15-R-0024_BECSRC_Sample_TO_Installation_of_MWs_Soil_Excavation_Griffiss__Eastern_Region_Exhibit_A_CDRL_11192015.pdf

PDF 36 KB Posted

Attached to
AFICA AFCEC BECSRC Eastern Solicitation
Solicitation number
FA8903-15-R-0024
Issued by

About this file

BECSRC East STO CDRL Exhibit A

View the file

Other files

File Type Posted
BECSRC_East_FY16-FY23_FFP_Labor_Rates_02012016.xlsx XLSX spreadsheet
BECSRC_East_Solicitation_Amendment_FA8903-15-R-0024-0002_signed.pdf PDF
BECSRC_East_Pricing_Model_3_Feb_2016.xlsx XLSX spreadsheet
FA8903-15-R-0024_Section_M_20160201.pdf PDF
FA8903-15-R-0024_Section_L_20160201.pdf PDF
BECSRC_EAST_CONSOLIDATED_QUESTIONS_011416.pdf PDF
FA8903-15-R-0024_Section_M_20151216.pdf PDF
BECSRC_East_FY16-FY23_FFP_Labor_Rates_11192015.xlsx XLSX spreadsheet
15-R-0024_BECSRC_East__Basic_SOW__11192015.pdf PDF
15-R-0024_BECSRC_Sample__TO_SOW_Installation_of_MWs_Soil_Excavation_Griffiss__Eastern_Region_11192015.pdf PDF
FA8903-15-R-0024_Section_L_20151125.pdf PDF
BECSRC_East_Solicitation_Amendment_FA8903-15-R-0024-0001_signed.pdf PDF
BECSRC_EAST_CONSOLIDATED_QUESTIONS_011316.pdf PDF
BECSRC_EAST_CONSOLIDATED_QUESTIONS_121715.docx DOCX document
BECSRC_EAST_CONSOLIDATED_QUESTIONS_121115.docx DOCX document
FA8903-15-R-0024_Section_L_20151119.pdf PDF
15-R-0024_BECSRC_Sample__TO_SOW_Installation_of_MWs_Soil_Excavation_Griffiss__Eastern_Region_11192015.pdf PDF
15-R-0024_BECSRC_Basic_Eastern_Region_Exhibit_B_CDRL_111915.pdf PDF
15-R-0024_BECSRC_Sample_TO_Installation_of_MWs_Soil_Excavation_Griffiss__Eastern_Region_Exhibit_B_CDRL_11192015.pdf PDF
15-R-0024_BECSRC_Basic_Eastern_Region_Exhibit_C_CDRL_111915.pdf PDF
15-R-0024_BECSRC_East__Basic_SOW__11192015.pdf PDF
15-R-0024_BECSRC_Basic_Eastern_Region_Exhibit_A_CDRL_11192015.pdf PDF
15-R-0024_BECSRC_Sample_TO_Installation_of_MWs_Soil_Excavation_Griffiss__Eastern_Region_Exhibit_C_CDRL_11192015.pdf PDF
FA8903-15-R-0024_Section_M_20151119.pdf PDF
BECSRC_East_FY16-FY23_FFP_Labor_Rates_11192015.pdf PDF
Solicitation_BECSRC_East_111915.pdf PDF
Exhibit_A_BECSRC_Basic_East__CDRL_05132015.pdf PDF
FA8903-15-R-0024_SF_33_05282015_Final.pdf PDF
Attachment_2_FA8903-15-R-0024_BECSRC_Section_L_New_20150528.pdf PDF
Attachment_8_Sample_TO_Exhibit_B_East_Griffiss__CDRL_05112015.pdf PDF
Attachment_1_FA8903-15-R-0024_BECSRC_East__Basic_SOW_05132015.pdf PDF
Attachment_7_Sample_TO_Exhibit_A_East_Griffiss__CDRL_05112015.pdf PDF
Exhibit_B_BECSRC_Basic_East__CDRL_05132015.pdf PDF
Attachment_5_BECSRC_East_FY15-FY22_FFP_Labor_Rates_05282015.xlsx XLSX spreadsheet
Exhibit_C_BECSRC_Basic_East__CDRL_05132015.pdf PDF
Attachment_4_BECSRC_East_Pricing_Matrix_03232015.xlsx XLSX spreadsheet
Attachment_6_Sample_TO_East_Griffiss_AFB_SOW_05122015.pdf PDF
Attachment_3_FA8903-15-R-0024_BECSRC_Section_M_New_20150528.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA8903-15-R-0024

STO Exhibit A

8 September 2015

1. DATA 2. TITLE 4. AUTHORITY

ITEM NO. 5. CONTRACT REFERENCE

3. SUBTITLE 16. REMARKS HC CD HC CD HC CD HC CD

A001 Scientific and Technical

Reports

As Required AFCEC/CIB 0 0 2 (e-mail) 2 0 0 2 (e-mail) 2

772d ESS/PKC 0 0 LT 0 0 0 LT 0

Remedial Action

Completion Report

SOW paragraphs: 3.7.4, 4.11, 6.0, 6.3, 6.6, 6.6.1, 6.6.4, 6.7 and 6.16.2 Base POC 0 0 1 (e-mail) 0 0 0 1 (e-mail) 0

Remedial Investigative

Report

AFCEC Library

POC

0 0 0 0 0 0 0 0

Monitoring Well

Installation Report

Submit per instruction from the COR. Shall include original disposal manifests for debris/wastes.

Shall include final results and laboratory quality data from sampling/analysis.

AFCEC/CDUT

0 0 0 0 0 0 0 1

Analytical Data Packages

(Draft or validated)

Submit per instruction from the COR. The government will require 20 business days for review. The Contractor shall incorporate government comments and submit next/final version within 10 business days of receipt of government comments.

Geographical Information

System Reporting

AFCEC Library POC: Send electronic copy of Final deliverable to Monico

Luna (monico.luna@us.af.mil).

Groundwater Monitoring

Report

AFCEC: Submit deliverable submittal letter to Dave Farnsworth

(david.farnsworth@us.af.mil).

All Working Copy (WC), Draft (D), Draft Final (DF), and Final (F) deliverables shall also be submitted by compact disc (CD) and hard copy (HC) as specified in the distribution section. The F versions shall include hard copies and web-ready (WR) files. The WR files shall be submitted in a single portable document file (pdf) format.

Field Summary Report Letters of transmittal (LT) shall be submitted by e-mail and HC.

All deliverables shall be prepared in a format compatible with current AFCEC

Administrative Record requirements.

DRAFT FINAL

SOLICITATION NO.: FA8903-15-R-0024

FINAL

BRAC ENVIRONMENTAL CONSTRUCTION AND SERVICES REQUIREMENTS CONTRACT TO SUPPORT INSTALLATION OF MONITORING WELLS, OIL WATER SEPARATOR REMEDIAL INVESTIGATION, AND SOIL

EXCAVATION

PROJECT NO: TBD

10. FREQUENCY

14. DISTRIBUTION (Per Deliverable)

ADDRESSEE

WORKING COPY DRAFT

AT FORMER GRIFFISS AIR FORCE BASE, NEW YORK

8 September 2015

1. DATA 2. TITLE 4. AUTHORITY

ITEM NO. 5. CONTRACT REFERENCE

3. SUBTITLE 16. REMARKS HC CD HC CD HC CD HC CD

DRAFT FINAL

SOLICITATION NO.: FA8903-15-R-0024

FINAL

BRAC ENVIRONMENTAL CONSTRUCTION AND SERVICES REQUIREMENTS CONTRACT TO SUPPORT INSTALLATION OF MONITORING WELLS, OIL WATER SEPARATOR REMEDIAL INVESTIGATION, AND SOIL

EXCAVATION

PROJECT NO: TBD

10. FREQUENCY

14. DISTRIBUTION (Per Deliverable)

ADDRESSEE

WORKING COPY DRAFT

AT FORMER GRIFFISS AIR FORCE BASE, NEW YORK

A003 Monthly AFCEC/CIB 0 0 2 2 2 2 2 2

Waste Manifest 772d ESS/PKC 0 0 LT 0 0 0 LT 0

Site Visit/Survey Report Base POC 0 0 1 1 1 1 1 1

Hazardous/Non-hazardous material/Waste

Report

Submit per instruction from the COR. Reports shall include original disposal manifests for hazardous wastes when applicable.

Reports shall include final results and laboratory quality data from sampling/analysis when applicable.

AFCEC Library

POC

0 0 0 0 0 0 0 1

ERPIMS Data

Submission

AFCEC/CDUT

0 0 0 1 0 1 0 1

The government will require 20 business days for review. The Contractor shall incorporate government comments and submit next/final version within

10 business days of receipt of government comments.

AFCEC Library POC: Send electronic copy of Final deliverable to Monico

Luna (monico.luna@us.af.mil).

AFCEC: Submit deliverable submittal letter to Dave Farnsworth

(david.farnsworth@us.af.mil).

All WC, D, DF, and F deliverables shall also be submitted by compact disc

CD and HC as specified in the distribution section. The F versions shall includeHCs and WR files. The WR files shall be submitted in a single pdf format.

LT shall be submitted by e-mail and HC.

All deliverables shall be prepared in a format compatible with current AFCEC

Administrative Record requirements.

SOW paragraphs: 4.11, 4.12, 4.16, 6.2, 6.3, and 6.7

8 September 2015

1. DATA 2. TITLE 4. AUTHORITY

ITEM NO. 5. CONTRACT REFERENCE

3. SUBTITLE 16. REMARKS HC CD HC CD HC CD HC CD

DRAFT FINAL

SOLICITATION NO.: FA8903-15-R-0024

FINAL

BRAC ENVIRONMENTAL CONSTRUCTION AND SERVICES REQUIREMENTS CONTRACT TO SUPPORT INSTALLATION OF MONITORING WELLS, OIL WATER SEPARATOR REMEDIAL INVESTIGATION, AND SOIL

EXCAVATION

PROJECT NO: TBD

10. FREQUENCY

14. DISTRIBUTION (Per Deliverable)

ADDRESSEE

WORKING COPY DRAFT

AT FORMER GRIFFISS AIR FORCE BASE, NEW YORK

A004 Environmental Permits As required

AFCEC/CIB 0 0 2 2 2 2 2 2

Dig/Utility Clearance 772d ESS/PKC 0 0 LT 0 0 0 LT 0

Miscellaneous Permits SOW paragraphs: 3.7.4, and 3.7.8 Base POC 0 0 1 1 1 1 1 1

AFCEC Library

POC

0 0 0 0 0 0 0 1

AFCEC/CDUT 0 0 0 1 0 1 0 1

Submit per instruction from the COR. The government will require 20 business days for review. The Contractor shall incorporate government comments and submit next/final version within 10 business days of receipt of government comments.

AFCEC Library POC: Send electronic copy of Final deliverable to Monico

Luna (monico.luna@us.af.mil).

AFCEC: Submit deliverable submittal letter to Dave Farnsworth

(david.farnsworth@us.af.mil).

All WC, D, DF, and F deliverables shall also be submitted by compact disc

CD and HC as specified in the distribution section. The F versions shall includeHCs and WR files. The WR files shall be submitted in a single pdf format.

LT shall be submitted by e-mail and HC.

All deliverables shall be prepared in a format compatible with current AFCEC

Administrative Record requirements.

File details come from the government source that posted it. Updated .