Attachment 3 - RTWC250418 DRAWINGS.pdf
PDF 3 MB Posted
- Attached to
- Maintain Lindsey Road, Irish Hill Test Site
- Solicitation number
- FA875125B0006
About this file
This document is a civil engineering project plan for the U.S. Air Force Research Laboratory, Information Directorate, located in Rome, NY. The project involves maintaining Lindsey Road at the Irish Hill Test Site (Project No: RTWC250418), with specific roadway repair and improvement work. The scope includes cold mill asphalt repairs, pavement joint sealing, and roadway surface restoration on approximately a 20' x 20' damaged section of road. The project details include technical specifications for asphalt overlay, tack coat application, joint sealing, and guardrail installation, with all materials to conform to the latest New York State Department of Transportation specifications. The project is managed by P. Fitzgerald and is scheduled for completion by 06/30/2025, with work focusing on addressing pavement damage, ensuring proper drainage, and maintaining the roadway infrastructure at the research site.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D
ES
C
R
IP
TI
O
N O
F R
EV
IS
IO
N
M M
/D D
/Y Y
ROME RESEARCH SITE
U .S
.A
IR
F O
R C
E R
ES
EA
R C
H L
AB
O
R
AT
O R
Y
IN
FO
R
M
AT
IO
N
D
IR
EC
TO
R
AT
E, IN
TE
G
R
AT
IO
N
A N
D O
PE
R
AT
IO
N S
C
IV
IL
E
N G
IN
EE
R
IN
G , P
R O
G R
AM
M
IN
G
E
N G
IN
EE
R
IN
G
E
LE
C
TR
O N
IC
P
AR
KW
AY
, R
O M
E, N
Y
SHEET SIZE: 24" x 36"
PR
O
JE
C
T M
AN
AG
ER
D
ES
IG
N
ED
B
Y
D R
AF
TE
D B
Y
C H
EC
KE
D B
Y
D
AT
E
PU
BL
IS
H
ED
M
AR
K D
ES
C
R
IP
TI
O
N O
F R
EV
IS
IO
N
D
AT
E
AIR FORCE RESEARCH LABORATORY
INFORMATION DIRECTORATE, ROME, NY
MAINTAIN LINDSEY RD ROADWAY, IRISH HILL TEST SITE
Project No: RTWC250418
LINDSAY ROAD
POLAND, NY 13431
N
DRAWING NO.
G-001 COVER
CIVIL DRAWINGS
C-001 PROJECT NOTES AND LEGEND
C-100 PAVEMNT REPAIRS
C-500 DETAILS
DRAWING LIST
WORK AREA
G-001
P.
F
IT
ZG
ER
AL
D
R
TW
C
M
AI
N
TA
IN
L
IN
D
SE
Y
R O
AD
R
O
AD
W
AY
, I R
IS
H
H
IL
L
TE
ST
S
IT
E
C O
VE
R
S H
EE
T
P.
F
IT
ZG
ER
AL
D
P.
F
IT
ZG
ER
AL
D
/3
0/
LEGEND
-COLDMILL ASPHALT REPAIRS
-ROADWAY, EDGE OF PAVEMENT
-ROADWAY, CENTERLINE
-EXISTING CATCH BASIN
-GRUB DITCH STARTING POINT
(CONTINUE UP THE HILL UNTIL YOU REACH
THE SITE ENTRY GATE)
-EXISTING BOX BEAM BARRIER RAIL
-EXISTING UNDERGROUND COMM.UT UT
D
ES
C
R
IP
TI
O
N O
F R
EV
IS
IO
N
M M
/D D
/Y Y
ROME RESEARCH SITE
U .S
.A
IR
F O
R C
E R
ES
EA
R C
H L
AB
O
R
AT
O R
Y
IN
FO
R
M
AT
IO
N
D
IR
EC
TO
R
AT
E, IN
TE
G
R
AT
IO
N
A N
D O
PE
R
AT
IO
N S
C
IV
IL
E
N G
IN
EE
R
IN
G , P
R O
G R
AM
M
IN
G
E
N G
IN
EE
R
IN
G
E
LE
C
TR
O N
IC
P
AR
KW
AY
, R
O M
E, N
Y
SHEET SIZE: 24" x 36"
PR
O
JE
C
T M
AN
AG
ER
D
ES
IG
N
ED
B
Y
D R
AF
TE
D B
Y
C H
EC
KE
D B
Y
D
AT
E
PU
BL
IS
H
ED
M
AR
K D
ES
C
R
IP
TI
O
N O
F R
EV
IS
IO
N
D
AT
E
N
GENERAL NOTES PAVING NOTES
AN AIR FORCE FORM 103, BASE CIVIL ENGINEERING WORK CLEARANCE, MUST BE
COMPLETED FOR THIS PROJECT. CONTRACTOR TO VERIFY THE EXISTENCE OF
UNDERGROUND UTILITIES IN THE AREA PRIOR TO COMMENCING EXCAVATION.
CONTRACTOR TO CLEAR PAVEMENT OF ANY LOSE DEBRIS PRIOR TO BEGINNING
ANY ROAD WORK, SWEEP ENTIRE PAVEMENT SURFACE AREA WITH MECHANICAL
SWEEPER TO REMOVE ALL DEBRIS.
PROVIDE POSITIVE DRAINAGE IN ALL AREAS. WATER SHALL BE USED TO CHECK
FOR BIRD BATH CONDITIONS. ANY BIRD BATH LOCATIONS SHALL BE CUT OUT AND
REGRADED TO DRAIN.
APPLY ASPHALTIC TACK COAT, NYSDOT ITEM 407.0103 OVER THE ENTIRE BINDER
COURSE AT AN APPLICATION RATE OF A MINIMUM 0.05 GALLONS PER SQUARE
YARD. THE BINDER COURSE SURFACE SHALL BE CLEAN AND DUST FREE PRIOR TO
PLACEMENT OF THE TACK COAT AND THE TACK COAT SHOULD BE APPLIED
IMMEDIATELY BEFORE THE PLACEMENT OF THE TOP COURSE.
INSTALL 2" ASPHALT TOP COURSE, NYSDOT ITEM 402.127303 IN A SINGLE LIFT.
COMPACTION SHALL BE SPECIFIED IN TABLE 402-6 OF SECTION 402 OF THE NYSDOT
STANDARD SPECIFICATION UTILIZING THE 80 SERIES COMPACTION METHOD.
CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL SITE CONDITIONS
ALL WORK PERFORMED ON THIS PROJECT SHALL CONFORM TO THE LATEST EDITIONS
AND ALL APPLICABLE SECTIONS OF THE UNIFIED FACILITIES CRITERIA (UFC) STANDARD
SPECIFICATIONS FOR UTILITIES, NYSDOT STANDARD SPECIFICATIONS FOR ROAD
CONSTRUCTION, AND ALL APPLICABLE REQUIREMENTS AND STANDARDS FOR UNITED
STATES AIR FORCE RESEARCH LABORATORY (AFRL) ROME, NEW YORK.
PRIOR TO COMMENCEMENT OF CONSTRUCTION, THE CONTRACTOR SHALL VERIFY ALL
DIMENSIONS, AND CONDITIONS AFFECTING THEIR WORK WITH THE ACTUAL CONDITIONS
AT THE JOB SITE. IN ADDITION, THE CONTRACTOR SHALL VERIFY THE ENGINEER'S LINES
AND GRADES. IF THERE ARE ANY DISCREPANCIES FROM WHAT IS SHOWN ON THE
CONSTRUCTION PLANS, STANDARD SPECIFICATIONS AND/OR SPECIAL DETAILS, THE
CONTRACTOR SHALL SECURE WRITTEN INSTRUCTION FROM THE CONTRACTING
OFFICERS REPRESENTATIVE (COR) PRIOR TO PROCEEDING WITH ANY PART OF THE WORK
AFFECTED BY THE DISCREPANCIES. FAILING TO SECURE SUCH INSTRUCTION, THE
CONTRACTOR WILL BE CONSIDERED TO HAVE PROCEEDED AT HIS OWN RISK AND
EXPENSE. IN THE EVENT OF ANY DOUBT OR QUESTION ARISING WITH RESPECT TO THE
TRUE MEANING OF THE CONSTRUCTION PLANS OR SPECIFICATIONS, THE DECISION OF
THE COR SHALL BE FINAL AND CONCLUSIVE.
EXISTING UTILITIES ARE SHOWN ON THE PLANS ACCORDING TO AVAILABLE RECORDS.
SUCH INFORMATION REPRESENTS ONLY THE OPINION OF THE ENGINEER AS TO THE
LOCATION OF SUCH UTILITIES AND IS ONLY INCLUDED FOR THE CONVENIENCE OF THE
CONTRACTOR. THE ENGINEER AND OWNER ASSUME NO RESPONSIBILITY WHATSOEVER IN
RESPECT TO THE SUFFICIENCY OR ACCURACY OF THE INFORMATION SHOWN ON THE
PLANS RELATIVE TO THE LOCATION OF THE UNDERGROUND UTILITY FACILITIES OR THE
MANNER IN WHICH THEY ARE REMOVED OR ADJUSTED. IT SHALL BE THE CONTRACTOR'S
RESPONSIBILITY TO DETERMINE THE ACTUAL LOCATION OF ALL SUCH FACILITIES AND
THEIR PROTECTION FROM DAMAGE DUE TO CONSTRUCTION OPERATIONS. IF EXISTING
UTILITY LINES OF ANY NATURE ARE ENCOUNTERED WHICH CONFLICT WITH NEW
CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY THE COR SO THAT THE CONFLICT MAY
BE RESOLVED. HE SHALL ALSO OBTAIN FROM THE RESPECTIVE UTILITY COMPANIES
DETAILED INFORMATION RELATIVE TO THE LOCATION OF THEIR FACILITIES AND THE
WORKING SCHEDULES OF THE UTILITY COMPANIES FOR REMOVING OR ADJUSTING THEM.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE INSTALLATION AND MAINTENANCE
OF SIGNS, TRAFFIC CONTROL DEVICES, AND WARNING DEVICES TO INFORM AND PROTECT
THE PUBLIC DURING ALL PHASES OF CONSTRUCTION.
THE CONTRACTOR SHALL REMOVE FROM THE SITE AND DISPOSE OF IN A LEGAL MANNER,
ANY ENVIRONMENTALLY NON-HAZARDOUS SPOILS AND/OR DEBRIS WHICH RESULT FROM
CONSTRUCTION OPERATIONS AT NO ADDITIONAL EXPENSE TO THE GOVERNMENT. ANY
MATERIALS DISCOVERED WHICH ARE POTENTIALLY HAZARDOUS WILL BE REPORTED TO
THE COR FOR THEIR INPUT AND DIRECTION.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR RETURNING ALL AREAS AFFECTED BY
CONSTRUCTION EQUIPMENT TO PRE-CONSTRCUTION CONDITIONS. CONTRACTOR SHALL
BE RESPONSIBLE FOR PROTECTING ALL NEW WORK UNTIL COMPLETION OF THIS
CONTRACT.
WHERE SECTION OR SUBSECTION SURVEY MONUMENTS ARE ENCOUNTERED, THE
CONTRACTOR SHALL PROTECT AND CAREFULLY PRESERVE ALL PROPERTY MARKERS
AND MONUMENTS UNTIL THE COR AND AN AUTHORIZED SURVEYOR OR AGENT HAVE
WITNESSED OR OTHERWISE REFERENCED THEIR LOCATION.
ALL PROPOSED ITEMS ARE INTENDED TO BE PROVIDED AND INSTALLED BY THE
CONTRACTOR UNLESS OTHERWISE NOTED.
THE CONTRACTOR SHALL NOTIFY THE COR 72 HOURS IN ADVANCE FOR ROAD AND/OR
INTERSECTION CLOSURES.
THE CONTRACTOR SHALL PROVIDE ROADWAY SIGNS AND OTHER DELINEATING DEVICES
THAT MEET LOCAL MAINTENANCE OF TRAFFIC STANDARDS DURING CONSTRUCTION FOR
CONVENIENCE AND TRAFFIC SAFETY.
THE CONTRACTOR SHALL COORDINATE ALL ELECTRICAL SHUT DOWNS AND
CONSTRUCTION WITH THE COR A MINIMUM OF 72 HOURS PRIOR TO WORK.
CONTRACTOR SHALL PROTECT AND RESTORE SURFACES OR OBJECTS TO REMAIN
INCLUDING, BUT NOT LIMITED TO, EXISTING PAVEMENT SURFACES, TREES AND
VEGETATION, FENCES, POSTS, UTILITIES, AND LAWN AREAS. REMOVE ALL DEBRIS PILES
AND MATERIALS FROM THE SITE IMMEDIATELY FOLLOWING PROJECT COMPLETION. ANY
DISTURBED LAWN AREAS MUST BE TOP SOILED AND SEEDED, WITH GUARANTEED
GROWTH FOR 1 YEAR.
THE CONTRACTOR SHALL PROVIDE 48 HOUR NOTICE PRIOR TO PERFORMING ANY FIELD
TESTING. FIELD TESTING WILL BE CONDUCTED IN THE PRESENCE OF THE CONSTRUCTION
INSPECTOR. FORMAL TEST REPORTS WILL BE PROVIDED WITHIN 72 HOURS OF TEST
COMPLETION. FAILURE TO PERFORM OR PROVIDE TESTING REPORTS MAY RESULT IN
REFUSAL TO ACCEPT WORK.
ALL CONSTRUCTION DEBRIS SHALL BE DISPOSED OF PROPERLY TO AN APPROVED OFF
BASE DISPOSAL SITE LOCATION.
PAVEMENT JOINT SEALING GENERAL NOTES
JOINT SEAL ONLY AROUND PATCHED AREAS AND WHERE NEW ASPHALT PAVEMENT
JOINTS AGAINST EXISTING PAVEMENT.
THE JOINT MUST BE FREE OF MOISTURE, DUST AND LOOSE AGREGATE PRIOR TO
FILLING..
THE AMBIENT AIR AND PAVEMENT TEMPERATURE MUST BE ABOVE 50*F BEFORE
COMMENCING FILLING OPERATIONS.
HOT-APPLIED RUBBERIZED ASPHALT CRACK AND JOINT SEALER SHALL MEET ASTM
D-5329 SPECIFICATIONS AND BE SEALMASTER CRACKMASTER SUPREME OR
APPROVED EQUAL.
JOINT SEALANT SHALL BE APPLIED WITH AN OIL-JACKETED MELTER CAPABLE OF
HEATING SEALANT TO A MINIMUM OF 400*F.
FINAL SEALANT LEVEL MUST NEVER BE ABOVE THE EXISTING PAVEMENT SURFACE.
IF THE JOINT SEAL IS ABOVE PAVEMENT SURFACE, REMOVE EXCESS WITH HEATED
BLADES.
C-001
P.
F
IT
ZG
ER
AL
D
R
TW
C
M
AI
N
TA
IN
L
IN
D
SE
Y
R O
AD
R
O
AD
W
AY
, I R
IS
H
H
IL
L
TE
ST
S
IT
E
PR
O
JE
C
T N
O
TE
S
LE
G
EN
D
P.
F
IT
ZG
ER
AL
D
P.
F
IT
ZG
ER
AL
D
/3
0/
AutoCAD SHX Text
CB
D
ES
C
R
IP
TI
O
N O
F R
EV
IS
IO
N
M M
/D D
/Y Y
ROME RESEARCH SITE
U .S
.A
IR
F O
R C
E R
ES
EA
R C
H L
AB
O
R
AT
O R
Y
IN
FO
R
M
AT
IO
N
D
IR
EC
TO
R
AT
E, IN
TE
G
R
AT
IO
N
A N
D O
PE
R
AT
IO
N S
C
IV
IL
E
N G
IN
EE
R
IN
G , P
R O
G R
AM
M
IN
G
E
N G
IN
EE
R
IN
G
E
LE
C
TR
O N
IC
P
AR
KW
AY
, R
O M
E, N
Y
SHEET SIZE: 24" x 36"
PR
O
JE
C
T M
AN
AG
ER
D
ES
IG
N
ED
B
Y
D R
AF
TE
D B
Y
C H
EC
KE
D B
Y
D
AT
E
PU
BL
IS
H
ED
M
AR
K D
ES
C
R
IP
TI
O
N O
F R
EV
IS
IO
N
D
AT
E
N
S01 2" COLD MILL ASPHALT PAVEMENT, SEE DETAIL
S02 GRUB DRAINAGE DITCH BETWEEN CHECK DAMS
S03 RECONNECT BOX BEAM BARRIER TO MOUNTING PLATES WHERE DISCONNECTED, SEE DETAIL
S04 CLEAN, GRUB & INSPECT CULVERT PIPE. MAKE REPAIRS AS NECESSARY.
DRAWING NOTES
C-500
C-500
GENERAL NOTES
A. CONTRACTOR MUST VERIFY DIMENSIONS PRIOR TO COMMENCING WORK.
B. CONTRACTOR MUST VERIFY NO UTILITIES ARE DISTURBED PRIOR TO
COMMENCING WORK.
C. ALL FINISH GRADES SHALL SLOPE TO DRAIN
C-100
P.
F
IT
ZG
ER
AL
D
R
TW
C
M
AI
N
TA
IN
L
IN
D
SE
Y
R O
AD
R
O
AD
W
AY
, I R
IS
H
H
IL
L
TE
ST
S
IT
E
R O
AD
W
AY
R
EP
AI
R S
P.
F
IT
ZG
ER
AL
D
P.
F
IT
ZG
ER
AL
D
/1
0/
S01
S03
S03
S02
S02
DAMAGED PAVEMENT - LINDSEY ROAD
APPROX. 20' X 20'
S04
AutoCAD SHX Text
BOT. BANK
AutoCAD SHX Text
TOP BANK
AutoCAD SHX Text
TOP BANK
AutoCAD SHX Text E.P.
AutoCAD SHX Text E.P.
AutoCAD SHX Text
W-BEAM GUIDERAIL
AutoCAD SHX Text
W-BEAM GUIDERAIL
AutoCAD SHX Text
BARBED WIRE FENCE
AutoCAD SHX Text
RIP-RAP DITCH
AutoCAD SHX Text
RIP-RAP DITCH
AutoCAD SHX Text
RIP-RAP
AutoCAD SHX Text
RIP-RAP
AutoCAD SHX Text
BM #3
AutoCAD SHX Text
RIP-RAP
AutoCAD SHX Text
RIP-RAP
AutoCAD SHX Text
EXISTING HIGHWAY ROW
AutoCAD SHX Text
EXISTING HIGHWAY ROW
AutoCAD SHX Text
EXISTING HIGHWAY ROW
AutoCAD SHX Text
AutoCAD SHX Text
48" RCP
AutoCAD SHX Text
LINDSAY ROAD
AutoCAD SHX Text
(IRISH HILL ACCESS ROAD)
AutoCAD SHX Text
EXISTING HIGHWAY ROW
CB
NTS
TYPICAL COLDMILL AND OVERLAY DETAILS01
C-500NTS
BOX BEAM BARRIER RAIL02
C-500
FINISH GRADE
1/4"x8"x32"
STEEL PLATE
PLATE MAY BE CUT
AS SHOWN FOR DRIVING
3" I 5.7 POST
(SPACE 5' ON CENTER)
1/4"x8"x32"
STEEL PLATE
3" I 5.7 POST
(SPACE 5' ON CENTER)
6"x6"x3/16" BOX BEAM RAIL
1/2" DIA x 1-1/2" LONG STD
HEX BOLT WITH FLAT WASHER
FINISH GRADE2'
-8
4"
2' -8
1'
6' -8
6"
3"3" 6"
NOTE:
ALL MATERIALS SHALL CONFORM TO
THE LATEST EDITION OF THE NEW
YORK STATE DEPARTMENT OF
TRANSPORTATION SPECIFICATIONS.
SEAL JOINT (TYP.)
TACK COAT
EXISTING PAVEMENT
2" MILL AND OVERLAY
-2" TOP COURSE, NYSDOT 402.127303
2" COLDMILL AND OVERLAY
NOTES:
1. GUARD RAIL SHALL BE CONSTRUCTED USING
CORTEN TUBULAR STEEL.
2. INSTALL GUARD RAIL POSTS ON OUTSIDE.
3. PROVIDE RAIL END SLIP FIT PLATE AT ALL ENDS.
SIDE POST FRONT
ROAD
SIDE
C-500
D
ES
C
R
IP
TI
O
N O
F R
EV
IS
IO
N
M M
/D D
/Y Y
ROME RESEARCH SITE
U .S
.A
IR
F O
R C
E R
ES
EA
R C
H L
AB
O
R
AT
O R
Y
IN
FO
R
M
AT
IO
N
D
IR
EC
TO
R
AT
E, IN
TE
G
R
AT
IO
N
A N
D O
PE
R
AT
IO
N S
C
IV
IL
E
N G
IN
EE
R
IN
G , P
R O
G R
AM
M
IN
G
E
N G
IN
EE
R
IN
G
E
LE
C
TR
O N
IC
P
AR
KW
AY
, R
O M
E, N
Y
SHEET SIZE: 24" x 36"
PR
O
JE
C
T M
AN
AG
ER
D
ES
IG
N
ED
B
Y
D R
AF
TE
D B
Y
C H
EC
KE
D B
Y
D
AT
E
PU
BL
IS
H
ED
M
AR
K D
ES
C
R
IP
TI
O
N O
F R
EV
IS
IO
N
D
AT
E
P.
F
IT
ZG
ER
AL
D
R
TW
C
M
AI
N
TA
IN
L
IN
D
SE
Y
R O
AD
R
O
AD
W
AY
, I R
IS
H
H
IL
L
TE
ST
S
IT
E
D
ET
AI
LS
P.
F
IT
ZG
ER
AL
D
P.
F
IT
ZG
ER
AL
D
/3
0/
SEAL JOINT (TYP.)
| G-001 |
| Sheets and Views |
| G-001 |
| C-001 |
| Sheets and Views |
| C-001 |
| C-100 |
| Sheets and Views |
| C-100 |
| C-500 |
| Sheets and Views |
| C-500 |
| C-100.pdf |
| Sheets and Views |
| C-100 |
File details come from the government source that posted it. Updated .