01_Performance-Based_Work_Statement.docx

DOCX document 748 KB Posted

Attached to
Systems Engineering & Integration-2 (SE&I-2) FINAL Request for Proposal (RFP) Federal contract opportunity
Solicitation number
FA8811-20-R-0003
Issued by
Department of the Air Force Space Command Space and Missile Systems Center

About this file

This draft Request for Proposals (RFP) from the Department of the Air Force Space Command Space and Missile Systems Center seeks industry feedback on continued Systems Engineering & Integration (SE&I-2) services. Responses are due by 8 November 2019. The North American Industry Classification System code is 541715, with a small business size standard of 1250 employees. Interested parties must request access to the Bidder's Library containing additional sensitive documents by 18 October 2019 and sign a non-disclosure agreement. The Government plans an Industry Day on 23-25 October 2019 with one-on-one meetings, for which interested parties must also submit a request. Though not a small business set-aside, responses from small and small disadvantaged businesses are encouraged. Tecolote Research, Inc. provides non-governmental administrative support under appropriate non-disclosure agreements. All communications must be submitted to the email points of contact provided using the comment resolution matrix.

01_Performance-Based Work Statement

View the file

Other files for this federal contract opportunity

Other files attached to Systems Engineering & Integration-2 (SE&I-2) FINAL Request for Proposal (RFP), newest first.
File Type Posted
24Jan20_Conformed_03_Section L Instructions to Offerors.pdf PDF
24Jan20_Conformed_06_Section M Evaluation Criteria.pdf PDF
24Jan20_TrackedChanges_06_L-5_PP_Questionnaire.pdf PDF
24Jan20_Tracked Changes_03_PWS.pdf PDF
24Jan20_TrackedChanges_07_Section M Evaluation Criteria.pdf PDF
13Jan20_TrackedChanges_05 _L-3_Staffing_Govt_Estimate.xlsx XLSX spreadsheet
13Jan20_TrackedChanges_06_L-4_PP_Information.docx DOCX document
13Jan20_TrackedChanges_03_Instructions_to_Offerors.pdf PDF
13Jan2020_09_FA8811-20-R-0003_SEI-2_CRM.pdf PDF
13Jan20_Conformed_04_L-1_SB_Percentage_Calculation.xlsx XLSX spreadsheet
13Jan20_Conformed_05_L-3_Staffing_Govt_Estimate.xlsx XLSX spreadsheet
13Jan20_Conformed_01_FA8811-20-R-0003.pdf PDF
13Jan20_Conformed_06_L-4 PP_Information.docx DOCX document
13Jan20_TrackedChanges_04_L-1_SB_Percentage_Calculation.xlsx XLSX spreadsheet
12Dec2019_17_L-4 Past Performance Information.docx DOCX document
12Dec2019_10_45th OG Base Support.pdf PDF
12Dec2019_06_DD-254.pdf PDF
12Dec2019_22_L-9 Data Rights.pdf PDF
12Dec2019_18_L-5 Past Performance Questionnaire.docx DOCX document
12Dec2019_03_Performance-Based_Work_Statement.pdf PDF
12Dec2019_21_L-8 OCI_Mitigation_Plan_Checklist.pdf PDF
12Dec2019_12_Data Rights Assertions.pdf PDF
12Dec2019_01_Model Contract.pdf PDF
12Dec2019_08_OCI Mitigation Plan.pdf PDF
12Dec2019_15_L-2 Contractor Staffing Plan and Matrix.xlsx XLSX spreadsheet
12Dec2019_07_Performance_Incentive_Plan.pdf PDF
12Dec2019_02_ExhibitA_CDRLs.pdf PDF
12Dec2019_13_Section L Instructions to Offerors.pdf PDF
6 Dec 2019_L-3_Staffing_Govt_Estimate_Final.xlsx XLSX spreadsheet
6 Dec 2019_Section L Instructions to Offerors.docx DOCX document
6 Dec 2019_Objective Performance_Incentive_Plan.docx DOCX document
6 Dec 2019_L-5 Past Performance Questionnaire.docx DOCX document
26Nov2019_Time Phased Person Loading Graph Sample.pdf PDF
26Nov2019_Consolidated_Industry_Day_Comments.pdf PDF
22 Nov2019_PWS Appendix E Labor Category Description.docx DOCX document
22Nov2019_Objective_Performance_Incentive_Plan.docx DOCX document
02_Small_Business_Subcontracting_Plan_-_Reserved.docx DOCX document
12g_L-7_PP_Client_Authorization.docx DOCX document
12a_L-1_Labor_Category_Description.docx DOCX document
12c_L-3_Staffing_Govt_Estimate_Final.xlsx XLSX spreadsheet
12i_L-9_Data_Rights.docx DOCX document
12b_L-2_Contractor_Staffing_Plan_and_Matrix.xlsx XLSX spreadsheet
12d_L-4_Past_Performance_Information_for_Offerors.docx DOCX document
07_45th_OG_Base_Support.docx DOCX document
06_30th_OG_Base_Support.docx DOCX document
03_DD_Form_254_Contract_Security.pdf PDF
12_Section_L_Instructions_to_Offerors.docx DOCX document
_ExhibitA_CDRLs.pdf PDF
05_OCI_Mitigation_Plan_-_Reserved.docx DOCX document
__Model_Contract_FA8811-20-R-0003.pdf PDF
Show all 50

Systems Engineering & Integration-2 (SE&I-2) FINAL Request for Proposal (RFP) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 1

SPACE AND MISSILE SYSTEMS CENTER/ENTERPRISE CORPS LAUNCH (SMC/ECL)

SYSTEMS ENGINEERING & INTEGRATION-2 (SE&I-2)

PERFORMANCE WORK STATEMENT (PWS)

FA8811-20-R-0003

10 October 2019

Department of the Air Force Space and Missile Systems Center Enterprise Corps Launch Los Angeles AFB, California 90245-2808

1.INTRODUCTION4
1.1.Scope4
1.2.Description of Service5
2.APPLICABLE DOCUMENTS5
2.1.Compliance Documents5
2.2.Reference Documents5
3.REQUIREMENTS6
3.1.General Requirements6
3.2.Transition of SE&I-2 Effort7
3.3.Los Angeles Air Force Base (LAAFB) Requirements9
3.4.Cape Canaveral Air Force Station CCAFS Requirements28
3.5.Vandenberg Air Force Base (VAFB) Requirements39
3.6.Research, Development, Test, and Evaluation (RDT&E)55
4.Performance Requirements55
4.1.General requirements55
4.2.LA AFB Support.56
4.3.CCAFS, KSC, VAFB Support.62
5.SERVICES SUMMARY63
5.1.General:63
5.2.Performance Evaluation:63
5.3.Base support65
5.4.USG-FURNISHED PROPERTY:67
5.5.GENERAL INFORMATION68
5.6.GENERAL SECURITY68
5.7.BACKGROUND INVESTIGATIONS69
5.8.VISIT AUTHORIZATION LETTER (VAL)/VISIT AUTHORIZATION REQUEST(VAR)69
5.9.SECURITY MANAGEMENT69
5.10.Employee Training:70
5.11.Employee Certifications:70
5.12.Dress and Appearance:70
5.13.Employment of USG Employees:70
5.14.INSTALLATION AND CONTROLLED AREA ACCESS70
5.15.HOURS OF OPERATION71
5.16.INSPECTION OF FILES:72
5.17.PERFORMANCE EVALUATION MEETINGS:73
5.18.Contractor Manpower Reporting73
5.19.QUALITY ASSURANCE73
5.20.SAFETY:75
APPENDIX A - ACRONYMS, ABBREVIATIONS AND DEFINITIONS76
APPENDIX B - GLOSSARY83
APPENDIX C - REFERENCE DOCUMENTS99
APPENDIX D - COMPLIANCE DOCUMENTS107
APPENDIX E – LABOR CATEGORY REQUIREMENTS114
Annex A – Enabling Requirements174
Annex B - Associate Contractor Agreement Requirements177

INTRODUCTION

Scope The Systems Engineering and Integration-2 (SE&I) contractor (referred to as the contractor for the remainder of this document) shall furnish all personnel, equipment, labor, tools, materials, supervision, transportation and other items and services necessary to perform SE&I-2 services for the Enterprise Corps Launch organization (referred to as either SMC/ECL or Launch Enterprise (LE) for the remainder of this document) located at the Space and Missile Systems Center at Los Angeles Air Force Base, California (LAAFB); Cape Canaveral Air Force Station, Florida (CCAFS); Vandenberg Air Force Base, California (VAFB), and other locations as required. The contractor shall support SMC/ECL in its current configuration and shall continue to support SMC/ECL as it evolves through the life of this contract.

Services provided under this contract support SMC/ECL’s space launch operations for current and future SMC/ECL launch systems. Deliverables provided under this contract are in accordance with (IAW) Exhibit A, B, and C. The services include the following functional areas:

a) Systems Engineering and Integration (SE&I)

b) Mission Integration Management

c) Systems Safety Engineering

d) Systems Environmental Engineering

e) Systems Security & Cybersecurity

f) Quality and Production

g) Manufacturing Engineering

h) Quality Engineering

i) Launch Schedule Management Launch Risk Management

j) Delta Launch Systems Certification for configuration changes (for the following potential systems: SpaceX - Falcon Family, United Launch Alliance – Atlas, Delta and Vulcan Next Generation Launcher, Blue Origin - New Glenn, Northrup Grumman - OmegA, Other Potential New Entrant(s), and Additional Launch Service Agreement (LSA) Vehicle Efforts Certification.

k) Data Management and Configuration Control Management

l) Enterprise Management Effective March 2019, Evolved Expendable Launch Vehicle (EELV) is referred to as National Security Space Launch (NSSL). SMC is evolving continuously and can be expected to evolve during the period of performance. This contract shall cover SMC/ECL launch services operations requirements in its current and future names, missions, and configurations based on organizational evolution to meet National Security Space (NSS) needs. Additionally, it can be reasonably expected that the roles and responsibilities (i.e., leading an effort versus supporting an effort) in certain areas of this PWS might evolve during the period of performance. The contractor shall support all the requirements in this PWS and any additional tasks based on evolving requirements.

Description of Service This PWS consists primarily of systems engineering and integration (SE&I) tasks in support of SMC/ECL, but will also encompass support to the collective NSSL Government personnel and team members, to include Federally Funded Research Development Centers. The SE&I-2 contract also includes overarching integration requirements for launch and range programs which will require interfacing both the NSSL and any future SMC/ECL launch systems. In addition, this contract effort provides for SE&I support to the 45th Space Wing (45 SW) and the 30th Space Wing (30 SW) launch responsibilities at Cape Canaveral Air Force Station (CCAFS), Vandenberg Air Force Base (VAFB) and other locations as required.

For NSSL, the SE&I-2 contractor will provide support of SMC/ECL and Operations Group (OG) mission assurance efforts for an average of 12 National Security Space (NSS) missions per year; approximately 3 from VAFB and approximately 9 from CCAFS/Kennedy Space Center (KSC) and other locations as required. Additionally, the SE&I-2 contractor will provide support of fleet surveillance for non-NSS mission activity for no more than 40 missions per year, in order to assess the cross-over impact to NSS mission assurance as implemented and directed by SMC/ECL at the time of performance. Fleet surveillance includes performing surveillance of commercial and civil launch activities for the purpose of maintaining awareness of issues that intersect or may intersect NSSL flight worthiness or other Government mission assurance requirements for NSSL and Launch Service Providers (LSPs).

The contract effort will be performed at LAAFB, VAFB, CCAFS and other locations as required. The contract efforts needed to support SMC/ECL launch services will be funded by the SMC/ECL at LAAFB (Section 3.2, 3.3.1, 3.4.1, 3.6, and 4.2), CCAFS (Section 3.3.2 and 4.3), VAFB (Section 3.4.2 and 4.3).

APPLICABLE DOCUMENTS

Compliance Documents The contractor shall comply with the applicable documents listed in Appendix D.

Reference Documents The reference documents applicable to this PWS are listed in Appendix C.

REQUIREMENTS

General Requirements Tools, Processes & Procedures The contractor shall only use the Government approved software tools and standard COTS software (i.e. MS Office applications, Microsoft Project, MS IE). Any other software and/or tools (including proprietary software or tools) may be used only upon explicit written authorization by the Contracting Officer’s Representative (COR), and PCO stating the impacts to data rights.

The contractor shall only use the Government approved software tools and standard COTS software (i.e. MS Office applications, Microsoft Project, MS IE), unless an exception is granted. The contractor is encouraged to develop tools and processes that will result in efficiencies and process improvement for SMC/ECL. The contractor shall notify the PCO of potential software and/or tools (including proprietary software or tools) that may be used for process improvement purposes.

The Contractor shall exclusively use Government funds for the development of any non-commercial tools and processes.

Staffing The contractor shall fill the positions and meet all the qualifications, experience, and certifications (or equivalency) pursuant to Contract Attachment 8, Staffing Plan and Appendix E, Labor Category Requirements. The Government’s decision regarding equivalency of qualifications, experience, or certification will be final.

Document Review The contractor shall develop, submit, and review program documents consistent with Appendix C, Reference Documents and applicable military, federal, state, local, contractual, commercial, or international statutes, regulations, policies, publications, directives, instructions, executive orders, codes, requirements or standards and report findings to the Government.

Contractor Recommendations When presenting recommendations to the Government in the performance of this PWS, the contractor shall provide a detailed analysis of the Courses of Actions, Risks, Opportunities, and impacts to maximize the Government’s ability to make informed decisions consistent with the Government’s responsibility to perform Governmental functions in the public interest. The contractor, when required by the Government, shall provide comments using the approved Comment Resolution Matrix (CRM) format, or other Government directed format, and provide the completed CRM to the Government representative for review, approval, and action on or before mutually agreed schedule.

Meetings The contractor shall host, and participate in meetings, such as Integrated Product Team (IPT) meetings, Technical Interchange Meetings (TIMs), working group meetings, process improvement meetings, etc., with Government and USG Team organizations as directed by the Contracting Officer’s Representative (COR). The contractor will also be required to attend and provide support for time sensitive and classified actions meetings in-person. Repeated inability to attend will reflect negatively on the contractor’s performance evaluation, and be graded against the services summary.

The contractor shall prepare presentation materials, special technical reports, and papers as requested, and provide the Government with copies of all materials presented at the meetings. This information shall be delivered to the Government as Technical Reports, Presentation Materials, or Conference Minutes, or other format as required by the Government (CDRL A001 Program Progress Report). Continuous Improvement Recommendations The contractor shall submit, as appropriate, recommendations for streamlining and improving the standards, plans and processes used to execute the tasks within this PWS.

Training Government Personnel The contractor shall develop and implement, upon Government approval, a training program regarding areas covered by this PWS for the purpose of providing on-the-job and classroom training to Government personnel.

Priority of the Tasks The Government may prioritize tasks and requirements, including quantity and schedule requirements, and the contractor shall accept the Government priority as directed. The contractor shall promptly report to the Government discrepancies in task sequencing and opportunities to improve product and process efficiencies.

3.1.8 Small Business Utilization Report (CDRL A005)

The contractor shall report actual achievements relative to proposed small business utilization in performance of this specific contract (including subcontracting dollars/percentages relative to total contract value/total subcontracting). Reports are due 30 days after the close of each reporting period and within 30 days of contract completion.

Transition of SE&I-2 Effort Kick-Off Meeting The Contractor shall conduct a kick-off meeting at their facility within fourteen (14) calendar days after contract award. The contractor shall address the transition plan and progress as part of the kick-off meeting. (CDRL A001 Program Progress Report) Transition-In Plan (CDRL A006 Transition Plan)

1.1.1.1. The contractor shall develop and implement, a Government-approved, Transition Plan to coordinate with the current SE&I contractor to ensure a smooth transition between the inbound contractor and the outbound contractor. The contractor shall present how each PWS task will be executed during the kickoff meeting. Details of Transition-In requirements are described below:

1.1.1.1.1. Days 1-30 after Authorization To Proceed (ATP) will be considered as Transition-In period.

1.1.1.1.2. Days 31-365 after ATP will be considered as base period for performance on these PWS tasks.

Transition-in will be managed by a dedicated contractor Transition Manager who is not a key personnel. The Transition Manager will coordinate with the SMC/ECL COR and incumbent contractor Transition Team to integrate efforts, channel communications, resolve issues, and track progress. The Transition Manager will schedule and lead a weekly formal coordination meeting between the COR, and incumbent contractor to brief staffing and transition progress to the Government.

The scope of work for transition-in is to perform all activities necessary, and staff all positions identified in Contract Attachment 8, Staffing Plan to be prepared to assume full responsibility of the contract requirements by day 31 after ATP.

The contractor shall staff all positions as identified in the Contract Attachment 8, Staffing Plan as follows: All Key personnel on day 1 after ATP; all positions identified as minimum staffing before day 15 after ATP; and, all positions identified in contractor proposed staffing matrix on or before 30th day of ATP.

Transition-In Implementation During the transition-in period, the contractor may observe work being accomplished by the incumbent contractor, which shall be on a non-interference basis. The contractor shall familiarize personnel as defined in the transition plan with work in-progress, reporting, priorities, forms, documents, scheduling, storage, safety, security, and quality control procedures. The incumbent contractor’s transition out period will be thirty (30) calendar days.

Contract Transition-Out (CDRL A006 Transition Plan) The contractor shall support and appropriately staff all transition-out activities. The contractor shall contribute to organizational, system, process and information knowledge transfer to the Government program office team (Government, FFRDC, and SETA members) and inbound contractor.

The contractor shall implement transition-out activities to minimize impact to SMC/ECL program schedules, cost, performance, and risk.

Transition Program Technical Baselines The contractor shall transition the SMC/ECL program Configuration Control Board (CCB)-controlled technical baseline to the inbound SMC/ECL SE&I contractor. The contractor shall verify and validate that the traceability from the functional baseline to the allocated baseline is correct for all CCB-controlled requirements.

Los Angeles Air Force Base (LAAFB) Requirements Systems Engineering Launch Systems The contractor shall perform assessments of SMC/ECL launch systems engineering program documents as required for adequacy, currency, and compliance with the Office of the Secretary of Defense (OSD), Air Force (AF), Air Force Space Command (AFSPC), and SMC instructions. The contractor shall assess and SMC/ECL internal compliance with the approved SMC/ECL systems engineering documents on an annual basis, or as otherwise required by SMC/ECL. For the SMC/ECL systems engineering documents, the contractor shall produce and assess needed changes, and gather inputs from stakeholders, maintain comment resolution matrices (CRMs), Confluence, Jira, or other comment database tracking system approved by the Government in order to incorporate agreed to changes, and deliver draft updated documents to SMC/ECL on a mutually agreed to schedule, and support staffing and Technical Review Board (TRB)/ Configuration Control Board (CCB) approval.

The contractor shall perform the following:

a) Support New Entrant Certification validation traceability to the SPRD/SIS, as needed.

b) Support future launch systems architecture non-recurring engineering requirements as a part of the larger Launch Enterprise mission assurance efforts; which includes architecture verifications and design validations.

c) Provide support to AFSPC Capabilities Production Document (CPD) updates, CONOPS and Operating Concepts.

d) Support SMC/ECL taskers, including review and CRM responses. The contractor should expect an average of 2 taskers per week with the understanding that there may be more depending on tasker fluctuations.

e) Attend, document, and track assigned action items in support of the SMC/ECL Chief Engineer’s Council (CEC) and Technical Review Board (TRB).

f) Coordinate meeting logistics for the National Aeronautics and Space Administration (NASA), National Reconnaissance Office (NRO), and SMC/ECL leadership collaboration at Launch Collaboration Steering Groups.

The contractor shall maintain the following documents:

a) System Performance Requirements Document (SPRD)

b) Standard Interface Specification (SIS)

c) Systems Engineering Plan (SEP)

d) Risk Management Plan (RMP)

e) SMC/ECL Process Guide

f) Life Cycle Sustainment Plan (LCSP) (CDRL A004)

g) The contractor shall develop any other required launch systems engineering documents identified by the Government.

Configuration Management The Contractor shall provide Configuration Management and Data Management (CM/DM) for the SMC/ECL NSSL documentation as described below:

a) NSSL Configuration Management: The contractor shall execute the NSSL Configuration Management Plan (CMP) IAW SMCI 62-109 to ensure all CM required functions and activities are executed and documented, including managing technical review boards/configuration control boards, configuration identification, change control, status accounting, verification, reviews, audits, and metrics for the program baseline documentation. The Contractor shall review and update the NSSL Change Control Board (NCCB) Operating Instruction (OI) annually to document Change Control processes that are enforceable and subject to inspection.

b) LSP Contract Data Requirements List (CDRL) Management: The contractor shall manage the LSP CDRL process from submittal through acceptance to archival. The CDRL management process shall include but is not limited to: acquiring and maintaining all CDRLs submitted by LSPs, notification and distribution of the documents for review, maintaining the current status of each CDRL, collecting metrics, maintaining comments submitted against CDRLs, coordinating reviews, and facilitating the CDRL Review Board and Actions Items.

c) Data Management Development: The contractor shall review and update annually the Data Governance Policy that defines the rules, standards and models that govern and define the type of data that exists in the SMC/ECL (Enterprise Data) and how it is used, stored, managed and integrated within the organization and its systems.

d) Data Management Plan: The contractor shall review and update annually the SMC/ECL Data Management Plan (DMP) to incorporate the tenets of the Data Governance policies and processes into a single source document for Enterprise Data management.

e) Configuration Management Plan: The contractor shall review and update annually the SMC/ECL Configuration Management Plan (CMP) to incorporate the tenets of the Data Governance policies and processes.

f) Data Management Implementation: The contractor shall implement the new DMP’s structures and processes in accordance with the Data Governance Policy (DGP) across the Launch Enterprise and its systems, as tailored by the United States Government (USG).

g) Data Repository: The contractor shall operate and maintain the repositories of enterprise critical data and protected data on the SMC Livelink system or other Government owned and administered system.

Model Based Systems Engineering (MBSE) Implementation and Maintenance The contractor shall develop and implement handling requirements and processes for a model-based era. This includes, but is not limited to: designing the approach on incorporating how updated requirements both external (e.g. Joint Capabilities Integration and Development System (JCIDS)) or internal, the process for integrating higher level architectures (e.g., AFSPC and SMC) and the process for “what if” assessments being executed in a modeled environment.

a) MBSE Environment Development: The contractor shall develop a MBSE Governance Policy (MGP) IAW DoD, USAF, AFSPC, SMC, and commercial best practices and make a recommendation that defines the rules, standards and architectures that govern and define the type of MBSE environment that exists in the SMC/ECL (Enterprise MBSE Environment) and how it is used, managed, and integrated within the organization and its systems.

b) MBSE Data Management Plan: The contractor shall update the SMC/ECL Data Management Plan (DMP) to incorporate the tenets of the MBSE Governance policies and processes into a single source document for Enterprise Data management.

c) MBSE Configuration Management Plan: The contractor shall update as required the SMC/ECL Configuration Management Plan (CMP) to incorporate the tenets of the MBSE Governance policies and processes.

d) MBSE Conversion Plan: The contractor shall create a one-time MBSE Conversion Plan (MCP) for reorganizing/migrating existing hardcopy architecture, requirements, and interface documents (e.g. Department of Defense Architecture Framework (DoDAF), SPRD, SIS) into integrated models to incorporate the updated tenets of the DMP and the CMP.

e) MBSE Environment Implementation: The contractor shall implement the new MBSE Environment aspects of the DMP and CMP structures and processes in accordance with the MBSE Governance Policy across the SMC/ECL and its systems, as tailored by the USG.

f) MCP migration: The contractor shall implement the one-time MBSE Conversion Plan's reorganizing/migrating of existing hardcopy architecture, requirements, and interface documents (e.g. DoDAF, SPRD, SIS) into integrated models across the SMC/ECL and its systems, as tailored by the USG and as approved per phase, in accordance with the MGP, DMP, and CMP.

g) Operation and Maintenance: The contractor shall operate and maintain the MBSE Environment and its contents of models and data.

Integration The contractor shall provide overarching systems integration for launch verification and integration with associated launch support systems across all existing and new acquisition programs falling under SMC/ECL and the NSSL enterprise. This activity will include integration between launch and associated launch support systems acquisition.

The contractor shall perform project management for New Entrant Certification. Products may include, but are not limited to, technical assessments of Certification Guides/Plans, Schedules, and other systems engineering products.

The contractor shall support concept trade studies for launch and other relevant subjects as directed by SMC/ECL (e.g. west coast GPS launches, autonomous flight termination, and space-based telemetry).

The contractor shall support Mission Manifest Office (MMO) operations relating to mission manifesting. Activities may include, but are not limited to, SE&I related support relative to executing manifest activities. These activities may involve supporting MMO cooperation with DoD, Intelligence Community, Civil, and Commercial agencies. The contractor will support MMO integrated payload arrangement responsibilities and work with the MMO to establish repeatable CONOPs in this developing work area. The contractor shall support of the Launch Manifest Systems Integrator on Do-No-Harm and Environmental Analyses for all current and future launch vehicles.

The contractor shall perform strategic planning for launch and range support (e.g. LV program viability to 2030 and range divestiture), identify and propose cost reduction initiatives, and launch systems sustainment strategies.

The contractor shall support the AFSPC studies and Analysis of Alternatives (AoA) for future launch systems (e.g., Space Enterprise Vision/Space Warfighting Construct).

The contractor shall support the development, and coordination of studies, Broad Agency Announcements, and the like, in support of the NSSL strategy for future development and acquisition for USG review as required. The contractor shall assess and make recommendations in response to external program inquiries as required.

The contractor shall support the development, technically assess, and update SMC/ECL launch service acquisition strategies, request for proposals, and supporting documentation for USG review as required. The contractor shall use standard, and create as necessary, templates and tools to document, update and make recommendations for product disposition. Products include but are not limited to the following: acquisition strategy plans and briefings; technical Justification & Approvals; Requests for Proposals (RFPs); draft Performance Work Statements (PWS); Work Breakdown Structure (WBS) Summaries; Contract Data Requirements Lists (CDRLs); Incentive Plans; Proposal Instructions; and other ad hoc documentation/presentations. The contractor shall support program management activities under the execution of launch service contracts (excluding the NSSL Phase 1 contract FA8811-13-C-0003 and the NRO Delta IV Heavy sole source contract FA8811-16-R-0005) to include review of contract deliverables, and support of program reviews as required.

The contractor shall provide master schedules that integrate acquisition tasks for new NSSL contracts as required.

The contractor shall provide technical assessments, evaluations and recommendations for post-RFP release activities, to include fact finding, proposal evaluations, and negotiations.

The contractor shall assess and make recommendations in response to external program inquiries as required.

Continuous Innovation and Improvement

a) The contractor shall conduct ongoing assessments of SMC/ECL performance and recommend innovative ways to improve that performance, to include, but not limited to, process improvement. Accordingly, the contractor shall also research innovations it is implementing on other contracts for applicability, identify best practices elsewhere in Government for applicability, and identify best practices in industry for applicability. The contractor shall present findings quarterly and document them in an Innovation Recommendations Report.

b) The contractor shall support Government processes to approve/disapprove implementation of recommended innovations pursued by the Government.

c) The contractor shall support implementation of innovations across applicable portions of the SMC/ECL upon innovation approval.

Engineering Launch Support Systems (ELSS) The contractor shall technically analyze ELSS user-requested changes and provide recommended implementation options to SMC/ECL. The contractor shall analyze the requested changes in the context of the ELSS requirements, develop system designs, implement system updates, and document changes to ELSS Launch Support Centers (LSCs), High Speed Network (HSN) and campus network interface requirements.

The contractor shall revise the ELSS Systems Requirements Document (SRD) to reflect requirements changes. The contractor shall perform technical assessments of ELSS systems changes and document them as appropriate. This will include ELSS systems integration and activation activities, and ELSS system revisions to support LE launch vehicle systems operations. (ELSS includes interfaces to NRO Operations Squadron (NOPS) and Spacelift Telemetry Acquisition and Reporting System (STARS)).

The contractor shall perform technical analysis of NOPS, CSC, and STARS proposed changes to ELSS interfaces as specified in the Interface Control Document (ICD). The contractor shall provide written recommendations to LE on optimum implementation of proposed changes to ELSS interfaces. The contractor shall document verification of revised ELSS interface requirements implementation compliance by assessing end-to-end launch vehicle systems and ELSS operations testing.

The contractor shall develop and document a recapitalization plan for systems satisfying ELSS requirements. The contractor shall address supportability and sustainment planning and shall perform and document Requirements Definition and Functional Analysis as required when operational capability is identified and determined.

The ELSS currently consists of the following LSCs: Launch Vehicle Launch Support Center (LV_LSCs) at CCAFS and VAFB supporting United Launch Alliance (ULA) Atlas and Delta missions; the Multi-Vehicle LSC (MVLSC) at CCAFS supporting Falcon missions; and the Falcon LSC (FLSC) at VAFB supporting Falcon missions. The contractor shall also integrate preliminary requirements for new entrant LSCs as required into program documentation.

RD-180 Engineering The contractor shall develop, document and support integrated technical assessments of Government-funded launch vehicle risks associated with the RD-180 engine to accomplish Project Engineering tasks for the RD-180 engine as outlined in paragraph 3.2.5.

The contractor shall conduct integrated assessments to include an RD-180 Accountability Matrix, RD-180 Issues Log, analyses and recommendations in support of USG technical review boards, and summary and analysis of launch vehicle contractor technical review boards, reported to SMC/ECL.

The contractor shall evaluate and provide assessments of the RD-180 manufacturing process, to include foreign supplier political/management reports, crossover assessments, and technology transfer status reports.

Project Engineering The contractor shall provide integrated assessments (as directed by SMC/ECL at the time of performance) to aid USG evaluation of cost, schedule, and performance risks and opportunities associated with NSSL systems, subsystems and components. Subject breadth incorporates, but is not limited to, separation systems, booster propulsion, upper stage propulsion, solid motors, ordnance, avionics, structures, ground support equipment, payload fairings, and launch site facilities. Integrated assessments may include but not limited to draft Statement of Objectives (SOOs) and Statement of Work (SOWs) for launch vehicle system modifications; draft PWS, Engineering Change Proposals (ECPs), and Proposal Technical Evaluations; schedules, weekly status reviews, telecons, Preliminary Design Reviews (PDRs), Critical Design Reviews (CDRs), Program Management Reviews (PMRs), ARBs, CABs, Engineering Review Boards (ERBs), TDMs, Pedigrees, Hardware Acceptance Reviews, Design Center Walkdowns, development projects, requirements, manufacturing, test, and discrepancies; and provide recommendations in support of USG technical in support of USG technical and acquisition activities. Capture and document Best Practices and provide training and certification support as directed. Perform Fleet Surveillance of non-NSS launch vehicle and acquisition activity and assess impact to NSS, and provide mitigating recommendations as directed.

Operations Support: The contractor shall coordinate cohesive technical and program management activities and communication between the USG, launch vehicle contractor, the Aerospace Corporation, and other support contractors to enable launch readiness and provide integrated assessments. The contractor shall support development of training and certification and operations materials for the Program Office Technical Team and participate in training, certification, critical pre-launch and launch events (e.g., Integrated Crew Exercises, Mission Reediness Review, Launch Reediness Review, Mission Dress Rehearsals, Wet Dress Rehearsals, Static Fire, and Day of Launch.) The contractor shall support and assess pre-launch and post-launch reviews for readiness and cross-overs. Functional areas: separation systems, booster propulsion, upper stage propulsion, solid motors, ordnance, avionics, structures, ground support equipment, payload fairings, and launch site facilities.

Technical Issue Resolution Process (TIRP): The contractor shall participate in TIRP activities to assess issues and risks, both mission- specific and fleet-wide, associated with launch vehicle and ground systems, subsystems, and components. The contractor shall provide an integrated assessment and recommendations to the USG regarding the status of mission- specific and fleet-wide risk mitigation activities. Functional areas: separation systems, booster propulsion, upper stage propulsion, solid motors, ordnance, avionics, structures, ground support equipment, payload fairings, and launch site facilities. Perform Fleet Surveillance and Resource Protection analyses and assess for cross-overs from non-NSS missions to NSS Missions. Propose risk mitigation activities in support of Mission Assurance.

Lessons Learned, Process Capture and Improvements: The contractor shall provide integrated assessments of LSP and DoD processes and media as requested to aid USG evaluation of cost, schedule, and performance risks and opportunities. The contractor shall capture existing SMC/ECLG processes, recommend enhancements, and collaborate as required to implement approved changes.

The contractor shall provide integrated assessments of the LSP's and supplier subsystem/component design, performance, reliability/ maintainability, operability and supportability (as required) and perform Fleet Surveillance of non-NSS launch activity , assess impact to NSS, and provide mitigating recommendations as directed. Assessments shall include but are not limited to evaluations of factory operations, transportation, launch site operations, and mission operations.

The contractor shall assess the readiness of launch infrastructure (e.g., LSP, USG and commercial) and perform Fleet Surveillance of non-NSS launch site activity, assess impact to NSS, and provide mitigating recommendations as directed in support of SMC/ECL programs to meet launch requirements and recommend upgrades/repairs. The contractor shall recommend changes to the existing launch systems that could take advantage of identified and existing USG or Commercial infrastructures and meet USG launch requirements. Products include but are not limited to the Facilities, Infrastructure, and GSE Database (FIDB) specification, facility walk-down reports, major launch site maintenance and repair requirements, Facility Utilization Assessments, and Ground Systems Readiness Reviews. Functional areas: CCAFS and VAFB Space Launch Complexes used for SMC/ECL programs; ground support equipment (GSE), and Electrical Ground Support Equipment (EGSE).

The contractor shall evaluate launch infrastructure for supportability issues to include parts obsolescence, facility refresh/refurbishment and other supportability issues. The contractor shall recommend upgrades/repairs and prepare assessment reports as required. Functional areas: CCAFS, VAFB, and KSC Space Launch Complexes used for SMC/ECL programs; GSE, and EGSE.

The contractor shall provide weekly written summaries on their project engineering activity.

Mission Integration Management The contractor shall provide recommendations related to NSSL mission buy contract requirements and early integration studies for USG review. Products include, but are not limited to: draft Performance Work Statement, WBS Summary, Contract Data Requirements List (CDRLs), Incentive Plan, Proposal Instructions (proposal sections), and analyses of Basis of Estimates, as required.

The contractor shall analyze technical, schedule and programmatic issues related to the Launch Program contracts (e.g. cost, schedule and performance) and provide recommendations to the USG as required to support program mission integration related taskers, on average 2 per month.

The contractor shall analyze and identify mission management programmatic and technical issues associated with cost, schedule and performance, and provide assessments/recommendations to the USG. Products include recommendations for ICDs, technical assessments of mission unique efforts, de-confliction of mission schedules, etc.

The contractor shall provide integrated products required to execute readiness reviews, rehearsals, launch campaigns, and day of launch activities as specified below. These activities may be repeated due to unforeseen launch delays.

The contractor shall exercise anomaly processes and Day of Launch decision making processes during rehearsal campaigns. Evaluate success of rehearsal campaign with respect to pre-defined exit criteria, and brief results to the Mission Director for non-OSL missions. Evaluate, update and maintain the Day-of- Launch (DOL) decision process by ensuring that the SMC/ECL DOL decision process meets AF and AFSPC requirements.

The contractor shall, as the lead for Rehearsal Anomaly Team (RAT), integrate with the LSP, SVC, and other mission stakeholders (to include the Eastern/Western Ranges, Aerospace Corporation, NOPS, Space Launch Squadrons and Operations Groups) to plan, develop and de-conflict activities, and evaluate goals and objectives for launch campaign rehearsals (i.e., Integrated Crew Exercises (ICEs) and Mission Dress Rehearsals (MDRs); and tabletop exercises, stand-alone exercises as required) as defined in the Baseline USG Evolved Expendable Launch Vehicle Rehearsal Plan. Products include but are not limited to profile letters, pre-departure briefings and overview briefings anomaly development, timeline and clock planning. The Team shall execute up to three ICEs, as coordinated with mission stakeholders, and one MDR per LE for each mission identified by SMC/ECL.

The contractor shall define evaluation criteria, design and develop anomaly scenarios (e.g. design script inputs and provide inputs to members on console), and evaluate mission launch teams on operations execution performance. Products include timelines, anomaly scenarios, entry/exit briefings, initial conditions and rehearsal overview brief.

The contractor shall report findings to the integrated launch team. The contractor shall identify, evaluate and document rehearsal and day-of-launch Mission Integration lessons learned and provide them to the USG for continuous launch program improvement. The contractor shall update the Generic Baseline USG Launch Rehearsal Plan as required.

The contractor shall evaluate efficiencies of console operations and provide strategic planning recommendations for Mission Integration Management as needed.

The contactor shall evaluate mission integration activities for knowledge transfer to Government mission team members. Products and processes include updates to the Government Mission Integration Manager (GMIM) continuity/training book, GMIM Forums, on the job training, etc.

The contractor shall collect, evaluate and document operational "Lessons Learned" from launch rehearsals and day of launch activities. The contractor shall provide an out brief of lessons learned following each activity (e.g., hotwash, postflight review, etc) and incorporate lessons learned into the next launch activity. Products include but are not limited to documented lessons learned and briefing materials (e.g. database, postflight review, etc).System Safety Engineering The contractor shall conduct launch systems safety engineering for activities at LAAFB and report recommendations to SMC/ECL. The contractor shall evaluate and update the System Safety documentation (e.g. System Safety Management Plan (SSMP) and Programmatic Environmental Safety and Health Evaluations (PESHE)) IAW National Security Space Acquisition Policy Interim Guidance for DoD Space System Acquisition Process, and AFI 91-202 AFSPCSUP1, and determine compliance with applicable DoD and AF requirements.

The contractor shall evaluate LSP documentation and activities and report whether they are in technical compliance with applicable system safety requirements (e.g. EWR 127-1, AFSPCMAN 91-710, MIL-STD-882E, and AFI 91-202 AFSPCSUP1) and provide the USG with written documentation of discrepancies. Other products may include but are not limited to waiver packages, risk assessments, Space Debris Assessment Reports (SDARs), assessment of LVM products, etc.

The contractor shall technically assess and report on open launch and range safety items, and provide the USG with written recommendations for disposition of the open items.

The contractor shall provide systems safety assessments of payload integration, ground testing, and flight safety activities to ensure mission readiness. The contractor shall report noted deficiencies to the USG within twenty-four hours of the assessments, or as necessary to support LVM item closure. Products include but are not limited to other technical safety assessments on hardware, anomalies and mishaps.

The contractor shall analyze the design and testing of launch vehicle flight termination systems and other critical safety components to provide the USG with written recommendations for risk mitigation.

The contractor shall assess the LSP’s hazard analyses to verify all hazards are properly identified and mitigated; findings shall be reported to the USG.

The contractor shall evaluate mission-unique EWR 127-1 or AFSPCMAN 91-710 requirements and provide the USG with a technical assessment of discrepancies and potential cost impacts.

The contractor shall deliver system safety engineering analysis for the deactivation and disposition of SMC/ECL launch systems. This will include providing system safety and environmental safety analysis reports related to disposition alternatives and closeout activities.

The contractor shall provide safety personnel staffing on day of launch at the Mishap Control Center (MCC), and deliver products including the SMC/ECL MCC checklist and notebook for MD/LV1 use during Day of Launch activity, MCC personnel training and document recommendations to LE leadership during DOL anomaly or mishap. Other products include but are not limited to briefing charts to support launch pre-departure brief and integrated assessment of SMC/ECL, launch site and Launch Vehicle contractor mishap response, and coordination of response with external agencies (e.g. Headquarters (HQ) AFSPC).

The contractor shall provide technical assessments, and recommendations as required in mishap investigations including system safety and environmental safety analyses related to disposition alternatives and closeout activities.

The contractor shall review and contribute to and finalize drafts of orbital safety products: SDARs by mission, and SMC/ECL portions of the Orbital Debris Mitigation Standard Practices annual Exception to Policy package.

The contractor shall deliver technical assessments of SMC/ECL program and acquisition documents including SIS, SPRD, CPD, RFPs, Acquisition strategy, PWSs, and other acquisition documentation for compliance with safety requirements and provide a detailed assessment of NSSL impacts.

The contractor shall support SMC debris recovery with expert advice, review, briefing, scheduling and transportation (re-export) efforts of International deorbited US USG procured Launch Vehicle (LV) and Satellite Vehicle (SV) debris. Contractor shall support SMC liaison between Department of State (DoS), United Nations and host country officials. The contractor shall coordinate recovery team schedules and provide senior leadership briefings as directed by the Government. Procures MilAir and/or Commercial transportation, to include review of potential hazardous materials (HAZMAT), verification/validation of debris type and vehicle, and direction for packaging/transportation to ensure safe and efficient return of debris to Government control (AFI 91-217 para. 5.8.1). Contractor shall coordinate and participate with in-country inspection/shipment, re-export activities and arrival/transfer to SMC.

The contractor shall support Indemnification from Unusually Hazardous Risks (UHRs). The contractor will support SMC/ECL safety by determining the nature, scope, and level of effort of the system safety review in consultation with the program contracting officer and program manager. The contractor shall plan and conduct system safety assessments. The contractor will ensure that the LSP requesting U.S. Government indemnification complies with all applicable Government safety standards. The contractor shall utilize MIL-STD-882E, AFI 63 and AFI 91 series requirements to determine that the LSP requesting U.S. indemnification has provided adequate identification of UHRs and analysis to determine safety hazard risk’s probability and severity. The contractor shall survey and assess several of the LSP’s UHRs utilizing the MIL-STD-882E eight-step process to determine if the U.S. Government can determine, track, and accept mishap risks.

Systems Environmental Engineering The contractor shall evaluate the LSP’s designs, operations, and procedures for launch vehicles and ground support systems to verify compliance with environmental requirements, and report discrepancies. The Contractor shall provide strategies and recommendations for compliance.

The contractor shall review LSP proposed changes, and provide mitigation options to decrease or limit potential environmental liabilities and costs.

The contractor shall evaluate LSP to hazardous materials management to ascertain compliance with the provisions of applicable federal, state, and local laws, regulations, requirements, and standards, and hazardous materials management requirements imposed by contract. The contractor shall provide documentation of compliance status. Pollution prevention is a sub-part of hazardous materials management.

The contractor shall develop requests for Environmental Impact Analysis (AF Form 813) to initiate the National Environmental Policy Act (NEPA) process for launch activities.

The contractor shall assess launch operations NEPA documentation to verify that the documentation complies with applicable requirements. Contractor shall document discrepancies and recommend strategy for continued NEPA compliance.

The contractor shall monitor and document research and analyses of environmental impacts, as required, associated with launch operations to confirm continued compliance IAW NSSL Environmental Mitigation Plans (EMP).

The contractor shall review proposed federal, state and local environmental requirements, regulations, laws, and standards to evaluate potential impacts to launch operations and provide impact analyses.

The contractor shall evaluate program execution (e.g. PMRs, technical meetings, working groups, etc.) and provide technical assessments and recommendations to ensure compliance with federal, state, local environmental laws, regulations, requirements, and standards.

The contractor shall evaluate and update the PESHE and EMP. The Contractor shall deliver technical assessments of LE program and acquisition documents including SIS, SPRD, CPD, RFPs, Acquisition strategy, PWSs, and other acquisition documentation for compliance with environmental requirements and provide a detailed assessment of NSSL impacts.

Systems Security & Cyber Security Engineering Systems Security and Program Protection

a) The contractor shall provide Systems Security Engineering (SSE) expertise to assist the Government in all aspects of Program Protection Planning (PPP) including but not limited to an in-depth lifecycle program analysis to identify Critical Program Information (CPI), conduct threat and vulnerability assessments, identification and implementation of countermeasures, Anti-Tamper analysis and protection; counterintelligence, intelligence, and security assessments and support, Risk Management Framework (RMF) for Information Technology (IT) and cybersecurity strategies.

b) The contractor shall develop, review and update the NSSL Program Protection Plan (PPP) and develop, review and update LSP annexes as required. The contractor shall review and update the NSSL Counterintelligence Support Plan (CISP), Anti-Tamper plan, the Operations Security Plan (OPSEC) and Security Classification Guide (SCG) as needed, IAW DoDI 5000.02, DoDI 5200.39, DoDI 5200.1-M, and AFI 31-401.

c) The contractor shall evaluate and provide technical analysis of LSP's Program Protection Implementation Plans (PPIPs) and assess the plan’s effectiveness. The contractor shall conduct Program Protection Surveys to evaluate and validate protection methodologies identified in LSP’s PPIP with a focus on threat and countermeasure issues and recommendations for strengths and weaknesses. The contractor shall produce a lessons learned document describing the effective or ineffective use of the program’s established countermeasures to known or suspected vulnerabilities and the identification of unrecognized vulnerabilities.

d) The contractor shall evaluate LSP’s proposed security waivers and deviations, and perform security assessments IAW the applicable system contract, acquisition plan, SCG, and the PPP.

e) The contractor shall review program documentation for public release and ensure only Distribution A information is recommended for public release IAW the NSSL PPP, and SCG. The contractor shall also validate the information is not listed in the U.S. Munitions list, International Traffic in Arms Regulations (ITAR) or Commerce Control List (CCL).

f) The contractor shall develop and present all materials associated with the Quarterly NSSL System Security Working Group (SSWG) to include agenda topics, briefing charts, maps, meeting minutes, action items, visit requests and conference facilities as needed for classified and/or unclassified discussions and presentations.

g) The contractor shall develop, store and manage applicable security documentation in the LE Security Library on Livelink/SharePoint IAW the LE file plan, AFMAN 37-104, AFMAN 37-123, and AFI 37-138.

h) The contractor shall evaluate and update the SMC/ECL Security Operating Instruction (SOI) annually.

i) The contractor shall evaluate LE internal security documentation and provide recommendations to support systems security and cybersecurity self-inspections, AF-level Inspections, to include the Air Force Inspector General, Headquarters Air Force Space Command Inspector General, Air Force Audit Agency Inspections, and Space and Missile Systems Center Integrated Program Reviews annually.