Force has yet to receive the 2018 LTM Report.

Parts 1 and 2 of the previous 2017 LTM Report and the 2012 LTM Report are also available on the AR (AR#s 0211 and 099).

The link to the Air Force AR is below http://afcec.publicadmin-record.us.af.mil/

25. Performance Work Statement 22 Jan 2019

Will native files (Word, Excel, GIS/CADD, etc.) for the most recent reports referenced in questions 3 and 4 be made available to the successful firm?
No. Native files will not be provided.

2nd and 3rd year Five-Yr Review are available on the Air Force Administrative Record (AR#s 0201 and 0213).

Parts 1 and 2 of the previous 2017 LTM Report and the 2012 LTM Report are also available on the AR (AR#s 0211 and 099).

The Final RI document for newer wells installed under the Dobbins RI/FS will also be made uploaded to the AR by 15 Feb 2019 http://afcec.publicadmin-record.us.af.mil//

26. Performance Work Statement

The PWS states that the Contractor shall prepare a site-specific addendum sampling and analysis plan (SAP) to the current UFP-QAPP in place at Dobbins ARB, Georgia. Please provide a copy of the current UFP-QAPP in place at Dobbins ARB.
The most recent 2018 approved final Work and SAPs were just provided to the Government – and will be uploaded to the Air Force AR no later than 15 Feb 2019. The most recent version of the UFP-QAPP will also be available on the AR.

The link to the Air Force AR is below http://afcec.publicadmin-record.us.af.mil/

27. Performance Work Statement 22 Jan 2019

Section 5.4 of the PWS states that we are to analyze samples for Metals. Please clarify if we are to analyze for Total Metals, Dissolved Metals or for both Total and Dissolved.
ALL metals. Methods are specified in subparagraphs of 5.4 (5.4.2).

28. Performance Work Statement 22 Jan 2019

Please clarify if the drums of waste water generated at each site will be staged at the location of collection or does the contractor need to transport the drums to a central staging area.
One centrally located accumulation point can be used unless the quantity of drums exceeds available space. The contractor will work with the on base personnel to determine the location of drums. If drums are not covered, they will need secondary containment. All drums generated must be disposed within 90 days of generation. If secondary containment is used, simple pallet-size secondary containment containers used with protective covering over the drums is sufficient.

29. Performance Work Statement

Is the successful firm permitted to select the sampling dates (following approval of their plans), or must the sampling be done during a specific month or months?
There are no specific sampling dates for this effort. However, the contractor is expected to provide proposed sampling dates in their proposal for government review and approval. Furthermore, the Contractor must realize that a draft report will be provided to the Government for review and correction (60 days review), and then a Draft-Final will be submitted to the GaEPD for their regulatory review and comment (60 days) to which the contractor must make corrections for the Final document.

The PWS will be revised to account for the report frequency and review timeframes.

30. Performance Work Statement 22 Jan 2019

Please specify the metals analyte list for all sites requiring metals analysis (i.e., TAL list, RCRA list, or a subset).
ALL metals. Methods are specified in subparagraphs of 5.4 (5.4.2).

31. Performance Work Statement 22 Jan 2019

Please clarify if the contractor will be required to provided secondary containment for the drums containing purge water from the sampling events. If so, please provide specifications of the required secondary containment.
One centrally located accumulation point can be used unless the quantity of drums exceeds available space. The contractor will work with the on base personnel to determine the location of drums. If drums are not covered, they will need secondary containment. All drums generated must be disposed within 90 days of generation. If secondary containment is used, simple pallet-size secondary containment containers used with protective covering over the drums is sufficient.

32. Performance Work Statement 22 Jan 2019

Do you require PID measurements for the monitoring wells prior to sampling?
No. PID measurements for groundwater monitoring well sampling is not required

33. Performance Work Statement 22 Jan 2019

For the well survey required under the LUC inspections (Section 5.4.1), please clarify if the number of wells to be surveyed matches the number of wells listed to be sampled in the scope of work. If not, please provide a list of all wells to be surveyed. Also, please provide a map.
There are more wells needing to be surveyed than are sampled, but the contractor will determine this using historical records. The purpose of the well survey is to create a single list of active wells.

34. Performance Work Statement 22 Jan 2019

For the well survey, is a licensed surveyor required or can the contractor use a hand held GPS unit to collect latitude and longitude of each well.
A licensed surveyor is required to produce an accurate survey. A hand held GPS unit may be used to confirm latitude and longitude of well data in historical documents. Historical data is known to be inaccurate.

35. Performance Work Statement 22 Jan 2019

Please provide access to the previous Work Plan
The most recent FINAL LTM work plan (Jan 2019) is being published and will be available on the Air Force Administrative Record no later than 15 Feb 2019

http://afcec.publicadmin-record.us.af.mil/

36. Performance Work Statement 22 Jan 2019

Please provide access to the previous site-specific addendum Sampling and Analysis Plan (SAP) to the current UFP-QAPP
The most recent SAP and UFP-QAPP will be posted to the Air Force Administrative Record no later than 15 Feb 2019

37. Performance Work Statement

Please provide access to the current UFP-QAPP
The most recent UFP-QAPP will be posted to the Air Force Administrative Record no later than 15 Feb 2019

http://afcec.publicadmin-record.us.af.mil//

38. Performance Work Statement 22 Jan 2019

Will a pre-bid site visit be allowed?
No. A site visit will not be conducted.

39. Performance Work Statement 22 Jan 2019

Are top of casing elevations available for all wells to be sampled or will a survey be required?
YES, this data is available (see previous 2017 and 2012 LTM Reports)

However, a well survey is still required.

40. Performance Work Statement

Do any of the areas have restricted work hours? Special access, training, or limitations? i.e. low clearance, flight line area access, inside buildings or secured areas?
Contractors are allowed on base at 0730, and must leave before 1730.

Two sites require a GOV escort for the contractor: FT002, and 1 well for FT003.

41. Performance Work Statement 22 Jan 2019

Are all the wells easily accessible? i.e. Would we need to go through fenced areas? If so is there a gate here (what size?) Are any inside buildings? May we have a map of the well locations provided?
Two sites have wells which require a GOV escort for the contractor through gates: FT002, and 1 well for FT003.

A well location map is provided in the appendices of the Second Five-Year Review Report available on the Air Force AR (AR# 0201)

42. Performance Work Statement

Should the contractor assume that some well locks may need to be cut and replaced after sampling.
No. All well locks are functional and have working keys. Keys are provided by base personnel.

43. Performance Work Statement 22 Jan 2019

When is the anticipated award date for this 12 month POP?
20 March 2019

44. Performance Work Statement

Please confirm if there is a designated timeframe for the annual groundwater sampling to occur, if required (i.e. does sampling have to be done in a specific month or quarter of the year).
There are no specific sampling dates for this effort. However, the contractor is expected to provide proposed sampling dates in their proposal for government review and approval. Furthermore, the Contractor must realize that a draft report will be provided to the Government for review and correction (60 days review), and then a Draft-Final will be submitted to the GaEPD for their regulatory review and comment (60 days) to which the contractor must make corrections for the Final document.

The PWS will be revised to account for the report frequency and review timeframes.

45. Performance Work Statement 22 Jan 2019

Is an Air Force escort required at any of the sites?
Two sites require a GOV escort for the contractor: FT002, and 1 well for FT003.

46. Performance Work Statement 22 Jan 2019

Please provide figures showing the locations and boundaries of each of the LUC inspection sites.
A well location map is provided in the appendices of the Second Five-Year Review Report available on the Air Force Administrative Record (AR#0201)

http://afcec.publicadmin-record.us.af.mil/

47. Performance Work Statement 22 Jan 2019

Please provide figures showing the locations of monitoring wells at all sites to be sampled.
A well location map is provided in the appendices of the Second Five-Year Review Report available on the Air Force Administrative Record (AR#0201)

http://afcec.publicadmin-record.us.af.mil/

48. Performance Work Statement 22 Jan 2019

Please confirm if the monitoring wells at all sites contain dedicated sampling pumps. If so, please provide specifications for the pumps.
Wells do not contain dedicated pumps or tubing

49. Performance Work Statement

Do any of the monitoring wells contain dedicated tubing?
Wells do not contain dedicated pumps or tubing

50. Performance Work Statement 22 Jan 2019

Scope of work indicates that Draft and Final versions of the Work Plan are to be prepared. Will the Air Force require an Initial Draft version? Will the Draft version also be submitted for regulatory review? If so, please specify the review time for the regulatory agency.
There are no specific sampling dates for this effort. However, the contractor is expected to provide proposed sampling dates in their proposal for government review and approval. Furthermore, the Contractor must realize that a draft report will be provided to the Government for review and correction (60 days review), and then a Draft-Final will be submitted to the GaEPD for their regulatory review and comment (60 days) to which the contractor must make corrections for the Final document. The PWS will be revised to account for the report frequency and review times.

51. Performance Work Statement

Scope of work indicates that Draft and Final versions of the Technical Report are to be prepared. Will the Air Force require an Initial Draft version? Will the Draft version also be submitted for regulatory review? If so, please specify the review time for the regulatory agency.
There are no specific sampling dates for this effort. However, the contractor is expected to provide proposed sampling dates in their proposal for government review and approval. Furthermore, the Contractor must realize that a draft report will be provided to the Government for review and correction (60 days review), and then a Draft-Final will be submitted to the GaEPD for their regulatory review and comment (60 days) to which the contractor must make corrections for the Final document. The PWS will be revised to account for the report frequency and review times.

52. Performance Work Statement 22 Jan 2019

Are all wells that require sampling easily accessible within several feet by a standard pickup truck? Are the wells located on pavement, grass, or dirt?
No, not all wells are easily accessible. Some may only be accessed on foot. A well location map is provided in the appendices of the Second Five-Year Review Report (AR# 0201)

The link to the Air Force AR is below http://afcec.publicadmin-record.us.af.mil

53. Performance Work Statement 22 Jan 2019

What is the frequency of conducting the LUCs? (i.e. monthly, quarterly, semi-annual, annually)?
Annually

54. Performance Work Statement

When does the sampling generally take place at Dobbins (e.g. spring, summer, fall, winter)?
There are no specific sampling dates for this effort. However, the contractor is expected to provide proposed sampling dates in their proposal for government review and approval. Furthermore, the Contractor must realize that a draft report will be provided to the Government for review and correction (60 days review), and then a Draft-Final will be submitted to the GaEPD for their regulatory review and comment (60 days) to which the contractor must make corrections for the Final document. The PWS will be revised to account for the report frequency and review times.
55. Item 6.5.3.2 on pages 3 and 4
Has a schedule been established for actual field activities to commence – i.e., when are sampling activities expected to begin? When would we expect approval of all associated plans? When would all audits/meetings be completed?
There are no specific sampling dates for this effort. However, the contractor is expected to provide proposed sampling dates in their proposal for government review and approval. Furthermore, the Contractor must realize that a draft report will be provided to the Government for review and correction (60 days review), and then a Draft-Final will be submitted to the GaEPD for their regulatory review and comment (60 days) to which the contractor must make corrections for the Final document. The PWS will be revised to account for the report frequency and review times.
56. Item 3 on page 1
Is there an electronic repository or library of historical data and/or reports we could utilize to gain perspective on the results of previous assessments and deliverable requirements?
Historical reports are available on the Air Force Administrative Record

2nd and 3rd year Five-Yr Review are available on the Air Force Administrative Record (AR#s 0201 and 0213).

Parts 1 and 2 of the previous 2017 LTM Report and the 2012 LTM Report are also available on the AR (AR#s 0211 and 099).

The Final RI document for newer wells installed under the Dobbins RI/FS will also be made uploaded to the AR by 15 Feb 2019 The link to the Air Force AR is below http://afcec.publicadmin-record.us.af.mil/

57.
Can a site walk be scheduled?
No. A site visit will not be conducted.
58.
How accessible are the wells? For example can a 4-wheel drive truck pull within 10 feet of each well?
Not all wells are accessible by vehicle; some are only accessible by foot. A well location map is provided in the appendices of the Second Five-Year Review Report available on the Air Force Administrative Record (AR#0201)

The Final RI document for newer wells installed under the Dobbins RI/FS will also be made uploaded to the AR by 15 Feb 2019

The link to the Air Force AR is below http://afcec.publicadmin-record.us.af.mil//

59.
Is there a site map or drawing that you can provide that shows the location of the wells?
Most recently installed wells at 4 sites are identified in the Draft Final RI Report. The Final RI document for newer wells installed under the Dobbins RI/FS will also be made uploaded to the AR by 15 Feb 2019

Well location maps are provided in the appendices of the Second Five-Year Review Report available on the Air Force Administrative Record (AR#0201) http://afcec.publicadmin-record.us.af.mil/

60.
The wells were sampled in 2018 and 2017. Please provide a copy of the annual report.
The 2018 report has not been provided to the GOV.

Parts 1 and 2 of The Final 2017 LTM Report are available on the Air Force Administrative Record (AR #0211) http://afcec.publicadmin-record.us.af.mil/

61.
Can Dobbins Air Reserve Base provide a forklift for loading and unloading 55-gallon drums or a 250 gallon tote tank?
No. The central storage facility has no loading dock either. Contractor must utilize a truck with a lift gate.
62.
When is the annual 2019 sampling event scheduled?
There are no specific sampling dates for this effort. However, the contractor is expected to provide proposed sampling dates in their proposal for government review and approval. Furthermore, the Contractor must realize that a draft report will be provided to the Government for review and correction (60 days review), and then a Draft-Final will be submitted to the GaEPD for their regulatory review and comment (60 days) to which the contractor must make corrections for the Final document. The PWS will be revised to account for the report frequency and review timeframes.
63.
How much purge water was generated during the 2018 annual sampling event?
No more than 20 drums total of IDW were generated.
64.
Was there any damage to the wells, fencing, or signage in the 2018 annual inspection?
The 2018 inspection results have not been provided to the government yet. Damage to fencing and signage was not observed. Some wells to be surveyed may not be located.
65. Attachment 1, PWS, Section 5.4.1, first bullet
How many inspections are required to be performed per year?
One
66. Attachment 1, PWS, Section 5.4.1, second bullet
Were the wells sampled in 2018? If so, is there an existing survey on the wells?
Yes the wells were sampled in 2018, but the results have not yet been provided to the GOV. There are no existing survey on the wells

The contractor is expected to create a single well list with all pertinent data.

Parts 1 and 2 of The Final 2017 LTM Report and 2012 LTM Report are available on the Air Force Administrative Record (AR#s 0211 and 099)

The link to the Air Force AR is below.

http://afcec.publicadmin-record.us.af.mil/

67. Attachment 1, PWS, Section 5.4.1, second bullet
If there is an existing survey, do bidders need to include the cost for a new survey?
There is no existing survey. PWS requires that the contractor develop a well survey for all historical wells.
68. PWS Section 5.4.2
Is there a specific period (e.g., month or quarter) when the LUC inspections and/or groundwater sampling event are required to be conducted?
There are no specific sampling dates for this effort. However, the contractor is expected to provide proposed sampling dates in their proposal for government review and approval. Furthermore, the Contractor must realize that a draft report will be provided to the Government for review and correction (60 days review), and then a Draft-Final will be submitted to the GaEPD for their regulatory review and comment (60 days) to which the contractor must make corrections for the Final document. The PWS will be revised to account for the report frequency and review timeframes.
69. PWS Section 5.4.2
Historically, has the purge water been disposed of as anything other than non-hazardous?
No
70. PWS Section 5.4.2
Do the monitoring wells to be sampled contain dedicated equipment or tubing? If so, please specify type(s).
Monitoring wells do not contain dedicated pumps or tubing
71. PWS Section 5.4.2
Are all monitoring wells easily accessible by a standard pickup truck?
Not all wells are accessible by vehicle; some are only accessible by foot. A well location map is provided in the appendices of the Second Five-Year Review Report available on the Air Force Administrative Record (AR#0201)

A link to the Air Force AR is below.

http://afcec.publicadmin-record.us.af.mil/

72. PWS Sections 1.1 and 5.4
Could we please be provided with the most recent five Annual Long-Term Management Reports, so that we have access to the following:

1. Site locations

2. Monitoring well locations

3. Recent levels of effort for well redevelopment requirements

4. Identification of well characterization data gaps

5. Typical low-flow purging parameters and lengths of time to stabilize

6. Identification of any monitoring wells that often have poor yield or run dry

7. Recent levels of effort for signage, fencing, and monitoring well repairs 2017 LTM Report is on the Air Force AR, as are other prior reports. The 2018 LTM report has not been provided to the GOV yet.

The Contractor is expected to develop and determine all information on their own using historical documents, and additional data that may become available to the GOV.

A well location map is provided in the appendices of the Second Five-Year Review Report available on the Air Force Administrative Record (AR#0201) Parts 1 and 2 of The Final 2017 LTM Report and the 2012 LTM Report are available on the Air Force Administrative Record (AR# 0211 and 099)

The link to the Air Force AR is below.

http://afcec.publicadmin-record.us.af.mil/

73. PWS Section 3.6.5
How much advance notice does the Base require of the contractor to obtain site access?
A minimum of 3 calendar weeks; However, more time is better
74. PWS Section 4.8
Could the most recent project documents (UFP-QAPP, Addendum SAP, HSP, and WP) please be provided?
The most recent SAP and UFP-QAPP will be posted to the Air Force Administrative Record no later than 15 Feb 2019

http://afcec.publicadmin-record.us.af.mil/

75. PWS Section 4.10
Have all current well construction and analytical results for each site been uploaded to ERPIMS?
No. Older wells cannot be verified as existing in ERPIMS; newest wells are in ERPIMS.
76. PWS Section 4.4
Are there any site-specific trainings required to work on this project or access the sites?
No not at this time
77. PWS Sections 1.1 and 5.4.1
Is required repair work limited to only signage, fencing, and well damage that occurs during the contract period of performance?
YES.
78. PWS Section 5.4.2
Please confirm that bidders must assume that the liquid IDW from each site must be directly sampled for waste characterization. Many waste transportation and disposal subcontractors do not require additional waste characterization beyond the groundwater sampling results for purge water and decontamination water IDW.
IDW must be directly sampled for waste characterization prior to disposal.
79. PWS Section 5.4.2
If the liquid IDW from each site must be sampled directly for waste characterization, are there any contract requirements for what parameters the IDW samples must be analyzed for?
RCRA characterization standards.
80. PWS Sections 1.1 and 4.9
Section 1.1 mentions multiple LUC reports. Please confirm that there will only be one LUC report (as suggested in Section 4.9) which will include the results of the LUC inspections conducted at all nine sites.
Confirmed
81. PWS Sections 1.1 and 3.6.3
Please confirm that well abandonment is to be performed under this contract. If so, please provide the circumstances under which well abandonment will be required.
Well abandonment is not likely required. However, this is unknown since the Government has yet to receive the 2018 LTM Report. For purposes of this acquisition, the contractor shall assume well abandonment activities will not be required.
82. PWS Section 3.6.6
What permits are anticipated to be required for this project.
Yes (see answer to question 86). It is not anticipated that any additional permits will be required to perform this effort but if one is needed the contractor shall be responsible for coordinating and obtaining the permit.
83. PWS Section 4.3
Please confirm that the Contractor is only required to provide digital copies of all slides for the meetings, as opposed to paper copies mentioned in Section 4.3, given that all meetings will be conducted via teleconference.
Confirmed. The PWS has been revised
84. PWS Section 5.4.1
Please confirm that the required well survey need only include latitude and longitude locations and not top-of-casing elevations.
Well survey will be a single comprehensive list of all historical wells existing (not formally abandoned); if TOC elevations are missing from data, then contractor needs to determine the TOC elevation
85. PWS Section 5.4.1
Must well survey information be collected by a Georgia-licensed land surveyor?
Yes.
86. PWS Sections 3.6.6 and 6.1
Is a photography permit required to conduct photo documentation of site activities?
Yes – limited, and a base permit must be obtained.
87. PWS Section 5.4.2
If there is a specific location where drums of IDW must be staged, please provide its location.
YES. One centrally located accumulation point can be used unless the quantity of drums exceeds available space. The contractor will work with the on base personnel to determine the location of drums. If drums are not covered, they will need secondary containment. All drums generated must be disposed within 90 days of generation. If secondary containment is used, simple pallet-size secondary containment containers used with protective covering over the drums is sufficient.
88. PWS Section 5.4.2
Will the contract awardee be provided with all available GIS shapefiles applicable to generate the figures (e.g., site maps, etc.) required for project documents?
A GIS file showing location of the sites is available.
89. PWS Section 5.4.2
Are purge, development, and decontamination water IDW the only anticipated media that will require containerization, characterization, and off-site disposal; or would other waste, such as disposable PPE and/or disposable sampling equipment also require these measures?
All waste generated as a result of work under this contract shall be drummed, characterized and disposed of off-site.

One centrally located accumulation point can be used unless the quantity of drums exceeds available space. The contractor will work with the on base personnel to determine the location of drums. If drums are not covered, they will need secondary containment. All drums generated must be disposed within 90 days of generation. If secondary containment is used, simple pallet-size secondary containment containers used with protective covering over the drums is sufficient.