01 01 20 - Execution.pdf

PDF 37 KB Posted

Attached to
Convert Steam to Hot Water, Building 101 Federal contract opportunity
Solicitation number
FA875120B0005
Issued by
Department of the Air Force Materiel Command Research Laboratory

About this file

This document contains instructions for contractors regarding safety, disposal, fire protection, clean-up, pollution control, and hazardous materials management requirements for a federal contract opportunity to convert steam to hot water in Building 101 at an Air Force research laboratory. Key details include the contractor's responsibilities for safety programs, disposal of waste materials, using adequate fire protection, keeping the work area clean, reporting oil or hazardous material spills, and obtaining authorization before using any hazardous materials. The contractor must submit safety data sheets for all hazardous materials and complete a hazardous materials product request form, as well as monthly hazardous material usage data sheets, to facilitate tracking in the Air Force's data system.

View the file

Other files for this federal contract opportunity

Other files attached to Convert Steam to Hot Water, Building 101, newest first.
File Type Posted
Proposal RFI QA 20b0005 Additional Information 1.docx DOCX document
Solicitation Amendment FA875120B00050001 SF 30.pdf PDF
Attachment 3 Wage Decision 10 April 2020.pdf PDF
SF1442 FA875120B0005.pdf PDF
Attachment 4 RRS FORM 31 Site Visit.pdf PDF
Attachment 1 Final Specifications.pdf PDF
Attachment 5 AFRL Supplemental Requirements.pdf PDF
Attachment 2 Final Drawings.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

3.0 EXECUTION:

3.1 Safety Requirements: It shall be the responsibility of the contractor to initiate and maintain such programs as to comply with the provisions of the Air Force Occupational Safety and Health Standards. These programs shall include the education and training of employees and subcontractors' personnel in the recognition, avoidance and prevention of unsafe conditions. See Section 01 35 29 for further instructions.

3.2 Disposal of Materials: AFRL/RI shall have right of first refusal over all scrap metal generated; the Environmental Office shall provide appropriately sized containers to collect the material. Unless designated as salvageable, all waste materials generated by any work under this contract shall be handled, transported, stored and disposed of off Government property by the contractor at the end of each day’s work. Such materials shall be disposed of in accordance with applicable federal, state or local laws, ordinance or regulations. Spoils from excavation for marker bases may be spread evenly around the work area, but at no time will piles of soil be allowed in the work area. Coordination with the Environmental and Occupational Health office (EOH) is required before the generation and disposal of any Resource Conservation and Recovery Act (RCRA) ( http://www.access.gpo.gov/uscode/title42/chapter82_.html ) hazardous wastes.

3.2.1 Lead: The Contractor is responsible for ensuring surfaces coated with lead paint are properly remediated and disposed of IAW EPA protocols. Lead contaminated waste exceeding RCRA toxicity thresholds must be disposed IAW with Air Force, EPA, and NYSDEC regulations, and disposal must be coordinated with the Environmental office. Under no circumstances shall a contractor sign a hazardous waste manifest on behalf of

AFRL/RI.

3.2.2 Universal Wastes: The contractor is responsible for ensuring that Universal Wastes (batteries, light bulbs, mercury-containing equipment/thermostats) is collected and disposed of IAW with EPA and NYSDEC regulations. The Environmental Office will provide appropriate containers to collect Universal Waste. The Contractor is responsible for disposing of Universal Wastes generated during projects. Disposal must be coordinated with the Environmental Office; under no circumstances shall a contactor sign a Universal Waste manifest on behalf of AFRL/RI.

3.3 Fire Protection: The contractor shall be responsible for furnishing adequate and proper fire protection for all phases of the contract work. USACE Engineering Manual (EM), EM-385- 1-1 and NFPA 241 shall be adhered to for through the duration of the construction contract.

3.4 Reference Standards and Publications: The standards and publications listed in each section of these specifications form part of these specifications to the extent referenced. The contractor shall conform with the provision of the dated issue of the listed standard or publication.

3.5 Clean-up: The contractor shall at all times, keep the construction area, including storage areas used by him, free from accumulation of waste materials or rubbish. Prior to completion of the work each day, remove from the construction site all waste materials or rubbish. Upon completion of the construction, the contractor shall leave the work premises in a clean, neat condition.

3.6 Pollution Control/Hazardous Substances: The contractor shall report any spill of oil or hazardous material to the EOH Office and to take every reasonable precaution to prevent the spillage of oil or other hazardous substances. The Contractor will perform all work consistent with the requirements of all Federal, State and Local laws, rules and regulations pertaining to pollution control. Additionally, Contractors using HAZMAT on this installation must comply with the procedures outlined in the Hazardous Materials Management Plan (HMMP), section 2.4.4 (see below). Any clarification of these procedures can be provided by the EOH Office.

4.0 HAZARDOUS MATERIALS MANAGEMENT

Pertaining to Contractor Usage For the purposes of this contract, the “HMMP Team” and the “HAZMART” are the Environmental

Office. HAZMAT Determination and Authorization Procedures for Contractors

AFI 32-7086 Hazardous Materials Management:

4.1 If a contract is reasonably expected to require a contractor to bring or to use HAZMAT on an http://www.access.gpo.gov/uscode/title42/chapter82_.html installation, the requiring activity working with the Contracting Office shall include the following contract requirements to ensure that contractor materials can be evaluated for authorization and tracking under the

HMMP.

4.2 Federal Acquisition Regulation (FAR) Clause 52.223-3, Hazardous Material Identification and Material Safety Data.

4.3 FAR Clause 52.223-5, Pollution Prevention and Right-to-Know Information.

4.4 FAR Clause 52.223-19, Compliance with Environmental Management Systems.

4.5 AFFARS Clause 5352.223-9001, Health and Safety on Government Installations.

4.6 FAR Clause 52.223-7, Notice of Radioactive Materials.

4.7 The locally developed HAZMAT tracking and reporting tasks necessary to ensure contractor compliance with this AFI.

All HAZMAT brought onto an installation for use shall be authorized via the process described in this section. The Environmental office has developed these local procedures to ensure that the HAZMAT monitoring process does not impede time-critical mission-essential materiel requests.

4.8 IAW FAR Clause 52.223-3, each Contractor must provide the Contracting Office (CO) with a list of proposed Hazardous Materials (HAZMAT) that it plans to use on the installation during the performance of the contract (includes any sub-contractor HAZMAT). IAW AFI 32-7086, contractors must obtain Air Force authorization prior to using HAZMAT on an Air Force installation, and must report usage data to the Environmental Office (RIOCV).

This includes fuels used to run generators and other construction/maintenance equipment.

4.8.1 Contractors shall submit through the CO to RIOCV, Safety Data Sheets (formerly known as Material

Safety Data Sheets or MSDS’s), for all potentially hazardous materials/products that will be brought on to the installation.

4.8.2 RIOCV will review all potentially hazardous materials and identify the materials deemed as HAZMAT that require tracking. RIOCV may remove any materials from consideration for use by the Contractor that contain ingredients prohibited buy the AF or other regulatory agency.

4.8.3 RIOCV will communicate to the Contracting Officer Representative the list of HAZMAT that will require

AF- EESOH-MIS tracking. Those materials will require the completion of one Contractor HAZMAT Product Request Form (PRF) per HAZMAT by the Contractor. RIOCV will provide the Hazardous Material Form to the Contractor and can assist the Contractor with this documentation if requested.

4.8.4 RIOCV will complete their portion on the Contractor PRF and load all information from the forms into the AF-EESOH-MIS data system. The Contractor will also retain a copy of their Contractor HAZMAT PRF for the duration of the specified project.

4.8.5 If the contractor needs to bring a material on the installation that was not included in the original

HAZMAT listing, the contractor must first notify the CO and then obtain prior authorization, if RIOCV determines the material to be a HAZMAT.

4.8.6 The Contractor will submit a Contractor Material Usage Data Sheet provided by RIOCV to the CO once a month for contracts over 60 days. For contracts less than 60 days, a Material Usage Data Sheet will be submitted by the Contractor to CO at the completion of the contract.

4.8.7 The CO will provide a copy of the Usage Data Sheet to RIOCV.

4.8.8 Any HAZMAT brought on site for the contract and not used in its entirety will be removed from the installation by the Contractor. If HAZMAT can be used in another contract at this installation, please contact RIOCV for assistance.

4.8.9 RIOCV is ready to assist the CO and Contractor in any way to simplify and expedite this reporting and tracking procedure. Please contact RIOCV (330-2098) with any questions.

3.0 EXECUTION:
4.0 HAZARDOUS MATERIALS MANAGEMENT