FA8751-11-R-0006 RFI 20 Answered.doc

DOC document 129 KB Posted

Attached to
Repair Fire Alarm System Federal contract opportunity
Solicitation number
FA8751-11-R-0006
Issued by
Department of the Air Force Materiel Command Research Laboratory

About this file

RFI 20

View the file

Other files for this federal contract opportunity

Other files attached to Repair Fire Alarm System, newest first.
File Type Posted
FA8751-11-R-0006 RFI 21 Answered.doc DOC document
RFP Q A 3 —
Addendum No. 2 dated 4 August 2011 RFP FA8751-11-R-0006 Attach 7.pdf PDF
FA8751-11-R-0006 RFI 11 Answered.doc DOC document
FA8751-11-R-0006-02.pdf PDF
FA8751-11-R-0006 additional information 3 Aug 2011.doc.docx DOCX document
Addendum 1 dated 26 July 2011 RFP FA8751-11-R-0006.pdf PDF
RFP Q A 2 —
11r6 rfp attch 5R site visit form.doc DOC document
FA8751-11-R-0006 additional information 26 July 2011.docx DOCX document
RFP Q A 1 —
FA8751-11-R-0006-01.pdf PDF
FA8751-11-R-0006 attach 3R.docx DOCX document
FA8751-11-R-0006 RFI 1 Answered.doc DOC document
FA8751-11-R-0006 additional information 19 July 2011.doc.docx DOCX document
FA8751-11-R-0006 RFI Request Form.doc DOC document
11R6 attach 4.docx DOCX document
FA8751-11-R-0006 attach 3.docx DOCX document
Drawings —
Drawings —
11r6 rfp attch 5 site visit form.doc DOC document
11R0006 Specs.zip ZIP file
FA8751-11-R-0006.pdf PDF
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Air Force

REQUEST FOR INFORMATION

Research

Project: Repair Fire Alarm System

Laboratory Contract No: FA8751-11-R-0006

RFI #: 20

PAGE

TO:

(Contracting Officer)

FROM: (Contractor)

AFRL/RIKO

Attn: Bryant Soule

26 Electronic Pkwy

Rome, NY 13441

Telephone: (315)330-4723 Fax: (315)330-2555

INFORMATION REQUESTED:
Date:
8/8/11

Question 1: Who will be responsible to provide power to the speaker array locations?

Question 2: Who shall be responsible for providing/running and terminating fiber optic cabling?

ARCHITECTURAL ENGINEER RESPONSE BY: Gary Siver
Date:
8/9/11

Question 1: The contractor is responsible for providing power to the high power speaker arrays as shown on sheet 2.

Question2: The owner will provide the fiber optic cable and termination between the buildings. The contractor is responsible for providing the fiber optic cabling and terminations between the Autonomous Control Unit/Fire Alarm Control Panels within each building.

CIVIL ENGINEERING COMMENTS BY: Mark Franz
Date:
8/9/2011

RIOC concurs with Towne’s response.