100006P1_Addendum_2.docx
DOCX document 22 KB Posted
- Attached to
- Chiller Plant Alterations and Repair
- Solicitation number
- FA8751-16-B-0002
About this file
Requirements Addendum 2
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions_ _Answers.docx | DOCX document | |
| Questions_ _Answers.docx | DOCX document | |
| FA8751-16-B-0002-0002.pdf | ||
| 3364_S_15570_9-08-2016.pdf | ||
| Questions_ _Answers.docx | DOCX document | |
| FA8751-16-B-0002-0001.pdf | ||
| Solicitation_-_Addendum_1.docx | DOCX document | |
| FA8751-16-B-0002.pdf | ||
| 16B0002_-_Attachment_2_-_Drawings.pdf | ||
| 16B0002_-_Attachment_1_-_Technical_Specifications.pdf | ||
| 16B0002_-_Attachment_3_-_Wage_Determination.pdf | ||
| 16B0002_-_Attachment_4_-_Site_Visit_Form.pdf | ||
| 16B0002_-_Attachment_5_-_Reporting_of_Hazardous_Material_For_Civilian_Contractors.pdf | ||
| Technical_Specifications_10-0006P1.pdf | ||
| Drawings_10-0006P1.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REPAIR AIR HANDLERS & CONTROLS
Building 3
Phase 1
‘CHILLER PLANT ALTERATIONS AND REPAIR (NLC)’
ADDENDUM #2
DATED: 13 SEPTEMBER 2016
1. ADD: “Specification Section 15570 Automatic Temperature Controls”.
| AFRL, Repair Air Handlers, Bldg 3 | GENERAL SCOPE |
| SECTION 01010-2 |
File details come from the government source that posted it. Updated .