Attach_2_Task_Order_1_Requirement_Docs_SOW_ _Drawings.pdf
PDF 953 KB Posted
- Attached to
- Mechanical Maintenance/Repair IDIQ Federal contract opportunity
- Solicitation number
- FA8751-15-R-0017
About this file
Atch 2 - Task Order Number 1 Requirement Documents Statement of Work
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA8751-15-R-0017-0001.pdf | ||
| Attach_5_RRS_Form_31.pdf | ||
| FA8751-15-R-0017.pdf | ||
| Attach_3_PPQ.doc | DOC document | |
| Attach_1_Mechanical_IDIQ_SPECIFICATIONS.pdf | ||
| Attach_4_Wage_Determination.pdf | ||
| 15r17_a08_acq_plan_PPQ.doc | DOC document | |
| Mechanical_IDIQ_SPECIFICATIONS.pdf | ||
| 15r17_a08_acq_plan_LM.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
FOR
Add Propane Heater, B1624/1612 Newport
PREPARED BY AFRL/RIOC
AIR FORCE RESEARCH LABORATORY
ROME RESEARCH SITE
ROME, NEW YORK
PROJECT NR: ULDF 15-0322 DATED: 7/21/2015
Attachment 2 - TO Requirements
FA8751-15-R-0017
1.01 SCOPE
A. The work covered under this contract consists of furnishing all labor, equipment, devices, materials, and performing all work required for the installation of a propane fired unit heater in Building 1624 at the Newport Test Site.
1.02 LOCATION
A. The work area is located in the Building 1624 Irish Hill of Newport Test Site, Rome, New York.
1.03 PRINCIPAL FEATURES
1. Provide and install gas unit heater according to gas unit heater schedule in location shown on contract drawing. Propane unit heater and all other installed equipment and products shall be selected to meet contract specifications and installed according to manufacturer’s recommendations.
2. Install fuel gas piping as shown on drawing. Piping shall be sized and installed according to IFGC standards. Provide shutoff valve at branch takeoff. Install all equipment, fuel gas piping, combustion air and venting in accordance with manufacturer's recommendations, ICC, IFGC, NFPA 54 & 70. Refer to contract specifications for specific installation details.
3. Provide and install electrical power and temperature control service necessary for proper operation of unit heater.
4. Test unit to verify correct operation.
1.04 GENERAL NOTES
A. The locations of all items shown on the drawings that are not definitely fixed by dimensions are approximate only. The exact locations necessary to secure the best conditions and results must be determined by the project site conditions and shall have the approval of the construction inspector before being installed.
B. Contract document drawings for mechanical work are diagrammatic only and are intended to convey scope and general arrangement only. It is the contractor’s responsibility to verify existing field conditions prior to construction.
C. The above description of work is for the purpose of general information only and is not intended to include and describe every feature of work or to define the scope of the work. Mini-Plus DAPA-XXXX-P Air Cooled Packaged Vertical Supply/Return Air Plenum, 2.5 to 3 ton
1.05 SUBMITTALS
1. Submit after award of delivery order but prior to installation:
A. Steam Unit Heater Catalog data, Operating Instructions
B1624
B1612
T
1/2"
PROPANE GAS UNIT HEATER
EXISTING PROPANE FIRED INFRARED HEATER
3/4"
NEW PROPANE
GAS SUPPLY PIPING
EXISTING PROPANE
GAS SUPPLY PIPING"
THERMOSTAT
ELECTRIC DISTRIBUTION PANEL
FEEDING UNIT HEATER
ROME RESEARCH SITE
ADD PROPANE
HEATER B1624_1612 NEWPORT
1 4 Aug. 2015
EVS
ULDF 15-0322
BLDG. 1624
MECHANICAL
M-101 1
EVS
EVS
EXISTING HANGAR HEATING SYSTEM LAYOUT
SCALE 1/4" = 1'
NOTES
1. PROVIDE AND INSTALL PROPANE UNIT HEATER ACCORDING TO GAS UNIT HEATER SCHEDULE. PROPANE UNIT HEATER
AND ALL OTHER INSTALLED EQUIPMENT AND PRODUCTS SHALL BE SELECTED TO MEET CONTRACT SPECIFICATIONS.
2. INSTALL FUEL GAS PIPING AS SHOWN ON DRAWING. PIPING SHALL BE SIZED AND INSTALLED ACCORDING TO IFGC
STANDARDS. PROVIDE SHUTOFF VALVE AT BRANCH TAKEOFF.
3. PROVIDE AND INSTALL ELECTRICAL POWER AND TEMPERATURE CONTROL SERVICE NECESSARY FOR PROPER
OPERATION OF UNIT HEATER.
4. PROVIDE AND INSTALL NECESSARY COMBUSTION AIR AND VENTING FOR GAS FIRED UNIT HEATER.
5. PROVIDE SHUTOFF VALVE IN PROPANE LINE AND ELECTRICAL DISCONNECT, OR ACCEPTABLE METHOD DISCONNECT, AT UNIT HEATER FOR ISOLATION AND SERVICING.
6. INSTALL ALL EQUIPMENT, FUEL GAS PIPING, COMBUSTION AIR AND VENTING IN ACCORDANCE WITH MANUFACTURER'S
RECOMMENDATIONS, ICC, IFGC, NFPA 54 & 70.. REFER TO CONTRACT SPECIFICATIONS FOR SPECIFIC INSTALLATION
DETAILS.
7. TEST UNIT TO VERIFY CORRECT OPERATION.
LOCATION PLAN - NEWPORT B1624/1612
WORK AREA
GENERAL NOTES
A. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE MECHANICAL
SYSTEMS AS INDICATED ON THE DRAWINGS, AS SPECIFIED AND AS REQUIRED BY CODE
B. CONTRACT DOCUMENT DRAWINGS ARE DIAGRAMMATIC ONLY AND ARE INTENDED TO CONVEY SCOPE AND GENERAL ARRANGEMENT
ONLY.
C. INSTALL ALL MECHANICAL EQUIPMENT AND APPURTENANCES IN ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS, CONTRACT
DOCUMENTS, AND APPLICABLE CODES AND REGULATIONS.
D. THE LOCATIONS OF ALL ITEMS SHOWN ON THE DRAWINGS OR CALLED FOR IN THE SPECIFICATIONS THAT ARE NOT DEFINITELY FIXED BY
DIMENSIONS ARE APPROXIMATE ONLY. THE EXACT LOCATIONS NECESSARY TO SECURE THE BEST CONDITIONS AND RESULTS MUST BE
DETERMINED BY THE PROJECT SITE CONDITIONS AND SHALL HAVE THE APPROVAL OF THE ENGINEER BEFORE BEING INSTALLED.
E. PROVIDE VIBRATION ISOLATION FOR ALL MECHANICAL EQUIPMENT TO PREVENT TRANSMISSION OF VIBRATION TO BUILDING STRUCTURE.
F. PROVIDE VIBRATION ISOLATORS FOR ALL PIPING SUPPORTS CONNECTED TO, AND WITHIN 50 FT. OF ISOLATED EQUIPMENT (EXCEPT AT
BASE ELBOW SUPPORTS AND ANCHOR POINTS) THROUGHOUT MECHANICAL EQUIPMENT ROOMS. DO THE SAME FOR SUPPORTS OF
STEAM MAINS WITHIN 50 FT. OF BOILER OR PRESSURE-REDUCING VALVES.
G. MAINTAIN A MINIMUM 6'8” CLEARANCE TO THE UNDERSIDE OF PIPES, DUCTS, CONDUITS, SUSPENDED EQUIPMENT, ETC… THROUGHOUT
ACCESS ROUTES IN MECHANICAL ROOMS.
H. ALL TESTS SHALL BE COMPLETED BEFORE ANY MECHANICAL EQUIPMENT OR PIPING INSULATION IS APPLIED
I. LOCATE ALL TEMPERATURE, PRESSURE, AND FLOW MEASURING DEVICES IN ACCESSIBLE LOCATIONS WITH THE STRAIGHT SECTION OF
PIPE OR DUCT UP AND DOWNSTREAM AS RECOMMENDED BY THE MANUFACTURER FOR GOOD ACCURACY.
J. LOCATE ALL MECHANICAL EQUIPMENT FOR UNOBSTRUCTED ACCESS TO UNIT ACCESS PANELS, CONTROLS, AND VALVING.
K. WHERE TWO OR MORE ITEMS OF THE SAME TYPE OF EQUIPMENT ARE REQUIRED, THE PRODUCT OF ONE MANUFACTURER SHALL BE
USED.
L. COORDINATE ALL EQUIPMENT CONNECTIONS WITH MANUFACTURER'S CERTIFIED DRAWINGS. COORDINATE AND PROVIDE ALL DUCT AND
PIPING TRANSITIONS REQUIRED FOR FINAL EQUIPMENT CONNECTIONS TO FURNISHED EQUIPMENT. FIELD VERIFY AND COORDINATE ALL
DUCT AND PIPING DIMENSIONS BEFORE FABRICATIONS.
M. ALL CONTROL WIRE AND CONDUIT SHALL COMPLY WITH NATIONAL ELECTRIC CODE AND DIVISION 16 OF THE SPECIFICATION.
N. THE LOCATIONS OF ALL ITEMS SHOWN ON THE DRAWINGS OR CALLED FOR IN THE SPECIFICATIONS THAT ARE NOT DEFINITELY FIXED BY
DIMENSIONS ARE APPROXIMATE ONLY. THE EXACT LOCATIONS NECESSARY TO SECURE THE BEST CONDITIONS AND RESULTS MUST BE
DETERMINED BY THE PROJECT SITE CONDITIONS AND SHALL HAVE THE APPROVAL OF THE ENGINEER BEFORE BEING INSTALLED. DO NOT
SCALE DRAWINGS.
O. ALL EQUIPMENT, PIPING, ETC. SHALL BE SUPPORTED, SPECIFIED AND REQUIRED TO PROVIDE A VIBRATION-FREE INSTALLATION.
P. REFER TO TYPICAL DETAILS FOR PIPING AND EQUIPMENT INSTALLATION.
Q. FIELD VERIFY CONDITIONS, REPORT ANY ERRORS TO PROJECT INSPECTOR
| 150322 - SOW - Add Propane Heater, B1624_B1612, Newport |
| PREPARED BY AFRL/RIOC |
| PROJECT NR: ULDF 15-0322 DATED: 7/21/2015 |
150322 - Add Propane Heater, B1624_B1612, Newport-MECH
File details come from the government source that posted it. Updated .