- Operations and Maintenance of the Base Telecommunications System (BTS) at LAUGHLIN AFB TX
- Solicitation number
- FA8773-10-R-0078
About this file
PWS Laughlin AFB 04 Nov 2010
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Pricing Table 21 Dec 2010.xlsx | XLSX spreadsheet | |
| Amendment 0003.pdf | ||
| PWS Laughlin AFB 08 Dec 2010.docx | DOCX document | |
| FA8773-10-R-0078-0002.pdf | ||
| Questions Answers.doc | DOC document | |
| Preproposal Attendees.pdf | ||
| Pricing Table 10 Dec 2010.xlsx | XLSX spreadsheet | |
| Briefing Charts - Laughlin.ppt | PPT presentation | |
| FA877310R00780001.doc | DOC document | |
| Cover Letter.pdf | ||
| EIPS Final 08 Nov 2010.pdf | ||
| Pricing Table 17 Nov.xlsx | XLSX spreadsheet | |
| Signed CDRL.pdf | ||
| Performance Plan-Aug 2010.pdf | ||
| FA8773-10-R-0078.pdf | ||
| FA877310R00780001.doc | DOC document |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PWS-09-001 – Revised Laughlin AFB TX – 04 NOV 2010
PERFORMANCE BASED WORK STATEMENT (PWS)
FOR
OPERATIONS AND MAINTENANCE SERVICES
BASE TELECOMMUNICATIONS SYSTEM (BTS)
AT
LAUGHLIN AFB, TX
1.0. DESCRIPTION OF SERVICES
1.1. SCOPE OF WORK
1.2. GENERAL REQUIREMENTS
1.2.1. Continuation of Mission Essential Services
1.2.2. Accident/Incident Reporting and Investigation
1.2.3. Sub-Contractor Compliance
1.2.4. Base Civil Engineering Work Clearance Requests
1.2.5. Personnel
1.2.6. Key Personnel Listing
1.3. OPERATE AND MAINTAIN (O&M) REQUIREMENTS
1.3.1. Telephone Switch System O&M
1.3.2 Perform ISP and OSP O&M……………………………………………………………………………………….3
1.3.3 Preventive Maintenance Inspections (PMIs)
1.3.4 System and Service Outages and Trouble Calls/Tickets
1.3.5 Alarm Notification
1.3.6 Cable Location, Staking, and Marking
1.3.7 System Cross-Connect and Disconnect Services
1.3.8 Voice Mail
1.3.9 Traffic Measurement and Analysis
1.3.10 Contractor Support Services
1.3.11 Technical Solutions
1.3.12 BTS Work Center Records
1.4. WORK ORDERS
1.4.1. Work Order Procedures
1.4.2. Work Order Classifications
1.4.3. Work Orders Subject to the Davis Bacon Act
1.4.4. Submittal of Completed Work Orders
1.5. SPECIAL PROJECT REQUIREMENTS
2.0. SERVICE DELIVERY SUMMARY (SDS)
2.1. INSPECTION OF SERVICES
2.2. CONTRACT DISCREPANCY REPORT (CDR)
3.0. GOVERNMENT-FURNISHED PROPERTY AND SERVICES
3.1. AIR FORCE-PROVIDED SPARES\CONTACTOR LOGISTIC SUPPORT
3.2. BASE SUPPORT
3.3. GOVERNMENT SUPPORT FOR CVC EFFORTS
4.0. GENERAL INFORMATION
4.1. CONTRACTOR’S QUALITY CONTROL PROGRAM
PWS-09-001 – Revised Laughlin AFB TX – 04 NOV 2010
4.2. SECURITY
4.3. SAFETY, SECURITY, AND ENVIRONMENTAL MEETING
4.4. OVERTIME
APPENDIX 5.1 - WORKLOAD ESTIMATES
APPENDIX 5.2 - ITEMS TO BE MAINTAINED BY THE CONTRACTOR
APPENDIX 5.3 - GLOSSARY AND ACRONYMS
APPENDIX 5.4 - VOICE SWITCHING SYSTEM (VSS) SUSTAINMENT
APPENDIX 5.5 - RESERVED
APPENDIX 5.6 - APPLICABLE DOCUMENTS
APPENDIX 5.7 - INSTRUCTIONS FOR KEEPING CSIR AS-BUILT RECORDS
APPENDIX 5.8 – GLOBAL POSITIONING SYSTEM SERVICE DOCUMENTS
(PWS) 1
1.0. DESCRIPTION OF SERVICES
1.1. Scope of Work.
The Contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision and other items and services, unless specified in this contract as Government Furnished Property (GFP). Work under this PWS will support the mission of the 47th Communication Squadron (CS) at Laughlin Air Force Base TX by providing highly reliable wired telecommunications and networked voice, video and data services. The Contractor shall perform Operation and Maintenance (O&M) and other services required to ensure the Base Telecommunications System (BTS) is available 24 hours per day, 7 days per week. The BTS consists of the base telephone system switch, the outside plant (OSP) and inside plant (ISP) systems, network, transmission systems, and all associated equipment described in Appendix 5.2, which may include other systems (e.g. radio, etc). The Contractor shall operate and maintain all BTS equipment and systems in accordance with (IAW) the Original Equipment Manufacturers’ (OEM) technical manuals and specifications, Department of Defense (DoD) and US Air Force (AF) policy and regulations, applicable federal, state, and local laws and regulations.
1.2. General Requirements.
1.2.1. Continuation of Mission Essential Services.
IAW DFARS 252.237-7602 policy, it is determined that the O&M services in PWS paragraphs
1.3.2 and 1.3.4 are essential for Contractor performance during a crisis situation. In the event of a crisis, additional areas may be identified by the CO. The Contractor may be required to support base mission changes; major or minor BTS infrastructure modifications; and other support requirements necessary for the BTS to meet mission requirements. Base exercises or actual ongoing base security events frequently interrupt missions. Support requirements may originate from technology changes, hardware and software systems upgrade, reconfigurations, new or additional equipment, local area network (LAN) cable installations and upgrade, and Dial Central Office (DCO) reconfigurations. This includes routing/diversity requirements and any other environmental changes that could impact or alter the base BTS.
1.2.2. Accident/Incident Reporting and Investigation
The Contractor shall record and report all available facts relating to each instance of accidental Government property damage or Contractor personnel injury to the QAP within two hours of the incident. The Contractor shall secure the scene of any accident and wreckage until released by the accident investigative authority through the Contracting Officer (CO). If the Government elects to conduct an investigation of the incident, the Contractor shall cooperate fully with the QAP, CO, and other Government investigation personnel until the investigation is completed.
1.2.3. Sub-Contractor Compliance.
The Contractor shall be responsible for ensuring Sub-Contractors satisfy the requirements set forth in the contract. The Contractor shall include a provision in all subcontracts to require Sub- Contractor compliance with terms and conditions of this contract.
1.2.4. Base Civil Engineering Work Clearance Requests.
The Contractor shall prepare and coordinate a Base Civil Engineering Work Clearance Request, AF Form 103, prior to any trenching, digging, manhole or handhole entry. The Contractor shall prepare and coordinate an AF Form 332, prior to any work requiring facility modification.
(PWS) 2
Trenching, excavation, confined spaces entry, confined spaces atmospheric testing/forced air ventilation, and marking and barricading of open trenches are to be performed IAW Occupational Safety and Health Act (OSHA) standards, AFOSH, any local procedures, and other provisions of this contract.
1.2.5. Personnel.
The Contractor is solely responsible for ensuring sufficient personnel are assigned to this contract and all personnel are qualified to perform the requirements listed herein, including those required by the OEM requirements to maintain, install, or operate the equipment covered by this contract.
The Contractor shall ensure personnel also meet the criterion stated in its proposal for this requirement, (as revised during the discussion process).
1.2.6. Key Personnel Listing.
Contractor shall provide a key personnel listing and contact information to the QAP prior to commencing work and update information on a continual basis as changes occur to ensure it is always current and correct throughout the life of the contract. All personnel shall be proficient in understanding, reading, writing, and speaking the English language. The key personnel list shall list the employees’ names, function they support, and whether they are supporting O&M or work orders, and what percentage of each.
1.2.7. Contractor Notification.
Contractor employees shall identify themselves as contractor personnel by introducing themselves or being introduced as contractor personnel and displaying distinguishing badges or other visible identification for meetings with Government personnel. In addition, contractor personnel shall appropriately identify themselves as contractor employees in telephone conversations and in formal and informal written correspondence.
1.3. Operate and Maintain (O&M) Requirements.
Overall responsibility to properly operate and maintain the BTS shall rest with the Contractor as described by the Maintenance Support Plan (MSP) (See PWS section 1.3.14, BTS Work Center Records) and the OEM’s recommended procedures. Appendix 5.2 identifies GFM requirements.
O&M actions include all actions taken by the Contractor to operate and maintain equipment and systems in a serviceable condition or to restore it to a serviceable condition to include purchasing of commercially available parts, inspection, periodic testing, adjustment, and repair. The effort may include the replacement of defective circuit packs and Customer Premise Equipment (CPE), preventive maintenance IAW applicable publications (OEM, Appendix 5.6, and otherwise specifically listed herein) and other routine work to optimize the life expectancy of the equipment and cable systems. Work orders will be accomplished IAW Section 1.4. The Contractor shall not postpone or otherwise delay O&M efforts to accomplish work orders. The Contractor is responsible for completing both O&M and work orders simultaneously to ensure mission support and contractual timelines are met for both.
1.3.1. Telephone Switch System O&M.
The Contractor shall operate and maintain the system(s) identified in Appendix 5.2. The Government will measure the acceptable standard performance level by a determination of the total systems availability (up time) and reliability rating during any given month. All equipment or services installed by the Contractor shall automatically become part of the O&M services.
This includes management; administration and maintenance; perform software functions (i.e.
(PWS) 3
number reclamation) and translations for any trunk or circuit of configurations required by on-base systems or users; data administration; trouble assistance; and records administration. O&M shall also include Voice over Internet Protocol (VoIP) operations as part of the BTS to include programming of the VoIP phones. VoIP equipment is identified in Appendix 5.2. Demarcation of VoIP maintenance shall not extend beyond the Voice Gateway and Call Servers(s). The O&M contractor shall be responsible for database administration of VOIP phones, software changes to include upgrades/patches, etc. and database administration of the gateway-router to include trunk (PRI)/ analog connections.
1.3.2 Perform ISP and OSP O&M.
Contractor shall maintain ISP and OSP cable and equipment as identified in Appendix 5.2 and IAW applicable documents listed in Appendix 5.6 of this PWS.
1.3.3 Preventive Maintenance Inspections (PMIs).
Contractor shall perform PMIs as required on all systems covered by this contract IAW OEM recommended or established schedules and/or manuals. Contractor shall elevate any problems and identify any trends to the QAP in writing within one workday. Contractor shall correct deficiencies IAW the paragraphs below.
1.3.3.1 Switch Power Test. The Contractor shall perform scheduled PMI tests of the telephone switch backup power system. PMIs shall test and document the power systems identified in Appendix 5.2. Each power system shall be tested IAW OEM specifications. Test results shall be documented IAW PWS section 1.3.9, Work Center Records.
1.3.3.2 Spare Conductor Test. Contractor shall perform a scheduled PMI test of all spare conductors. PMIs shall test and document at least two selected, out-of service pair (one low and one high numbered pair) in each 25-pair group of every cable terminating in the DCO. These PMI tests are to be accomplished quarterly. Test results shall be documented IAW PWS section 1.3.9.
1.3.3.3 Manholes and/or Handholes. The Contractor shall inspect at least two (2) QAP-accepted manholes per month under the O&M portion of this contract. Additional inspections (over two each per month) shall be accomplished as a work order IAW PWS section 1.4. If the Contractor is working in a manhole not scheduled for a PMI in that month, the Contractor must correct any discrepancies before the job is considered complete. This manhole will not be counted in that month’s PMI schedule. The Contractor shall inspect each manhole/handhole for the following discrepancies and correct as required:
All cables will be identified and tagged. At each splice, tags will be placed on each side of the splice identifying each cable. In manholes with pull through cables, each cable will be identified with a tag.
All cables will be racked to the manhole cable supports.
All ducts (vacant or occupied) will be sealed.
All manholes or handholes will be cleaned of mud, water and any other debris.
Update the CVC database - for the manhole or handhole and record all descriptive information for splices, cables, ducts and other communication features in the manhole or handhole to include third party installations (if not already documented).
(PWS) 4
1.3.3.4 Cable Analysis. The Contractor shall review Telecommunication Management System (TMS) records quarterly and perform cable analysis. The Contractor shall determine the number of bad pair(s) in each cable and report the percentage in each cable to QAP. The Contractor shall also determine the cable fill rates and report to QAP. Update CVC as necessary to record accurate cable information.
1.3.4 System and Service Outages and Trouble Calls/Tickets.
1.3.4.1 Contractor Availability. The Government shall be able to contact Contractor personnel 100% of the time. The Contractor shall respond in case of emergencies, outages, alerts and exercises, 24 hours a day, seven days per week. If contacted, the Contractor shall report for duty and provide services as necessary until the emergency, alert, or exercise is completed.
1.3.4.2 Scheduled Outages. Contractor shall identify, coordinate, and schedule service outages with the QAP. The Contractor shall schedule such outages to minimize inconvenience to users based upon Government user work schedules. This may require working outside of normal duty hours. The user must release all affected equipment and circuits prior to any service disruption. The Contractor shall follow established local procedures for scheduling and implementing scheduled outages. Notification shall include the reason for the interruption, start and stop times, duration and the equipment, lines, and buildings affected. The Contractor shall log the outage IAW the guidance in PWS section 1.3.9 (work center records).
1.3.4.3 Restoration/Completion of Outages, Trouble Calls/Tickets. The QAP will assign the category of the outage/trouble and establish the repair priority if an outage occurs. The Contractor shall respond on site and initiate repair actions within the specified time listed below from the time the QAP advises the Contractor of the problem. However, exceptions to time limits may be allowed, with the written approval of the QAP or CO, with appropriate justification. The Contractor shall restore services in the priority order determined by the QAP. The Restoration Priority List (RPL) shall apply only in the absence of the QAP. The Contractor shall continue to work on repair actions until service is restored based on priority. The Contractor shall work closely with the QAP on all service or system outages, trouble calls/tickets and notify the QAP in writing upon restoration of service providing the time service was restored and a description of repair action. The Contractor shall coordinate with base Network Control Center (NCC) to restore any Internet Protocol (IP) phone set outages after contractor completes all trouble shooting at their certification level. The Contractor shall log the outage IAW the guidance in PWS section
1.3.9. Outage/trouble call categories are further defined as:
1.3.4.3.1 Emergency. Contractor shall respond on-site within two hours and restore service within eight hours unless otherwise approved by the QAP in writing. Expedition of parts and/or labor is required at no additional charge. If an outage/trouble significantly affects a mission, the QAP may declare the outage/trouble as an Emergency. Emergency outages/troubles are classified as any of the following:
Loss of over 75% or more of total call handling capability of any communications system Loss of any Primary or Secondary Crash System or any portion thereof Failure of one or more circuits listed in the Base RPL Loss of LAN connectivity affecting 100 or more users
(PWS) 5
Affects security or emergency type operations, including Emergency Operations Center (EOC); as well as those affecting safety
Affect specifically identified events and/or exercises
1.3.4.3.2 Priority. Contractor shall respond on-site within six hours and restore service soon as possible, but shall not exceed three work days. Expedition of parts or labor may be required at no additional charge. Priority outages are classified as:
Loss of over 25% or more of total call handling capability of any communications system;
Major alarm of any switching system identified in Appendix 5.2;
Loss of the Commanders Net or Land Mobile Radio (LMR) telephone/radio circuits;
Total loss of telephone service within a building IAW RPL or QAP guidance;
Loss of LAN connectivity affecting 15-99 users.
1.3.4.3.3 Routine. Contractor shall respond on-site within 24 hours and restore service as soon as practicable but not to exceed five (5) work days. Expedition of parts and/or labor is not required. Routine outages/troubles are any other outage(s) not included in the above categories.
1.3.4.3.4 Outage/Trouble Cause Identification. The Contractor shall determine if a recorded problem or system failure is attributable to the BTS or other causes. The Contractor shall immediately notify the QAP if the malfunction is determined to be due to other causes (outside the Contractor-maintained system/equipment). The Contractor may be liable for the cost of any third party service calls or charges necessary to isolate and repair the problem if it is later determined that the cause of failure is related to the BTS or failure of proper O&M of the system.
1.3.5 Alarm Notification.
Contractor shall comply with the details of its Alarm Notification method as documented in the Contractor’s MSP and its proposal. Alarm Notification shall not interfere with any Government owned system. Alarm Notification of the switch system(s) shall not require assistance from base personnel. Notification of switch outages shall not be through a continuous direct line to the switching system for security reasons. Remote maintenance via modem connection shall be performed in accordance with AFI 33-111, Section G. Contractor is responsible for all materials and equipment necessary to implement alarm Notification and shall take all actions to implement the MSP and comply with telephone switching security standards IAW Air Force Instruction (AFI) 33-111, Section G.
1.3.6 Cable Location, Staking, and Marking.
The Contractor shall locate, stake, and mark up to 41,000 feet of encased or direct buried conduits/cable per base period and each option period (if exercised) when requested by the QAP.
Marking shall be within three feet of the actual location at ten-foot intervals and at direction changes. The marking shall begin two feet from the point of entry into the work area and shall continue two feet past the point of exit from the work area. Contractor shall complete location, staking and marking within the specified time listed below from the time the QAP advises the Contractor of the requirement unless additional time is permitted by the QAP. The Contractor shall document time extensions in writing, which includes the signatures of the QAP and the BTS manager. Communication Feature Data (CFD) collection shall be accomplished via work order. See EIPS and Contract Line Item Number (CLIN) X008 when directed to collect CFD
(PWS) 6
data by the QAP. The Contractor shall comply with the following timelines for location, staking, and marking:
Emergency: Within two hours of notification.
Priority: Within twenty-four (24) hours of notification.
Routine: Within three business days of notification.
1.3.7 System Cross-Connect and Disconnect Services.
Contractor shall perform system cross-connect and disconnect services. All cross-connects and disconnects, which are required or incidental to the performance of O&M actions (including those outside of the DCO), shall be included as part of the O&M service.
1.3.8 Voice Mail.
The Contractor shall provide voice mail O&M. This includes but is not limited to: management and administration of system network table and networking plan for multiple systems; additions;
deletions; modifications to user’s mailbox; password resets; distribution list; holiday schedule tables; daylight savings time synchronization with the phone switch; and proper functioning of the auto attendant feature. Functions also include diagnostic, maintenance and minor programming changes on current software applications. System backup includes backup of system configuration, names, and print “list all” of database.
1.3.9 Traffic Measurement and Analysis.
The Contractor shall perform traffic measurement and analysis within system capabilities and limitations and perform analysis and studies on the base switching system on a biannual basis.
The information required by the contract must cover no less than a five-day period, (Monday- Friday, excluding holidays). See PWS section 1.3.9.15 for report requirements.
1.3.10 Contractor Support Services.
The below actions shall not violate FAR 9.505, Organizational Conflict of Interest.
1.3.10.1 Contractor Support for Government Engineering and Installation. The Contractor shall provide technical support to include an interchange of information on technical parameters and capabilities of the BTS; location and identification of building terminals and communication rooms; and verification of cable record information as directed by the QAP or CO. These efforts include setting of equipment options to determine proper operational conditions; restoration of service to existing equipment; establishment of service to new facilities; establishment of service for existing facilities under renovation; transfer from one system to another system; and support of hardware and software upgrades.
1.3.10.2 Contractor Interface and Support for other Vendors. The Contractor shall cooperate, share and exchange routine or available technical and system equipment interface information with other vendors as directed by the QAP or CO.
1.3.10.3 Workload/Status Meetings. The BTS Manager shall attend up to four local meetings per month with the QAP(s), Communications Squadron Plans Office, and/or CO to discuss status of current and future work orders, trouble tickets, outages, PMIs, or any other work/event that may impact contractual performance. The Contractor shall provide a list of work orders, trouble
(PWS) 7
tickets, etc at the meeting for reconciliation and discussion with the QAP(s), Contracting Officer, or other personnel (approved by the QAPs or CO).
1.3.10.4. Design Review Meetings. The Contractor shall review program or project drawings and provide comments concerning communications requirements within ten working days from receipt when requested by the QAP. The Contractor shall participate in designated design review meetings identified by the QAP. The BTS manager shall attend up to four design review meetings per month.
1.3.11 Technical Solutions.
Contractor shall perform detailed technical solutions for work intended to be performed under this contract upon receipt of a written request from the QAP. The technical solution includes a listing of those efforts/items required to complete the job and shall be provided to the QAP using the work order format specified in PWS Section 1.4. The Contractor shall provide the proposed solution to the QAP within five working days from receipt of requirement unless a longer period is agreed to by the QAP and documented on the requirement.
1.3.12 BTS Work Center Records.
Contractor shall establish and maintain BTS work center records. The Contractor shall update work center records within two duty days after completion of the associated task(s) unless specified differently within this section. All BTS records and documents established and maintained by the Contractor are Government property and shall remain at the site and turned over to the QAP for disposition upon contract completion. Failure to do so may result in withholding of final payment until all records are recovered or in a reduction in final payment for records lost or misplaced. The Government requires electronic maintenance and storage of records unless otherwise specified herein. The Contractor shall identify all acronyms, codes, abbreviations, signs and symbols used in each record. The Contractor shall use the same format for initial and all subsequent submissions of the same record unless otherwise approved by the CO. All records shall be readily available for review by the QAP, CO and other personnel (authorized in writing by the CO). The Contractor shall update all errors found or identified during review of the work center records. Contractor shall develop, update and/or maintain accurate, complete, and readable work center records as listed below:
1.3.12.1 Maintenance Support Plan (MSP).
The MSP shall enable the scheduling and tracking of preventive maintenance actions on Contractor-maintained equipment. This record shall be available within 30 calendar days after period of performance begins. When changes occur that affect the plan, revisions shall be submitted within 10 work days after the effective change (e.g. modification adding equipment) unless otherwise requested by the CO (e.g. with the proposal to add new equipment to maintenance). The Government will review and approve the revisions, or provide the Contractor with required corrections. Changes may be implemented only after CO approval. The MSP shall contain as a minimum: a schedule of PMIs due on each piece of equipment being maintained (Appendix 5.2) for the life of the contract IAW equipment manufacturer’s recommendations;
alarm notification procedures; and specific maintenance tasks to be performed on each system.
1.3.12.2 PMI Inspection and Malfunction Records.
PMI Inspection records shall, at a minimum, contain: the date and time inspection was performed; a short description of inspection conducted; malfunctions or problems annotated on
(PWS) 8
record with equipment data, serial number, etc.; the corrective action taken by the Contractor and the initials of the technician performing the inspection.
1.3.12.3 Maintenance/Repair Logs (e.g. maintenance actions, trouble tickets).
Contractor shall establish and maintain an accurate and legible BTS Maintenance/Repair Log to show all maintenance and inspections (other than PMIs) performed during each 24-hour period as a result of trouble report actions or scheduled/unscheduled outages. The log shall be initialed by the BTS Manager and shall include, as a minimum, initials of the person reporting a discrepancy;
time a discrepancy was reported (start time); short description of the discrepancy; identification of the customer/user by station line affected (telephone number or circuit number); location of equipment (building and room number, etc); time a technician(s) was dispatched; dates/times of coordination and restoration; time discrepancy was corrected (stop time) and annotation of log with the person or office contacted to provide status information; corrective action(s) taken; and restoration priority (emergency, priority, or routine outage(s)). For scheduled outages, also include the Government authorization.
1.3.12.4 Manhole, Handhole, and Building Terminal Inspection/Maintenance/Repair.
The Contractor shall maintain manhole, handhole, distribution pedestal terminal, and building terminal inspection records as defined in PWS paragraphs 1.3.3.3 and paragraphs 3.16.1 and
3.16.2 of the Equipment and Installation Performance Specification (EIPS). The Contractor shall update the CVC database with pertinent CFD information gathered during the inspections. The record shall be available for inspection and analysis by the Government. If other electronic documentation is implemented, the Contractor shall grant the Government access to those records.
1.3.12.5 Cable Installation/Repair Test Results.
Contractor shall develop and maintain a cable installation/repair test results record after the installation or repair of an outside plant cable. Graphics and pictorials may be used to illustrate.
The results shall, at a minimum, contain the purpose of test/inspection; complete identification of item tested/inspected and test equipment used; complete description of the physical set-up (e.g., item, facility, and equipment used); complete description of procedures used; copy of results/analysis; actual recorded data (e.g., instrument readings) (if extensive, provide as an appendix); conclusions and recommendations; and authentication of results and acceptability.
The Contractor shall update the CVC database with pertinent CFD information resulting from installation or repair.
1.3.12.6 Communications and Information Systems Installation Record (CSIR).
1.3.12.6.1 New Developments for Maintaining CSIR Drawing Records: The Air Force is in the process of developing and implementing the Cyberspace Infrastructure Planning System (CIPS) Visualization Component (CVC). It changes the method of developing, maintaining, and editing information historically contained in installation drawings (CSIRs) from a Computer Aided Drawing and Design (CADD) process to a Geographic Information Systems (GIS) process that interfaces with the Geobase initiative and provides an Air Force portal accessible, enterprise-wide database structure suitable for storing, visualizing, editing, and analyzing base-level communications and information systems infrastructure. At this time, CVC is not designed to store inside plant information. Until such time as the CVC has standard provisions for recording inside plant information, inside plant record drawings shall be maintained in Base’s existing
(PWS) 9
drawing record systems or as directed by the CSIR Manager. The Contractor shall coordinate with the Base CSIR Manager, and develop and maintain CSIR IAW AFI 33-101, and TO 00-33A-1001, and TO 00-33D-3003.
1.3.12.6.2 Contractor shall produce, update, and post changes to drawings, plant records or documents using Government provided forms, software and web browser applications.
Contractor shall load, edit, update and maintain CSIR information, for the outside plant, in the CVC database IAW AFI33-101 and TO 00-33A-1001. Contractor shall transfer to the CVC database all pertinent outside plant CFD information from administrative and maintenance CSIR, Legacy CSIRs, work orders, inspection results, as-built and as-installed marked-up drawings. The Contractor shall update the CVC database with outside plant information from as-built drawings or other pertinent documents or electronic data pertaining to work done by third parties (organic or Contractor) when tasked through the work order process. A separate pre-priced Sub-Contract Line Item Number (SLIN)/Product Identification (PID) shall be use for conversion of third party as-built drawings, document, or electronic data information. Contractor is responsible for verifying Contractor entered information, accuracy and completeness. Contractor will use the CVC Viewer/Editor to update the CVC by opening and utilizing Live Direct Edit Sessions.
During the edit session the contractor will update CVC with as-built information or with information transcribed from shape files created or produced in accordance with Appendix 5.8.
When the update is completed, the contractor will close the session and notify the CISR Manager the session edit is ready to be approved. The CSIR Manager will review the Contractor’s edit session and Quality Control (QC) approve or reject each Contractor’s Live Direct Session Edit by inspecting each feature added or modified during the lived direct edit session. The CSIR Manager will notify the Contractor of each feature that was rejected during the quality control approval process in order for the Contractor to take corrective action.
1.3.12.6.3 Inside Plant Drawing Records: The contractor shall maintain Inside Plant Drawing records in Micro station, AutoCAD, or VISIO format. Contractor shall transfer to inside plant drawing records all pertinent inside plant information from administrative and maintenance CSIR, Legacy CSIRs, work orders, inspection results, as-built and as-installed marked-up drawings or other information produced as a result of the Contractor’s operations. The Contractor shall also develop and maintain correct, manually annotated paper copies of changes to the inside plant in addition to the electronic drawing files. Once the CSIR Manager or QAP has verified that the Contractor has properly updated the electronic drawing with the annotated changes, the paper copy may be destroyed. Color plots of electronic files are acceptable providing they display the same information as a manually marked up drawing. The Contractor shall update Legacy CSIR drawing records with inside plant information from as-built drawings or other pertinent documents or electronic data pertaining to work done by third parties (organic or Contractor) when tasked through the work order process. The work order process shall also be used for conversion of third party as-built drawings, document, or electronic data information. The Contractor shall not produce new electronic files unless no file exists. In cases when no electronic file exists, the Contractor shall produce a new drawing for ISP permanent drawing records. The Contractor shall also update any associated drawings to incorporate any changes/additions made to a drawing record; for example, if a floor plan has changes, the changes shall also be posted to the equipment data list/face equipment diagram, as applicable.
(PWS) 10
1.3.12.6.4 Contractor must have a CIPS account in order to use CVC. Contractor may apply for a new account by visiting the CIP website at https://cipsaf.tinker.af.mil/cips, selecting Create New Account, and providing the required information.
1.3.12.7 Global Positioning System (GPS) Service Data.
Contractor shall collect, update and maintain the CFD and use the data to update the location and attributes of communication features in the CVC database in accordance with 1.3.9.6 and Appendix 5.8 (for any GPS requirement).
1.3.12.8 Switching System and Inside & OSP Equipment Operational Records.
Contractor shall retain all records on site and make available for QAP or CO/CA review at any time.
1.3.12.9 CLIN/PID Utilization Listing.
The Contractor shall produce and maintain an electronic record of the CLINs/SLINs/PIDs, ordered under the contract. The record shall include: the CLIN, SLIN, or PID number;
descriptions; and quantities of each item. The record shall exclude price information. Contractor shall update this record within two days of work order completion.
1.3.12.10 Air Force (AF) Logistics Support Spares Records (Inventory).
Contractor shall maintain and update the AF Logistics Spares records in the on-site work center.
The QAP will provide the initial inventory to the Contractor for maintenance. Records include spares inventory list and spares replacement log. Spares inventory list shall include, as a minimum, Product Engineering Code (PEC), serial number, description, quantity, and vendor.
Spares replacement log shall include, as a minimum, name of calling and called personnel, time, requesting description, Material Return Authorization (MRA) number, equipment item’s PEC and serial number, shipping date, and material return date.
1.3.12.11 Contractor-Furnished Hazardous Material.
Contractor shall develop this record to document bringing or using hazardous material on Government facilities. Contractor shall develop this record not later than 30 calendar days after contract award and develop and maintain electronic updates to records quarterly thereafter. If no hazardous material is used in performance of the contract during the quarterly period, the Contractor shall indicate “none” on the applicable quarterly record. The report shall consist of the following:
Section 1, General Information.
This section shall contain: Contract number; contract performance period; Contractor’s name; date of record; name and phone number of on-base Contractor point of contact;
emergency phone number; and address or physical location of the Contractor’s on-base field office.
Section 2, Product Information.
This section shall contain: product nomenclature; product trade name; product part number;
manufacturer’s name and address; physical location(s) of on-base usage and storage;
description of how product is used; justification for use.
https://cipsaf.tinker.af.mil/cips/mycips.aspx�
(PWS) 11
Section 3, Usage/Storage Amount.
This section shall contain: unit of measure (e.g., gallons, quarts, pints, fluid ounces, pounds, other (specify); amount brought on installation; amount used during reporting period;
amount stored; amount removed; and signature of responsible Contractor.
1.3.12.12 Equipment Inventory Records (PWS Appendix 5.2).
The Contractor shall maintain a working copy of Appendix 5.2. Appendix 5.2 shall identify equipment installed, changed, or removed via contract modification or the work order process identified in PWS section 1.4. The record shall include all assemblies of the equipment configuration, which would be logically disassembled from the total configuration for the purpose of packing and shipping. The Contractor shall update the record when individual work orders are completed using the “track changes” feature in MS Word® software.
1.3.12.13 Telecommunications Management System (TMS). The Contractor shall perform daily record updates using the TMS employed at the base. Some updates may require the Contractor to manually enter the data upon completion of individual work orders or record changes. Contractor shall also maintain cable pair assignment records using TMS.
1.3.12.14 Work Order Records, Including Warranty Records.
Contractor shall develop and maintain work order records. The Contractor shall update work center records within two duty days after completion of the task(s) specified on individual work orders and notify QAP in writing. All physical records of work orders shall be retained and be available locally (on-base). Electronic storage of completed (accepted by the QAP) is acceptable and preferred. Paper copies of completed work orders may be destroyed by using a cross cut shredder to prevent unauthorized disclosure after electronic storage is complete.
1.3.12.15 Traffic Measurement Records
The switch-generated record shall be used to satisfy this requirement as needed. The record shall contain an analysis of the traffic measurements including a trunk traffic summary and individual analysis of each trunk group. Printed record shall be available for the QAP on an as needed basis, not more than quarterly. The Government may also request measurement and analysis records for a particular line or group of lines. This selective record shall be maintained on site and made available to the QAP within two work days from occurrence of the Traffic Measurement analysis.
1.3.12.16 System Capacity Records.
Contractor shall produce system capacity records quarterly and upon request by the QAP.
Semi-annual system capacity records include outside plant cables and building records.
Records shall include each cable and terminated cable count, type of cable (bad and spare), and number of conductors used. Quarterly system capacity records shall be produced for the host switch and remotes. The records shall include total line ports, line ports in use, line port type (analog/digital/ISDN/etc.) total used, and DS-1 digital trunk ports (total ports used and available).
1.3.12.17 System Security Audit Record.
Contractor shall develop and maintain an electronic weekly user event log that contains, at a minimum: the number of logins (remote and local); number of login attempts (remote and local);
(PWS) 12
password changes; and/or any critical table modifications including new user accounts as allowed by the switch.
1.3.12.18 Quality Control Plan (QCP).
Contractor shall develop and maintain a highly effective QCP for all services provided under this PWS within 30 calendar days of contract award. The QCP shall remain in effect during the term of the contract (including any option periods if exercised). The Contractor shall: maintain the QCP; retain a copy on site; and ensure availability at all times to all members of their on-site staff, as well as the QAP and CA. The Contractor’s QCP shall reflect depot-level Contractor logistic support, centralized maintenance and Alarm Notification from the I-NOSC and refrain from relying on Government QAPs as a means to ensure their own quality control. The Contractor shall notify the parties specified in this paragraph of any changes to the QCP at least ten work days prior to implementation of those changes.
(Remainder of page intentionally left blank)
(PWS) 13
1.4. Work Orders.
The Contractor shall comply with the following requirements. Examples of work orders include, but are not limited to, equipment purchases, installations, removals, or relocations. Additionally, work orders may include installation or removal of cables/transmission media as required for new requirements, and follow-on O&M of these equipment items/media. The QAP will be notified of any installation found to be incomplete or not installed according to industry standards. The Contractor shall maintain the installed infrastructure and will not be held responsible for completing third party installations or bringing third party installations up to industry standard unless directed by issuance of a work order or contract modification. The EIPS provides detailed descriptions of the material and labor effort (e.g. material, labor, and incidentals for installation, removal, and/or relocation) required by the attached Pricing Table and identified by PIDs. When an item required to complete a work order is not pre-priced within the Pricing Table (Attachment 1), the Government may negotiate the addition of these items, negotiate a special project (PWS Section 1.5), or opt to use another vehicle to accomplish the task.
1.4.1. Work Order Procedures.
1.4.1.1. Work orders for pre-priced items shall be prepared by the contractor and/or QAP that have a signature limit established by CO. The work orders prepared by the Contractor shall be submitted to the QAP for review before submission to CO for final approval and work starts. All work orders shall be prepared via TMS, on DD Form 1367, Commercial Communications Work Order form. Work order numbers shall be established by the QAP. If necessary, the Contractor shall walk-through the proposed work site to ensure understanding of the work to be performed, which is not the same as a technical solution, (See FAR 52.236-2, Site Investigation). The Contractor may be accompanied by Government personnel. See also item descriptions within the schedule of the basic contract.
1.4.1.2. All work orders issued hereunder are subject to the terms and conditions of the contract.
In the event of conflict with any work order, the contract will take precedence. The Contractor shall refer any questions, concerns, or disputes concerning work orders to the QAP in writing within 24 hours (two hours for emergencies) of receipt of the work order. In the case of misunderstanding or concern, the Contractor does not have the right to reject work orders. Should questions, concerns, or disputes occur, the Contractor shall continue work while elevating to the CO in writing for direction/resolution.
1.4.1.3. Work orders will be accomplished during normal duty hours; however, occasions may arise that require work to be accomplished outside of these hours. The Contractor shall be responsible for covering such situations with adequate personnel and completing the work within the stipulated time. Premium pay per appropriate labor law is included within the pre-priced items for work orders (see also PWS paragraph 4.4).
1.4.2. Work Order Classifications.
The QAP will classify work orders as routine, priority, or emergency. The QAP is authorized to reclassify/reprioritize work orders without cost before work commences. The Contractor shall comply with the time limits listed below from the time of receipt of the work order. However, exceptions to time limits may be allowed, with the written approval of the QAP or CO and appropriate justification. Failure to obtain materials due to supplier delay is not considered an
(PWS) 14
adequate reason for an extension. All cable cut repairs shall be classified as emergency unless determined otherwise by the QAP.
Routine. Complete within ten duty days
Priority. Complete within three duty days
Emergency. Respond within two hours and complete work as soon as possible upon approval. The QAP may provide initial notification to the Contractor verbally, with a written request follow-up within two hours. The Contractor will keep the QAP apprised of emergency work order status.
1.4.2.1. Required Information on Work Orders.
Work orders placed under the contract will contain the following information as a minimum:
Date of preparation.
Contract number, Task Order number, and work order number.
CLIN/SLIN/PID, description, quantity ordered, building number, room number, and contract unit and extended prices and total Not To Exceed (NTE) price.
The work order priority and established completion time.
Statement “Davis Bacon Act Applies…___Y or ___N ____(Contractor Initials)” Changes to work orders, as permitted by the terms within this PWS, shall reflect mutual agreement by attaching supporting documentation; signatures of the QAP and Contractor;
and dates of signatures.
When complete, a stamp or other text block indicating customer acceptance, contractor initials and dates of completion for work and applicable work center records.
Any other pertinent information required to properly document work performed.
Include the statement “Invoice Work Order Against Funding SLIN _____” prior to work order approval (do not use “x” placeholders, e.g. x011AA on work orders)
1.4.3. Work Orders Subject to the Davis Bacon Act.
The Contractor shall identify work orders where the DBA applies on the face of the work order and obtain approval from the CO before work begins. Work orders using CLINs x005-007 and x009 may be subject to DBA dependent upon work effort to be performed. A copy of all DBA work orders shall be forwarded to the CO/CA for changes and also when completed.
1.4.4. Submittal of Completed Work Orders.
The Contractor shall provide copies of all completed work orders issued under this contract to the QAP by dropping them into a designated location within two duty days of completion.
Completed work orders shall have the date of completion of the work, the completion date of applicable deliverables, customer and contractor initials. Work orders will remain open until all records have been updated.
1.5. Special Project Requirements.
Special projects are Firm Fixed Price (FFP) negotiated requirements. The CO will request a proposal from the Contractor for special projects. The Government may negotiate a special project into the contract when an effort is needed that is not covered by current line items on the contract. These are one-time efforts that are within the scope of the contract. Special projects
(PWS) 15
will not cumulatively total more than 25% of the total price of CLINs X004-X008 for the Base Period and all Option Periods as calculated at time of award. Proposals shall be submitted on DD Form 1367, Commercial Communications Work Order or equivalent format and include the information below, as a minimum.
1.5.1. Contractor shall submit detailed proposals for work intended to be performed under special projects as requested by the CO at no additional price. Contractor shall provide its proposal to the CA/CO within five work days. The Contractor’s proposal shall provide adequate detail of efforts/items required to complete the job, including but not limited to item description, quantity, unit of issue and extended prices.
1.5.2. Contractor’s proposal shall include all direct and indirect expenses and profit within the price of the items specified. Contractor’s proposal shall be priced for inspection/acceptance at final destination.
1.5.3. Contractor’s proposal shall identify existing CLINs/PIDs, proposed for use on the special project.
(The remainder of this page intentionally left blank.)
(PWS) 16
2.0. SERVICE DELIVERY SUMMARY (SDS).
Performance Objective
PWS
Reference
Performance Threshold (Monthly unless otherwise specified)
Provide sufficient and qualified personnel to perform the requirements
1.2.5 No more than one instance of insufficient or
unqualified personnel
Operate and maintain minimum switching system(s)
1.3. / 1.3.1 / 1.3.2
Downtime shall not exceed 1 instance
Perform PMI Switch Power Tests 1.3.3.1 No more than one instance of failure to test IAW OEM specifications or document results
Perform PMI tests of spare conductors
1.3.3.2
No more than one instance of failure to test & document IAW PWS each quarter
Perform PMI of Manholes and Handholes
1.3.3.3 No more than one instance of failure to
perform PMIs IAW PWS
Perform PMI Cable Analysis 1.3.3.4 No more than one instance of failure to perform PMIs IAW PWS
Respond to and restore all system and service outages within the required time constraints specified in the PWS
1.3.4.3
Emergency – Zero instances exceeding response/restoration times
Priority – One instance exceeding response/restoration times
Routine – One instance exceeding response/restoration times
Provide location, staking, and marking services
1.3.6
Emergency – Zero instances exceeding completion time
Routine – One instance exceeding completion time
Accurately record CFD in the CVC database within time lines.
1.3.12.7 No more that 2 instances of exceeding 2 duty
days to record CFD in the CVC.
No more than one instance of not accurately recording communication features.
Provide contractor support services IAW the PWS
1.3.10
No more than one instance of failure to provide support/interface
No more than one unexcused meeting absence
Technical Solutions IAW PWS
1.3.11
No more than one instance of failure to provide an implementable technical solution within specified time frame.
(PWS) 17
Update work center records after completion of new task/work orders
1.3.12
No more than two instances exceeding timeframe specified within PWS.
No more than one work-center records update error.
Comply with established procedures for completion of work orders
1.4.2
Emergency –…