15-R-0024_BECSRC_Sample_TO_Installation_of_MWs_Soil_Excavation_Griffiss__Eastern_Region_Exhibit_A_CDRL_11192015.pdf
PDF 36 KB Posted
- Attached to
- AFICA AFCEC BECSRC Eastern Solicitation
- Solicitation number
- FA8903-15-R-0024
About this file
BECSRC East STO CDRL Exhibit A
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA8903-15-R-0024
STO Exhibit A
8 September 2015
1. DATA 2. TITLE 4. AUTHORITY
ITEM NO. 5. CONTRACT REFERENCE
3. SUBTITLE 16. REMARKS HC CD HC CD HC CD HC CD
A001 Scientific and Technical
Reports
As Required AFCEC/CIB 0 0 2 (e-mail) 2 0 0 2 (e-mail) 2
772d ESS/PKC 0 0 LT 0 0 0 LT 0
Remedial Action
Completion Report
SOW paragraphs: 3.7.4, 4.11, 6.0, 6.3, 6.6, 6.6.1, 6.6.4, 6.7 and 6.16.2 Base POC 0 0 1 (e-mail) 0 0 0 1 (e-mail) 0
Remedial Investigative
Report
AFCEC Library
POC
0 0 0 0 0 0 0 0
Monitoring Well
Installation Report
Submit per instruction from the COR. Shall include original disposal manifests for debris/wastes.
Shall include final results and laboratory quality data from sampling/analysis.
AFCEC/CDUT
0 0 0 0 0 0 0 1
Analytical Data Packages
(Draft or validated)
Submit per instruction from the COR. The government will require 20 business days for review. The Contractor shall incorporate government comments and submit next/final version within 10 business days of receipt of government comments.
Geographical Information
System Reporting
AFCEC Library POC: Send electronic copy of Final deliverable to Monico
Luna (monico.luna@us.af.mil).
Groundwater Monitoring
Report
AFCEC: Submit deliverable submittal letter to Dave Farnsworth
(david.farnsworth@us.af.mil).
All Working Copy (WC), Draft (D), Draft Final (DF), and Final (F) deliverables shall also be submitted by compact disc (CD) and hard copy (HC) as specified in the distribution section. The F versions shall include hard copies and web-ready (WR) files. The WR files shall be submitted in a single portable document file (pdf) format.
Field Summary Report Letters of transmittal (LT) shall be submitted by e-mail and HC.
All deliverables shall be prepared in a format compatible with current AFCEC
Administrative Record requirements.
DRAFT FINAL
SOLICITATION NO.: FA8903-15-R-0024
FINAL
BRAC ENVIRONMENTAL CONSTRUCTION AND SERVICES REQUIREMENTS CONTRACT TO SUPPORT INSTALLATION OF MONITORING WELLS, OIL WATER SEPARATOR REMEDIAL INVESTIGATION, AND SOIL
EXCAVATION
PROJECT NO: TBD
10. FREQUENCY
14. DISTRIBUTION (Per Deliverable)
ADDRESSEE
WORKING COPY DRAFT
AT FORMER GRIFFISS AIR FORCE BASE, NEW YORK
8 September 2015
1. DATA 2. TITLE 4. AUTHORITY
ITEM NO. 5. CONTRACT REFERENCE
3. SUBTITLE 16. REMARKS HC CD HC CD HC CD HC CD
DRAFT FINAL
SOLICITATION NO.: FA8903-15-R-0024
FINAL
BRAC ENVIRONMENTAL CONSTRUCTION AND SERVICES REQUIREMENTS CONTRACT TO SUPPORT INSTALLATION OF MONITORING WELLS, OIL WATER SEPARATOR REMEDIAL INVESTIGATION, AND SOIL
EXCAVATION
PROJECT NO: TBD
10. FREQUENCY
14. DISTRIBUTION (Per Deliverable)
ADDRESSEE
WORKING COPY DRAFT
AT FORMER GRIFFISS AIR FORCE BASE, NEW YORK
A003 Monthly AFCEC/CIB 0 0 2 2 2 2 2 2
Waste Manifest 772d ESS/PKC 0 0 LT 0 0 0 LT 0
Site Visit/Survey Report Base POC 0 0 1 1 1 1 1 1
Hazardous/Non-hazardous material/Waste
Report
Submit per instruction from the COR. Reports shall include original disposal manifests for hazardous wastes when applicable.
Reports shall include final results and laboratory quality data from sampling/analysis when applicable.
AFCEC Library
POC
0 0 0 0 0 0 0 1
ERPIMS Data
Submission
AFCEC/CDUT
0 0 0 1 0 1 0 1
The government will require 20 business days for review. The Contractor shall incorporate government comments and submit next/final version within
10 business days of receipt of government comments.
AFCEC Library POC: Send electronic copy of Final deliverable to Monico
Luna (monico.luna@us.af.mil).
AFCEC: Submit deliverable submittal letter to Dave Farnsworth
(david.farnsworth@us.af.mil).
All WC, D, DF, and F deliverables shall also be submitted by compact disc
CD and HC as specified in the distribution section. The F versions shall includeHCs and WR files. The WR files shall be submitted in a single pdf format.
LT shall be submitted by e-mail and HC.
All deliverables shall be prepared in a format compatible with current AFCEC
Administrative Record requirements.
SOW paragraphs: 4.11, 4.12, 4.16, 6.2, 6.3, and 6.7
8 September 2015
1. DATA 2. TITLE 4. AUTHORITY
ITEM NO. 5. CONTRACT REFERENCE
3. SUBTITLE 16. REMARKS HC CD HC CD HC CD HC CD
DRAFT FINAL
SOLICITATION NO.: FA8903-15-R-0024
FINAL
BRAC ENVIRONMENTAL CONSTRUCTION AND SERVICES REQUIREMENTS CONTRACT TO SUPPORT INSTALLATION OF MONITORING WELLS, OIL WATER SEPARATOR REMEDIAL INVESTIGATION, AND SOIL
EXCAVATION
PROJECT NO: TBD
10. FREQUENCY
14. DISTRIBUTION (Per Deliverable)
ADDRESSEE
WORKING COPY DRAFT
AT FORMER GRIFFISS AIR FORCE BASE, NEW YORK
A004 Environmental Permits As required
AFCEC/CIB 0 0 2 2 2 2 2 2
Dig/Utility Clearance 772d ESS/PKC 0 0 LT 0 0 0 LT 0
Miscellaneous Permits SOW paragraphs: 3.7.4, and 3.7.8 Base POC 0 0 1 1 1 1 1 1
AFCEC Library
POC
0 0 0 0 0 0 0 1
AFCEC/CDUT 0 0 0 1 0 1 0 1
Submit per instruction from the COR. The government will require 20 business days for review. The Contractor shall incorporate government comments and submit next/final version within 10 business days of receipt of government comments.
AFCEC Library POC: Send electronic copy of Final deliverable to Monico
Luna (monico.luna@us.af.mil).
AFCEC: Submit deliverable submittal letter to Dave Farnsworth
(david.farnsworth@us.af.mil).
All WC, D, DF, and F deliverables shall also be submitted by compact disc
CD and HC as specified in the distribution section. The F versions shall includeHCs and WR files. The WR files shall be submitted in a single pdf format.
LT shall be submitted by e-mail and HC.
All deliverables shall be prepared in a format compatible with current AFCEC
Administrative Record requirements.
File details come from the government source that posted it. Updated .