FA8751-11-R-0006 attach 3.docx
DOCX document 67 KB Posted
- Attached to
- Repair Fire Alarm System Federal contract opportunity
- Solicitation number
- FA8751-11-R-0006
About this file
Attachment 3 - Wage Rates
View the file
Other files for this federal contract opportunity
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA8751-11-R-0006 Attachment #3
GENERAL DECISION: NY20100014 06/10/2011 NY14
Date: June 10, 2011 General Decision Number: NY20100014 06/10/2011
Superseded General Decision Number: NY20080014
State: New York
Construction Type: Building
County: Oneida County in New York.
BUILDING CONSTRUCTION PROJECTS (excluding single family homes and apartment up to and including 4 stories)
Modification Number Publication Date 0 03/12/2010 1 04/16/2010 2 07/23/2010 3 09/10/2010 4 10/08/2010 5 10/15/2010 6 11/12/2010 7 12/03/2010 8 01/21/2011 9 04/22/2011 10 05/20/2011 11 06/10/2011
BRNY0002-005 06/01/2010
UTICA CHAPTER
Rates Fringes
BRICKLAYER
BRICKLAYERS, STONE MASONS,
CEMENT MASONS, PLASTERERS,
POINTERS, CLEANERS &
CAULKERS....................$ 25.16 12.80
Marble, Tile & Terrazzo Finisher.........................$ 21.36 13.40 Marble, Tile & Terrazzo Workers..........................$ 24.71 13.80
CARP0747-003 06/01/2010
Rates Fringes
CARPENTER
BUILDING CONSTRUCTION
Carpenters, Millwrights....$ 24.08 13.17 Piledriver.................$ 24.08 13.17
HEAVY & HIGHWAY
CONSTRUCTION................$ 28.44 12.40
ELEC0043-001 06/01/2010
Rates Fringes
CABLE SPLICER....................$ 33.00 3%+17.67
ELECTRICIAN......................$ 30.00 3%+17.67
ELEV0035-002 01/01/2011
Rates Fringes
Elevator Constructor.............$ 38.94 21.985
FOOTNOTES:
a. 8 PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, and the day after Thanksgiving Day, Christmas Day.
b. Employer contributes 8% of basic hourly rate for 5 years or more of service or 6% of basic hourly rate for 6 months to 5 years of service as vacation pay credit.
ENGI0545-006 06/01/2010
Rates Fringes
Power Equipment Operator Backhoe, Bulldozer, Forklift....................$ 25.79 20.30+a Crane, Loader, Roller.......$ 27.58 20.30+a
FOOTNOTE:
a. PAID HOLIDAYS: New Year's day, Memorial day, Independence Day, Labor day, Thanksgiving Day and Christmas Day, provided the employee has worked five consecutive working days before the holiday and the working day after the holiday
CRANE PREMIUMS (ADD TO GROUP 1 RATE):
Boom length incl. jib over 150 1.25 Boom length incl. jib over 200 ft 2.25 Boom length incl. jib over 300 ft 3.25
IRON0440-001 05/01/2011
REMANINDER OF COUNTY
Rates Fringes
Ironworkers:
Structural, Ornamental, Rodman, Machinery Mover, Rigger, Fence Erector, Reinforcement, and Stone Derrickman..................$ 23.63 22.01
LABO0035-003 07/01/2010
BUILDING CONSTRUCTION
Rates Fringes
Laborers:
(Hazardous waste removal includes, wetting, stripping, removal, scrapping, vaccuming, bagging and disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems)........$ 19.00 6.84 Asbestos Removal...........$ 18.50 6.19 Blasters, Form Setters, Motor-Buggy Operator (Ryder Type)...............$ 17.50 6.19 Laborers...................$ 17.00 6.19 Pipelayers, Motor Mixers, Motor Buggy Operator (Walk Behind), Power Lift (Walk Behind) Wagon Drill Operator...................$ 17.15 6.19 Wagon Drill Operator.......$ 17.40 6.19 Asbestos Removal............$ 21.50 13.44 Blasters, Form Setters, Motor-Buggy Operator (Ryder Type)................$ 20.50 13.44 Hazardous Waste Removal (Hazardous waste removal includes, wetting, stripping, removal, scrapping, vaccuming, bagging and disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems)........$ 21.50 13.44 Laborers....................$ 20.00 13.44 Pipelayers, Motor Mixers, Motor Buggy Operator (Walk Behind), Power Lift (Walk Behind) Wagon Drill Operator....................$ 20.15 13.44 Wagon Drill Operator........$ 20.40 13.44
PAIN0004-021 05/01/2010
Rates Fringes
Painters:
Brush & Roller, Drywall Taping/Finishing............$ 22.40 14.03 Spray/Sandblasting/Structural Steel.......................$ 22.90 14.03
PAIN0677-002 05/01/2010
Rates Fringes
GLAZIER..........................$ 22.00 11.99
PLUM0112-005 05/01/2011
Rates Fringes
Plumber and Steamfitter Northern Zone...............$ 29.90 19.95
ROOF0195-001 06/01/2010
Rates Fringes
ROOFER, Including Built Up, Composition and Single Ply Roofs............................$ 24.50 15.07
* SFNY0669-001 04/01/2011
Rates Fringes
SPRINKLER FITTER.................$ 30.15 18.90
SHEE0058-001 05/01/2009
Rates Fringes
Sheet Metal Worker Projects 10 million or less.$ 25.85 15.56 Projects over $10 million...$ 26.85 15.56
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
| Branch of Construction Wage Determinations |
| Wage and Hour Division |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
| Wage and Hour Administrator |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
| Administrative Review Board |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
4.) All decisions by the Administrative Review Board are final.
GENERAL DECISION: NY20100033 06/10/2011 NY33
Date: June 10, 2011 General Decision Number: NY20100033 06/10/2011
Superseded General Decision Number: NY20080033
State: New York
Construction Types: Building, Heavy and Highway
County: Herkimer County in New York.
BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories), HEAVY AND HIGHWAY CONSTRUCTION
PROJECTS
Modification Number Publication Date 0 03/12/2010 1 04/16/2010 2 04/30/2010 3 05/14/2010 4 07/23/2010 5 09/17/2010 6 10/08/2010 7 10/15/2010 8 11/12/2010 9 12/03/2010 10 01/28/2011 11 04/22/2011 12 05/20/2011 13 06/10/2011
ASBE0030-001 05/01/2009
Rates Fringes
Asbestos/Insulator Worker includes application of all materials, protective coverings, coatings and finishings to all types of mechanical systems. Also the application of firestopping material to openings and penetrations in walls, floors, ceilings, curtain walls and all lead abatement......$ 28.15 14.53
HAZARDOUS MATERIAL HANDLER
SCOPE OF WORK: DUTIES
LIMITED TO preparation, wetting, stripping, removal, scrapping, vacuuming, bagging, and disposing of all insulation materials, whether they contain asbestos or not from mechanical system...........$ 18.72 9.95
BOIL0197-001 01/01/2010
Rates Fringes
BOILERMAKER......................$ 30.24 20.03
BRNY0002-002 06/01/2010
UTICA CHAPTER
Rates Fringes
BRICKLAYER
BRICKLAYERS & STONE
MASONS. CEMENT MASONS,
PLASTERERS, POINTERS,
CLEANERS & CAULKERS........$ 25.16 12.80
MARBLE, TILE & TERRAZZO
WORKERS.....................$ 24.71 13.80
MARBLE, TILE & TERRAZZO
FINISHERS...................$ 21.36 13.40
BRNY0002-010 07/01/2009
UTICA CHAPTER
Rates Fringes
CEMENT MASON/CONCRETE FINISHER
HEAVY/HIGHWAY CONSTRUCTION
CEMENT MASONS..............$ 27.87 15.04
FOOTNOTE:
a. Paid Holidays: Memorial Day, July the 4th, Labor Day, and Thanksgiving Day (provided the employee is employed one day before and one day after the holiday).
CARP0747-003 06/01/2010
Rates Fringes
CARPENTER
BUILDING CONSTRUCTION
Carpenters, Millwrights....$ 24.08 13.17 Piledriver.................$ 24.08 13.17
HEAVY & HIGHWAY
CONSTRUCTION................$ 28.44 12.40
ELEC0043-005 06/01/2010
Rates Fringes
CABLE SPLICER....................$ 33.00 3%+17.67
ELECTRICIAN......................$ 30.00 3%+17.67
ELEC1249-003 01/01/2011
Rates Fringes
LINE CONSTRUCTION: Lineman
(LIGHTING AND TRAFFIC SIGNAL
Including any and all Fiber Optic Cable necessary for Traffic Signal Systems, Traffic Monitoring systems and Road Weather information systems) Flagman.....................$ 23.28 15.00 + 6.5% +a Groundman Truck Driver (tractor trailer unit)......$ 32.98 15.00 + 6.5% +a Groundman Truck Driver......$ 31.04 15.00 + 6.5% +a Lineman & Technician........$ 38.80 15.00 + 6.5% +a Mechanic....................$ 31.04 15.00 + 6.5% +a
FOOTNOTE:
a. New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, plus President's Day, Good Friday, Decoration Day, Election Day for the President of the United States and Election Day for the Governor of the State of New York, provided the employee works the day before or the day after the holiday.
ELEC1249-004 01/01/2011
Rates Fringes
Line Construction:
Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities (where no other trades are or have been involved):
Flagman....................$ 24.79 15.00+6.5%+a Groundman digging machine operator...................$ 37.19 15.00+6.5%+a Groundman truck driver (tractor trailer unit).....$ 35.12 15.00+6.5%+a Groundman Truck driver.....$ 33.06 15.00+6.5%+a Lineman and Technician.....$ 41.32 15.00+6.5%+a Mechanic...................$ 33.06 15.00+6.5%+a Overhead transmission line work (where other trades are or have been involved):
Flagman....................$ 26.29 15.00+6.5%+a Groundman digging machine operator...................$ 39.44 15.00+6.5%+a Groundman truck driver (tractor trailer unit).....$ 37.25 15.00+6.5%+a Groundman truck driver.....$ 35.06 15.00+6.5%+a Lineman and Technician.....$ 43.82 15.00+6.5%+a Mechanic...................$ 35.06 15.00+6.5%+a Substation:
Cable Splicer..............$ 45.45 15.00+6.5%+a Flagman....................$ 24.79 15.00+6.5%+a Ground man truck driver....$ 33.06 15.00+6.5%+a Groundman digging machine operator...................$ 37.19 15.00+6.5%+a Groundman truck driver (tractor trailer unit).....$ 35.12 15.00+6.5%+a Lineman & Technician.......$ 41.32 15.00+6.5%+a Mechanic...................$ 33.06 15.00+6.5%+a Switching structures;
railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation Cable Splicer..............$ 46.87 15.00+6.5%+a Flagman....................$ 25.57 15.00+6.5%+a Groundman Digging Machine Operator...................$ 38.35 15.00+6.5%+a Groundman Truck Driver (tractor-trailer unit).....$ 36.22 15.00+6.5%+a Groundman Truck Driver.....$ 34.09 15.00+6.5%+a Lineman & Technician.......$ 42.61 15.00+6.5%+a Mechanic...................$ 34.09 15.00+6.5%+a
TELEPHONE, CATV
FIBEROPTICS CABLE AND
EQUIPMENT
Cable splicer/Central Office Person..............$ 27.44 4.43 + 3% Groundman..................$ 13.81 4.43 + 3% Installer Repairman- Teledata Lineman/Tecnician- Equipment Operator.........$ 26.05 4.43 + 3%
TREE TRIMMER................$ 21.64 7.36+3%
FOOTNOTE:
a. PAID HOLIDAYS: New Year's Day, Presidents' Day, Memorial Day, Good Friday, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, and Election Day for the President of the United States and Election Day for the Governor of New York State, provided the employee works two days before or two days after the holiday.
b. New Years Day, Washington's Birthday, Good Friday, Decoration Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, Day after Thanksgiving Day and Christmas Day.
ELEV0035-002 01/01/2011
Rates Fringes
Elevator Constructor.............$ 38.94 21.985
FOOTNOTES:
a. 8 PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, and the day after Thanksgiving Day, Christmas Day.
b. Employer contributes 8% of basic hourly rate for 5 years or more of service or 6% of basic hourly rate for 6 months to 5 years of service as vacation pay credit.
ENGI0106-003 07/01/2010
HERKIMER COUNTY (Area East of a line running North and South through the railroad station at Little Falls)
Rates Fringes
Power equipment operators:
HEAVY & HIGHWAY
GROUP 1....................$ 33.87 19.65+a GROUP 2....................$ 33.44 19.65+a GROUP 3....................$ 32.53 19.65+a GROUP 4....................$ 29.96 19.65+a GROUP 5....................$ 35.05 19.65+a GROUP 6....................$ 34.37 19.65+a GROUP 7....................$ 34.87 19.65+a
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1:-Boom Truck (over 5 tons), Crane, Cherry Picker (over 5 ton capacity) Derricks (steel erection), Dragline, Overhead Crane (Gantry or Straddle type), Pile Driver, Truck Crane
GROUP 2:- Automated Concrete Spreader (CMI), Automatic Fine Grader, Backhoe (Except Tractor Mounted, Rubber Tired), Backhoe Excavator Full Swing (CAT 212 or similar type), Belt Placer (CMI type), Black Top Plant (Automated), Cableway, Caisson Auger, Central Mix Concrete Plant (Automated), Concrete Curb Machine, Self-Propelled, Slipform, Concrete Pump (8" or over), Dredge, Dual Drum Paver, Excavator (All Purpose-Hydraulically Operated), (Gradall or Similar), Front End Loader (4 c.y. and over), Head Tower (Sauerman or Equal), Hoist (2 or 3 Drum), Holland Loader, Hydro Axe, Mine Hoist, Mucking Machine or Mole, Pavement Breaker (SP) Wertgen; PB-4 and similar type, Power Grader, Profiler (over 105 H.P.), Quad 9, Quarry Master or equivalent), Scraper, Shovel, Side boom, Slip Form Paver, Tractor Drawn Belt-Type Loader, Truck Crane, Truck or Trailer Mounted Log Chipper (Self-Feeder), Tug Operator (Except Manned Rented Equipment), Tunnel Shovel, GROUP 3 - Asphalt Paver, Backhoe (Tractor Mounted, Rubber Tired), Bituminous Spreader and Mixer, Blacktop Plant (Non-Automated), Blast or Rotary Drill (Truck or Tractor Mounted), Boring Machine, Cage-Hoist, Central Mix Plant (Non-Automated) and All Concrete Batching Plants, Cherry Picker (5 Tons Capacity and Under), Concrete Paver (over 16S), Concrete Pump (Under 8"), Crawler Drill, Self Contained, Crusher, Diesel Power Unit, Drill Rigs (Tractor Mounted), Front End Loader (under 4 c.y.), Hi-Pressure - Boiler (15 lbs. and over), Hoist (One Drum) Kolman Plant Loader and Similar Type Loaders, L.C.M.Work Boat Operator, Locomotive, Maintenance Engineer/Greaseman/ Welder, Mixer (For Stabilized Base Self-Propelled), Monorail Machine, Plant Engineer, Pug Mill, Pump Crete, Ready Mix Concrete Plant, Refrigeration Equipment (For Soil Stabilization), Road Widener, Roller (All Above Subgrade), Self-contained Ride on Rock Drill, excluding Air-Track Type Drill, Skidder, Tractor with Dozer and/or pusher, Trencher, Tugger Hoist, Vermeer saw (ride on, any size or type), Winch, Winch Cat. GROUP 4 - A-Frame Winch Hoist on Truck, Ballast Regulator (Ride- On), Compressors (4 not to exceed 2000 C.F.M. Combined Capacity; or 3 or less with more than 1200 C.F.M. but not to exceed 2000 C.F.M.), Dust Collectors, Generators, Pumps, Welding Machines, Light Plants (4 of Any Type Of Combination), Concrete Pavement Spreaders and Finishers, Conveyor, Directional Drill Machine Locator, Drill Core, Drill Well, Electric Pump Used In Conjunction with Well Point System, Farm Tractor with Accessories, Fine Grade Machine, Fork Lift (under 15 ft.), Grout Pump Gunite Machine, Hammers (Hydraulic-Self-Propelled), Hydra- Spiker (Ride-On), Hydro-Blaster Water, Post Hole Digger and Post Driver, Power Sweeper, Roller (Grade and Fill), Scarifier (Ride- On Spansaw (Ride-On), Skid Steer loader (Bobcat or similar), Sumbersible Electric Pump (When Used In Lieu Of Well Point System), Tamper (Ride-On), Tie Extractor (Ride-On), Tie Handler, Tie Inserter (Ride-On), Tie Spacer (Ride-On), Tire Repair, Track Liner, Tractor With Towed Accessories, Vibrator Compactor, Vibro Tamp, Well Point, Aggregate Plant, Boiler (Used In Conjunction With Production), Cement and Bin Operator, Compressors (3 or less not to Exceed 1200 C.F.M. Combined Capacity), Dust Collectors, Generators, Pumps, Welding Machines, Light Plants (3 or less of Any Type or Combination), Concrete Paver or Mixer (16S and under), Concrete Saw (Self-Propelled), Fireman, Form Tamper, Hydraulic Pump (Jacking System), Light Plants, Mulching Manchine, Oiler, Parapet-Concrete or Pavement Grinder, Power Broom (Towed), Power Heaterman, Revinius Widener, Shell Winder, Steam cleaner, Tractor.
GROUP 4 - Master Mechanic
GROUP 5 - Crane Premium with Boom Length and Jib 150' - 199'
GROUP 6 - Crane Premium with Boom Length and Jib 200' and over.
Tower Crane Premium .50 Hazmat Work premium 2.50 Hydrographic .50
FOOTNOTE:
a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, Lincoln's Birthday, Washington's Brithday, Good Friday, Columbus Day, November Election Day and Veteran's Day
ENGI0106-005 07/01/2009
HERKIMER COUNTY (Area East of a line running North and South through the railroad station at Little Falls)
Rates Fringes
Power equipment operators:
(BUILDING)
GROUP 1.....................$ 32.74 18.88+a GROUP 2.....................$ 32.30 18.88+a GROUP 3.....................$ 31.39 18.88+a GROUP 4.....................$ 28.82 18.88+a
GROUP 5
1..........................$ 33.24 18.88+a 2..........................$ 33.74 18.88+a GROUP 6.....................$ 33.24 18.88+a GROUP 7.....................$ 34.29 18.88+a GROUP 8.....................$ 36.79 18.88+a
POWER EQUIPMENT OPERATORS CLASSIFICATIONS:
GROUP 1: Crane, hydraulic cranes, tower crane, locomotive crane, piledriver, cableway, derricks, whirlies, dragline.
GROUP 2: Shovel, All backhoe (except tractor mounted rubber tired John Deere 510 or smaller), gradalls, power road grader, all CMI equipment, front-end rubber tire loader, tractor-mounted drill (quarry master), mucking machine, concrete central mix plant, concrete pump, belcrete system, automated asphalt concrete plant and tractor road paver.
GROUP 3: Backhoe, (tractor mounted rubber tired equivalent to John Deere 510 or less), bulldozer, pushcat, tractor, traxcavator, scraper, LeTourneau grader, form fine grader, road roller, blacktop roller, blacktop spreader, power brooms, sweepers, trenching machine, Barber Green loader, side booms, hydrohammer, concrete spreader, concrete finishing machine, one drum hoist, power hosting (single drum), hoist - two drum or more, three drum engine, power hoisting (two drum and over), two drum and swinging engine, three drum swinging engine, hod hoist, A-L frame winches, cord and well drillers (one drum), post hole digger, model CHB Vibro-Tamp or similar machine, batch bin and plant operator, dinkey locomotive, skid steer loader, track excavator 5/8 cu. yd. or smaller.
GROUP 4: Fork lift, high lift, lull, Oiler, fireman and heavy- duty greaser, boilers, and steam generators, pump, vibrator, motor mixer, air compressor, dust collector, welding machine, well point, mechanical heater, generators, temporary light plants, concrete pumps, electric submersible pump 4" and over, murphy type diesel generator, conveyor, elevators, concrete mixer and belcrete power pack (belcrete system), seeding, and mulching machines, pumps.
GROUP 5: Crane Premiums
1 over 150' 2 over 200'
GROUP 6: Tower Crane
GROUP 7: Master mechanic (other than nuclear work)
GROUP 8: Master mechanic on nuclear work
FOOTNOTE:
a. PAID HOLIDAYS; New Years Day, Memorial Day, Independence Day Labor Day, Thanksgiving Day, and Christmas Day, provided the employee has worked the day before and the day after the holiday.
ENGI0545-007 07/01/2010
HERKIMER COUNTY (Area West of a line running North and South through the railroad station at Little Falls)
Rates Fringes
Power equipment operators:
HEAVY AND HIGHWAY
GROUP 1....................$ 28.90 22.95+a GROUP 2....................$ 28.02 22.95+a GROUP 3....................$ 24.74 22.95+a GROUP 4....................$ 30.25 22.95+a
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Automated Concrete Spreader (CMI Type); Automatic Fine Grader; Backhoe (Except Tractor Mounted, Rubber Tired); Belt Placer (CMI Type); Blacktop Plant (Automated);
Boom Truck 100' & over (jib and Boom); Cableway; Caisson Auger; Central Mix Concrete Plant (Automated); Cherry Picker (over 5 tons capacity); Concrete Curb Machine, Self-propelled, Slipform; Concrete Pump 8" and over; Crane;
Derricks; Dragline; Dredge; Dual Drum Paver; Excavator (All Purpose-Hydraulically operated) (Gradall or Similar); Front End Loader (4cu. yd. and over); Head Tower (Sauerman or equal); Hoist (Two or Three Drum); Holland Loader;
Hydrodemolition equipment (self contained); Maintenance Engineer; Mine Hoist; Mucking Machine or Mole; Overhead Crane (Straddle Type); Pavement Profiler (over 300 horsepower); Pile Driver; Power Grader; Quad 9; Quarry Master (or equivalent); Scraper; Shovel; Side Boom;
Slipform Paver (If a second man needed, he shall be an oiler); Tractor Drawn Belt-Type Loader; Truck Crane; Truck or Trailer Mounted Log Chipper (self Feeder); Tug Operator (Manned Rented Equipment Excluded); Tunnel shovel;
GROUP 2: Bituminous Spreader and Mixer; Blacktop Plant (Non- Automated); Blast or Rotary Drill (Truck or Tractor Mounted); Boring machine; Cage Hoist; Central Mix Plant (Non Automated) and all Concrete Batching Plants; Cherry Picker (5 Tons capacity and under); Compressors (4 or less) exceeding 2,000 C.F.M. combined capacity; Concrete Paver (over 16s); Concrete Pump (under 8"); Crawler Drill (self-contained); Crusher; Diesel Power Unit; Drill Rigs, Tractor Mounted; Front End Loader (under 4 cu. yd.);
Greaser man, Hi-Pressure Boiler (15 lbs. and over); Hoist (One Drum); Kolman Plant Loader & Similar Type Loaders;
L.C.M. Work Boat Operator; Locomotive; Mixer (for stabilizad base self- propelled); Monorail Machine; Plant Engineer; Pump Crete; Ready Mix Concrete Plant;
Refrigeration Equipment (for soil stablization); Road Widener; Roller (all above sub-grade); Sea Mule; Seamule;
Tractor with Dozer and/or Pusher; Trecher; Tugger Hoist;
Welder; Winch; Winch Cat
GROUP 3: A Frame Truck; Ballast Regulator, Ride on;
Compressors (4 not to exceed 2,000 c.f.m. combined capacity; or 3 or less with more than 1,200 c.f.m. but not to exceed 2,000 c.f.m.); Compressors, Dust Collectors, Generators Pumps, Welding Machines, Light Plants (4 of any type or combination); Concrete Pavement Spreader and Finishers; Conveyer; Drill (core); Electric Pump used in conjunction with well-point system; Farm Tractor with accessories; Fine grade machine; Fork lift (under 15 ft.);
Grout Pump; Gunite Machine; Hammers (Hydraulic self-propelled); Hydra Spiker, ride on; Hydro-blaster (water); Post Hole Digger and Post Driver; Power Sweeper;
Roller (Grader and fill); Scarifier, ride on; Span-Saw, ride on; Submersible Electric Pump (when used in lieu of well point system); Tamper, ride on; Tie extractor, ride on; Tie Handler; Tie Inserter, ride on; Tie Spacer, ride on; Track Liner, ride on; Tractor with towed accessories;
Vibatory Compactor; Well Point; Vibro Tamp
GROUP 4: Master Mechanic
PREMIUMS:
Hazmat Work 2.50
CRANE PERMIUMS (Add to Group 1 Rate)
Boom length incl. jib under 115 ft 1.00 Boom length incl. jib over 115 ft -149 ft 2.00 Boom length incl. jib over 150 ft 3.50 Tower Crane .50
FOOTNOTE:
a. PAID HOLIDAYS: New Years Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day, provided the employee has worked the working day before and the working day after the holiday.
ENGI0545-008 06/01/2010
HERKIMER COUNTY (Area West of a line running North and South through the railroad station at Little Falls)
Rates Fringes
Power equipment operators:
BUILDING
GROUP 1....................$ 27.58 20.30+a GROUP 2....................$ 25.79 20.30+a GROUP 3....................$ 22.21 20.30+a GROUP 4....................$ 29.26 20.30+a
POWER EQUIPMENT OPERATOR CLASSIFICATIONS (BUILDING)
GROUP 1: Air plako, asphalt and blacktop roller, automated concrete spreader (CMI or equivalent), automated fine grade machine (CMI), backhoe, elt palcer, blacktop spreader (such as barber Green & Blaw Knox), blacktop plant (automated), blast or rotary drill (truck or cat mounted), boom truck, cableway, caisson auger, central mix plant (automated), cherry picker (15 tons), concrete pump, crane, crusher (rock), derrick, diesel power unit, dragline, dredge, dual drum paver, elevating grader (self-propelled), elevator hoist (2 cage), excavator (all purpose-hydraulically operated), fork lift (loed and lull and other rough terrain type), front end loader (4 c.y. and over), gradall, grader (power), head tower (Saurman or equal), host ( 2 or 3 drum), hydroblaster (laser pump), work boat operator (LCM), light plants (compressors and generators), locomotive,maintenance engineer, maintenance welder, mine hoist, mucking machine or mole, overhead crane -fixed permanent, pile driver, quarry master or equivalent, refrigeration equipment (for soil stabilization), scraper sea mule, shovel, side boom, slip form paver, straddle buggy (ross carrier, lumber carrier), tractor drawn belt type loader (Euclid loader), tranching machine (digging capacity of over 4 ft depth), truck crane (operator), truck of trailer mounted log chipper (self feeder), tug operator (manned, rented equipment excluded), tunnel shovel, vibro or sonic hammer controls (when not mounted in proximity to the rig operator
GROUP 2: "A" frame truck, blacktop plant (non automatic), All Back Dumps, boring machine, bulldozer, cagehoist, central mix plant (non automated), cherry picker 15 tons and under), than 5), concrete paver (single drum over 16S), core boring machine, drill rigs (tractor mounted), elevator (as a material hoist), fork lift (all others), front end loader (under 4 c.y.), gunite machine, high pressure boiler 915 lbs & over), hoist (one drum), hydraulic breaking hammer (drop hammer), Kolman plant loader (screening gravel), maintenance grease man, mizer for stabilized base (self propelled Seaman mixer), monrail machine, parapet concrete or pavement grinder, parts man, post hole digger (truck or tractor mounted), power sweeper (wayne or similar), grout pump, pump- crete or sqeeze-crete, road widener (front end of grader or self prop.), roller, self contained hydraulic bench drill, shell winder (motorized), snorkel (overhead arms), snowblower control man, trenching machine (digging capacity of 4 ft or less), tugger hoist, vibrotamp, well drill, well point system, winch (motor driven), winch cat, winch truck
GROUP 3: Compressor (up to 500 C.F.), concrete pave ror mixer (under 16S), concrete pavement spreaders and finishers (not automated), conveyor (over 12 ft), electric submersible pump (4" and over), farm tractor with or without accessories, fine grade machine (not automated), fireman, form tamper, generator (2,500 Watts and over), hydraulic pump, mechanical heaters (more than 2 whosw combined output exceeds 640,000 BTU per hour (manufacturer's rating) plus one self contained heating unit (sundog, air heat type, new Holland hay dryer type excluded), power heaterman (hay dryer), pumps (water and trash), revinus widener (road widener), single light plant, steam cleaner or jenny, tractor with or without towed accessories
GROUP 4: Master mechanic
PREMIUMS:
Hazmat Work 2.50 Quad 9 Bulldozer or Multibowl Scraper .50
CRANE PREMIUMS (add to Group 1 Rate):
All Lattic Boom Cranes (65 ton capacity and over) Class A Rate Plus 1.25 All Hydraulic Cranes (100 ton capacity and over) Class A Rate Plus 1.25 All Hydraulic Cranes (80 ton capacity to 99 ton capacity)Class A Rate Plus .75 All Hydraulic Cranes (65 ton capacity to 79 ton capacity)Class A Rate Plus .60
FOOTNOTE:
a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day provided the employee has worked five consecutive working days before and the working day after the holiday.
IRON0440-001 05/01/2011
REMANINDER OF COUNTY
Rates Fringes
Ironworkers:
Structural, Ornamental, Rodman, Machinery Mover, Rigger, Fence Erector, Reinforcement, and Stone Derrickman..................$ 23.63 22.01
LABO0035-005 06/01/2010
Rates Fringes
Laborers:
BUILDING CONSTRUCTION:
Asbestos Removal...........$ 21.50 13.44 Blasters, Form Setters, MotorBuggy Operator (Rider Type)...............$ 20.50 13.44 Hazardous Waste Removal (Hazardous waste removal includes, wetting,stripping, removal, scrapping, vaccuuming, bagging and disposing of all insulation materials, wheather they contain asbestos or not, from mechanical systems)........$ 21.50 13.44 Laborers...................$ 20.00 13.44 Pipelayers, Motor Mixers, Motor Buggy Operator (Walk Behind) Power Lift (Walk Behind)..............$ 20.15 13.44 Wagon Drill Operator.......$ 20.40 13.44
HEAVY & HIGHWAY
CONSTRUCTION:
GROUP 1:...................$ 24.30 16.54
GROUP 2:...................$ 24.50 16.54
GROUP 3:...................$ 24.70 16.54
GROUP 4:...................$ 24.90 16.54
GROUP 5:...................$ 22.40 10.14+a
FOOTNOTE:
a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day Labor Day, Thanksgiving Day and Christmas Day.
GROUP 1: Common Laborers, Flagman, Outboard and Hand boats
GROUP 2: Bull Float, Chain Saw, Concrete aggregate bin, Concrete Bootman, Gin Buggy, Hand or Machine Vibrator, Jackhammer, Mason Tender, Mortor Mixer, Pavement Breaker, Handlers of all steel mesh, Small generators for laborers's tools, Installation of bridge drainage, Pipelayers, Vibrator type rollers, Tamper, Drill doctor, Tail or Screw Operator on asphalt paver, Water pump operator (1 1/2" and single diaphram), Nozzle (aphlat, gunnite, seeding and sand blasting), Laborers on chain link fence erection, Rock splitter and power unit, Pusher type concrete saw and all other gas, electric, oil, and Air tool operators, Wrecking laborers
GROUP 3: All rock or drilling machine operators (except quarry master amd similar type), Acetylene torch operators, and Asphalt paver, Powerman
GROUP 4: Blasterers, Form setters, Stone or Granite Curb setters
GROUP 5: Hazardous waste removal
PAIN0004-020 05/01/2010
Rates Fringes
Painters:
BUILDING CONSTRUCTION
Brush & Roll, Drywall Taping/Finishing...........$ 22.40 14.03 Spray, Sandblasting, Structural Steel...........$ 22.90 14.03
HEAVY & HIGHWAY
CONSTRUCTION
Bridges....................$ 31.00 16.10
PAIN0677-002 05/01/2010
Rates Fringes
GLAZIER..........................$ 22.00 11.99
PLUM0112-003 05/01/2011
Rates Fringes
Plumber and Steamfitter Northern Zone...............$ 29.90 19.95
ROOF0195-001 06/01/2010
Rates Fringes
ROOFER, Including Built Up, Composition and Single Ply Roofs............................$ 24.50 15.07
* SFNY0669-001 04/01/2011
Rates Fringes
SPRINKLER FITTER.................$ 30.15 18.90
SHEE0058-001 05/01/2009
Rates Fringes
Sheet Metal Worker Projects 10 million or less.$ 25.85 15.56 Projects over $10 million...$ 26.85 15.56
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
| Branch of Construction Wage Determinations |
| Wage and Hour Division |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
| Wage and Hour Administrator |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
| Administrative Review Board |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
4.) All decisions by the Administrative Review Board are final.
File details come from the government source that posted it. Updated .