This document is a comprehensive Industry Day briefing for the HADES (Hybrid Architecture and Development for Experimental Systems) Contract Follow-On Acquisition by the Space Systems Command. The acquisition is a competitive, performance-based service contract with a potential $200M ceiling, targeting small businesses, scheduled for award in December 2026. The contract will have a three-year base period with four one-year option periods, potentially spanning seven years total, and will include both Cost Plus Fixed Fee (CPFF) and Firm Fixed Price (FFP) contract line items.
The HADES Contract aims to provide ground operations and development support for the Research and Development Space and Missile Operations (RDSMO) program Ground System Enterprise. Key mission directives include developing innovative solutions to reduce ground system costs, operating an efficient ground system for R&D, building and supporting ground system instantiations, performing cyber defense, and supporting different operational environments from R&D prototypes to operational efforts. The source selection will use a best-value trade-off approach, with technical factors being significantly more important than cost, and will evaluate proposals based on mission support, program management, transition plan, past performance, and pricing.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| CONTENTS OF A VISIT REQUEST_Feb25.pdf | ||
| MapForIndustryDay.docx | DOCX document | |
| DISS Visit Request Form.pdf | ||
| HADES Contract SOO.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HADES Contract Industry Days
Mr. Devlin Lasiter – HADES PM Lt Col Purcell – Contracting Officer
Ms. Alyssa Phillips – Contract Manager
19-20 August 2025
Highest Overall Classification:
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.
• Present EDIS (Hybrid Architecture and Development for Experimental Systems HADES) Follow-On acquisition to potential industry partners
• Provide opportunity for open dialog during one-on-one sessions
• Provide tour of facilities for better understanding of HADES program operational environment
Purpose
Tuesday, 19 August 2025 (Bldg –Base Theater) 0830-0840 General Information 0840-0850 HADES Program 0850-0920 HADES Follow-On Acquisition/Contract 0920-0940 Break 0940-1030 Ground Systems Branch (SSC/SZIG) 1030-1100 Space Operations Branch (SSC/SZIX) 1100-1130 Virtual RSC Tour 1130-1200 Q&A Session
Agenda
3DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.
Tuesday, 19 August 2025 (Building 414 – Conference Room 3) 1200-1300 Lunch 1300-1730 One-on-One Sessions
Wednesday 20 August 2025 (Building 414 – Conference Room 3)
0730-1730 One-on-One Sessions
Agenda (cont’d)
• Restrooms
• Breaks–
• Bowling Alley is near by, and serves Breakfast and Lunch
• AAFES shoppette is by the BX and has coffee and other snacks
General Information: Movie Theater
• All SSC facility restrictions
• No recording devices
• No interaction with SAIC/Current EDIS Contract contractor personnel
• Questions or discussions only with Gov’t host
• Please remain within the Bldg 414 lobby area when waiting for one-on-ones
General Information: Facility Restrictions
• One-On-One Sessions (no longer than 20 minutes each)
• Sessions will be held in bldg 414 Conference Room 3
• Arrive 15 minutes prior to scheduled session. Meet in bldg 414 lobby for obtaining badges and meeting escort for one-on-one session
General Information: One-On-One Sessions
General Information: Rules for Questions
• Hold all questions regarding this brief until the end
• Questions may be submitted as follows:
• For all questions seeking a formal response, submit directly to PCO and
Contract Manager
• Questions may be addressed today during the open Q&A session, or may be deferred for a later response
• During One-on-One Sessions
• Gov’t team will answer clarifying questions based on the SOO and Industry Day brief but will not answer questions regarding pre-decisional information
• Post Industry Day questions must be submitted in writing
• Send to PCO via e-mail at any time prior to RFP release
John.Purcell.3@spaceforce.mil or
Alyssa.Phillips.4@spaceforce.mil
• All submitted questions and responses will be posted to Sam.Gov
• Sources of questions will not be disclosed
• Answers to Gov’t questions will not be disclosed
EDIS Program
Briefer: Devlin Lasiter
EDIS Program History
• Previous/Current Contracts: Prime - SAIC
• EDS 1996: Initial contract award – Lockheed Martin
• EDS 2001: First follow-on contract – Lockheed Martin
• EDS 2006: Lockheed Martin
• EDIS 2020: SAIC
• Current Follow-On Acquisition
• HADES Follow-On – Considering small business set-aside acquisition
10DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.
EDIS Follow-On Support Services
• HADES Contract-Purpose
• The purpose of the HADES Contract is for support services providing Ground Operations and Development (GOD) support and services of the Research and Development Space and Missile Operations (RDSMO) program Ground System Enterprise (GSE).
• HADES Contract Mission Scope
• The Scope of this contract includes ground operations
(systems engineering and sustainment), and development (development and integration) support and services in support of Space Systems Command Innovation and Prototyping Delta (SZI) Prototype Ground Development and Sustainment Branch’s (SZIG) mission directives.
• HADES Contract Mission Directives
• Develop innovative solutions to reduce ground system costs
• Provide and operate an efficient GSE for Research and
Development (R&D)
• Build and support ground system instantiations
• Perform Cyber Defense across multiple missions, security levels and baselines
• Develop, operate, and maintain multiple security classification levels and external interfaces with multiple instantiations to support the operational environment
• Support different types of operations ranging from R&D efforts and prototypes to operational efforts
HADES FOLLOW-ON
ACQUISITION/CONTRACT
Briefers: Lt Col Purcell Ms. Alyssa Phillips
Semper Supra
Current Acquisition Schedule
Sources Sought Synopsis Posted 29 May '25 Industry Day 19 – 20 Aug '25
• Early Strategy and Issue Session TBD
• Acquisition Strategy Approved TBD
• Draft RFP Late Oct '25
• Final RFP Released Jan '26
• Proposal Evaluations Mar '26 – May '26
• Contract Award Dec 26
PLANNING INFORMATION - SUBJECT TO CHANGE
• Anticipating $200M Ceiling
• Performance-Based Service Contract
• Multiple Contract Types:
• Cost Plus Fixed Fee (CPFF) and Firm Fixed Price (FFP) CLINs
• Three (3) year base and Four (4)– One (1) year Options
• Potential for 7 years of performance
Contract Structure
PLANNING INFORMATION - SUBJECT TO CHANGE
Acquisition/Source Selection Approach
• Competitive acquisition
• Small Business set-aside being considered (No Decision Made)
• Follow FAR 15.3 and DoD Mandatory Source Selection Procedures
• Best-Value Continuum
• Best value trade-off procedures
• Technical subfactors will use the DoD standard rating tables
• Non-Government team members: The Aerospace Corp
• RFP development
• Proposal evaluation advisors
PLANNING INFORMATION - SUBJECT TO CHANGE
Source Selection Planning Evaluation Factors and Subfactors
Evaluation Factors & Subfactors Factor/Subfactor Name
Factor 1 Technical
Subfactor 1 Mission Support – Systems Engineering, Integration, Development, Support to Current Systems
Subfactor 2 Program Management Subfactor 3 Transition Plan
Factor 2 Cost or Price
Factor 3 Past Performance
Note: The evaluation factors listed above are in descending order of importance. Within the technical factor, the subfactors are listed in descending order of importance. In accordance with Federal Acquisition Regulation (FAR) 15.304(e), the evaluation factors other than cost or price, when combined, are significantly more important than cost or price. However, cost/price will contribute substantially to the selection decision.
PLANNING INFORMATION - SUBJECT TO CHANGE
Source Selection Planning Evaluation Methods
Evaluation Methods Factor/Subfactor Name Evaluation Method
Factor 1 Technical Technical subfactors will be evaluated on separate technical and risk ratings. The technical rating will be based on the strengths and deficiencies of the proposal. The risk rating will be based on the weaknesses of the proposal.
Subfactor 1 Mission Support
Subfactor 2 Program Management
Subfactor 3 Transition Plan
Factor 2 Price Price will be evaluated on the Total Evaluated Price, reasonableness, and unbalanced pricing.
Factor 3 Past Performance
Past performance will be evaluated and rated at the factor level. Evaluations will be based on offeror’s performance on recent contracts (past 5 years). An overall confidence assessment will be made based on the relevancy and quality of work performed.
PLANNING INFORMATION - SUBJECT TO CHANGE
• Still developing the acquisition strategy
• Free and open communication is our goal
• Information presented during Industry Day is subject to change
• Will post RFP once drafted
• RFP will be updated as necessary until FINAL is posted
• After final RFP is issued, communication will be strictly controlled by and through Contracting Officer
Contracting Officer Notes
FOLLOW INSTRUCTIONS IN THE FINAL RFP
Contract Parameters Contract Incentives
• Performance will be incentivized through execution of the Quality Assurance Surveillance Plan (QASP), which will provide non-monetary incentives to improve and sustain performance, primarily through issuance of a Contractor Performance Assessment Report (CPAR)
• Exercise of contract options
PLANNING INFORMATION - SUBJECT TO CHANGE
Contract Management Oversight Plan
• An initial performance review will be conducted NLT 6 months after contract award
• Quarterly Program Management Reviews anticipated
• Multi-Functional team members will assess contractor performance based on the Services Summary surveillance methods
• Surveillance procedures will be captured in the HADES Quality Assurance Surveillance Plan
• Current staff providing Government oversight of the EDIS contract will provide oversight of the Follow-On contract
PLANNING INFORMATION - SUBJECT TO CHANGE
Semper Supra 23
SZIG
SZIG Mission & Vision Mission:
SZIG develops, fields, and transitions prototype ground systems supporting prototype satellite command, control, and data distribution through disciplined and innovative program management and engineering to enable mission partner objectives.
Vision:
Transition from legacy hardware-based systems and develop automated and cloud-based systems to leverage emerging technologies.
We are the masters of connection
Branch Chief
NH-04, 1101
EDIS COR
GS-13, 1101
Deputy Chief Maj, 63A
1st Lt, 62E
Deputy Chief Lt Col, 63A
GS-07, 0801
NH-03, 0801
Maj, 63A Maj, 13S
Chief Engineer
NH-04, 0801
Ground Control
• CUE&COMM Sust.
• Hybrid Cloud
Ground Support
• RSC Sust.
• MOA/MOU Coord
Ground Systems
• XPro-Spark Sust.
Technical Director Maj, 62E
1st Lt, 62E
GS-13, 1101
NH-03, 0801
Capt, 63A
Kt Support
GS-13, 1101
Maj, 63A
1st Lt, 62E 1st Lt, 63A
2d Lt, 63A
1st Lt, 62E
Ground Integration, Mission Onboarding
• Cost & Schedule
• Contracts
• Customer Engagement
• Requirements
• Interfaces
• Architecture
POPS-I
TO 0037
SDL
CLIN 0001
MARRVN
DO XX
EDIS
TO B007
EDIS
TO B007
EDIS
TO B004
Ta ct ic al
Im pl em en ta tio n
O ve rs ig ht O pe ra tio na l O ve rs ig ht
Pr io rit ie s
JWCC
AWS Pro
1st Lt, 62E
Capt, 63A
Jaguar
• PM Support
• SE Support
Maj, 62E
EDIS
TO 0103
SZIG Task Organization
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.
Special Assistant Maj, 63A
LDPE-1
EAGLE (SSFB)
ORS-5 (SSFB)
STPSAT-2
CLOUDSAT
LDPE-2
LDPE-3A
ROOSTER 4
No Longer Supported Current Prototypes Operations Upcoming
Prototypes
EC2-S MMSOC-S
XProEC2-K Spark AcmeGEMMAMMSOC-K
Jaguar
CUE & COMM – Underpins all RSC operations both legacy and cloud
Legacy Ground Systems Acme (cloud-based ground system)
SpecificsSystem Capability USSF’s only 24/7 R&D satellite C2 operations center
Operates 8 missions, develops/tests warfighter technologies for next-gen satellites, transfers on-orbit missions to operational units
Supports ground systems, networks, and facilities for on-orbit tactics, techniques, and procedure development
Facilitates rapid satellite C2 integration capability and operations environment
Explores and implements innovative ground automation, C2, and data dissemination in concert with experimental, demonstration, and prototype space missions
Delivers operational flexibility for new and legacy satellite missions designed to out-pace adversary on-orbit systems
EDIS restructure – Completed on 18 June Agreement on future use of Room 103 as flexible ‘high-side’ café (RSC) Successfully transitioned direct support for EC2-S, QZSS Feb 2025 (C2 Enclave) LDPE-3A on-orbit Demo – Oct 2024 (R2C2 Acme) Decommission EC2-K, MMSOC-S and XPro-K – Early 2025 (C2 Enclave) Installation of REPR Complex Video Wall – Dec 2024 (RSC) SZI/NSTTC MOA Appendix 2 & 3 (LDPE-1 & 2 Transfer) Signed – Feb 2025 (RSC) Addition of JWICS and Starburst to REPR SOC – FY 2025 (RSC) RSC CUE & COMM Cloud Deployment on-site test – FY 2025 (C2 Enclave)
Milestones
Engineering, Development Integration, and Sustainment (EDIS) Contract Scope: Contract Support Services contract providing Engineering, Development, Integration, and Sustainment services for all current and future missions.
IDIQ Ordering Period: 10 Feb 20 – 9 Feb 25 (5-yr Base)
Two 1-yr Options thru Feb 2027 Prime Vendor: SAIC Contract Ceiling: $655M Contract Type: CPFF
Tetra-5
NTS-3
Tetra-6
Tetra-1
GUTS
CUE & COMM
RDSMO Program Description
FY24 FY25 FY26 FY27 FY28 FY29 FY30
LDPE: Long Duration Propulsive ESPA RSC: RDT&E Support Complex CUE&COMM: Common User Equipment & Communication R2C2: Rapid and Resilient Command and Control
LDPE-1
Operations / sustainment Integration / testDesign / development Key events
Concept activities Production/Fielding
LDPE-2
LDPE-3A
ROOSTER-4
Tetra-5
ROOSTER-5
Tetra-6
Ops/Sust
Ops/Sust
Ops/Sust
Design/Dev Ops/Sust
Design/Dev Int/Test Ops/Sust
ILC
ILC
Design/Dev Ops/Sust
ILC
CUE&COMM
Design/Dev Int/Test Ops/Sust
ILC
Ops/Sust
RSC Satellite Operations Center Ops/Sust
Design/Dev
Design/Dev
SpRCO R2C2 Acme Design/Dev Ops/Sust
Time Now
Long-term Schedule
Int/Test
Int/Test
Int/Test
FY2024 FY2025 FY2026
GSTRSCN
RSC CUE
& COMM
XPro- Spark
NTS-3 GS
N
EC2-K
Jag S2 XPro-K
L2L1 L3A
Annex B
B
GSTRSCN
RSC CUE
& COMM
NTS-3 GS
N Annex B
B
GEMMA
Jag
ADC
S2
RIP
XPro-K
RIP
EC2-K
AWS
XPro- Spark
L2L1 L3A
Southpark
Customers with Data
R4
Acme (TFEN)
R4 T5
GSTRSCN
RSC CUE
& COMM
NTS-3 GS
N Annex B
B
Swedish
RIP
XPro-K
RIP
EC2-K
AWS
Customers with Data
R4
Acme (TFEN)
R4 T3 T4 T5
RIP
Spark
R5 L3AL1 L2
SSC/SZI
Mission Partner
Commercial
GEMMA
Jag
ADC
S2 Complete Complete
Complete Complete
CompleteComplete
Complete
X X
Technical Roadmap
CompleteComplete
X
• Operating in cost constrained environment
• Constrained budget
• Funding for sustainment of infrastructure reduced
• Customer budgets limited, looking for ‘best value’ in supporting missions while meeting USSF vision
• Mission schedules constantly changing
• Launch slips, mission extensions, early mission terminations, funding shortfalls, and mission transitions between locations
• Overlapping pre-launch campaigns
• Changes may result in fluctuating staffing level requirements
• Organizational Re-structure
• Re-structure may impact current scope of the HADES Contract
Challenges
REQUIRES INNOVATIVE TECHNIQUES TO MEET MISSION
REQUIREMENTS WHILE KEEPING COSTS LOW
RSC
Overview
Ground Support Section
• Problem Statement: The RSC facility, critical infrastructure, and mission peripherals have not had a single-minded mission focused driving force to ensure proper sustainment and future operational capability
• Solution: RSC Program Manager: Oversees all RSC activities including facility maintenance, physical security, cybersecurity compliance, mission support requirements, and peripheral management
• Included the Configuration Management delegation memo to SZIG and Standard Operating Procedure detailing the flow of requirements
• “RSC as a Weapon System”
• REPR Floor Readiness for FY26 missions
• Operator Networks & communications
• Space Warfighting Framework: Readiness & Mission Sustainment
• Infrastructure (Facility capacity-workstations, bathrooms, etc.)
• Resilient Energy (Generators & UPS, etc.)
• Control Systems (Badging, security cameras, environmental controls & monitors, etc.)
• Physical & Cybersecurity (Access Control, ingress/egress, Operational Risk Posture, etc.)
• Master Planning (Support Agreements, use of space, etc.)
Mission Partner
MOA
Video Wall
REPR Complex
Building- Wide KVM
ENTRY
CORRIDOR
Room S101
480V 120/208V
ROOM 103 ROOM 104 ROOM 105 ROOM 106
DOCK ENTRY
VESTIBULE
MANX Room Comm Room A
Comm Room B
Multi-Purpose Room A
Control Room A
Control Room B
Multi-Purpose Room B
Vestibule
BSOC
Vestibule
ASOC
Entryway
Bo w lin g
Al le y Ro om C1
Comm Room 109
Room 111
Reception Area Room 100
Break Room Room 110
Room 113
Conference Room (Zia) Room 114
Ops Floor Room 115
Comm Room 002
Comm Room 116
Comm Corridor
Corridor C110
Mission Planning Room 115-A
Review Room Room 115-B
Comm Room Room 114A
PTC-6
Room 104
PTC-7
Room 102
PTC-1
Room 114B
PTC-2
Room 114D
Room 114C
PTC-4
Room 118
Room 101
Room 114F Room 114G
Room 114E
RSC
Ground Support Section Overview
Section Chief:
RSC PM:
GS-13, 1101
Roles and Responsibilities
• The RSC Weapon System: What does the RSC need now to accomplish its mission?
• Projects: What does the RSC need in the future to accomplish its mission/Where can we make strategic investments now to yield future dividends?
• Room 103 Renovation: Turning an underutilized server room into a “REPR-lite” flexible space capable of high-side office work, payload data analysis, satellite operations, etc.
• Customer Relations: What do our customers need out of the RSC/what do we need from our customers for the RSC?
• MOAs & MOUs: Documenting our agreements as they relate to the use of space and resources within the RSC and balancing those requirements among internal requirements and other mission partners.
• Each Functional Area requires the same considerations:
• Facility: (Infrastructure Requirements)
• Physical security: (Program Protection Plan)
• Cybersecurity: (ATO, ATC, Configuration Management)
• Program Management: (Cost, Schedule, Performance, Coordination)
Projects PM:
GS-12, 1101
Systems Engineer:
NH-03, 0801
Sustainment (LCSP)
• UPS & Generators
• HVAC
• Facilities Maintenance
• Systems
• Building-wide KVM
• ATO Sustainment
• Peripherals
• Other infrastructure:
• Configuration Management
• Patch Panels/Racks
• Security requirements
Sustainment & Projects
Projects (Agile Sprints)
• Building-wide KVM Baseline
• Administrative Configuration
• Physical Reconfigurations
• Customized Workstations
• Mission Unique Requirements
• Infrastructure Upgrades
• Master Planning
Research, Development, Test & Evaluation (RDT&E) Support Complex (RSC)
• Sustain and maintain the Rendezvous & Proximity (REPR) operations center Video Display System (RVDS)--currently a ThinkLogical Keyboard, Video, Mouse (KVM)--from a cyber, software, hardware, and user perspective
• Sustain and maintain resilient power systems to include Uninterrupted Power Supplies (UPS) and generators from a hardware and user perspective
• Sustain and maintain peripheral infrastructure to include the Video Wall and additional audio/video equipment from a cyber, software, hardware, and user perspective
• Sustain and maintain Environmental Monitoring System(s) (EMS) from a cyber, software, hardware, and user perspective and integrate them with other systems and infrastructure, as required
• Support upgrades to and maintain Heating, Ventilation, and Air Conditioning (HVAC) and electrical systems
• Support facility management to include but not limited to configuration management, assembling/moving furniture, and installing floor/ceiling tiles, and lights within the RSC
• Support enterprise networks through functionality verification, cabling, and equipment installation, as required
• Develop concepts of system/architecture management and acquire, deploy, and sustain management tools, as required
• Procure material (e.g., hardware, software, equipment, furniture) and professional trades (e.g., subcontract electrical or plumbing work as approved by CE), as required
Jaguar
Jaguar Mission
• Scope of work:
• Provide a ground system to enable satellite bus operations for two space vehicles
• Expected system availability is 95%
• Integrates with the SCN and a dedicated antenna network
• Includes sustainment of the TT&C software baseline
• A third space vehicle is anticipated to be onboarded during the period of performance
• Provide a ground system to enable payload operations
• Expected system availability is 99%
• Integrates with a dedicated antenna network
• Continuous engineering, development, and integration of the mission systems to ensure operational readiness to include improvement projects
• Limited support to mission partners and integration with external systems
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.
• Priorities:
• The top priority is always ensuring operational availability of the two ground systems
• Additional priorities are assigned based on impact and benefit to the operational readiness of the mission systems
Ground Control Section
Rendezvous and Proximity (REPR) Operations Floor
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.
RSC CUE & COMM
• Serves as the KAFB Satellite Control Network (SCN) Node for RSC missions
• CUE & COMM Hybrid Cloud
• Consists of on-premise and cloud compute / applications
• On-premise provides physical connections to interface with
SCN
• Cloud compute houses operator applications, telemetry recordings, state-of-health monitoring, and eventually antenna broker software
• Current State
• Hybrid Network
• AWS Snowballs
• SCN Connection
• Future State
• Maximum virtualization
• GovCloud
• SCN + Commercial Connections
Crawl: On-Prem Ground Systems
Walk: On-Prem Cloud Compute, Tools, Logging + Cloud Development
Run: Scalable Cloud-Native Compute, Tools, Logging
Ground Control
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.
RSC CUE & COMM (Continued)
• RSC Mobile Communication Suite (RMCS)
• Deploys to space vehicle vendor sites to provide connection to SCN for Factory Compatibility Testing
• Conduit between SOC & SV to verify successful telemetry receipt
• Currently 4 systems, 3 of which are being modernized
Ground Control Current FCT Data Flow
Legacy Gateway
Media Converter
Crypto
XXU Case Media
Converter
Router
Media Converter
Legacy RMCS
Switch
Firewall
Gateway
12U Case
KVM
UPS
Eth / Ser Cabling
Modernized RMCS
KVM UPS
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.
On-Premise SCN Modernization
• RSC Timing System Upgrades
• Upgrading RSC timing system to modern, redundant architecture
• AFSCN Schedule Tool (AST) Terminal Integration & Operationalization
• Replacement for Electronic Scheduling Disseminator
• Runs Managed Intelligent Deconfliction & Scheduling (MIDAS) suite
• SCN Node Port Expansion
• Installing additional switches to posture SCN node for future customers
• Distributed Communication Controller (DCC) System Refresh
• Replacing end-of-life hardware to support RSC ops
SCN Modernization Support
• SpOC MD31 SCN Virtualization Pilot Program Support
Ground Control
Space Rapid Capabilities Office
Rapid Resilient Command and Control (R2C2) Acme Integration
Acme Integration Requirements
Primary Objective Establish secure, reliable, and scalable off-premises capabilities connected to the Research, Development, Test, and
Evaluation (RDT&E) Support Complex at Kirtland AFB and SSFB to support current and future satellite operations.
Key Requirements Ground System Hardware Support - Engineering and sustainment for cryptographic units and network equipment Secure Connectivity - Redundant connectivity at multiple classification levels to commercial cloud providers Cyber Security & Approvals - Development and maintenance of cybersecurity documentation and compliance Remote Operator Terminal Integration - Design, integrate, and test secure remote terminals COMSEC Integration - Complete lifecycle support for all COMSEC equipment and network connections Configuration Management - Develop and sustain CM plans for all COMSEC buildouts and connections System Engineering – Design and implementation support for hardware and network components Desired Outcomes Secure, reliable, and scalable off-premises environment for critical satellite operations Seamless integration of remote operator terminals Full compliance with cybersecurity regulations and policies Effective stakeholder communication and collaboration
Acme Outpost
Channel Bank Pool 1
KG-255XJ (x2)
On-Prem Switch (SCAcme)
P P P
PT
M
GM
T
CT
IP_X
On-Prem Firewall IPSEC Initiator
MGMT
MGMT VLAN Trunk
Acme Outpost (KAFB)
MGMT
Secret Mx
On-Prem Firewall IPSEC Initiator
On-Prem Switch (TAcme)
MGMT
MGMT
VLAN Trunk
Channel Bank Pool 2
KG-255XJ (x2)
Channel Bank Pool 3
KG-255XJ (x10)
PT
M
GM
T
Channel Bank Pool 4
KG-255XJ (x2)
P
CT
PT
M
GM
T
CTPT
M
GM
T
CT
P P P P P
P
On-Prem Switch (UAcme)
P P
On-Prem Firewall IPSEC Initiator
MGMT
MGMT VLAN Trunk
Terminals (~85) TAcme MOCLAN
P
P
IP_X
M
GM
T
Unclass Mx
Top Secret Mx
IP_XMGMT
UAcme MOCLAN Terminals (8)
Acme Outpost – Physical instantiation of specialty hardware for the integration into the Acme Cloud tenants. Specialty hardware support hosting of cryptographic equipment, external network connectivity, and access to user operations terminals.
Channel Bank Pool 5
KG-255XJ (x2)
On-Prem Switch (UAcme)
P P P
PT
M
GM
T
CT
IP_X
On-Prem Firewall IPSEC Initiator
MGMT
MGMT VLAN Trunk
Acme Outpost (KAFB)
MGMT
Semper Supra 45
SZIX
Current Mission/Vision
• Mission: Accelerate the operationalization of innovative space capabilities through bold and creative on-orbit experimentation and test to deter conflict and deliver decisive advantage to the warfighter.
• Delivered decisive advantage = technological superiority, operational and tactical proficiency, and space force posture and logistics
• Vision: USSF’s Space Transformation Center of Excellence
• Center of Excellence = Institution that provides specialized expertise and support to the DoD and mission partners in the USSF’s transformational space capabilities, acting as a knowledge hub and force multiplier. Offers training, education, input to doctrine development, experimentation, and lessons learned to enhance USSF capabilities and interoperability.
RDT&E Support Complex (RSC)
• Satellite Operations Center (RSC)
• 24x7 contractor-operated facility
• Ops floor for day-to-day satellite housekeeping
• DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited. thru Classified ops
• Tailorable data distribution over multiple networks
• Full range of TT&C capabilities
• Mission planning, including orbit determination, antenna scheduling, and command plan generation
• Ground equipment configuration and control
• Real-time satellite commanding and anomaly response
• Telemetry processing, analysis, and display
• Mission and satellite bus data archiving and distribution
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.
http://upload.wikimedia.org/wikipedia/commons/a/ac/CNOFS.jpg
Current Missions
RSC Life Cycle
Initial Contract
Mission Acceptance
Launch
Residual Ops
Testing and Evaluation
L+1 - 2 Years LDPE-3a
USSF-12
MISSION OPS
L-12 Months Readiness
Campaign Start
ROOSTER-4
Tetra-5
READINESS
18 - 36 Months
ROOSTER-5
Tetra-6
POTENTIAL
L+1 – 2 Months
NTS-3
LEOPS
Re-enter/Shutdown Failure/SCA Transfer
CloudSAT Tetra-1
LDPE-1
LDPE-2
EOM/EOL
Long Duration Propulsive ESPA (LDPE-1)
Follow-on evolution of the ESPA Augmented Geostationary Laboratory Experiment (EAGLE) program. LDPE-1 offers a propulsive rideshare core to GEO, providing a forward operating base and agile campaign testing platform for hosted ECP/SSA payloads, and evaluating the resilience of an emulated high-value asset (HVA) in support of future DoD space operations.
Manifest: 4 Payloads (3 hosted, 1 separable)
Insertion & Operating Orbit: GEO ± 300km
Mission Description
Long Duration Propulsive ESPA (LDPE-2)
LDPE-2 continues the innovation of LDPE-1 and serves as a surrogate to evaluate the effectiveness of communications technologies and efforts for Space Situational Awareness through its separable and hosted payloads.
Manifest: 7 Payloads (3 hosted, 4 separable)
Insertion & Operating Orbit: GEO ± 300km
Mission Description
Long Duration Propulsive ESPA (LDPE-3a)
LDPE-3a continues the generational improvement of rideshare capabilities for streamlined access to space, forwarding
USSF superiority in SDA and more through prototype payload experiments. Follow-on LDPE missions were rebranded to the Rapid On-Orbit Space Evaluation Ring (ROOSTER) on 3 December 2019, making LDPE-3a the last of its name.
Manifest: 5 Payloads (5 hosted, 0 separable)
Insertion & Operating Orbit: GEO ± 300km
Mission Description
NTS-3 (Vanguard)
NTS-3, dubbed Vanguard, is the first DoD experimental PNT satellite in 47+ years. Leading with 4 decades of improvement, Vanguard will augment the US GPS constellation, hardening PNT signal proliferation through anti-jamming/anti-spoofing technologies to enhance reliability for agile ground forces.
Manifest: 1 Payload (1 hosted, 0 separable)
Insertion & Operating Orbit: 100% Sub-GEO
“Bathtub Orbit” moving East
Mission Description
Future RSC Missions
- ROOSTER-4
- ROOSTER-5
Rapid On-Orbit Space Technology Evaluation Ring(ROOSTER-4)
ROOSTER-4 carries the torch passed along by previous LDPE missions, enhancing the USSF’s premier rideshare capability for streamlined access to space and innovative payload experiments that will further US space superiority.
Manifest: 7 Payloads (3 hosted, 4 separable)
Insertion & Operating Orbit: GEO ± 300km
Mission Description
Rapid On-Orbit Space Technology Evaluation Ring(ROOSTER-5)
ROOSTER-5’s objective is to transition operationally relevant capabilities to current and future systems through the execution of on-orbit demonstrations and prototypes. ROOSTER-5 implements an “over-manifest” strategy, manifesting more payloads than available ports, to reduce the likelihood of launching mass models or vacancies.
Manifest: X Payloads (X hosted, X separable)
Insertion & Operating Orbit: GEO ± 300km
Mission Description
Questions and Answers Session
57DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.
| �HADES Contract Industry Days |
| Purpose |
| Agenda |
| Agenda (cont’d) |
| General Information: Movie Theater |
| General Information: Facility Restrictions |
| General Information: One-On-One Sessions |
| General Information: Rules for Questions |
| Slide Number 9 |
| EDIS Program History |
| EDIS Follow-On Support Services |
| EDIS Follow-On Support Services |
| EDIS Follow-On Support Services |
| Slide Number 14 |
| Current Acquisition Schedule |
| Contract Structure |
| �Acquisition/Source Selection Approach |
| Source Selection Planning Evaluation Factors and Subfactors |
| Source Selection Planning Evaluation Methods |
| Contracting Officer Notes |
| Contract Parameters Contract Incentives |
| Contract Management Oversight Plan� |
| Slide Number 23 |
| SZIG Mission & Vision |
| Slide Number 25 |
| Slide Number 26 |
| Long-term Schedule |
| Slide Number 28 |
| Challenges |
| Slide Number 30 |
| Ground Support Section |
| RSC |
| Ground Support Section Overview |
| Slide Number 34 |
| Research, Development, Test & Evaluation (RDT&E) Support Complex (RSC) |
| Slide Number 36 |
| Jaguar Mission |
| Slide Number 38 |
| Ground Control |
| Ground Control |
| Ground Control |
| Rapid Resilient Command and Control (R2C2) Acme Integration� |
| Acme Integration Requirements |
| Acme Outpost |
| Slide Number 45 |
| Current Mission/Vision |
| RDT&E Support Complex (RSC) |
| Slide Number 48 |
| Slide Number 49 |
| Slide Number 50 |
| Slide Number 51 |
| Slide Number 52 |
| Slide Number 53 |
| Future�RSC Missions |
| Slide Number 55 |
| Slide Number 56 |
| Slide Number 57 |
File details come from the government source that posted it. Updated .