This document contains Questions and Answers related to the federal contract opportunity for Maintain Pavements and Striping - DFAS, Solicitation Number FA875124B0003. The key details are:
The scope of work does not include the installation of roadway lighting along Brooks Road, as previously mentioned in the technical specifications. The project only covers the installation of new signposts, not the provision of new signs. The dimensions for Depot Bay Access spot #2 have been clarified as a spot mill, as outlined in Addendum #1. The bid opening date for this Invitation for Bid (IFB) is August 22, 2024 at 0900, issued by the Department of the Air Force Materiel Command Research Laboratory.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Depo Bay Access area 2.png | PNG image | |
| Solicitation Amendment - FA875124B00030001.pdf | ||
| ULDF240410 Addendum 1.pdf | ||
| Drawing Addendum 1.pdf | ||
| Attch 4-Wage Determination NY20240014.pdf | ||
| Attch 1-ULDF240410 Asphalt Patch Repair Sizes.pdf | ||
| Solicitation - FA875124B0003.pdf | ||
| Attch 3-ULDF240410 Technical Specifications.pdf | ||
| Attch 2-ULDF240410 DRAWINGS.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA875124B0003 -Maintain Pavements & Striping -DFAS: Questions & Answers
1. Please confirm that the installation of roadway lighting along Brooks Road is not included in the scope of work. Just want to clarify as mentioned in Attach 3 – Technical Specification, Division 01, 1.4 Project Description - sub-section 1.4.2.
Answer: Roadway lighting along Brooks Road is not included in this project. Please disregard the technical specification Division 01, 1.4 Project Description - sub-section 1.4.2.
2. Could you confirm that the scope only includes the supply and installation of new sign posts, and does not cover the providing of new signs?
Answer: The scope of the project only covers the installation of new signposts. The existing handicap signage at the spots where the new signposts are to be installed is to be mounted to the new signposts.
3. Referring to Attachment 1, which outlines the asphalt patch sizes for the DFAS Depot Bay Access (Full Depth Patch Sizes), could you please verify the dimensions for the patch identified as number 2?
Answer: Depo Bay Access identified spot #2 is to be treated as a spot mill. This is outline in addendum #1. (Please see attachment for dimensions)