Attachment_No_2_Project_Drawings_ULDF_16-0044.pdf

PDF 2 MB Posted

Attached to
Modernize Restrooms, Building 106 Federal contract opportunity
Solicitation number
FA8751-18-B-0002
Issued by
Department of the Air Force Materiel Command Research Laboratory

About this file

Attachment 2 - Project Drawings

View the file

Other files for this federal contract opportunity

Other files attached to Modernize Restrooms, Building 106, newest first.
File Type Posted
FA875118B00020002.pdf PDF
FA875118B00020001.pdf PDF
Attachment_No_4_Site_Visit_Request.pdf PDF
Attachment_No_3_Wage_Decision_NY20170013.pdf PDF
Attachment_No_5_Reporting_of_Hazardous_Material_For_Civilian_Contractors.pdf PDF
FA875118B0002.pdf PDF
Attachment_No_1_Project_Manual_ULDF_16-0044.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NKB

N. .______________________________________________________

ARCHITECTURE & ENGINEERING, PC..

K BHANDARI

SHEET SIZE: 24" x 36"

DRAWING NO: SHEET: FACILITY NO:

OF

SHEET TITLE:

PROJECT TITLE:

Rev. Date Description Drawn Approved

DATE:

PROJECT MANAGER:

PROJECT NO:

DRAFTER:

Rome Research Site

Air Force Research Laboratory

Rome Research Site, New York

RIO:

RIOCC:

RIOS:

66abw/def:

RIOC:

RIOCO:

RIOF:

USER:

RIOCC:

RIOCV:

DET 4/SE:

USER:DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DESIGNER:

B-106

DESIGN FIRM NKB# 16340.03

NYS Education Law, Section 7209 Prohibits any person to alter these drawings other than a licensed architect or the design engineer. Information on these drawings remainsthe property of the licensed professionals who prepared them and may only be used on the project identified below.

Copyright 2017 N.K. BHANDARI, Architecture & Engineering, P.C.

CONSULTANT:

6/6/2017 9:38:04 AM

1 12G-001 05/15/17

COVER SHEET

Modernize Restrooms D233 & D235, B-106

ULDF 160044AE

KRS

KRS

DBH

DRAWING LIST

SHEET NUMBER SHEET NAME

DRAWING

NO.

GENERAL

G-001 COVER SHEET 1

ARCHITECTURAL

A-001 GENERAL NOTES, SYMBOLS & ANNOTATIONS 2

A-002 PARTITION TYPES 3

AE101 FLOOR & CEILING PLANS 4

AE102 ELEVATIONS 5

AE103 ELEVATIONS, DOOR SCHEDULE & DETAILS 6

AE104 FINISH & EQUIPMENT SCHEDULES 7

PLUMBING

P-101 FLOOR PLANS 8

MECHANICAL

M-101 FLOOR PLANS 9

FIRE PROTECTION

FP101 FLOOR PLANS 10

FIRE ALARM

FA101 FLOOR PLANS 11

ELECTRICAL

E-101 FLOOR & CEILING PLANS 12

Grand total: 12

ARCHITECT, CIVIL ENGINEER, & STRUCTURAL ENGINEER:

MECHANICAL, ELECTRICAL, PLUMBING, & FIRE PROTECTION ENGINEER:

N.K. BHANDARI,

ARCHITECTURE & ENGINEERING, P.C.

1005 W. FAYETTE STREET, SUITE 4A

SYRACUSE, NEW YORK 13203

315.428.1177

C&S COMPANIES

499 COL. EILEEN COLLINS BLVD

SYRACUSE, NEW YORK 13212

315.455.2000

MODERNIZE RESTROOMS

D233 & D235, B-106

AIR FORCE RESEARCH LABORATORY,

ROME RESEARCH SITE, ROME, NEW YORK

PROJECT NO. ULDF 160044AE A/E CONTRACT NO. FA8751-16-D-0002

SENSITIVE BUT UNCLASSIFIED (SBU)

PROPERTY OF THE UNITED STATES GOVERNMENT

COPYING, DISSEMINATION, OR DISTRIBUTION OF THIS DOCUMENT

TO UNAUTHORIZED RECIPIENTS IS PROHIBITED

Do not remove this notice Properly destroy or return documents when no longer needed.

PROJECT CERTIFICATION:

TO THE BEST OF MY KNOWLEDGE, BELIEF AND PROFESSIONAL JUDGMENT,

THE DRAWINGS AND SPECIFICATIONS WHICH COMPRISE THE

CONSTRUCTION DOCUMENTS FOR THE PROJECT ARE IN COMPLIANCE WITH

APPLICABLE CODES, INCLUDING THE LATEST EDITIONS OF THE

INTERNATIONAL BUILDING CODE AND NFPA 101.

1/8" = 1'-0"A0102 A0101

1 View Name

ROOM NAME

150 SF

901bs

ZZZ

ROOM TAG

VIEW TAG

BUILDING SECTION

WALL SECTION

FLOOR LEVEL

COLUMN GRID

METAL PANEL /

CURTAIN WALL PANEL

TAG

ITEM TAG

KEYED NOTE

REVISION TAG

DEMOLITION TAG

PARTITION TAG

ITEMS TO BE

DEMOLISHED

NEW CONSTRUCTION

EXISTING / NIC /

PREVIOUS WORK

SHEET NUMBER

OF VIEW

SHEET NUMBER OF

VIEW ORIGINATION

SHEET NUMBER

OF VIEW

SECTION NUMBER

BREAK LINE

ALIGN ALIGN ELEMENTS

DOOR TAG

P R

1E

FLOOR

ELEVATION

FLOOR NAME

EXTERIOR ELEVATION

CALLOUT

ELEVATION

NUMBER

AE001

SIM

DETAIL CALLOUT

SHEET NUMBER

OF VIEW

DETAIL NUMBER

ROOM NAME

ROOM NUMBER

ROOM AREA

FIRE/SMOKE

RATING

WALL

TYPE

AE001

AE001

INTERIOR ELEVATION

CALLOUT

NORTH ARROW

MAGNETIC

NORTH

PROJECT

NORTH

TP1

SHEET NUMBER

OF VIEW

SECTION NUMBER

SHEET NUMBER

OF VIEW

ELEVATION

NUMBER

SHEET NUMBER

OF VIEW

AE001

SIM

AE001

SIM

Name Elevation

THE APPLICABLE MODEL CODES, STANDARDS AND REFERENCES DOCUMENTS PERTINENT

TO THE PROJECT ARE AS FOLLOWS:

• NFPA 101 LIFE SAFETY CODE 2012

• NFPA NATIONAL FIRE CODES WITH EXCEPTION OF NFPA 5000 AND NFPA 900

• NFPA 10 STANDARD FOR PORTABLE FIRE EXTINGUISHERS (201)

• INTERNATIONAL BUILDING CODE (IBC 2015)

• INTERNATIONAL MECHANICAL CODE (IMC 2015)

• INTERNATIONAL PLUMBING CODE (IPC 2015)

• IEBC INTRNATIONAL EXISTING BUILDING CODE (IEBC 2015)

• INTERNATIONAL ENERGY CONSERVATION CODE (IECC 2015)

• INTERNATIONAL FIRE CODE (IFC 2015)

• INTERNATIONAL FUEL AND GAS CODE (IFGC 2015)

• ICC A117.1 2009 ACCESSIBLE AND USABLE BUILDING AND FACILITIES

• UNIFORM FEDERAL ACCESSIBLITY STANDARDS

• UNIFIED FACILITIES CRITERIA (UFC)

• DoD UNIFIED DESIGN GUIDANCE

GENERAL CONSTRUCTION NOTES

1 DESIGN CONSTRUCTION AND SAFETY SHALL CONFORM TO ALL LOCAL, STATE AND OWNER SPECIFIC CODES, INCLUDING (BUT NOT LIMITED TO) THE “INTERNATIONAL BUILDING CODE 2015 (IBC)", THE NFPA 101 LIFE SAFETY CODE, LATEST REVISION, ANSI A117.1 - LATEST REVISION, OSHA, AIR FORCE HANDBOOK 32-1084, STANDARD FACILITY REQUIREMENTS HANDBOOK, & UNIFORM FEDERAL ACCESSIBILITY STANDARDS - LATEST REVISION, AND ANY OTHER CODES GOVERNED BY THE JURISDICTION IN WHICH THIS PROJECT IS BEING CONSTRUCTED

2 THIS CONTRACT REQUIRES COMPLETE, FINISHED WORKABLE PROJECT OF THE AREAS INDICATED BY THE CONTRACT DOCUMENTS, AND SHALL INCLUDE ALL MATERIALS AND LABOR NECESSARY TO COMPLETE, REGARDLESS OF WHETHER OR NOT ALL WORK OR EACH ITEM IS SPECIFICALLY INDICATED ON ANY OTHER PORTION OF THE DRAWINGS AND/OR NOTES.

3 WHERE MATERIALS REFERENCED ON DRAWINGS, OR NECESSARY TO COMPLETE THE WORK OF THIS CONTRACT ARE NOT SPECIFIED HEREIN, PROVIDE BEST QUALITY MATERIAL. WHERE MATERIALS ARE INTENDED TO MATCH EXISTING, PROVIDE CLOSEST POSSIBLE MATCH, SUBJECT TO OWNER'S APPROVAL. ALL ITEMS AND WORK ON DRAWINGS ARE NEW, UNLESS INDICATED EXISTING. ALL WORK WHICH HAS BEEN DAMAGED SHALL BE REPAIRED TO A “NEW CONDITION,” OR WHERE THE STRUCTURAL INTEGRITY HAS BEEN AFFECTED, ITEMS SHALL BE REPLACED AT NO COST TO THE OWNER.

4 CONTRACTOR IS RESPONSIBLE TO VERIFY ALL SITE, FIELD AND BUILDING CONDITIONS PRIOR TO SUBMITTING BIDS AND COMMENCING WORK. IF THERE ARE ANY DISCREPANCIES BETWEEN DRAWINGS AND FIELD CONDITIONS, NOTIFY THE CONSTRUCTION MANAGER AND ARCHITECT/ENGINEER AND REQUEST CLARIFICATION.

5 DRAWINGS MAY NOT INDICATE ALL DEMOLITION/REMOVALS. CONTRACTOR SHALL REFER TO DRAWINGS, SPECIFICATIONS AND VERIFY FIELD CONDITIONS TO DETERMINE FULL SCOPE AND PARTICULARS OF REMOVALS AS REQUIRED FOR AND COORDINATED WITH THE NEW WORK PRIOR TO BIDDING WORK. VERIFY AND CONFIRM WITH OWNER WHICH ITEMS ARE TO BE SAVED FOR OWNER’S USE OR REINSTALLATION BY

CONTRACTOR.

6 WHERE CONSTRUCTION OR ITEMS HAVE BEEN INFILLED, REMOVED AND/OR DISTURBED FOR INSTALLATION OF NEW WORK, CAUSING THE EXPOSURE OF UNFINISHED AND/OR DAMAGED SURFACES, RESULTING SURFACES AND INFILLED SURFACES SHALL BE RECONSTRUCTED WITH MATERIALS TO MATCH FINISHED AREAS. ALL ABANDONED OPENINGS (I.E., DUCT/PIPE REMOVALS, ETC.) AT WALLS, ROOF OR FLOOR TO BE

INFILLED SOLID.

7 WHERE CONSTRUCTION RESULTS IN DEPRESSIONS AND/OR UNEVEN FLOOR CONDITIONS, PATCH, LEVEL AND FEATHER AREAS AS REQUIRED TO PROVIDE UNIFORMITY OF NEW FLOORING.

8 WORK IS REQUIRED IN VARIOUS PORTIONS OF THE FACILITY TO EXECUTE WORK OF OTHER TRADES (I.E. ELECTRICAL, MECHANICAL). ALTHOUGH NOT NECESSARILY SHOWN ON DRAWINGS, WORK IS REQUIRED IN

THESE AREAS CONSISTING OF PLACEMENT OF CEILINGS, WALLS, FINISHES, PAVEMENT AND OTHER CONSTRUCTION AS NECESSARY TO PERFORM WORK AND RESTORE THESE SPACES OR AREAS TO ORIGINAL

CONDITIONS.

9 CONTRACTOR SHALL OBTAIN FROM OWNER ALL REQUIREMENTS FOR INSTALLATION OF OWNER PROVIDED EQUIPMENT INCLUDING ROUGHING DIAGRAMS, INSTALLATION INSTRUCTIONS, ELECTRICAL SCHEMATICS, TEMPLATES, LAYOUTS AND DIMENSIONS AND ALL OTHER INFORMATION NECESSARY FOR A PROPER, WELL COORDINATED INSTALLATION. PRIOR TO ROUGH-IN OF SERVICES, CONFER WITH OWNER EXACT LOCATION

OF ALL ITEMS.

10 CONTRACTOR SHALL COORDINATE THE WORK WITH EACH TRADE SO THAT THE WORK AND SCHEDULE ARE NOT IMPEDED. SCHEDULE WORK PROGRESS THROUGHOUT THE ENTIRE PROJECT TO PREVENT CONFLICTS AND INTERFERENCES. OBTAIN ALL NECESSARY INFORMATION SUCH AS SIZES, LOCATIONS, TEMPLATES, LAYOUT, DIMENSIONS AND ALL OTHER INFORMATION NECESSARY FOR A PROPER AND WELL COORDINATED INSTALLATION. PRIOR TO INSTALLATION OF ITEMS, VERIFY AND CONFIRM WITH EACH TRADE EXACT LOCATION OF ALL ITEMS

11 ALL PENETRATIONS THROUGH FLOORS AND FULL HEIGHT WALLS TO BE FIRE STOPPED. ALL GAPS AND JOINTS AT RATED FLOORS, ROOFS AND WALL TO BE FIRE AND SMOKE STOPPED. GAPS AND JOINTS INCLUDE (BUT ARE NOT LIMITED TO) TOP OF WALL TO FLOOR OR ROOF DECK WALL TO BEAMS, AND CONTROL OR EXPANSION JOINTS. FIRE STOPPING INCLUDES BOTH FORM OR PACKING MATERIAL AND THE FILL, VOID OR

CAVITY MATERIAL.

12 EXTERIOR PERIMETER OF ALL WINDOWS, DOOR FRAMES, LOUVERS OR OTHER ITEMS INSERTED IN AN EXTERIOR WALL SHALL BE SEALED WEATHER TIGHT WHETHER INDICATED ON DRAWINGS OR NOT.

13 WOOD USED FOR BLOCKING OR OTHER PURPOSES ON OR ABOVE THE ROOF DECK WITHIN 2’-0” OF GRADE AND OTHER LOCATIONS OUTSIDE THE BUILDING ENVELOPE WHERE EXPOSED TO THE WEATHER, SHALL BE

PRESSURED TREATED TYPE. WOOD USED FOR BLOCKING OR OTHER PURPOSES SHALL BE FIRE RETARDANT TYPE.

14 FINISHED DOOR OPENINGS SHALL BE NOMINAL 6" FROM FINISHED CORNER OF ROOM AT HINGE SIDE, EXCEPT WHERE DIMENSIONED OTHERWISE, ON THE ‘PULL’ SIDE OF A DOOR OPENING , THE STRIKE SIDE SHALL

BE NOMINAL 18" FROM A PERPENDICULAR WALL ON THE ‘PUSH’ SIDE OF A DOOR OPENING EQUIPPED WITH BOTH A CLOSER AND LATCH, THE STRIKE SIDE SHALL BE NOMINAL 12” FROM A PERPENDICULAR WALL.

15 SUSPENDED GRID CEILINGS SHALL BE ARRANGED SO THAT A GRID IS SPACED EQUALLY FROM EACH MOST REMOTE WALL IN EACH DIRECTION, WITH NO TILE LESS THAN 6” UNLESS OTHERWISE INDICATED. CEILING

MOUNTED ITEMS TO BE CENTERLINE OF CEILING TILES, UNLESS OTHERWISE NOTED.

16 INTERIOR AND EXTERIOR CONCRETE SLABS SHALL BE SEPARATED FROM ANY VERTICAL SURFACE WITH AN ISOLATION JOINT. ALL SLAB ON-GRADE (CONTROL, EXPANSION, CONSTRUCTION (COLD), ETC.) JOINTS TO

RECEIVE SEALANT. ALL EXTERIOR SLABS TO SLOPE TO DRAIN AWAY FROM BUILDING AT 1/8” PER 1’-0” UON.

17 PROVIDE BUILDING EXPANSION JOINT AND CONTROL JOINTS AT INTERIOR AND EXTERIOR MASONRY WALLS PER THE BRICK INSTITUTE OF AMERICA AND THE NATIONAL CONCRETE MASONRY ASSOCIATION

SPECIFICATIONS AND RECOMMENDATIONS, AND WHERE BUILDING ADDITIONS MEET EXISTING BUILDING. AT RATED WALLS, EXPANSION JOINT OR CONTROL JOINT TO EQUAL WALL RATING.

18 ALL DRAWINGS INDICATED AS GENERAL APPLY TO ENTIRE PROJECT, INCLUSIVE OF ALL BUILDINGS.

ABBREVIATIONS

SHT SHEET

SHWR SHOWER

SIM SIMILAR

SP SPECIAL

SPEC SPECIFICATION (S)

SPKR SPEAKER

SPL SPANDREL PANEL

SQ SQUARE

SS SOLID SURFACE

SST STAINLESS STEEL

ST STREET

STD STANDARD

STL STEEL

STOR STORAGE

STR STRUCTURE (AL)

SURF SURFACE

SUSP SUSPENDED

SW SWITCH

SY SQUARE YARD

SYM SYMMETRY (ICAL)

SYS SYSTEM

T

T TREAD

T&B TOP & BOTTOM

T&G TONGUE & GROOVE

T&P TAPE & PRIME

TBD TO BE DETERMINED

TEL TELEPHONE

TEMP TEMPORARY

TERR TERRAZZO

THK THICK (NESS)

TO TOP OF

TOL TOLERANCE

TOS TOP OF STEEL

TP TOILET PARTITION

TPH TOILET PAPER HOLDER

TRANS TRANSVERSE

TS TERMINATION STRIP

TV TELEVISION

TYP TYPICAL

TYPOS TYPICAL OTHER SIDE

U

UC UNDERCUT

UH UNIT HEATER

UL UNDERWRITERS'

LABORATORIES

UNEX UNEXCAVATED

UNF UNFINISHED

UON UNLESS OTHERWISE

NOTED

UR URINAL

V

VAR VARIES (ABLE)

VB VINYL BASE

VC VINYL COVE

VCT VINYL COMPOSITION TILE

VERT VERTICAL

VEST VESTIBULE

VG VISION GLASS

VIF VERIFY IN FIELD

VWC VINYL WALL COVERING

W

W WEST

W/ WITH

W/O WITHOUT

WC WATER CLOSET

WD WOOD

WNCT WAINSCOTING

WP WATERPROOFED (ING)

WT WEIGHT

WWF WELDED WIRE FABRIC

WWM WELDED WIRE MESH

X

XPS EXTRUDED POLYSTYRENE

INSULATION

ABBREVIATIONS

NF NEAR FACE

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NORM NORMAL

NTS NOT TO SCALE

O

OA OVERALL

OBS OBSCURE

OC ON CENTER (S)

OD OUTSIDE DIAMETER

OFF OFFICE

OH OVERHEAD

OPNG OPENING

OPP OPPOSITE

P

P LAM PLASTIC LAMINATE

P&R PATCH & REPAIR

PAVMT PAVEMENT

PC PLUMBING CONTRACTOR

PCC PRECAST CONCRETE

PCF POUNDS PER CUBIC FOOT

PERF PERFORATED

PERM PERMANENT

PL PLATE

PLAS PLASTER

PLAST PLASTIC

PLBG PLUMBING

PLYWD PLYWOOD

PNL PANEL

PNT PAINT

POLYIS

O

POLYISOCYANURATE

INSULATION

PR PAIR

PREP PREPARE (ATION)

PROJ PROJECT (ION)

PROP PROPERTY

PRTN PARTITION

PSF POUNDS PER SQUARE

FOOT

PSI POUNDS PER SQUARE

INCH

PT PRESSURE TREATED

PTD PAINTED

PVC POLYVINYL CHLORIDE

Q

QTY QUANTITY

R

R RISER, RADIUS

RA RETURN AIR

RAD RADIUS

RB RUBBER BASE

RD ROOF DRAIN

RECP RECEPTICLE

REF REFERENCE

REFL REFLECT (ED), (IVE), (OR)

REFR REFRIGERATOR,

REFRIGERATION

REINF REINFORCE (D), (ING)

REQD REQUIRED

RES RESILIENT

RET RETURN, RETAINING

REV REVISION (S), REVISED

RH RIGHT HAND

RI RIGID INSULATION

RM ROOM

RO ROUGH OPENING

ROW RIGHT-OF-WAY

RUBR RUBBER

S

S SOUTH

SA SUPPLY AIR

SAD SADDLE

SAN SANITARY

SC SOLID CORE

SCH SCHEDULE

SCW SOLID CORED WOOD

SDT STATIC DISSIPATIVE TILE

SECT SECTION

SF SQUARE FOOT (FEET)

SG SPANDREL GLASS

ABBREVIATIONS

HD HAND

HDR HEADER

HDWE HARDWARE

HGT HEIGHT

HM HOLLOW METAL

HMI HOLLOW METAL

INSULATED

HORIZ HORIZONTAL

HP HIGH POINT

HR HANDRAIL, HOUR

HTG HEATING

HTR HEATER

HVAC HEATING/VENTILATING/AIR

CONDITIONING

HW HOT WATER

I

ID INSIDE DIAMETER

IN INCH OR INCHES

INCL INCLUDE (ING)

INSUL INSULATE (D), (ION)

INT INTERIOR

INV INVERT

J

J JOIST

JAN JANITOR

JCT JUNCTION

JT JOINT

K

KD KNOCKED DOWN

KIT KITCHEN

L

L LENGTH, LONG

LAB LABORATORY

LAM LAMINATE (D)

LAV LAVATORY

LF LINEAR FOOT (FEET)

LH LEFT HAND

LIN LINEAR

LL LIVE LOAD

LLH LONG LEG HORIZONTAL

LLV LONG LEG VERTICAL

LONG LONGITUDINAL

LOUV LOUVER

LP LOW POINT

LT LIGHT

LW LONG WAY

M

MAG MAGNETIC

MAR MARBLE

MAS MASONRY

MAX MAXIMUM

MBD MARKER BOARD

ME MATCH EXISTING

MECH MECHANICAL

MED MEDIUM

MEM MEMBER

MEMB MEMBRANE

MEP MECHANICAL, ELECTRICAL,

PLUMBING

MEPFP MECHANICAL, ELECTRICAL,

PLUMBING, FIRE

PROTECTION

MET METAL

MEZZ MEZZANINE

MFR MANUFACTURER

MH MANHOLE

MIN MINIMUM

MIRR MIRROR

MISC MISCELLANEOUS

MLDG MOULDING

MO MASONRY OPENING

MR GWB MOISTURE RESISTANT

GYPSUM WALL BOARD

MTD MOUNTED

MTG MOUNTING

MTL METAL

MULL MULLION

N

N NORTH

NAT NATURAL

ABBREVIATIONS

DS DOWNSPOUT

DWG DRAWING

E

E EAST

EA EACH

EC ELECTRICAL CONTRACTOR

EF EACH FACE

EIFS EXTERIOR INSULATION

FINISH SYSTEM

EJ EXPANSION JOINT

EJCP EXPANSION JOINT COVER

PLATE

EL ELEVATION

ELEC ELECTRIC (AL)

ELEV ELEVATOR

EMER EMERGENCY

ENCL ENCLOSURE

EP ELECTRICAL PANEL

EPDM ETHYLENE PROPYLENE

DIENE MONOMER

EPS EXPANDED POLYSTYRENE

INSULATION

EQ EQUAL

EQUIP EQUIPMENT

ES EXPOSED SLAB

EST ESTIMATE (D)

ETR EXISTING TO REMAIN

EXH EXHAUST

EXIST EXISTING

EXP EXPANSION, EXPAND

EXPO EXPOSED

EXT EXTERIOR

EXTR EXTRUDED

F

FA FIRE ALARM

FAB FABRICATE

FAP FIRE ALARM CONTROL

PANEL

FD FLOOR DRAIN

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER

CABINET

FF FINISHED FLOOR

FH FLOOR HATCH

FHC FIRE HOSE CABINET

FIG FIGURE

FIN FINISH (ED)

FIXT FIXTURE

FL FLANGE

FLASH FLASHING

FLEX FLEXIBLE

FLR FLOOR (ING)

FLUOR FLUORESCENT

FM FLOOR MOUNTED

FNDN FOUNDATION

FO FACE OF

FP FIRE PROTECTION

FR FRAME (ING)

FRP FIBERGLASS REINFORCED

PANEL

FT FOOT OR FEET

FTG FOOTING

FURR FURRING

FUT FUTURE

G

GA GAUGE

GAL GALLON

GALV GALVANIZED

GB GRAB BAR

GC GENERAL CONTRACTOR

GEN GENEARL

GL GLASS / GLAZING

GR GUARDRAIL

GRG GLASS REINFORCED

GYPSUM

GT GLAZED TILE

GWB GYPSUM WALL BOARD

GYP GYPSUM

H

H/C HANDICAPPED

HB HOSE BIB

HC HOLLOW CORE

ABBREVIATIONS

A

A/C AIR CONDITIONING

AB ANCHOR BOLT

ACC ACCESS

ACOUS ACOUSTIC (AL)

ACT ACOUSTICAL CEILING TILE

ADD ADDENDUM

ADJ ADJACENT

ADJUST ADJUSTABLE

AFF ABOVE FINISHED FLOOR

AGGR AGGREGATE

ALT ALTERNATE

ALUM ALUMINUM

AP ACCESS PANEL

APPROX APPROXIMATE (LY)

ARCH ARCHITECTURAL

ASPH ASPHALT

AVG AVERAGE

B

BD BOARD

BET BETWEEN

BIT BITUMINOUS

BLDG BUILDING

BLK BLOCK

BLKG BLOCKING

BM BENCHMARK

BN BULLNOSE

BO BOTTOM OF

BOD BASIS OF DESIGN

BRD BOARD

BSMT BASEMENT

BUR BUILT-UP-ROOF

C

CAB CABINET

CB CATCH BASIN

CEM CEMENT

CER CERAMIC

CF CUBIC FOOT (FEET)

CFMF COLD FORMED METAL

FRAMING

CG CORNER GUARD

CI CAST IRON

CIP CAST IN PLACE

CJ CONTROL JOINT

CKBD CORKBOARD

CL CLOSET

CLG CEILING

CLKG CAULKING

CLL CONTRACT LIMIT LINE

CLR CLEAR

CM CEILING MOUNTED

CMU CONCRETE MASONRY UNIT

CO CLEANOUT

COL COLUMN

CONC CONCRETE

CONN CONNECTION

CONST CONSTRUCTION

CONT CONTINUE (OUS)

CONTR CONTRACTOR

CPT CARPET

CR CHAIR RAIL

CT CERAMIC TILE

CTR CENTER

CW COLD WATER

CY CUBIC YARD (S)

D

DBL DOUBLE

DEG DEGREES

DEMO DEMOLITION

DEPT DEPARTMENT

DET DETAIL

DF DRINKING FOUNTAIN

DH DOUBLE HUNG

DIA DIAMETER

DIAG DIAGONAL

DIM DIMENSION

DIV DIVISION

DL DEAD LOAD

DN DOWN

DO DOOR OPENING

DOM DOMESTIC

DR DOOR

TYPICAL SYMBOLS

NKB

N. .______________________________________________________

ARCHITECTURE & ENGINEERING, PC..

K BHANDARI

SHEET SIZE: 24" x 36"

DRAWING NO: SHEET: FACILITY NO:

OF

SHEET TITLE:

PROJECT TITLE:

Rev. Date Description Drawn Approved

DATE:

PROJECT MANAGER:

PROJECT NO:

DRAFTER:

Rome Research Site

Air Force Research Laboratory

Rome Research Site, New York

RIO:

RIOCC:

RIOS:

66abw/def:

RIOC:

RIOCO:

RIOF:

USER:

RIOCC:

RIOCV:

DET 4/SE:

USER:DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DESIGNER:

B-106

DESIGN FIRM NKB# 16340.03

NYS Education Law, Section 7209 Prohibits any person to alter these drawings other than a licensed architect or the design engineer. Information on these drawings remainsthe property of the licensed professionals who prepared them and may only be used on the project identified below.

Copyright 2017 N.K. BHANDARI, Architecture & Engineering, P.C.

CONSULTANT:

6/6/2017 9:37:51 AM

2 12A-001 05/15/17

GENERAL NOTES,

SYMBOLS & ANNOTATIONS

Modernize Restrooms D233 & D235, B-106

ULDF 160044AE

KRS

KRS

DBH

GENERAL DEMOLITION NOTES

1 ANY ITEM NOT SPECIFICALLY IDENTIFIED BUT REQUIRED TO BE REMOVED OR REPAIRED TO PREPARE THE BUILDING FOR THE NEW WORK OR TO OTHERWISE PRODUCE THE FINISHED PRODUCT SHOWN IN THE CONTRACT DOCUMENTS IS

THE RESPONSIBILITY OF THE GENERAL CONTRACTOR.

2 DEMOLITION WORK SHALL BE SCHEDULED AT ALL TIMES AND BE SUBJECT TO THE DIRECTION AND APPROVAL OF THE OWNER.

3 EXISTING CONSTRUCTION TO REMAIN SHALL BE PRESERVED AND PROTECTED DURING CONSTRUCTION. DAMAGE TO EXISTING CONSTRUCTION TO REMAIN SHALL BE PATCHED AND REPAIRED TO MATCH EXISTING CONDITIONS AT NO

ADDITIONAL COST TO THE OWNER, INCLUDING THE MAINTENANCE OF ALL FIRE RATINGS AT STRUCTURAL MEMBERS, FLOORS, WALLS, CEILINGS, ETC.

4 PRIOR TO ANY DEMOLITION, THE GENERAL CONTRACTOR SHALL COORDINATE BRACING TO MAINTAIN THE STRUCTURAL INTEGRITY OF THE REMAINING ELEMENTS OF THE BUILDING AS REQUIRED.

5 CONTRACTOR SHALL REMOVE ALL MATERIALS IN A WORKMAN-LIKE MANNER APPROVED BY THE OWNER AND DISPOSE OF ALL MATERIALS PER APPLICABLE CODES.

6 COMPLY WITH GOVERNING REGULATIONS PERTAINING TO ENVIRONMENTAL PROTECTION FOR POLLUTION CONTROL & HAZARDOUS MATERIALS.

7 REMOVE AND DISPOSE OF ALL EXISTING CASEWORK AND ACCESSORIES. FILL ANY OPENINGS IN FLOOR AND CEILING SLAB TO MATCH EXISTING.

8 REFER TO M/E/P DEMOLITION DRAWINGS FOR REMOVAL OF EXISTING ELECTRICAL, TELECOMMUNICATION, DATA, WALL-MOUNTED CONDUITS, MEDICAL GAS OUTLETS, LINES, METERS, DUCT WORK, PLUMBING.

9 EXISTING CEILING SYSTEM AND FIXTURES TO BE REMOVED THROUGHOUT. COORDINATE DISCONNECTION OF SERVICES WITH OTHER TRADES PRIOR TO REMOVAL.

10 EXISTING FLOOR FINISHES TO BE REMOVED DOWN TO EXISTING SUBSTRATE AND PREPARED TO RECEIVE NEW FLOORING AS SCHEDULED.

11 SPECIAL CONSIDERATIONS MUST BE MADE FOR ANY LIGHT BULBS AND BALLASTS REMOVED DURING THE PROJECT. "RIOCV" WILL PROVIDE BOXES AND PROTECTIVE MATERIAL (I.E. BUBBLE WRAP), FOR THE CONTRACTOR TO PLACE THE

OLD LIGHT BILBS IN. THE CONTRACTOR SHALL NOT DISPOSE OF THESE LIGHT BILBS; "RIOCV" MUST DISPOSE OF THEM IN ACCORDANCE WITH "UNIVERSAL WASTE" REGULATIONS. IN ADDITION, THE CONTRACTOR SHALL NOT DISPOSE OF ANY LIGHT BALLASTS REMOVED REMOVED DURING THIS PROJECT. THE CONTRACTOR SHOULD STAGE THE BALLASTSD FOR PROCESSING AND DISPOSAL BY "RIOCV". "RIOCV" MUST BE NOTIFIED/ CONSULTED IF THE CONTRACTOR ENCOUNTERS OR GENERATES ANY HAZARDOUS OR POTENTIALLY HAZARDOUS WASTE (I.E. BROKEN LIGHT BULBS, MERCURY CONTAINING THERMOSTATS.) THE CONTRACTOR SHALL NEVER ASSUME THAT GENERATED WASTES ARE HAZARDOUS. THE CONTRACTOR SHALL NOT DISPOSE OF ANY HAZARDOUS WASTES, OR SIGN HAZARDOUS WASTE MANIFESTS, ON BEHALF OF HTE GOVERNMENT.

12 THIS LOCATION HAS BEEN FOUND TO HAVE ASBESTOS CONTAINING MATERIALS, INCLUDING BUT NOT LIMITED TO PIPE INSULATION. THE CONTRACTOR SHALL COMPLY WITH THE OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION’S (OSHA) ASBESTOS CONSTRUCTION STANDARD 29 CFR 1910.1001. . THE CONTRACTOR SHALL CONDUCT WORK IN A MANNER THAT DOES NOT EXPOSE BUILDING OCCUPANTS, OTHER CONTRACTORS OR THE PUBLIC TO ASBESTOS. THE CONTRACTOR SHALL COLLECT, CONTAINERIZE, TEST, AND DISPOSE OF ALL ASBESTOS-CONTAINING WASTE IN ACCORDANCE WITH FEDERAL, STATE AND LOCAL REGULATIONS.

APPLICABLE CODES

9 1 0 b s

SPEC. CATEGORY

PARTITION CATEGORY

FIRE RATING

SEQUENCE NUMBER

SPECIFICATION CATEGORY

CONCRETE

MASONRY

WOOD STUD

METAL STUD

PARTITION CATEGORY

EXISTING

NO SPECIALTIES

INSULATION

TILE (CEMENT BACKER)

LEAD LINING

SECURITY MESH

(RESERVED)

(RESERVED)

(RESERVED)

SHAFT

SEQUENCE NUMBER

(UNASSIGNED)

(UNASSIGNED)

(UNASSIGNED)

(UNASSIGNED)

(UNASSIGNED)

(UNASSIGNED)

(UNASSIGNED)

(UNASSIGNED)

(UNASSIGNED)

(UNASSIGNED)

FIRE RATING

s a as b bs c cs d ds

NOT RATED

SMOKE RATED

1 HOUR

1 HOUR, SMOKE RATED

2 HOUR

2 HOUR, SMOKE RATED

3 HOUR

3 HOUR, SMOKE RATED

4 HOUR

4 HOUR, SMOKE RATED

WALL TYPE 413:

UL --

RATING 0 HOUR

STC ---

CMU / CEMENT BOARD

4"x8"x16" CMU

(1) LAYER 5/8" CEMENT

BOARD ONE SIDE TO TOP

OF CMU

SLAB

CEILING AS SCHEDULED

SCHEDULED

CEILING

MATCH EXIST. CMU

4 1/4"

ACOUSTICAL SEALANT

RESTROOM SIDECORRIDOR SIDE

PAINTED CMU

WALL TYPE 980:

UL --

RATING 0 HOUR

STC ---

METAL STUD / CEMENT BOARD

3 5/8" 20 GAUGE CORROSION-

PROTECTED STEEL STUDS AT

24" O.C. (MAX)

(1) LAYER 5/8" CEMENT

BOARD ONE SIDE TO TOP

OF STUD

3 5/8" 20 GAUGE

CORROSION-PROTECTED

STEEL RUNNERS TOP &

BOTTOM

SLAB

T.O. ADJACENT CMU

SCHEDULED

CEILING

4 1/4"

ACOUSTICAL SEALANT

WALL TYPE 411:

UL --

RATING 0 HOUR

STC ---

CMU / HAT CHANNEL/ CEMENT BOARD

4"x8"x16" CMU

(1) LAYER 5/8" CEMENT

BOARD ONE SIDE TO TOP

OF CMU

SLAB

MATCH EXIST. CMU

7/8" METAL HAT CHANNEL

411A

5 1/8"

ACOUSTICAL SEALANT

PAINTED CMU

SCHEDULED

CEILING

RESTROOM SIDECORRIDOR SIDE

WALL TYPE 920:

UL --

RATING 0 HOUR

STC ---

METAL STUD / SOUND INSULATION / GYPSUM WALL BOARD

3 5/8" 25 GAUGE CORROSION-

PROTECTED STEEL STUDS

AT 24" O.C. (MAX)

ACOUSTIC INSULATION

3 5/8" 20 GAUGE

CORROSION-PROTECTED

STEEL RUNNERS TOP &

BOTTOM

(1) LAYER 5/8" CEMENT

BOARD EACH SIDE

SLAB

T.O. ADJACENT CMU

SCHEDULED

CEILING

4 7/8"

ACOUSTICAL SEALANT

WALL TYPE 921:

UL --

RATING 0 HOUR

STC ---

METAL STUD / SOUND INSULATION / GYPSUM WALL BOARD/ CEMENT BOARD

3 5/8" 25 GAUGE CORROSION-

PROTECTED STEEL STUDS

AT 24" O.C. (MAX)

ACOUSTIC INSULATION

3 5/8" 20 GAUGE

CORROSION-PROTECTED

STEEL RUNNERS TOP &

BOTTOM

(1) LAYER 5/8" CEMENT

BOARD ONE SIDE

SLAB

T.O. ADJACENT CMU

SCHEDULED

CEILING

ACOUSTICAL SEALANT

(1) LAYER 5/8" MOISTURE

RESISTANT WALL BOARD

ONE SIDE

4 7/8"

NOTCHED STUD TRACK, MIN 20

GA.

VA

R

IE

S

SE

E

D

ET

AI

LS

PROVIDE BLOCKING WHERE FASTENERS ARE

LOCATED AT WALL MOUNTED ITEMS (TYPICAL).

SECURE BLOCKING W/ 2 SCREWS PER STUD

SCHEDULED PARTITION FRAMING

SCHEDULED PARTITION

SHEATHING

NKB

N. .______________________________________________________

ARCHITECTURE & ENGINEERING, PC..

K BHANDARI

SHEET SIZE: 24" x 36"

DRAWING NO: SHEET: FACILITY NO:

OF

SHEET TITLE:

PROJECT TITLE:

Rev. Date Description Drawn Approved

DATE:

PROJECT MANAGER:

PROJECT NO:

DRAFTER:

Rome Research Site

Air Force Research Laboratory

Rome Research Site, New York

RIO:

RIOCC:

RIOS:

66abw/def:

RIOC:

RIOCO:

RIOF:

USER:

RIOCC:

RIOCV:

DET 4/SE:

USER:DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DESIGNER:

B-106

DESIGN FIRM NKB# 16340.03

NYS Education Law, Section 7209 Prohibits any person to alter these drawings other than a licensed architect or the design engineer. Information on these drawings remainsthe property of the licensed professionals who prepared them and may only be used on the project identified below.

Copyright 2017 N.K. BHANDARI, Architecture & Engineering, P.C.

CONSULTANT:

6/6/2017 9:37:52 AM

3 12A-002 05/15/17

PARTITION TYPES

Modernize Restrooms D233 & D235, B-106

ULDF 160044AE

KRS

KRS

DBH

PARTITION TYPE CODE EXAMPLEPARTITION NOTES - GWB

1 ALL DIMENSIONS ARE NOMINAL TO FACE OF GWB. WHERE CERAMIC TILE IS

SCHEDULED, DIMENSIONS ARE TO FACE OF GWB.

2 ALL METAL FRAMING TO BE 3 5/8” UNLESS OTHERWISE NOTED. METAL STUDS

TO BE PLACED 16” ON CENTER. WHERE REQUIRED STUD WIDTH CANNOT BE

INSTALLED, PROVIDE STUD WIDTH, FRAMING OF SUITABLE GAGE AND STYLE

TO SUIT JOB CONDITION.

3 ALL GYPSUM BOARD (GWB) TO BE 5/8” TYPE-X 1 HOUR FIRE RATED. AT

SHOWER, TUB, LOCKER ROOM OR WET AREAS ALL GWB (CEILINGS OR

PARTITIONS) TO BE MOISTURE RESISTANT TYPE. AT CERAMIC TILE AREAS

PROVIDE CEMENT BACKER UNIT (CEMENT BOARD) IN LIEU OF GWB TO

RECEIVE CERAMIC TILE.

4 PROVIDE ACOUSTICAL SEALANT AT ALL PARTITIONS, PERIMETERS,

RUNNERS, ELECTRICAL OUTLETS, PENETRATIONS AND OPENINGS, TO

MINIMIZE SOUND TRANSMISSION. ELECTRICAL OUTLETS SHALL BE

SEPARATED BY MINIMUM ONE STUD, BACK TO BACK RECEPTACLES ARE NOT

ACCEPTABLE.

5 ALL PARTITIONS TO RECEIVE 3” SOUND ATTENUATION BLANKET UNLESS

INDICATED IN PARTITION REMARKS SECTION OF PARTITION SYMBOL.

6 PROVIDE FIRE RATED PARTITIONS WHERE INDICATED. FIRE STOP/FIRE SAFE

AND SMOKE STOP ALL PENETRATIONS THROUGH PARTITIONS, GAPS AND

JOINTS. ALL FIRE RATED PARTITION ASSEMBLIES SHALL EXTEND FULL

HEIGHT UNLESS OTHERWISE NOTED. FIRE RATED PARTITION TERMINATIONS

SHALL BE FIRE STOPPED/FIRE SAFED TO PROVIDE THE SCHEDULED FIRE

RESISTANCE RATING. REFER TO BUILDING CODE REVIEW PLAN(S).

7 WHERE GWB PARTITION EDGE ALIGNS WITH CMU PARTITION EDGE, ADJUST

ALIGNMENT SO THAT GWB SURFACE LAMINATES OVER CMU, EXTEND GWB

TO CORNER.

8 METAL STUDS IN CHASE PARTITIONS TO BE BRACED TO EACH OTHER AT 1/3

POINTS.

9 PROVIDE SOLID BLOCKING AT ALL WALLS RECEIVING WALL MOUNTED

EQUIPMENT AND/OR ACCESSORIES. COORDINATE WITH ALL TRADES AND

OWNERS EQUIPMENT/FURNITURE LAYOUTS.

10 ALL RECESSED ITEMS SUCH AS ELECTRICAL PANELS, FIRE HOSE AND

EXTINGUISHER CABINETS, ETC., LOCATED IN FIRE RATED PARTITION

ASSEMBLIES SHALL BE BACKED W/ GWB AS REQUIRED TO MAINTAIN FIRE

RESISTANCE RATING.

11 WHERE INSULATION EXTENDS FULL HEIGHT AND IS NOT CONCEALED BY

GYPSUM BOARD, PROVIDE COMPRESSION RODS OR SUITABLE FRAMING TO

SUPPORT INSULATION.

12 GWB CONSTRUCTION SHALL BE ISOLATED WITH CONTROL JOINTS WHERE:

- PARTITIONS OR CEILINGS OF DISSIMILAR CONSTRUCTION MEET AND

REMAIN IN THE SAME PLANE.

- WHERE WINGS OF “L”, “U”, & “T” SHAPED CEILING AREAS ARE JOINED.

- EXPANSION OR CONTROL JOINTS OCCUR IN THE BUILDING STRUCTURE OR

WALL CONSTRUCTION. PROVIDE CONTROL JOINTS IN THE FACE OF GWB

PARTITIONS AND CEILINGS WHEN THE SIZE OF THE SURFACE EXCEEDS THE

FOLLOWING CONTROL JOINT SPACING:

- PARTITIONS: 30’ MAXIMUM IN EITHER DIRECTION.

- INTERIOR CEILINGS: 50’ MAX IN EITHER DIRECTION (W/PERIMETER RELIEF).

30’ MAX IN EITHER DIRECTION (W/O PERIMETER RELIEF).

13 PARTITION TYPES ARE INDICATED ON FLOOR PLANS. EACH PARTITION TYPE

SCHEDULED PROVIDES A COMPLETE ASSEMBLY DESCRIPTION INCLUDING

METAL STUD SIZE, THICKNESS AND NUMBER OF LAYERS OF GWB REQUIRED.

SOUND ATTENUATION BLANKET, AND OTHER DATA, WHERE PARTITION TYPES

ARE NOT INDICATED ON FLOOR PLANS, PROVED THE FOLLOWING:

- 3 5/8” METAL STUDS, (MIN GAUGE OF 20)

- (1) LAYER 5/8” GWB (BOTH SIDES).

- SOUND ATTENUATION BLANKET IN STUD CAVITY.

1" = 1'-0"

WALL TYPE 413

1" = 1'-0"

WALL TYPE 980

1" = 1'-0"

WALL TYPE 411

1" = 1'-0"

WALL TYPE 920

1" = 1'-0"

WALL TYPE 921

3/4" = 1'-0"A-002

7 TYPICAL BLOCKING DETAIL

WH

PF

EX.CO

EX.FD

EX.

FD1

3' - 2 1/2"

1' - 1 5/8"

2' - 0" 2' - 6" 3' - 8 5/8" 3' - 6"

9 9

MEN'S

RESTROOM

D233

WOMEN'S

RESTROOM

D235

JAN. CLO.

D-1

/4

6'

0"

EXISTING SPRINKLER

HEADS TO REMAIN

(TYP.)

MEN'S

RESTROOM

D233

WOMEN'S

RESTROOM

D235

JAN. CLO.

D-1

411A

1'

6"

AE103

AE102 96

AE1021 3

1 2

195 SF

MEN'S

RESTROOM

D233

204 SF

WOMEN'S

RESTROOM

D235

21 SF

JAN. CLO.

D-1 1

/8

6'

1/

8" 1'

7"

V.

I.F

4'

3/ 8"

5' -0

M

IN

. C

LR

1"

M

IN

3'

0" 1"

M

IN

3'

0"

M

IN

. C

LR

5'

0" 1"

M

IN

3'

0" 1"1'

6"

3'

0" 1'

6"

4' - 6" 7' - 9 3/8"

1'

8"

V.

I.F

2'

/8

1'

8"

AE102

6' - 10 1/8" 5' - 3 1/2" 3 5/8"

2' - 3"

5' - 0"

5' - 0"

4 4

AE102

CORRIDOR

D

2'

1/

8" 1"

2'

9"

TEMPORARY

CONSTRUCTION

BARRICADE

4"

4"

LINE OF NEW TOILET

PARTITONS BELOW (TYP.)

17TYP.

17 TYP.

MEN'S

RESTROOM

D233

WOMEN'S

RESTROOM

D235

JAN. CLO.

D-1

A.F.F.

2' x 2' ACT System

8' - 0" A.F.F.

2' x 2' ACT System

8' - 0"

CORRIDOR

D

CEILING TO BE

DEMOLISHED

KEY

NKB

N. .______________________________________________________

ARCHITECTURE & ENGINEERING, PC..

K BHANDARI

SHEET SIZE: 24" x 36"

DRAWING NO: SHEET: FACILITY NO:

OF

SHEET TITLE:

PROJECT TITLE:

Rev. Date Description Drawn Approved

DATE:

PROJECT MANAGER:

PROJECT NO:

DRAFTER:

Rome Research Site

Air Force Research Laboratory

Rome Research Site, New York

RIO:

RIOCC:

RIOS:

66abw/def:

RIOC:

RIOCO:

RIOF:

USER:

RIOCC:

RIOCV:

DET 4/SE:

USER:DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DESIGNER:

B-106

DESIGN FIRM NKB# 16340.03

NYS Education Law, Section 7209 Prohibits any person to alter these drawings other than a licensed architect or the design engineer. Information on these drawings remainsthe property of the licensed professionals who prepared them and may only be used on the project identified below.

Copyright 2017 N.K. BHANDARI, Architecture & Engineering, P.C.

CONSULTANT:

6/6/2017 9:37:54 AM

4 12AE101 05/15/17

FLOOR & CEILING PLANS

Modernize Restrooms D233 & D235, B-106

ULDF 160044AE

KRS

KRS

DBH

1/4" = 1'-0"AE101

1 DEMOLITION FLOOR PLAN

1/4" = 1'-0"AE101

2 DEMOLITION CEILING PLAN

1/4" = 1'-0"AE101

3 RENOVATION FLOOR PLAN

1/4" = 1'-0"AE101

4 RENOVATION CEILING PLAN

DEMOLITION FLOOR & CEILING PLAN- KEYED NOTES- SHEET AE101

NUMBER DESCRIPTION

1 REMOVE EXISTING WATER CLOSETS, LAVATORIES AND URINALS. EXISTING PLUMBING

INSULATION IN CHASE WALLS CONTAINS ASBESTOS CONTAINING MATERIALS. FOLLOW PROPER

ASBESTOS ABATEMENT PROCEDURES DURING REMOVALS AND DISPOSAL. SEE PLUMBING

DRAWINGS FOR SCHEDULED WORK.

2 REMOVE EXISTING SERVICE SINK AND WATER HEATER. REATAIN WATER HEATER FOR REUSE.

EXISTING PLUMBING INSULATION IN CHASE WALLS CONTAINS ASBESTOS CONTAINING

MATERIALS. FOLLOW PROPER ASBESTOS ABATEMENT PROCEDURES DURING REMOVALS AND

DISPOSAL. SEE PLUMBING PLANS FOR SCHEDULED WORK.

3 REMOVE EXISTING DRINKING FOUNTAIN. EXISTING PLUMBING INSULATION IN CHASE WALLS

CONTAINS ASBESTOS CONTAINING MATERIALS. FOLLOW PROPER ASBESTOS ABATEMENT

PROCEDURES DURING REMOVALS AND DISPOSAL. SEE PLUMBING PLANS FOR SCHEDULED

WORK.

4 REMOVE EXISTING LAVATORIES AND COUNTERTOPS. EXISTING PLUMBING INSULATION IN

CHASE WALLS CONTAINS ASBESTOS CONTAINING MATERIALS. FOLLOW PROPER ASBESTOS

ABATEMENT PROCEDURES DURING REMOVALS AND DISPOSAL. SEE PLUMBING DRAWINGS FOR

SCHEDULED WORK.

5 REMOVE EXISTING PARTITIONS AND FINISHES FROM LOCATIONS SHOWN. REMOVE EXISTING

G.W.B. AND FINISHES FROM RESTROOM PARTITIONS THAT WILL REMAIN.

6 REMOVE EXISTING DOOR AND FRAMES. EXISTING JAN. CLOSET DOOR CONTAINS ASBESTOS

CONTAINING MATERIALS. FOLLOW PROPER ASBESTOS ABATEMENT PROCEDURES DURING

REMOVALS AND DISPOSAL.

7 REMOVE EXISTING COUNTER.

8 REMOVE EXISTING TOILET PARTITIONS AND URINAL SCREENS.

9 REMOVE EXISTING FLOOR TILE AND MUDSET BACK TO CONCRETE SLAB.

10 REMOVE EXISTING VCT FLOORING FROM BELOW DRINKING FOUNTAIN AND AT AREAS WHERE

PARTITONS ARE BEING REMOVED. PREPARE TO INSTALL FLOORING TO MATCH EXISTING

WHERE EXISTING WAS REMOVED.

11 INSTALL TEMPORARY CONSTRUCTION BARRICADE OF 3-5/8" METAL STUD AND G.W.B. FROM

FLOOR TO CEILING DURING DEMOLITION AND CONSTRUCTION PERIODS. BARRICADE TO BE

CONSTRUCTED SO THAT A 44" CLERANCE IS MAINTAINED IN THE CORRIDOR.

12 REMOVE WALL MIRRORS, AND RESTROOM ACCESSORIES. RETAIN SOAP DISPENSERS, HAND

DRYERS AND TOILET PAPER DISPENSERS FOR REUSE. OWNER SHALL PROVIDE ADDITIONAL

ITEMS AS NEEDED.

13 REMOVE EXISTING ACT CEILING TILE AND GRID, LIGHT FIXTURES AND HVAC DIFFUSERS. SEE

REFLECTED CEILING PLAN AND MEP DRAWINGS FOR SCHEDULED WORK

14 REMOVE EXISTING ASBESTOS CONTAINING CEILING MATERIAL, LIGHT FIXTURES AND HVAC

DIFFUSERS. PROVIDE PROPER ASBESTOS ABATEMENT PROCEDURES DURING REMOVALS AND

DISPOSAL. PROTECT SPRINKLERS. SEE REFLECTED CEILING PLAN AND MEP DRAWINGS FOR

SCHEDULED WORK

15 PROTECT EXISTING CEILING TILE AND GRID WHERE PARTITONS ARE BEING REMOVED.

16 REMOVE AND RELOCATE EXISTING F/A HORNS AND STROBES. SEE F/A PLANS FOR SCHEDULED

WORK

RENOVATION FLOOR & CEILING PLAN - KEYED NOTES- AE101

NUMBER DESCRIPTION

1 REINSTALL WATER HEATER ABOVE MOP SINK ON MECHANICAL LOFT SPACE. PROVIDE DRAIN

PAN AND DRAIN LINE TO MOP SINK BELOW.

2 INSTALL NEW METAL STUD AND GYPSUM WALL BOARD PARTITIONS TO HEIGHT OF EXISTING

ADJACENT CMU PARTITIONS. PROVIDE CEMENT BOARD AT WALL TILE AND MOISTURE

RESISTANT WALL BOARD AT ALL WET LOCATIONS. PROVIDE FIBERGLASS REINFORCED PANELS

ON WALL IN JANITORS CLOSET TO 4''0" A.F.F. SEE PARTITION TYPES FOR DETAILS.

3 INFILL OPENING WITH CMU AND FUR WITH METAL STUD AND G.W.B TO MATCH EXTISTING

PARTITION THICKNESS AND FINISH. ALL MASONRY WALL INFILLS SHALL BE TOOTHED-IN.

4 INSTALL NEW DOORS AND HARDWARE AS SCHEDULED.

5 INSTALL NEW LAVATORIES AND COUTERTOPS AS SCHEDULED. SEE ELEVATIONS FOR DET AILS.

6 INSTALL NEW MOP SINK AS SCHEDULED. SEE PLUMBING PLANS FOR SCHEDULED WORK.

7 INSTALL NEW WATER CLOSETS AND URINALS AS SCHEDULED. SEE PLUMBING PLANS FOR

SCHEDULED WORK.

9 INSTALL NEW AND RELOCATED RESTROOM ACCESSORIES. SEE ELEVATIONS AND SCHEDULES

FOR DETAILS.

10 INSTALL NEW SOLID PHENOLIC TOILET PARTITIONS AND URINAL SCREENS.

11 INSTALL NEW ADA HEIGHT DRINKING FOUNTAIN AND HYDRATION STATION. SEE PLUMBING

PLANS FOR SCHEDULED WORK.

12 INSTALL NEW WALL AND FLOOR TILE IN RESTROOMS. TILE TO BE SET IN MUDSET AND BE

FINISHED AT SAME FLOOR ELEVATION AS CORRIDOR FLOOR FINISH. SEE FLOOR FINISH PLANS, ELEVATIONS AND SCHEDULES FOR DETAILS

13 INSTALL NEW FLOOR TILE IN JANITOR'S CLOSET. TILE TO BE SET IN MUDSET AND BE FINISHED

AT SAME FLOOR ELEVATION AS CORRIDOR FLOOR FINISH. SEE FLOOR FINISH PLAN AND

SCHEDULES FOR DETAILS.

14 INSTALL NEW FLOORING IN CORRIDOR WHERE EXISTING WAS REMOVED. FLOORING TO MATCH

EXISTING IN COLOR, SIZE, AND FINISH. SEE FLOOR FINISH PLAN FOR DETAILS.

15 RELOCATE EXISTING WATER HEATER ABOVE CEILING IN MECHANICAL SPACE. SEE PLUMBING

PLANS FOR SCHEDULED WORK AND DETAILS.

16 INSTALL NEW WALL MOUNTED LINEAR DIRECT AND INDIRECT LED LIGHT FIXTURES. SEE

ELEVATIONS FOR MOUNTING HEIGHTS AND ELECTRIC DRAWINGS FOR SCHEDULED WORK.

17 INSTALL NEW 2X2 DIRECT AND INDIRECT LED LIGHT FIXTURES. SEE ELECTRIC DRAWINGS FOR

SCHEDULED WORK.

18 RELOCATE EXISTING F/A HORN AND STROBE DEVICES. COORDINATE WITH F/A PLANS FOR

SCHEDULED WORK.

19 INSTALL NEW CEILING TILE AND GRID AT HEIGHT SHOWN. RELOCATE EXISTING SPRINKLER

HEADS AND COORDINATE WITH NEW CEILING, LIGHTING AND HVAC GRILLES..

GENERAL FLOOR PLAN NOTES

1 PATCH , REPAIR, AND LEVEL EXISTING CONCRETE FLOOR AS REQUIRED TO

RECEIVE SCHEDULED FINISHES.

GENERAL REFLECTED CEILING NOTES

1 MECHANICAL, ELECTRICAL, AND FIRE PROTECTION WORK SHOWN ON

REFLECTED CEILING PLAN IS SHOWN FOR REFERENCE ONLY. REFER TO M. E.

FP. DRAWINGS FOR MORE INFORMATION ON THE SCOPE OF THIS WORK.

2 CEILINGS TO BE AT 10’-0” UNLESS NOTED OTHERWISE.

Level 2 110' - 8"

M1 M1

6'

6" R

EF

LE

C

TI

VE

S

U R

FA

C

E

3'

4"

2'

PPB1

CT1

PPB1

CT1

SSM1

COUNTERTOP,

BACKSPLASH &

APRON

F/A DEVICES

8'

0"

CT2

CT1

CT2

CT1

4'

4"

1'

4" 2'

4"

HD1

TR1

PAPER TOWEL

DISPENSER BY OWNER

SOAP DISPENSERS

BY OWNER

3'

8"

Level 2 110' - 8"

2'

CT2

PPB1

SOLID PHENOLIC

TOILET

PARTITIONS

NEW TOILET

NEW LIGHT

FIXTURE

9"

CT1

CT1

2'

4" 1'

4"

4'

4"

8'

0"

PAPER TOWEL

DISPENSER BY

OWNER

TR1

Level 2 110' - 8"

CT2

PPB1 PPB1

TO

R

IM

1'

5"

URINAL SCREEN

SOLID PHENOLIC

TOILET PARTITIONS

8'

0"

ADA URINAL

CT1

CT1

CT2

CT1

CT1

4'

4" 1'

4"

2'

0"

Level 2 110' - 8"

PNT- DOOR FRAMES

CLEAR COAT FINISH

ON DOORS

CT2

PPB1

2'

1' - 0" 3' - 6"

M

IN

1'

6"

GB42

GB36 8'

0"

1'

5"

CT1

CT1

4'

4" 1'

4"

2'

4"

9"

TOILET PAPER

DISPENSER BY OWNER

Level 2 110' - 8"

NEW LIGHT FIXTURE

SSM1

COUNTERTOP,

BACKSPLASH, &

APRON

CT1

PPB1 PPB1

8'

0"

2'

M1

6'

6"

PNT- DOOR FRAMES

CLEAR COAT FINISH

ON DOORS

CT2

CT1

4'

4" 1'

4"

2'

4"

SOAP DISPENSER

BY OWNER

Level 2 110' - 8"

NEW LIGHT FIXTURES

M1 M1

SOLID PHENOLIC

TOILET

PARTITIONS

PPB1 PPB1

CT1

CT1

CT1

CT2

4'

4" 1'

4"

2'

4"

HD1

R

EF

LE

C

TI

VE

S U

R

FA

C E

3'

4"

SOAP DISPENSERS

PROVIDED BY OWNER

SSM1 COUNTERTOP,

BACKSPLASH & APRON

Level 2 110' - 8"

SOLID PHENOLIC

TOILET

PARTITIONS

F/A DEVICES

CT1

PPB1PPB1

CT2

CT1

2'

4" 1'

4"

4'

4"

8'

0"

TOILET PAPER

DISPENSER BY

OWNER

SN1

Level 2 110' - 8"

8'

0"

F/A DEVICES

CT1

PPB1

CT2

CT1

4'

4" 1'

4"

2'

4"

Level 2 110' - 8"

SN1

GB42

GB36

1'

6"

3' - 6" 1' - 0"

2'

9"

TOILET PAPER

DISPENSER BY OWNER

Level 2 110' - 8"

HD1

2'

4" 1'

4"

4'

4"

8'

0"

2'

CT2

CT1

CT1

TR1

PAPER TOWEL

DISPENSER BY

OWNER

NKB

N. .______________________________________________________

ARCHITECTURE & ENGINEERING, PC..

K BHANDARI

SHEET SIZE: 24" x 36"

DRAWING NO: SHEET: FACILITY NO:

OF

SHEET TITLE:

PROJECT TITLE:

Rev. Date Description Drawn Approved

DATE:

PROJECT MANAGER:

PROJECT NO:

DRAFTER:

Rome Research Site

Air Force Research Laboratory

Rome Research Site, New York

RIO:

RIOCC:

RIOS:

66abw/def:

RIOC:

RIOCO:

RIOF:

USER:

RIOCC:

RIOCV:

DET 4/SE:

USER:DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DESIGNER:

B-106

DESIGN FIRM NKB# 16340.03

NYS Education Law, Section 7209 Prohibits any person to alter these drawings other than a licensed architect or the design engineer. Information on these drawings remainsthe property of the licensed professionals who prepared them and may only be used on the project identified below.

Copyright 2017 N.K. BHANDARI, Architecture & Engineering, P.C.

CONSULTANT:

6/6/2017 9:37:58 AM

5 12AE102 05/15/17

ELEVATIONS

Modernize Restrooms D233 & D235, B-106

ULDF 160044AE

KRS

KRS

DBH

1/2" = 1'-0"AE101 AE102

1 WEST ELEVATION MEN'S RESTROOM

1/2" = 1'-0"AE101 AE102

2 NORTH ELEVATION MEN'S RESTROOM

1/2" = 1'-0"AE101 AE102

3 EAST ELEVATION MEN'S RESTROOM

1/2" = 1'-0"AE101 AE102

4 SOUTH ELEVATION MEN'S RESTROOM

1/2" = 1'-0"AE101 AE102

5 SOUTH ELEVATION WOMEN'S RESTROOM

1/2" = 1'-0"AE101 AE102

6 WEST ELEVATION WOMEN'S RESTROOM

1/2" = 1'-0"AE101 AE102

7 NORTH ELEVATION WOMEN'S RESTROOM

1/2" = 1'-0"AE101 AE102

9 EAST ELEVATION WOMEN'S RESTROOM

1/2" = 1'-0"AE101 AE102

8 ADA TOILET STALL ELEVATION

1/2" = 1'-0"AE101 AE102

10 NORTH ELEVATION WOMEN'S RESTROOM 2

Level 2 110' - 8"

1 3 2

NEW ADA DRINKING

FOUNTAIN & WALL

MOUNTED HYDRATION

STATION

VINYL BASE TO

MATCH EXISTING

ADJACENT

PAINT EXISTING AND

INFILLED CMU WALLS

TO MATCH EXISTING

ADJACENT

PAINT NEW G.W.B. TO

MATCH EXISTING ADJACENT

PAINT COLOR

3'

2'

6"

CLEAR COAT FINISH ON

DOORS PAINT FRAME TO

MATCH OTHERS IN

CORRIDOR

TYPE H1

HOLLOW METAL

MASONRY FRAME

0' - 2" 0' - 2"

DOOR WIDTH

0'

4"

SCHEDULED DOOR

JAMB BEYOND

BACK TO BACK STEEL

ANGLE HEADER FULL

GROUTED CMU CORES

HOLLOW METAL FRAME

FULLY GROUT FRAME

SCHEDULED WALL

CONSTRUCTION

T1

• INTERIOR

• MARBLE THRESHOLD

C .L

. T

YP

IC

AL

L O

C

KS

ET

3'

5/

C .L

. D

EA

D B

O

LT

4'

0"

C .L

. E

XI

T D

E V

IC

E

3'

5/

C .L

. P U

LL

P

LA

TE

P U

SH

P

L A

TE

3'

6"

AR

M

O R

PL

AT

E

2'

KI

C

KP

LA

TE

1'

4"

EQ

EQ

/4 " M

AX

" M

AX

FINISH FLOOR

HARDWARE SET #1

QTY ITEM DESCRIPTION

HARDWARE SCHEDULE

3 HINGES

PUSH PLATE

HARDWARE SET #2

3 HINGES

LOCK SET (STORAGE)

WALL STOP

SILENCERS

BEST LOCK - LOCKSET

STANLEY

40H7-D-15M x 26D BHMA 630

BHMA 630

CYLINDER

FBB 179 x 4-1/2 x 4-1/2 x 26D

BEST LOCK - CYLINDERS 7 PIN INTERCHANGEABLE BHMA 630

GRAY

WALL STOP

SILENCERS

CLOSER SARGENT 281 P1O x EN

WS 407 CVX x 26DIVES BHMA 630

IVES SR64 GRAY

BHMA 626

IVES

STANLEY BHMA 630FBB 168 x 4-1/2 x 4-1/2 x 26D

1 KICKPLATE 8400 10" x 34"IVES BHMA 630

8200 (6 x 16) x 32D BHMA 630

1 KICKPLATE

MANUFACTURER FINISH REMARKS

1 PULL PLATE IVES BHMA 6308308-8 (6 x 16) x 32D

8400 10" x 34"IVES BHMA 630

IVES SR64

WS 407 CVX x 26DIVES BHMA 630

Level 2 110' - 8"

FRP-1

4'

0" 4'

0"

PNT-1

8'

0"

MOP SINK

SCHEDULED DOOR

FULLY GROUT FRAME

SCHEDULED WALL

CONSTRUCTION

HOLLOW METAL FRAME

H-2-A-0

DOOR MATERIAL

LEAF CONFIGURATION

FIRE RATING

GLAZING

DOOR MATERIALS

A F G H P S W

ALUMINUM

FABRIC

GLASS

HOLLOW METAL

FRP

STEEL

WOOD

LEAF CONFIGURATION

SINGLE

PAIR

SINGLE ACCESS

DOOR

GLAZING

A B

C

D

FLUSH

NARROW TEMPERED

VISION GLASS

HALF-GLASS,

TEMPERED

VISION GLASS

FULL- GLASS

TEMPERED,

INSULATED VISION

GLASS

FIRE RATING

NOT RATED

20 MINUTE

30 MINUTE

45 MINUTE

60 MINUTE

90 MINUTE

NKB

N. .______________________________________________________

ARCHITECTURE & ENGINEERING, PC..

K BHANDARI

SHEET SIZE: 24" x 36"

DRAWING NO: SHEET: FACILITY NO:

OF

SHEET TITLE:

PROJECT TITLE:

Rev. Date Description Drawn Approved

DATE:

PROJECT MANAGER:

PROJECT NO:

DRAFTER:

Rome Research Site

Air Force Research Laboratory

Rome Research Site, New York

RIO:

RIOCC:

RIOS:

66abw/def:

RIOC:

RIOCO:

RIOF:

USER:

RIOCC:

RIOCV:

DET 4/SE:

USER:DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DESIGNER:

B-106

DESIGN FIRM NKB# 16340.03

NYS Education Law, Section 7209 Prohibits any person to alter these drawings other than a licensed architect or the design engineer. Information on these drawings remainsthe property of the licensed professionals who prepared them and may only be used on the project identified below.

Copyright 2017 N.K. BHANDARI, Architecture & Engineering, P.C.

CONSULTANT:

6/6/2017 9:37:59 AM

6 12AE103 05/15/17

ELEVATIONS, DOOR

SCHEDULE & DETAILS

Modernize Restrooms D233 & D235, B-106

ULDF 160044AE

KRS

KRS

DBH

1/2" = 1'-0"AE101 AE103

1 NORTH ELEVATION CORRIDOR

DOOR SCHEDULE NOTES

1 ALL DOORS TO BE 1 ¾” THICK X 84” HIGH UON. ALL FRAMES TO BE 16 GA FULLY WELDED HOLLOW METAL. PROVIDE ANCHORAGE TYPE TO SUIT WALL CONSTRUCTION. ALL FRAMES TO OVERLAP WALL FINISH. PROVIDE 20 GA STUDS AT JAMBS IN GYPSUM BOARD WALLS.

2 ALL VISION PANELS IN RATED DOORS AND FRAMES TO BE ¼” THICK FIRE RATED GLAZING. ALL VISION PANELS IN NON-RATED DOORS AND FRAMES TO BE LAMINATED SAFETY GLASS UON. ALL EXTERIOR DOOR LIGHTS, TRANSOMS, AND SIDELIGHTS TO BE 1” INSULATING TEMPERED GLASS UON.

3 WHERE RATED DOORS ARE INDICATED, DOOR FRAME RATING TO EQUAL DOOR RATING. FRAMES FOR WINDOWS INSTALLED IN RATED PARTITIONS TO

BE RATED SAME AS DOOR FRAMES AND BE COMPATIBLE WITH WALL TYPE.

4 “EX” AT SCHEDULE DENOTES EXISTING. VERIFY HEIGHT & WIDTH IN FIELD.

5 DOOR WIDTH IS INDICATED IN INCHES. TWO NUMBERS SEPARATED BY A SLASH (/) INDICATES DOUBLE DOORS.

6 UL LABELS: A LABEL = 3 HOURS

B LABEL = 1 ½ HOURS

C LABEL = ¾ HOUR

7 FINISHED DOOR OPENINGS SHALL BE NOMINAL 6” FROM FINISHED CORNER OF ROOM AT HINGE SIDE, EXCEPT WHERE DIMENSIONED OTHERWISE. ON THE “PULL” SIDE OF A DOOR OPENING, THE STRIKE SIDE SHALL BE NOMINAL 18” FROM A PERPENDICULAR WALL. ON THE “PUSH” SIDE OF A DOOR OPENING EQUIPPED WITH BOTH A CLOSER AND LATCH, THE STRIKE SIDE SHALL BE NOMINAL 12” FROM A PERPENDICULAR WALL.

8 ALL MASONRY OPENINGS TO RECEIVE LINTELS. SEE LINTEL SCHEDULE.

1/4" = 1'-0"AE103

4 DOOR FRAME TYPES

1 1/2" = 1'-0"AE103

3 DOOR HEAD DETAIL

6" = 1'-0"AE103

7 THRESHOLDS

3/4" = 1'-0"AE103

5 TYPICAL DOOR HARDWARE HEIGHTS

DOOR SCHEDULE

DOOR NUMBER ROOM NAME

ROOM

NUMBER TYPE

DOOR FRAME

THRESHOLD

FIRE

RATING

HARDWARE

SET REMARKS

WIDT

H

HEIGH

T THICKNESS FINISH FRAME TYPE

FRAME

MATERIAL FRAME FINISH FRAME DETAIL

1 MEN'S RESTROOM D233 W-1-A-0 3' - 0" 7' - 0" 0' - 1 3/4" MATCH SITE STANDARD

CLEAR FINISH

H1 HM PNT1 3/AE103, 6/AE103 T1 - 1 DOOR MANUFACTURER, TYPE AND FINISH SHALL BE SITE STANDARD

2 WOMEN'S RESTROOM D235 W-1-A-0 3' - 0" 7' - 0" 0' - 1 3/4" MATCH SITE STANDARD

CLEAR FINISH

H1 HM PNT1 3/AE103, 6/AE103 T1 - 1 DOOR MANUFACTURER, TYPE AND FINISH SHALL BE SITE STANDARD

3 JAN. CLO. D-1 W-1-A-0 3' - 0" 7' - 0" 0' - 1 3/4" MATCH SITE STANDARD

CLEAR FINISH

H1 HM PNT1 3/AE103, 6/AE103 T1 - 2 DOOR MANUFACTURER, TYPE AND FINISH SHALL BE SITE STANDARD

1/2" = 1'-0"AE103

2 JANITOR'S CLOSET ELEVATION

1 1/2" = 1'-0"AE103

6 DOOR JAMB DETAIL

DOOR TYPE CODE EXAMPLE

PPT1

PPT2

PPT1

PPT2

1' - 0"

1'

0"

1' - 0"

T1 THRESHOLDT1 THRESHOLD

PPT1

WOMEN'S

RESTROOM

D235

MEN'S

RESTROOM

D233

JAN. CLO.

D-1

CORRIDOR

D

DIAGONAL LINES

DENOTE AREA OF NEW

FLOORING TO MATCH

EXISTING VCT FLOORING

IN CORRIDOR FIELD

VERIFY EXTENTS

NKB

N. .______________________________________________________

ARCHITECTURE & ENGINEERING, PC..

K BHANDARI

SHEET SIZE: 24" x 36"

DRAWING NO: SHEET: FACILITY NO:

OF

SHEET TITLE:

PROJECT TITLE:

Rev. Date Description Drawn Approved

DATE:

PROJECT MANAGER:

PROJECT NO:

DRAFTER:

Rome Research Site

Air Force Research Laboratory

Rome Research Site, New York

RIO:

RIOCC:

RIOS:

66abw/def:

RIOC:

RIOCO:

RIOF:

USER:

RIOCC:

RIOCV:

DET 4/SE:

USER:DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DESIGNER:

B-106

DESIGN FIRM NKB# 16340.03

NYS Education Law, Section 7209 Prohibits any person to alter these drawings other than a licensed architect or the design engineer. Information on these drawings remainsthe property of the licensed professionals who prepared them and may only be used on the project identified below.

Copyright 2017 N.K. BHANDARI, Architecture & Engineering, P.C.

CONSULTANT:

6/6/2017 9:38:04 AM

7 12AE104 05/15/17

FINISH & EQUIPMENT

SCHEDULES

Modernize Restrooms D233 & D235, B-106

ULDF 160044AE

KRS

KRS

DBH

TOILET ACCESSORY SCHEDULE

Type Mark ITEM

BASIS OF DESIGN

FINISH COMMENTSMANUFACTURER MODEL

M1 MIRROR BOBRICK B-165 2436 S.S.

SN1 SANITARY NAPKIN DISPOSAL BOBRICK B-254 S.S.

TR1 TRASH RECEPTACLE Bobrick Washroom Equipment, Inc. B-3644 S.S.

HD1 HAND DRYER WORLD DRYER SLIM DRY - #L-973 BRUSHED S.S.

ROOM FINISH SCHEDULE

ROOM

NUMBER ROOM NAME

FLOORING CEILINGS WALLS

COMMENTSFLOOR FINISH

BASE

MATERIAL CEILING HEIGHT CEILING FINISH

WALL FINISH -

NORTH

WALL FINISH -

SOUTH

WALL FINISH -

EAST

WALL FINISH -

WEST

D CORRIDOR MATCH EXIST. MATCH EXIST. MATCH EXIST. ACT TILE/ GRID MATCH EXIST PAINT - - - D233 MEN'S RESTROOM PPT1/ PPB2 PPB1 8'-0" ACT1 CT1/ CT2 CT1/ CT2 CT1/ CT2 CT1/ CT2 D235 WOMEN'S RESTROOM PPT1/ PPB2 PPB1 8'-0" ACT1 CT1/ CT2 CT1/ CT2 CT1/ CT2 CT1/ CT2 D-1 JAN. CLO. PPT1 PPB1 8'-0" GWB/ PNT- FRP/ PNT1 FRP/ PNT1 FRP/ PNT1 FRP/ PNT1 PROVIDE FRP TO 4'-0" A.F.F. AND PAINT ABOVE TO

CEILING

FINISH LEGEND

MARK SPEC. DESCRIPTION MANUFACTURER SERIES/ MODEL COLOR COMMENTS

CT1 CERAMIC WALL TILE DALTILE ELEVARE LUNAR EL40 SIZE 4"X16"

CT2 CERAMIC WALL TILE DALTILE GLAZED/ MATTE CERAMIC TILE NAVY K189 SIZE 4"X4"

FRP-1 FIBERGLASS REINFORCED PANELS KEMLITE GLASBORD EMBOSSED WHITE 85 SIZE 4'X8'

PNT1 09 91 23 PAINT SHERWIN WILLIAMS - SW7030 ANEW GRAY LOW VOC. USED @ WALLS

PPB1 PORCELAIN BASE TILE DALTILE FORMULA AXIOM SILVER FM94 - UNPOLISHED

PPT1 PORCELAIN FLOOR TILE DALTILE FORMULA AXIOM SILVER FM94 - UNPOLISHED

PPT2 PORCELAIN FLOOR TILE DALTILE FORMULA EQUATION GREY FM96 - UNPOLISHED

SP1 SOLID PHENOLIC PANELS SCRANTON PRODUCTS HINY HIDERS SANDCASTLE - ORANGE PEEL TEXTURE

SSM1 SOLID SURFACE MATERIAL WILSONART SOLID SURFACE YUKON RIVERSTONE 919RS

GENERAL FINISH NOTES

1 PROVIDE RESILIENT EDGE AND TRANSITION STRIPS (SIZE AND TYPE TO SUIT JOB CONDITION) AT ALL CHANGES IN FLOORING MATERIAL

2 REFER TO FINISH PLANS FOR FLOOR PATTERNS, AND ACCENT WALL EXTENTS.

3 CONTRACTOR SHALL PROVIDE 12" HIGH STENCILED LETTERING FOR EACH FIRE-RATED PARTITION (I.E. TWO-HOUR) WHERE POSSIBLE. IF

NOT POSSIBLE TO DO ABOVE CEILINGS, PROVIDE THE LARGEST LETTERING POSSIBLE AS DIRECTED BY OWNER AND ARCHITECT. PAINT SHALL CONTRAST THE BACKGROUND PAINT COLOR OF THE WALL AND SHALL BE APPLIED EVERY 20 FEET (MINIMUM) OF LINEAR WALL SURFACE. PLACEMENT OF THIS SIGNAGE SHALL BE COORDINATED WITH THE OWNER AND ARCHITECT.

1/4" = 1'-0"AE102 AE104

1 FLOOR FINISH PLAN

NOTE:

1. TOILET PAPER DISPENSERS, PAPER TOWEL DISPENSERS, AND SOAP DISPENSERS SHALL BE PROVIDED BY OWNER AND

INSTALL BY CONTRACTOR. ALL OTHER ACCESSORIES SHALL BE PROVIDED AND INSTALL BE CONTRACTOR.

NOTE:

1. BRING CONCRETE FLOOR SLAB TO SMOOTH AND LEVEL SURFACE PRIOR TO INSTALLING NEW

MUDSET AND FLOOR TILE TO THICKNESS OF ADJACENT FLOOR FINISHES.

JAN. CLO.

D-1

MEN'S

RESTROOM

D233

WOMEN'S

RESTROOM

D235

JAN. CLO.

D-1

CORRIDOR

D

MEN'S

RESTROOM

D233

WOMEN'S

RESTROOM

D235

WOMEN'S

RESTROOM

D235

MEN'S

RESTROOM

D233

WOMEN'S

RESTROOM

D235

MEN'S

RESTROOM

D233

SHEET SIZE: 24" x 36"

OF

SHEET TITLE:

PROJECT TITLE:

PROJECT MANAGER:

PROJECT NO:

DRAFTER:

DESIGNER:

B-106

3/6/2017 2:10:28 PM

05/15/17

Modernize Restrooms D233

& D235, B-106

DESIGN FIRM NKB# 16340.03

NYS Education Law, Section 7209 Prohibits any person to alter these drawings other than a licensed architect or the design engineer. Information on these drawings remainsthe property of the licensed professionals who prepared them and may only be used on the project identified below.

Copyright 2017

N.K. BHANDARI, Architecture & Engineering, P.C.

CONSULTANT:

NKB

1/4" = 1'-0" P-101

DEMOLITION FLOOR PLAN

1/4" = 1'-0" P-101

RENOVATION FLOOR PLAN

1/4" = 1'-0" P-101

PARTIAL UPPER FLOOR PLAN

NOT TO SCALE

P-101

DOMESTIC WATER RISER DIAGRAM

P-101

NOT TO SCALE

P-101

SYMBOLS AND LEGEND

NOT TO SCALE

SANITARY / VENT RISER DIAGRAM

NOT TO SCALE

P-101

DEMOLITION PLAN KEYED NOTES

JAN. CLO.

D-1

CORRIDOR

D

MEN'S

RESTROOM

D233

WOMEN'S

RESTROOM

D235

JAN. CLO.

D-1

MEN'S

RESTROOM

D233

WOMEN'S

RESTROOM

D235

SHEET SIZE: 24" x 36"

OF

DRAFTER:

DESIGNER:

B-106

3/6/2017 2:10:28 PM

05/15/17

Modernize Restrooms D233

& D235, B-106

DESIGN FIRM NKB# 16340.03

NYS Education Law, Section 7209 Prohibits any person to alter these drawings other than a licensed architect or the design engineer. Information on these drawings remainsthe property of the licensed professionals who prepared them and may only be used on the project identified below.

Copyright 2017

N.K. BHANDARI, Architecture & Engineering, P.C.

CONSULTANT:

NKB

1/4" = 1'-0" M-101

DEMOLITION CEILING PLAN

1/4" = 1'-0" M-101

RENOVATION CEILING PLAN

NOT TO SCALE

M-101

SYMBOL LIST

JAN. CLO.

D-1

CORRIDOR

D

MEN'S

RESTROOM

D233

WOMEN'S

RESTROOM

D235

JAN. CLO.

D-1

MEN'S

RESTROOM

D233

WOMEN'S

RESTROOM

D235

SHEET SIZE: 24" x 36"

OF

DRAFTER:

DESIGNER:

B-106

3/6/2017 2:10:28 PM

05/15/17

Modernize Restrooms D233

& D235, B-106

DESIGN FIRM NKB# 16340.03

NYS Education Law, Section 7209 Prohibits any person to alter these drawings other than a licensed architect or the design engineer. Information on these drawings remainsthe property of the licensed professionals who prepared them and may only be used on the project identified below.

Copyright 2017

N.K. BHANDARI, Architecture & Engineering, P.C.

CONSULTANT:

NKB

1/4" = 1'-0"

FP-101

DEMOLITION CEILING PLAN

1/4" = 1'-0"

FP-101

RENOVATION CEILING PLAN

NOT TO SCALE

FP-101

KEYED NOTES (THIS SHEET)

JAN. CLO.

D-1

MEN'S

RESTROOM

D233

WOMEN'S

RESTROOM

D235

JAN. CLO.

D-1

CORRIDOR

D

MEN'S

RESTROOM

D233

WOMEN'S

RESTROOM

D235

SHEET SIZE: 24" x 36"

OF

DRAFTER:

DESIGNER:

B-106

3/6/2017 2:10:28 PM

05/15/17

Modernize Restrooms D233

& D235, B-106

DESIGN FIRM NKB# 16340.03

NYS Education Law, Section 7209 Prohibits any person to alter these drawings other than a licensed architect or the design engineer. Information on these drawings remainsthe property of the licensed professionals who prepared them and may only be used on the project identified below.

Copyright 2017

N.K. BHANDARI, Architecture & Engineering, P.C.

CONSULTANT:

NKB

1/4" = 1'-0"

FA101

DEMOLITION FLOOR PLAN

1/4" = 1'-0"

FA101

RENOVATION FLOOR PLAN

NOT TO SCALE

FP-101

KEYED NOTES (THIS SHEET)

MEN'S

RESTROOM

D233

WOMEN'S

RESTROOM

D235

JAN. CLO.

D-1

GFI

GFI

GFI

GFI

195 SF

MEN'S

RESTROOM

D233

204 SF

WOMEN'S

RESTROOM

D235

21 SF

JAN. CLO.

D-1

CORRIDOR

D

MEN'S

RESTROOM

D233

WOMEN'S

RESTROOM

D235

JAN. CLO.

D-1

CORRIDOR

D

MEN'S

RESTROOM

D233

WOMEN'S

RESTROOM

D235

JAN. CLO.

D-1

SHEET SIZE: 24" x 36"

OF

DRAFTER:

DESIGNER:

B-106

3/6/2017 2:10:28 PM

05/15/17

Modernize Restrooms D233

& D235, B-106

DESIGN FIRM NKB# 16340.03

NYS Education Law, Section 7209 Prohibits any person to alter these drawings other than a licensed architect or the design engineer. Information on these drawings remainsthe property of the licensed professionals who prepared them and may only be used on the project identified below.

Copyright 2017

N.K. BHANDARI, Architecture & Engineering, P.C.

CONSULTANT:

NKB

1/4" = 1'-0" E-101

DEMOLITION FLOOR PLAN

1/4" = 1'-0" E-101

RENOVATION FLOOR PLAN

1/4" = 1'-0" E-101

DEMOLITION CEILING PLAN

1/4" = 1'-0" E-101

RENOVATION CEILING PLAN

2 2

2 2

NOT TO SCALE

E-101

SYMBOL LIST

Architectural Dwgs
Sheets
A-001 - GENERAL NOTES, SYMBOLS & ANNOTATIONS
A-002 - PARTITION TYPES
AE101 - FLOOR & CEILING PLANS
AE102 - ELEVATIONS
AE103 - ELEVATIONS, DOOR SCHEDULE & DETAILS
AE104 - FINISH & EQUIPMENT SCHEDULES
G-001 - COVER SHEET
534048001_P-101-P-101
534048001_M-101-Work
534048001_FP101-Work
534048001_FA101-Work
534048001_E-101-Work

File details come from the government source that posted it.