Attachment 4 Supply Pricing Table.xlsx

XLSX spreadsheet 204 KB Posted

Attached to
DRAFT FOPR for 24/7 NOC _ OASIS+ Total Small Business Federal contract opportunity
Solicitation number
FA880625RB003
Issued by
Department of the Air Force

About this file

This document is an attachment to a draft Request for Proposal (RFP) for a 24/7 Network Operations Center (NOC) contract. It includes a Supply Pricing Table template for vendors to complete with their proposed pricing and labor details. The table covers a 5-year period and includes placeholders for different environments, application teams, platform teams, and equipment/services needed to support the NOC. Key elements include fully burdened labor rates, FTE level of effort, cores, storage, licenses, warranties, service agreements, and other direct costs. The complete pricing table will be used by the government to evaluate the total proposed price for the 24/7 NOC services. This is one of several attachments that would be included in the final RFP when released.

View the file

Other files for this federal contract opportunity

Other files attached to DRAFT FOPR for 24/7 NOC _ OASIS+ Total Small Business, newest first.
File Type Posted
24x7 NOC FORP PCO Letter.pdf PDF
Solicitation - Clauses and Provisions.pdf PDF
Attachment 2. Placement Procedures.pdf PDF
Attachment 5. Organizational Conflict of Interest Checklist.pdf PDF
Attachment 6. Quality Assurance Surveillance Plan.docx DOCX document
Solicitation - FA880625RB003.pdf PDF
Attachment 3. Master Contract Data Requirements List.docx DOCX document
Attachment 7. Contract Security Classification Specification DD254.pdf PDF
Attachment 8. Comments Resolution Matrix.docx DOCX document
Attachment 1. Stament Of Work.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions The pricing table will be used to evaluate the total price Each tab has additional instructions on how to fill out. The vendor should modify table and formats throughout the spreadsheet to enable linked calculations with formulas where applicable.

Orange tabs are placeholders for future needs and should not be included in the TEP for KM Baseline Description needs From the draft, only minor updates were made throughout the document Offeror may include additional tabs as needed for labor rate justification This supply pricing table shall include the total costs for all work proposed in this effort for the KM Baseline Description Needs This supply pricing table will be configuration controlled by the government as part of the award

The environment agnostic and each environment tab should include columns for each application team being supported in the KM Baseline Description and each platform team being proposed

Supply Payments shall not exceed once per month.

Environment Agnostic ** This is meant to be a guide and not prescriptive ** Vendor should modify to include aspect of proposal ** Orange tabs are placeholders for environments not needed for KM Baseline Description needs ** This one is meant to be a guide and whatever guide you use, apply it similarly across each environment

Dev Team NameDev Team ADev Team BPlatform Team NamePlatform Team APlatform Team BUnallocatedTotal
Application NameApplication AApplication BPlatform FunctionFunction AFunction BMR/SurgeBy Year
ItemUnit of MeasureYR1YR2YR3YR4YR5YR1YR2YR3YR4YR5YR1YR2YR3YR4YR5YR1YR2YR3YR4YR5YR1YR2YR3YR4YR5YR1YR2YR3YR4YR5
Team SizeFTE6553355555
Cores#3333366666
Storage TBTB1001201401602002022242630
FTE inflation Factor11.031.041.041.0411.031.041.041.04
Cost Reimbursable Inflation11.051.061.071.0911.051.061.071.09

CLIN 0001

Key PersonnelHeadcountFTE0.10.50.60.2
$ 550,000.00$ 55,000.00$ 283,250.00

CLIN Total Cost $ 55,000.00 $ 283,250.00 0.6 0.2

CLIN 0002
Not Environment SpecificLink to CLIN 0002 Tab$
(eg travel)
CLIN 1002

CLIN 2002

CLIN 3002

CLIN 4002

CLIN Total Cost 0 0

CLIN 0003

Not Applicable

CLIN Total Cost $ - 0 $ - 0 0 0

CLIN 0004
SEITFTE0010.75
Team Cost/FTE$ 350,000.00$ - 0$ - 0

CLIN Total Cost $ - 0 $ - 0 1 0.75

CLIN 0005
Not applicable

CLIN Total Cost $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

CLIN 0006

Enablement, Licenses, Warranties and Service Agreements

IT Services$/FTE$ 100.00$ 600.00$ 525.00$ 530.00$ 321.00$ 327.00
Connectivity$/FTE$ 2,000.00$ 12,000.00$ 10,500.00$ 10,600.00$ 6,420.00$ 6,540.00
License C$/Team$ 15,000.00$ 15,000.00$ 15,750.00$ 16,695.00$ 17,863.65$ 19,471.38
Computers$ (Qnty 120)$ 660,000.00$ 660,000.00

CLIN Total Cost $ 687,600.00 $ 26,775.00 $ 27,825.00 $ 24,604.65 $ 26,338.38

CLIN 0007
CAF FEE0.001
CLIN Totals$$ 742,600.00$ 310,025.00$ 27,825.00$ 24,604.65$ 26,338.38
$ 742.60$ 310.03$ 27.83$ 24.60$ 26.34
Total Cost$ 743,342.60$ 310,335.03$ 27,852.83$ 24,629.25$ 26,364.72

CLIN Breakdown ** This is meant to be a guide and not prescriptive, but it should include the total costs to delivery the supply in this Delivery Order ** Vendor should modify to include all costed aspects of proposal ** Orange tabs are placeholders for environments not needed for KM Baseline Description needs ** This one is meant to be a guide and whatever guide you use, apply it similarly across each environment ** Recommend only areas in Yellow should be filled out, but add additional columns, rows to accountfor KM Baseline needs, Platform Teams, etc ** use the unallocated/MR/Surge column to account for extra capacity/licenses/resouces (to meet requirements or based on block buys of capabilities...e.g. licence "C" is bought in 1000 user increments and we are only using 600)

Supported Team Name24x7 Team 1
Application Name
CLINItem or TeamUnit of MeasureYR1YR2YR3YR4YR5
CLIN 0001
As applicablePRODUCT TEAMSHeadcountFTE88888
Avg Team FTE Rate$ 300,000.00$ 2,400,000.00$ 2,400,000.00$ 2,400,000.00$ 2,400,000.00$ 2,400,000.00
ON SITE SUPPORTHeadcountFTE33333
Avg Team FTE Rate$ 400,000.00$ 1,200,000.00$ 1,200,000.00$ 1,200,000.00$ 1,200,000.00$ 1,200,000.00
CLIN Total Cost$ 3,600,000.00$ 3,600,000.00$ 3,600,000.00$ 3,600,000.00$ 3,600,000.00
CLIN 0002
As applicableQuarterly Program IncramentsHeadcountFTE22222
Avg Team FTE Rate$ 2,500.00$ 5,000.00$ 5,000.00$ 5,000.00$ 5,000.00$ 5,000.00
Test EventsHeadcountFTE22222
Avg Team FTE Rate$ 7,500.00$ 15,000.00$ 15,000.00$ 15,000.00$ 15,000.00$ 15,000.00
User EngagementsHeadcountFTE33333
Avg Team FTE Rate$ 2,500.00$ 7,500.00$ 7,500.00$ 7,500.00$ 7,500.00$ 7,500.00
CLIN Total Cost$ 12,500.00$ 12,500.00$ 12,500.00$ 12,500.00$ 12,500.00
CLIN 0003
As applicablePS Tier 2HeadcountFTE0.020.020.020.020.02
Avg Team FTE Rate$ 350,000.00$ 7,000.00$ 7,000.00$ 7,000.00$ 7,000.00$ 7,000.00
CLIN Total Cost$ 7,000.00$ 7,000.00$ 7,000.00$ 7,000.00$ 7,000.00
CLIN 0004
As applicableSEITHeadcountFTE11111
Avg Team FTE Rate$ 300,000.00$ 300,000.00$ 300,000.00$ 300,000.00$ 300,000.00$ 300,000.00
CLIN Total Cost$ 300,000.00$ 300,000.00$ 300,000.00$ 300,000.00$ 300,000.00
CLIN 0005
As applicableCloud RI ProcessingHeadcountFTEFTEERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
Cloud StorageAvg Team FTE Rate$ 350,000.00ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
HaaS Item 1
PaaS Item 1
Cloud Item 1
CLIN Total CostERROR:#REF!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
CAF FEE0.001
CLIN Totals$ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
Total Cost$ 3,919,500.00$ 3,919,500.00$ 3,919,500.00$ 3,919,500.00$ 3,919,500.00

NSS CLoud IL5 Prod ** This is meant to be a guide and not prescriptive, but it should include the total costs to delivery the supply in this Delivery Order ** Vendor should modify to include all costed aspects of proposal ** Orange tabs are placeholders for environments not needed for KM Baseline Description needs ** This one is meant to be a guide and whatever guide you use, apply it similarly across each environment ** Recommend only areas in Yellow should be filled out, but add additional columns, rows to accountfor KM Baseline needs, Platform Teams, etc ** use the unallocated/MR/Surge column to account for extra capacity/licenses/resouces (to meet requirements or based on block buys of capabilities...e.g. licence "C" is bought in 1000 user increments and we are only using 600)

Supported Dev Team NameDev Team ADev Team BSupported Platform Team NamePlatform Team APlatform Team BUnallocatedTotal
Application NameApplication AApplication BSupported Platform FunctionFunction AFunction BMR/SurgeBy Year
CLINItem or TeamUnit of MeasureYR1YR2YR3YR4YR5YR1YR2YR3YR4YR5YR1YR2YR3YR4YR5YR1YR2YR3YR4YR5YR1YR2YR3YR4YR5YR1YR2YR3YR4YR5
Team SizeFTE6553355555
Cores#3333366666
Storage TBTB1001201401602002022242630
FTE inflation Factor11.031.041.041.0411.031.041.041.04
Cost Reimbursable Inflation11.051.061.071.0911.051.061.071.09
CLIN 0001
LaborPlatform Team AHeadcountFTE00000
Avg Team FTE Rate$ - 0$ - 0$ - 0$ - 0$ - 0
Key PersonnelHeadcountFTE0.10.50.60.20.21.10.5000
Avg Team FTE Rate$ 550,000.00$ 55,000.00$ 283,250.00$ 330,000.00$ 110,000.00$ 110,000.00$ 605,000.00$ 283,250.00$ - 0$ - 0$ - 0
HeadcountFTE00000
Avg Team FTE Rate$ - 0$ - 0$ - 0$ - 0$ - 0
CLIN Total Cost$ 55,000.00$ 283,250.00$ - 0$ - 0$ - 0$ 330,000.60$ - 0$ - 0$ - 0$ - 0$ 110,000.20$ - 0$ - 0$ - 0$ - 0$ 110,000.20$ - 0$ - 0$ - 0$ - 0$ 605,001.10$ 283,250.50$ - 0$ - 0$ - 0
CLIN 0002
ODCsTravel$$ 1,000.00N/AN/AN/AN/A$ 1,000.00N/AN/AN/AN/A$ 1,000.00N/AN/AN/AN/A$ 1,000.00N/AN/AN/AN/A$ 1,000.00N/AN/AN/AN/A$ 5,000.00N/AN/AN/AN/A
ODC Item 1$N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A$ - 0N/AN/AN/AN/A
ODC Item 2$N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A$ - 0N/AN/AN/AN/A
CLIN 1002
ODCsTravel$N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A$ - 0N/AN/AN/A
ODC Item 1$N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A$ - 0N/AN/AN/A
ODC Item 2$N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A$ - 0N/AN/AN/A
CLIN 2002
ODCsTravel$N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A$ - 0N/AN/A
ODC Item 1$N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A$ - 0N/AN/A
ODC Item 2$N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A$ - 0N/AN/A
CLIN 3002
ODCsTravel$N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A$ - 0N/A
ODC Item 1$N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A$ - 0N/A
ODC Item 2$N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A$ - 0N/A
CLIN 4002
ODCsTravel$N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A$ - 0
ODC Item 1$N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A$ - 0
ODC Item 2$N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A$ - 0
CLIN Total Cost$ 1,000.00$ - 0$ - 0$ - 0$ - 0$ 1,000.00$ - 0$ - 0$ - 0$ - 0$ 1,000.00$ - 0$ - 0$ - 0$ - 0$ 1,000.00$ - 0$ - 0$ - 0$ - 0$ 1,000.00$ - 0$ - 0$ - 0$ - 0$ 5,000.00$ - 0$ - 0$ - 0$ - 0
CLIN 0003
Tier SupportPS Tier 2HeadcountFTE0.020.040.020.040.040.08000
Avg Team FTE Rate$ 350,000.00$ 7,000.00$ 14,000.00$ 7,000.00$ 14,000.00$ 14,000.00$ 28,000.00$ - 0$ - 0$ - 0
PS Tier 3HeadcountFTE0.020.040.020.040.040.08000
Avg Team FTE Rate$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
CLIN Total Cost$ 7,000.00$ 14,000.00$ - 0$ - 0$ - 0$ 7,000.00$ 14,000.00$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 14,000.00$ 28,000.00$ - 0$ - 0$ - 0
CLIN 0004
SEIT SupportSEITHeadcountFTE10.751.750000
Avg Team FTE Rate$ 350,000.00$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 350,000.00$ - 0$ - 0$ - 0$ - 0$ 262,500.00$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 612,500.00$ - 0$ - 0$ - 0$ - 0
CLIN Total Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 350,000.00$ - 0$ - 0$ - 0$ - 0$ 262,500.00$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 612,500.00$ - 0$ - 0$ - 0$ - 0

CLIN 0005

HaaS PaaS

CloudCloud RI Processing$/Core$ 3,000.00$ 9,000.00$ 9,000.00$ 9,000.00$ 9,000.00$ 9,000.00$ 18,000.00$ 18,000.00$ 18,000.00$ 18,000.00$ 18,000.00$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 27,000.00$ 27,000.00$ 27,000.00$ 27,000.00$ 27,000.00
Cloud Storage$/TB$ 50.00$ 5,000.00$ 6,000.00$ 7,000.00$ 8,000.00$ 10,000.00$ 1,000.00$ 1,100.00$ 1,200.00$ 1,300.00$ 1,500.00$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 6,000.00$ 7,100.00$ 8,200.00$ 9,300.00$ 11,500.00
HaaS Item 1$ - 0$ - 0$ - 0$ - 0$ - 0
PaaS Item 1$ - 0$ - 0$ - 0$ - 0$ - 0
Cloud Item 1$ - 0$ - 0$ - 0$ - 0$ - 0
CLIN Total Cost$ 14,000.00$ 15,000.00$ 16,000.00$ 17,000.00$ 19,000.00$ 19,000.00$ 19,100.00$ 19,200.00$ 19,300.00$ 19,500.00$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 33,000.00$ 34,100.00$ 35,200.00$ 36,300.00$ 38,500.00
CLIN 0006
Enablement, Licenses, Warranties and Service AgreementsIT Services$/FTE$ 100.00$ 600.00$ 525.00$ 530.00$ 321.00$ 327.00$ 500.00$ 525.00$ 530.00$ 535.00$ 545.00$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 1,100.00$ 1,050.00$ 1,060.00$ 856.00$ 872.00
Connectivity$/FTE$ 2,000.00$ 12,000.00$ 10,500.00$ 10,600.00$ 6,420.00$ 6,540.00$ 10,000.00$ 10,500.00$ 10,600.00$ 10,700.00$ 10,900.00$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 22,000.00$ 21,000.00$ 21,200.00$ 17,120.00$ 17,440.00
License C$/Team$ 15,000.00$ 15,000.00$ 15,750.00$ 16,695.00$ 17,863.65$ 19,471.38$ 17,863.65$ 18,756.83$ 19,882.24$ 21,274.00$ 23,188.66$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 32,863.65$ 34,506.83$ 36,577.24$ 39,137.65$ 42,660.04
Computers$ (Qnty 120)$ 660,000.00$ 660,000.00$ 660,000.00$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
CLIN Total Cost$ 687,600.00$ 26,775.00$ 27,825.00$ 24,604.65$ 26,338.38$ 28,363.65$ 29,781.83$ 31,012.24$ 32,509.00$ 34,633.66$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 715,963.65$ 56,556.83$ 58,837.24$ 57,113.65$ 60,972.04
CLIN 0007
CAF FEE0.001
CLIN Totals$$ 750,600.00$ 324,025.00$ 27,825.00$ 24,604.65$ 26,338.38$ 36,363.65$ 43,781.83$ 31,012.24$ 32,509.00$ 34,633.66$ 681,000.60$ - 0$ - 0$ - 0$ - 0$ 373,500.20$ - 0$ - 0$ - 0$ - 0$ 111,000.20$ - 0$ - 0$ - 0$ - 0$ 1,952,464.65$ 367,806.83$ 58,837.24$ 57,113.65$ 60,972.04
$ 750.60$ 324.03$ 27.83$ 24.60$ 26.34$ 36.36$ 43.78$ 31.01$ 32.51$ 34.63$ 681.00$ - 0$ - 0$ - 0$ - 0$ 373.50$ - 0$ - 0$ - 0$ - 0$ 111.00$ - 0$ - 0$ - 0$ - 0$ 1,952.46$ 367.81$ 58.84$ 57.11$ 60.97
Total Cost$ 751,350.60$ 324,349.03$ 27,852.83$ 24,629.25$ 26,364.72$ 36,400.01$ 43,825.61$ 31,043.25$ 32,541.51$ 34,668.29$ 681,681.60$ - 0$ - 0$ - 0$ - 0$ 373,873.70$ - 0$ - 0$ - 0$ - 0$ 111,111.20$ - 0$ - 0$ - 0$ - 0$ 1,954,417.11$ 368,174.64$ 58,896.08$ 57,170.76$ 61,033.01

GovSec Cloud IL6 Dev ** This is meant to be a guide and not prescriptive, but it should include the total costs to delivery the supply in this Delivery Order ** Vendor should modify to include all costed aspects of proposal ** Orange tabs are placeholders for environments not needed for KM Baseline Description needs ** This one is meant to be a guide and whatever guide you use, apply it similarly across each environment ** Recommend only areas in Yellow should be filled out, but add additional columns, rows to accountfor KM Baseline needs, Platform Teams, etc ** use the unallocated/MR/Surge column to account for extra capacity/licenses/resouces (to meet requirements or based on block buys of capabilities...e.g. licence "C" is bought in 1000 user increments and we are only using 600)

Dev Team NameDev Team ADev Team BPlatform Team NamePlatform Team APlatform Team BUnallocatedTotal
Application NameApplication AApplication BPlatform FunctionFunction AFunction BMR/SurgeBy Year
ItemUnit of MeasureYR1YR2YR3YR4YR5YR1YR2YR3YR4YR5YR1YR2YR3YR4YR5YR1YR2YR3YR4YR5YR1YR2YR3YR4YR5YR1YR2YR3YR4YR5
Team SizeFTE6553355555
Cores#3333366666
Storage TBTB1001201401602002022242630
FTE inflation Factor% multiplier11.031.041.041.0411.031.041.041.04
Cost Reimbursable Inflation% multiplier11.051.061.071.0911.051.061.071.09
CLIN 0001Platform Team AHeadcount/FTEFTE1.251.4X0.2
Team Cost/FTE$ 350,000.00$ 437,500.00$ 504,700.00$ 70,000.00
Platform Team BHeadcountFTE11.20.75X
Team Cost$ 335,000.00$ 335,000.00$ 414,060.00$ 251,250.00
…
CLIN Total Cost$ 772,500.00$ 918,760.00
CLIN 0002
Environment SpecificLink to CLIN 0002 Tab$

CLIN 1002

CLIN 2002

CLIN 3002

CLIN 4002

CLIN Total Cost 0 0

CLIN 0003
PS Tier 2Headcount/FTEFTE0.020.04
Team Cost/FTE$ 350,000.00$ 7,000.00$ 14,420.00
PS Tier 3Headcount/FTEFTE0.010.02
Team Cost/FTE$ 350,000.00$ 3,500.00$ 7,210.00

CLIN Total Cost $ 10,500.00 $ 21,630.00 0 0

CLIN 0004
SEITFTE0010.75
Team Cost/FTE$ 350,000.00$ - 0$ - 0

CLIN Total Cost $ - 0 $ - 0 1 0.75

CLIN 0005
Cloud RI Processing$/Core$ 3,000.00$ 9,000.00$ 9,000.00$ 9,000.00$ 9,000.00$ 9,000.00$ 18,000.00$ 18,000.00$ 18,000.00$ 18,000.00$ 18,000.00
Cloud Storage$/TB$ 50.00$ 5,000.00$ 6,000.00$ 7,000.00$ 8,000.00$ 10,000.00$ 1,000.00$ 1,100.00$ 1,200.00$ 1,300.00$ 1,500.00

CLIN Total Cost $ 14,000.00 $ 15,000.00 $ 16,000.00 $ 17,000.00 $ 19,000.00 $ 19,000.00 $ 19,100.00 $ 19,200.00 $ 19,300.00 $ 19,500.00

CLIN 0006
Service Support A$/Core$ 40.00$ 120.00$ 126.00$ 127.20$ 128.40$ 130.80
License A$/FTE$ 2,000.00$ 12,000.00$ 10,300.00$ 10,400.00$ 6,240.00$ 6,240.00
License B$$ 1,000,000.00$ 1,000,000.00$ 1,050,000.00$ 1,113,000.00$ 1,190,910.00$ 1,298,091.90
License C$/Team$ 15,000.00$ 15,000.00$ 15,750.00$ 16,695.00$ 17,863.65$ 19,471.38
Warranty A$$ 150,000.00$ 150,000.00$ 157,500.00$ 166,950.00$ 178,636.50$ 194,713.79

CLIN Total Cost $ 1,177,120.00 $ 1,233,676.00 $ 1,307,172.20 $ 1,393,778.55 $ 1,518,647.86

CLIN 0007
CAF FEE0.001
CLIN Totals$$ 1,960,120.00$ 2,174,066.00$ 1,307,172.20$ 1,393,778.55$ 1,518,647.86
$ 1,960.12$ 2,174.07$ 1,307.17$ 1,393.78$ 1,518.65
Total Cost$ 1,962,080.12$ 2,176,240.07$ 1,308,479.37$ 1,395,172.33$ 1,520,166.51

Secret On-Premise Prod ** This is meant to be a guide and not prescriptive, but it should include the total costs to delivery the supply in this Delivery Order ** Vendor should modify to include all costed aspects of proposal ** Orange tabs are placeholders for environments not needed for KM Baseline Description needs ** This one is meant to be a guide and whatever guide you use, apply it similarly across each environment ** Recommend only areas in Yellow should be filled out, but add additional columns, rows to accountfor KM Baseline needs, Platform Teams, etc ** use the unallocated/MR/Surge column to account for extra capacity/licenses/resouces (to meet requirements or based on block buys of capabilities...e.g. licence "C" is bought in 1000 user increments and we are only using 600)

Supported Dev Team NameDev Team ADev Team BSupported Platform Team NamePlatform Team APlatform Team BUnallocatedTotal
Application NameApplication AApplication BSupported Platform FunctionFunction AFunction BMR/SurgeBy Year
CLINItem or TeamUnit of MeasureYR1YR2YR3YR4YR5YR1YR2YR3YR4YR5YR1YR2YR3YR4YR5YR1YR2YR3YR4YR5YR1YR2YR3YR4YR5YR1YR2YR3YR4YR5
Team SizeFTE6553355555
Cores#3333366666
Storage TBTB1001201401602002022242630
FTE inflation Factor11.031.041.041.0411.031.041.041.04
Cost Reimbursable Inflation11.051.061.071.0911.051.061.071.09
CLIN 0001
LaborPlatform Team AHeadcountFTE00000
Avg Team FTE Rate$ - 0$ - 0$ - 0$ - 0$ - 0
Key PersonnelHeadcountFTE0.10.50.60.20.21.10.5000
Avg Team FTE Rate$ 550,000.00$ 55,000.00$ 283,250.00$ 330,000.00$ 110,000.00$ 110,000.00$ 605,000.00$ 283,250.00$ - 0$ - 0$ - 0
HeadcountFTE00000
Avg Team FTE Rate$ - 0$ - 0$ - 0$ - 0$ - 0
CLIN Total Cost$ 55,000.00$ 283,250.00$ - 0$ - 0$ - 0$ 330,000.60$ - 0$ - 0$ - 0$ - 0$ 110,000.20$ - 0$ - 0$ - 0$ - 0$ 110,000.20$ - 0$ - 0$ - 0$ - 0$ 605,001.10$ 283,250.50$ - 0$ - 0$ - 0
CLIN 0002
ODCsTravel$$ 1,000.00N/AN/AN/AN/A$ 1,000.00N/AN/AN/AN/A$ 1,000.00N/AN/AN/AN/A$ 1,000.00N/AN/AN/AN/A$ 1,000.00N/AN/AN/AN/A$ 5,000.00N/AN/AN/AN/A
ODC Item 1$N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A$ - 0N/AN/AN/AN/A
ODC Item 2$N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A$ - 0N/AN/AN/AN/A
CLIN 1002
ODCsTravel$N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A$ - 0N/AN/AN/A
ODC Item 1$N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A$ - 0N/AN/AN/A
ODC Item 2$N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A$ - 0N/AN/AN/A
CLIN 2002
ODCsTravel$N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A$ - 0N/AN/A
ODC Item 1$N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A$ - 0N/AN/A
ODC Item 2$N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A$ - 0N/AN/A
CLIN 3002
ODCsTravel$N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A$ - 0N/A
ODC Item 1$N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A$ - 0N/A
ODC Item 2$N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A$ - 0N/A
CLIN 4002
ODCsTravel$N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A$ - 0
ODC Item 1$N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A$ - 0
ODC Item 2$N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A$ - 0
CLIN Total Cost$ 1,000.00$ - 0$ - 0$ - 0$ - 0$ 1,000.00$ - 0$ - 0$ - 0$ - 0$ 1,000.00$ - 0$ - 0$ - 0$ - 0$ 1,000.00$ - 0$ - 0$ - 0$ - 0$ 1,000.00$ - 0$ - 0$ - 0$ - 0$ 5,000.00$ - 0$ - 0$ - 0$ - 0
CLIN 0003
Tier SupportPS Tier 2HeadcountFTE0.020.040.020.040.040.08000
Avg Team FTE Rate$ 350,000.00$ 7,000.00$ 14,000.00$ 7,000.00$ 14,000.00$ 14,000.00$ 28,000.00$ - 0$ - 0$ - 0
PS Tier 3HeadcountFTE0.020.040.020.040.040.08000
Avg Team FTE Rate$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
CLIN Total Cost$ 7,000.00$ 14,000.00$ - 0$ - 0$ - 0$ 7,000.00$ 14,000.00$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 14,000.00$ 28,000.00$ - 0$ - 0$ - 0
CLIN 0004
SEIT SupportSEITHeadcountFTE10.751.750000
Avg Team FTE Rate$ 350,000.00$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 350,000.00$ - 0$ - 0$ - 0$ - 0$ 262,500.00$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 612,500.00$ - 0$ - 0$ - 0$ - 0
CLIN Total Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 350,000.00$ - 0$ - 0$ - 0$ - 0$ 262,500.00$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 612,500.00$ - 0$ - 0$ - 0$ - 0

CLIN 0005

HaaS PaaS

CloudCloud RI Processing$/Core$ 3,000.00$ 9,000.00$ 9,000.00$ 9,000.00$ 9,000.00$ 9,000.00$ 18,000.00$ 18,000.00$ 18,000.00$ 18,000.00$ 18,000.00$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 27,000.00$ 27,000.00$ 27,000.00$ 27,000.00$ 27,000.00
Cloud Storage$/TB$ 50.00$ 5,000.00$ 6,000.00$ 7,000.00$ 8,000.00$ 10,000.00$ 1,000.00$ 1,100.00$ 1,200.00$ 1,300.00$ 1,500.00$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 6,000.00$ 7,100.00$ 8,200.00$ 9,300.00$ 11,500.00
HaaS Item 1$ - 0$ - 0$ - 0$ - 0$ - 0
PaaS Item 1$ - 0$ - 0$ - 0$ - 0$ - 0
Cloud Item 1$ - 0$ - 0$ - 0$ - 0$ - 0
CLIN Total Cost$ 14,000.00$ 15,000.00$ 16,000.00$ 17,000.00$ 19,000.00$ 19,000.00$ 19,100.00$ 19,200.00$ 19,300.00$ 19,500.00$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 33,000.00$ 34,100.00$ 35,200.00$ 36,300.00$ 38,500.00
CLIN 0006
Enablement, Licenses, Warranties and Service AgreementsIT Services$/FTE$ 100.00$ 600.00$ 525.00$ 530.00$ 321.00$ 327.00$ 500.00$ 525.00$ 530.00$ 535.00$ 545.00$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 1,100.00$ 1,050.00$ 1,060.00$ 856.00$ 872.00
Connectivity$/FTE$ 2,000.00$ 12,000.00$ 10,500.00$ 10,600.00$ 6,420.00$ 6,540.00$ 10,000.00$ 10,500.00$ 10,600.00$ 10,700.00$ 10,900.00$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 22,000.00$ 21,000.00$ 21,200.00$ 17,120.00$ 17,440.00
License C$/Team$ 15,000.00$ 15,000.00$ 15,750.00$ 16,695.00$ 17,863.65$ 19,471.38$ 17,863.65$ 18,756.83$ 19,882.24$ 21,274.00$ 23,188.66$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 32,863.65$ 34,506.83$ 36,577.24$ 39,137.65$ 42,660.04
Computers$ (Qnty 120)$ 660,000.00$ 660,000.00$ 660,000.00$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
CLIN Total Cost$ 687,600.00$ 26,775.00$ 27,825.00$ 24,604.65$ 26,338.38$ 28,363.65$ 29,781.83$ 31,012.24$ 32,509.00$ 34,633.66$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 715,963.65$ 56,556.83$ 58,837.24$ 57,113.65$ 60,972.04
CLIN 0007
CAF FEE0.001
CLIN Totals$$ 750,600.00$ 324,025.00$ 27,825.00$ 24,604.65$ 26,338.38$ 36,363.65$ 43,781.83$ 31,012.24$ 32,509.00$ 34,633.66$ 681,000.60$ - 0$ - 0$ - 0$ - 0$ 373,500.20$ - 0$ - 0$ - 0$ - 0$ 111,000.20$ - 0$ - 0$ - 0$ - 0$ 1,952,464.65$ 367,806.83$ 58,837.24$ 57,113.65$ 60,972.04
$ 750.60$ 324.03$ 27.83$ 24.60$ 26.34$ 36.36$ 43.78$ 31.01$ 32.51$ 34.63$ 681.00$ - 0$ - 0$ - 0$ - 0$ 373.50$ - 0$ - 0$ - 0$ - 0$ 111.00$ - 0$ - 0$ - 0$ - 0$ 1,952.46$ 367.81$ 58.84$ 57.11$ 60.97
Total Cost$ 751,350.60$ 324,349.03$ 27,852.83$ 24,629.25$ 26,364.72$ 36,400.01$ 43,825.61$ 31,043.25$ 32,541.51$ 34,668.29$ 681,681.60$ - 0$ - 0$ - 0$ - 0$ 373,873.70$ - 0$ - 0$ - 0$ - 0$ 111,111.20$ - 0$ - 0$ - 0$ - 0$ 1,954,417.11$ 368,174.64$ 58,896.08$ 57,170.76$ 61,033.01

GovSec Cloud IL6 Prod ** This is meant to be a guide and not prescriptive, but it should include the total costs to delivery the supply in this Delivery Order ** Vendor should modify to include all costed aspects of proposal ** Orange tabs are placeholders for environments not needed for KM Baseline Description needs ** This one is meant to be a guide and whatever guide you use, apply it similarly across each environment ** Recommend only areas in Yellow should be filled out, but add additional columns, rows to accountfor KM Baseline needs, Platform Teams, etc ** use the unallocated/MR/Surge column to account for extra capacity/licenses/resouces (to meet requirements or based on block buys of capabilities...e.g. licence "C" is bought in 1000 user increments and we are only using 600)

Supported Dev Team NameDev Team ADev Team BSupported Platform Team NamePlatform Team APlatform Team BUnallocatedTotal
Application NameApplication AApplication BSupported Platform FunctionFunction AFunction BMR/SurgeBy Year
CLINItem or TeamUnit of MeasureYR1YR2YR3YR4YR5YR1YR2YR3YR4YR5YR1YR2YR3YR4YR5YR1YR2YR3YR4YR5YR1YR2YR3YR4YR5YR1YR2YR3YR4YR5
Team SizeFTE6553355555
Cores#3333366666
Storage TBTB1001201401602002022242630
FTE inflation Factor11.031.041.041.0411.031.041.041.04
Cost Reimbursable Inflation11.051.061.071.0911.051.061.071.09
CLIN 0001
LaborPlatform Team AHeadcountFTE00000
Avg Team FTE Rate$ - 0$ - 0$ - 0$ - 0$ - 0
Key PersonnelHeadcountFTE0.10.50.60.20.21.10.5000
Avg Team FTE Rate$ 550,000.00$ 55,000.00$ 283,250.00$ 330,000.00$ 110,000.00$ 110,000.00$ 605,000.00$ 283,250.00$ - 0$ - 0$ - 0
HeadcountFTE00000
Avg Team FTE Rate$ - 0$ - 0$ - 0$ - 0$ - 0
CLIN Total Cost$ 55,000.00$ 283,250.00$ - 0$ - 0$ - 0$ 330,000.60$ - 0$ - 0$ - 0$ - 0$ 110,000.20$ - 0$ - 0$ - 0$ - 0$ 110,000.20$ - 0$ - 0$ - 0$ - 0$ 605,001.10$ 283,250.50$ - 0$ - 0$ - 0
CLIN 0002
ODCsTravel$$ 1,000.00N/AN/AN/AN/A$ 1,000.00N/AN/AN/AN/A$ 1,000.00N/AN/AN/AN/A$ 1,000.00N/AN/AN/AN/A$ 1,000.00N/AN/AN/AN/A$ 5,000.00N/AN/AN/AN/A
ODC Item 1$N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A$ - 0N/AN/AN/AN/A
ODC Item 2$N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A$ - 0N/AN/AN/AN/A
CLIN 1002
ODCsTravel$N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A$ - 0N/AN/AN/A
ODC Item 1$N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A$ - 0N/AN/AN/A
ODC Item 2$N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A$ - 0N/AN/AN/A
CLIN 2002
ODCsTravel$N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A$ - 0N/AN/A
ODC Item 1$N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A$ - 0N/AN/A
ODC Item 2$N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A$ - 0N/AN/A
CLIN 3002
ODCsTravel$N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A$ - 0N/A
ODC Item 1$N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A$ - 0N/A
ODC Item 2$N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A$ - 0N/A
CLIN 4002
ODCsTravel$N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A$ - 0
ODC Item 1$N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A$ - 0
ODC Item 2$N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A$ - 0
CLIN Total Cost$ 1,000.00$ - 0$ - 0$ - 0$ - 0$ 1,000.00$ - 0$ - 0$ - 0$ - 0$ 1,000.00$ - 0$ - 0$ - 0$ - 0$ 1,000.00$ - 0$ - 0$ - 0$ - 0$ 1,000.00$ - 0$ - 0$ - 0$ - 0$ 5,000.00$ - 0$ - 0$ - 0$ - 0
CLIN 0003
Tier SupportPS Tier 2HeadcountFTE0.020.040.020.040.040.08000
Avg Team FTE Rate$ 350,000.00$ 7,000.00$ 14,000.00$ 7,000.00$ 14,000.00$ 14,000.00$ 28,000.00$ - 0$ - 0$ - 0
PS Tier 3HeadcountFTE0.020.040.020.040.040.08000
Avg Team FTE Rate$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
CLIN Total Cost$ 7,000.00$ 14,000.00$ - 0$ - 0$ - 0$ 7,000.00$ 14,000.00$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 14,000.00$ 28,000.00$ - 0$ - 0$ - 0
CLIN 0004
SEIT SupportSEITHeadcountFTE10.751.750000
Avg Team FTE Rate$ 350,000.00$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 350,000.00$ - 0$ - 0$ - 0$ - 0$ 262,500.00$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 612,500.00$ - 0$ - 0$ - 0$ - 0
CLIN Total Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 350,000.00$ - 0$ - 0$ - 0$ - 0$ 262,500.00$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 612,500.00$ - 0$ - 0$ - 0$ - 0

CLIN 0005

HaaS PaaS

CloudCloud RI Processing$/Core$ 3,000.00$ 9,000.00$ 9,000.00$ 9,000.00$ 9,000.00$ 9,000.00$ 18,000.00$ 18,000.00$ 18,000.00$ 18,000.00$ 18,000.00$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 27,000.00$ 27,000.00$ 27,000.00$ 27,000.00$ 27,000.00
Cloud Storage$/TB$ 50.00$ 5,000.00$ 6,000.00$ 7,000.00$ 8,000.00$ 10,000.00$ 1,000.00$ 1,100.00$ 1,200.00$ 1,300.00$ 1,500.00$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 6,000.00$ 7,100.00$ 8,200.00$ 9,300.00$ 11,500.00
HaaS Item 1$ - 0$ - 0$ - 0$ - 0$ - 0
PaaS Item 1$ - 0$ - 0$ - 0$ - 0$ - 0
Cloud Item 1$ - 0$ - 0$ - 0$ - 0$ - 0
CLIN Total Cost$ 14,000.00$ 15,000.00$ 16,000.00$ 17,000.00$ 19,000.00$ 19,000.00$ 19,100.00$ 19,200.00$ 19,300.00$ 19,500.00$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 33,000.00$ 34,100.00$ 35,200.00$ 36,300.00$ 38,500.00
CLIN 0006
Enablement, Licenses, Warranties and Service AgreementsIT Services$/FTE$ 100.00$ 600.00$ 525.00$ 530.00$ 321.00$ 327.00$ 500.00$ 525.00$ 530.00$ 535.00$ 545.00$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 1,100.00$ 1,050.00$ 1,060.00$ 856.00$ 872.00
Connectivity$/FTE$ 2,000.00$ 12,000.00$ 10,500.00$ 10,600.00$ 6,420.00$ 6,540.00$ 10,000.00$ 10,500.00$ 10,600.00$ 10,700.00$ 10,900.00$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 22,000.00$ 21,000.00$ 21,200.00$ 17,120.00$ 17,440.00
License C$/Team$ 15,000.00$ 15,000.00$ 15,750.00$ 16,695.00$ 17,863.65$ 19,471.38$ 17,863.65$ 18,756.83$ 19,882.24$ 21,274.00$ 23,188.66$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 32,863.65$ 34,506.83$ 36,577.24$ 39,137.65$ 42,660.04
Computers$ (Qnty 120)$ 660,000.00$ 660,000.00$ 660,000.00$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
CLIN Total Cost$ 687,600.00$ 26,775.00$ 27,825.00$ 24,604.65$ 26,338.38$ 28,363.65$ 29,781.83$ 31,012.24$ 32,509.00$ 34,633.66$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 715,963.65$ 56,556.83$ 58,837.24$ 57,113.65$ 60,972.04
CLIN 0007
CAF FEE0.001
CLIN Totals$$ 750,600.00$ 324,025.00$ 27,825.00$ 24,604.65$ 26,338.38$ 36,363.65$ 43,781.83$ 31,012.24$ 32,509.00$ 34,633.66$ 681,000.60$ - 0$ - 0$ - 0$ - 0$ 373,500.20$ - 0$ - 0$ - 0$ - 0$ 111,000.20$ - 0$ - 0$ - 0$ - 0$ 1,952,464.65$ 367,806.83$ 58,837.24$ 57,113.65$ 60,972.04
$ 750.60$ 324.03$ 27.83$ 24.60$ 26.34$ 36.36$ 43.78$ 31.01$ 32.51$ 34.63$ 681.00$ - 0$ - 0$ - 0$ - 0$ 373.50$ - 0$ - 0$ - 0$ - 0$ 111.00$ - 0$ - 0$ - 0$ - 0$ 1,952.46$ 367.81$ 58.84$ 57.11$ 60.97
Total Cost$ 751,350.60$ 324,349.03$ 27,852.83$ 24,629.25$ 26,364.72$ 36,400.01$ 43,825.61$ 31,043.25$ 32,541.51$ 34,668.29$ 681,681.60$ - 0$ - 0$ - 0$ - 0$ 373,873.70$ - 0$ - 0$ - 0$ - 0$ 111,111.20$ - 0$ - 0$ - 0$ - 0$ 1,954,417.11$ 368,174.64$ 58,896.08$ 57,170.76$ 61,033.01

TS SCI On-Premise Prod ** This is meant to be a guide and not prescriptive, but it should include the total costs to delivery the supply in this Delivery Order ** Vendor should modify to include all costed aspects of proposal ** Orange tabs are placeholders for environments not needed for KM Baseline Description needs ** This one is meant to be a guide and whatever guide you use, apply it similarly across each environment ** Recommend only areas in Yellow should be filled out, but add additional columns, rows to accountfor KM Baseline needs, Platform Teams, etc ** use the unallocated/MR/Surge column to account for extra capacity/licenses/resouces (to meet requirements or based on block buys of capabilities...e.g. licence "C" is bought in 1000 user increments and we are only using 600)

Supported Dev Team NameDev Team ADev Team BSupported Platform Team NamePlatform Team APlatform Team BUnallocatedTotal
Application NameApplication AApplication BSupported Platform FunctionFunction AFunction BMR/SurgeBy Year
CLINItem or TeamUnit of MeasureYR1YR2YR3YR4YR5YR1YR2YR3YR4YR5YR1YR2YR3YR4YR5YR1YR2YR3YR4YR5YR1YR2YR3YR4YR5YR1YR2YR3YR4YR5
Team SizeFTE6553355555
Cores#3333366666
Storage TBTB1001201401602002022242630
FTE inflation Factor11.031.041.041.0411.031.041.041.04
Cost Reimbursable Inflation11.051.061.071.0911.051.061.071.09
CLIN 0001
LaborPlatform Team AHeadcountFTE00000
Avg Team FTE Rate$ - 0$ - 0$ - 0$ - 0$ - 0
Key PersonnelHeadcountFTE0.10.50.60.20.21.10.5000
Avg Team FTE Rate$ 550,000.00$ 55,000.00$ 283,250.00$ 330,000.00$ 110,000.00$ 110,000.00$ 605,000.00$ 283,250.00$ - 0$ - 0$ - 0
HeadcountFTE00000
Avg Team FTE Rate$ - 0$ - 0$ - 0$ - 0$ - 0
CLIN Total Cost$ 55,000.00$ 283,250.00$ - 0$ - 0$ - 0$ 330,000.60$ - 0$ - 0$ - 0$ - 0$ 110,000.20$ - 0$ - 0$ - 0$ - 0$ 110,000.20$ - 0$ - 0$ - 0$ - 0$ 605,001.10$ 283,250.50$ - 0$ - 0$ - 0
CLIN 0002
ODCsTravel$$ 1,000.00N/AN/AN/AN/A$ 1,000.00N/AN/AN/AN/A$ 1,000.00N/AN/AN/AN/A$ 1,000.00N/AN/AN/AN/A$ 1,000.00N/AN/AN/AN/A$ 5,000.00N/AN/AN/AN/A
ODC Item 1$N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A$ - 0N/AN/AN/AN/A
ODC Item 2$N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A$ - 0N/AN/AN/AN/A
CLIN 1002
ODCsTravel$N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A$ - 0N/AN/AN/A
ODC Item 1$N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A$ - 0N/AN/AN/A
ODC Item 2$N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A$ - 0N/AN/AN/A
CLIN 2002
ODCsTravel$N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A$ - 0N/AN/A
ODC Item 1$N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A$ - 0N/AN/A
ODC Item 2$N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A$ - 0N/AN/A
CLIN 3002
ODCsTravel$N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A$ - 0N/A
ODC Item 1$N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A$ - 0N/A
ODC Item 2$N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A$ - 0N/A
CLIN 4002
ODCsTravel$N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A$ - 0
ODC Item 1$N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A$ - 0
ODC Item 2$N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A$ - 0
CLIN Total Cost$ 1,000.00$ - 0$ - 0$ - 0$ - 0$ 1,000.00$ - 0$ - 0$ - 0$ - 0$ 1,000.00$ - 0$ - 0$ - 0$ - 0$ 1,000.00$ - 0$ - 0$ - 0$ - 0$ 1,000.00$ - 0$ - 0$ - 0$ - 0$ 5,000.00$ - 0$ - 0$ - 0$ - 0
CLIN 0003
Tier SupportPS Tier 2HeadcountFTE0.020.040.020.040.040.08000
Avg Team FTE Rate$ 350,000.00$ 7,000.00$ 14,000.00$ 7,000.00$ 14,000.00$ 14,000.00$ 28,000.00$ - 0$ - 0$ - 0
PS Tier 3HeadcountFTE0.020.040.020.040.040.08000
Avg Team FTE Rate$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
CLIN Total Cost$ 7,000.00$ 14,000.00$ - 0$ - 0$ - 0$ 7,000.00$ 14,000.00$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 14,000.00$ 28,000.00$ - 0$ - 0$ - 0
CLIN 0004
SEIT SupportSEITHeadcountFTE10.751.750000
Avg Team FTE Rate$ 350,000.00$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 350,000.00$ - 0$ - 0$ - 0$ - 0$ 262,500.00$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 612,500.00$ - 0$ - 0$ - 0$ - 0
CLIN Total Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 350,000.00$ - 0$ - 0$ - 0$ - 0$ 262,500.00$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 612,500.00$ - 0$ - 0$ - 0$ - 0

CLIN 0005

HaaS PaaS

CloudCloud RI Processing$/Core$ 3,000.00$ 9,000.00$ 9,000.00$ 9,000.00$ 9,000.00$ 9,000.00$ 18,000.00$ 18,000.00$ 18,000.00$ 18,000.00$ 18,000.00$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 27,000.00$ 27,000.00$ 27,000.00$ 27,000.00$ 27,000.00
Cloud Storage$/TB$ 50.00$ 5,000.00$ 6,000.00$ 7,000.00$ 8,000.00$ 10,000.00$ 1,000.00$ 1,100.00$ 1,200.00$ 1,300.00$ 1,500.00$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 6,000.00$ 7,100.00$ 8,200.00$ 9,300.00$ 11,500.00
HaaS Item 1$ - 0$ - 0$ - 0$ - 0$ - 0
PaaS Item 1$ - 0$ - 0$ - 0$ - 0$ - 0
Cloud Item 1$ - 0$ - 0$ - 0$ - 0$ - 0
CLIN Total Cost$ 14,000.00$ 15,000.00$ 16,000.00$ 17,000.00$ 19,000.00$ 19,000.00$ 19,100.00$ 19,200.00$ 19,300.00$ 19,500.00$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 33,000.00$ 34,100.00$ 35,200.00$ 36,300.00$ 38,500.00
CLIN 0006
Enablement, Licenses, Warranties and Service AgreementsIT Services$/FTE$ 100.00$ 600.00$ 525.00$ 530.00$ 321.00$ 327.00$ 500.00$ 525.00$ 530.00$ 535.00$ 545.00$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 1,100.00$ 1,050.00$ 1,060.00$ 856.00$ 872.00
Connectivity$/FTE$ 2,000.00$ 12,000.00$ 10,500.00$ 10,600.00$ 6,420.00$ 6,540.00$ 10,000.00$ 10,500.00$ 10,600.00$ 10,700.00$ 10,900.00$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 22,000.00$ 21,000.00$ 21,200.00$ 17,120.00$ 17,440.00
Facilities$/FTE$ 5,000.00$ 30,000.00$ 26,250.00$ 26,500.00$ 16,050.00$ 16,350.00$ 25,000.00$ 26,250.00$ 26,500.00$ 26,750.00$ 27,250.00$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 55,000.00$ 52,500.00$ 53,000.00$ 42,800.00$ 43,600.00
License C$/Team$ 15,000.00$ 15,000.00$ 15,750.00$ 16,695.00$ 17,863.65$ 19,471.38$ 17,863.65$ 18,756.83$ 19,882.24$ 21,274.00$ 23,188.66$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 32,863.65$ 34,506.83$ 36,577.24$ 39,137.65$ 42,660.04
Computers$ (Qnty 120)$ 660,000.00$ 660,000.00$ 660,000.00$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
CLIN Total Cost$ 717,600.00$ 53,025.00$ 54,325.00$ 40,654.65$ 42,688.38$ 53,363.65$ 56,031.83$ 57,512.24$ 59,259.00$ 61,883.66$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 770,963.65$ 109,056.83$ 111,837.24$ 99,913.65$ 104,572.04
CLIN 0007
CAF FEE0.001
CLIN Totals$$ 780,600.00$ 350,275.00$ 54,325.00$ 40,654.65$ 42,688.38$ 61,363.65$ 70,031.83$ 57,512.24$ 59,259.00$ 61,883.66$ 681,000.60$ - 0$ - 0$ - 0$ - 0$ 373,500.20$ - 0$ - 0$ - 0$ - 0$ 111,000.20$ - 0$ - 0$ - 0$ - 0$ 2,007,464.65$ 420,306.83$ 111,837.24$ 99,913.65$ 104,572.04
$ 780.60$ 350.28$ 54.33$ 40.65$ 42.69$ 61.36$ 70.03$ 57.51$ 59.26$ 61.88$ 681.00$ - 0$ - 0$ - 0$ - 0$ 373.50$ - 0$ - 0$ - 0$ - 0$ 111.00$ - 0$ - 0$ - 0$ - 0$ 2,007.46$ 420.31$ 111.84$ 99.91$ 104.57
Total Cost$ 781,380.60$ 350,625.28$ 54,379.33$ 40,695.30$ 42,731.07$ 61,425.01$ 70,101.86$ 57,569.75$ 59,318.26$ 61,945.54$ 681,681.60$ - 0$ - 0$ - 0$ - 0$ 373,873.70$ - 0$ - 0$ - 0$ - 0$ 111,111.20$ - 0$ - 0$ - 0$ - 0$ 2,009,472.11$ 420,727.14$ 111,949.08$ 100,013.56$ 104,676.61

TS SCI Cloud Prod ** This is meant to be a guide and not prescriptive, but it should include the total costs to delivery the supply in this Delivery Order ** Vendor should modify to include all costed aspects of proposal ** Orange tabs are placeholders for environments not needed for KM Baseline Description needs ** This one is meant to be a guide and whatever guide you use, apply it similarly across each environment ** Recommend only areas in Yellow should be filled out, but add additional columns, rows to accountfor KM Baseline needs, Platform Teams, etc ** use the unallocated/MR/Surge column to account for extra capacity/licenses/resouces (to meet requirements or based on block buys of capabilities...e.g. licence "C" is bought in 1000 user increments and we are only using 600)

Dev Team NameDev Team ADev Team BPlatform Team NamePlatform Team APlatform Team BUnallocatedTotal
Application NameApplication AApplication BPlatform FunctionFunction AFunction BMR/SurgeBy Year
ItemUnit of MeasureYR1YR2YR3YR4YR5YR1YR2YR3YR4YR5YR1YR2YR3YR4YR5YR1YR2YR3YR4YR5YR1YR2YR3YR4YR5YR1YR2YR3YR4YR5
Team SizeFTE6553355555
Cores#3333366666
Storage TBTB1001201401602002022242630
FTE inflation Factor% multiplier11.031.041.041.0411.031.041.041.04