Attch_5__Beale_CSA__Questions_With_Answers_29_July_2018.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- Local Exchange Services for Beale AFB, CA
- Solicitation number
- FA877318Q0002
About this file
Beale AFB CSA Solicitation Q&A
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attch_1_-_Beale_CSA_PWS__V2_5_July_2018.docx | DOCX document | |
| FA8773-18-Q-0002_Amend_0002_Beale_CSA_(signed).pdf | ||
| Attch_2_-_Beale_CSA_-_Pricing_Schedule_-_5_July_2018.xlsx | XLSX spreadsheet | |
| Combined_SynSol_Amend_01_-_Beale_CSA__22_June_2018.doc | DOC document | |
| Attch_5_-_Beale_AFB_CSA_Q-A_Spreadsheet.xlsx | XLSX spreadsheet | |
| FA877318Q0002_Amend_01_22_June_2018.pdf | ||
| Attch_1_-_Beale_CSA_PWS__V1_30_May_2018.docx | DOCX document | |
| Combined_SynSol_-_Beale_CSA__8_June_2018.doc | DOC document | |
| Attch_2_-_Beale_CSA_-_Pricing_Schedule_-_31_May_2018.xlsx | XLSX spreadsheet | |
| Attch_4_-_Beale_CSA_Addendum_to_FAR_52.212-2.docx | DOCX document | |
| Attch_3_-_Beale_CSA_Addendum_to_FAR_52.212-1.docx | DOCX document | |
| Attch_5_-_Beale_CSA_-_Question_Spreadsheet_Template.xlsx | XLSX spreadsheet |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| SOLICITATION: FA8773-18-Q-0002 | |||
| Requirement: Local Telecommunications Services for Beale AFB, CA | |||
| Contractor Name and POC: | |||
| PWS Paragraph, Synopsis/Solicitation, or Attachment Reference | Page Number | Contractor Question | Government Response |
| ADDENDUM TO FAR 52.212-2, EVALUATION FACTORS FOR AWARD, Evaluation Criteria 2.2.2 (Subfactor 2) | 2 | This section calls for a sound approach for supporting local communications services at each base via diagram and descriptive legend. The sample drawings in PWS appendix 1 are stick drawings which provide little detail or information. Moreover, the government is requesting these drawings pre-site survey. Request the government change the RFP requirement such that these documents are due 14 days after award. | The drawings are due with the technical proposal and will be used in the evaluation of technical proposals. The drawings in Appendix 1 were intended as merely generic examples and were never intended to be representative of all potential solutions and are not site specific. Offerors are requested to provide their own drawings specific to the requirements and your proposed solution. A pre-proposal site visit/site survey was offered to all vendors. |
| PWS 4.3 | 9 | This section asks for a cutover and installation plan with the technical proposal. Do all vendors provide an installation plan for diverse transmission paths? | No; as stated in PWS 4.3…"In the event that the award is made to the incumbent contractor, no installation/cutover plans are required and this PWS section shall not apply." Thus, only non-incumbents are to provide cutover and installation plans. The requirement for two transmission paths per PWS 5.11 has been removed. |
| PWS 5.11 | 14 | This section asks for 2 transmission paths between the vendor CO and base demark. This requires a construction bid to complete the pricing effort and can be very time consuming. Does the AF want this pricing to be included in the pricing proposal? Are these future paths to be depicted on the drawings requested in the evaluation criteria? | The requirement for two transmission paths per PWS 5.11 has been removed |
| PWS 5.12 | 15 | This section asks for configuration diagrams to show access to 911. This is also asked for pre-site survey. Are these diagrams also required in the technical proposal? | Yes, diagrams are required in technical proposal; A pre-proposal site visit/site survey was offered to all vendors. |