Attachment_1-_Statement_Of_Work.pdf
PDF 537 KB Posted
- Attached to
- Wright Line Laboratory Furniture - CCF Federal contract opportunity
- Solicitation number
- FA8751-17-R-0033
About this file
Attachment 1 - Statement of Work
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Lab_Furniture_FINAL_-_Suite_E2.pdf | ||
| Attachment_1b-Drawings.pdf | ||
| Attachment_4_-_Request_for_Visit_Authorization_to_Rome_Research_Site.pdf | ||
| Attachment_3_-Reps_&_Certs.pdf | ||
| Attachment_1a-_Alter_CCF_Furniture_Parts_List.pdf | ||
| Attachment_2_-Brand_Name_J&A_Redacted.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
MODIFY LAB FURNITURE, IN SUITES C2, E2 AND NEW ANNEX
BUILDING 3
AT
AIR FORCE RESEARCH LABORATORY- ROME, NY
PROJECT NR: ULDF 150329 09 MAR 2017
1.01 SCOPE
A. The scope of this effort consists of furnishing all design services, delivery and labor, equipment, devices, and materials, and to perform all work required to Reconfigure existing Eaton-Wrightline Technical Lab furniture, and provide new components as required for SUITE C2, SUITE E2, and the new ANNEX Areas, all located in Building 3 at the Air Force Research Laboratory.
1.02 PRINCIPAL FEATURES:
A. The work to be performed involves the following principal features:
1. Reconfiguring/install (185) workstations in the Suite C2 Lab area/ Suite E2 Lab area and the Annex, in configurations shown to maximize new lab space provided as part of current renovation project. (See project Drawings)
2. Perform site visits and document accurate field measurements prior to ordering all lab furniture.
3. After AFRL/RIOC approval, order all new parts (see attached Parts List) and deliver new parts and materials to work area site per Phasing plan below.
4. Install complete furniture system, utilizing new and existing parts and all accessories as shown on plans. NOTE: Remove all packing materials and boxes from the job site.
5. Building 3 is a one story building so the furniture will all be delivered and installed on the same level. There is a loading dock with dock leveler.
6. Project Phasing: The project furniture will be installed in phases.
Phase 1: Install all furniture in SUITE E2, complete, including new parts and used parts from the B/2 warehouse (May/Jun 2017)
FA8751-17-R-0033
Attachment 1
Phase 2: Install all furniture for the ANNEX Areas, including new parts and parts from the B/2 warehouse/parts from Suite C2. (TBD)
Phase 3. Install all furniture for the SUITE C2 area, including new and used parts from the B/2 warehouse. Requires the disassembly of approximately 40' of existing Demountable partitions in C2-G lab and relocation of it within the same room (TBD – Aug/Sept 17)
END OF SOW