09r0005 rfp atch do-01-s-01 sow b2ph5 6.pdf

PDF 100 KB Posted

Attached to
Roofing Indefinite Delivery Indefinite Quantity (IDIQ) Federal contract opportunity
Solicitation number
FA8751-09-R-0005
Issued by
Department of the Air Force Materiel Command Research Laboratory

About this file

FA8751-09-R-0005 Atch DO-01-S-01 Statement of Work Building 2 Phases 5 6

View the file

Other files for this federal contract opportunity

Other files attached to Roofing Indefinite Delivery Indefinite Quantity (IDIQ), newest first.
File Type Posted
09r0005 RFI 3.doc DOC document
09r0005_rfp_add'l_info_2.doc DOC document
09r0005 rfp addt'l info 1.doc DOC document
09r0005 rfp atch 3 wage det ny14 27 mar 09.doc DOC document
09r0005 rfp atch 4 ppq.doc DOC document
09r0005 rfp.doc DOC document
09r0005 rfp atch 2 price sched.xls XLS spreadsheet
09r0005 rfp atch do-01-d-03 drwg 3.pdf PDF
09r0005 rfp atch do-01-d-01 drwg 1.pdf PDF
09r0005 rfp recovery act clauses.doc DOC document
09r0005 rfp atch do-01-d-04 drwg 4.pdf PDF
09r0005 rfp atch 5 site visit.doc DOC document
09r0005 rfp atch 1 sos 10 feb 09.doc DOC document
09r0005 rfp atch do-01-d-02 drwg 2.pdf PDF
09r0005 price sched.xls XLS spreadsheet
09r0005 sos 10 feb 09.doc DOC document
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Roofing Maintenance and Repair IDIQ

STATEMENT OF WORK

FOR

<<REPAIR ROOF LOGISTICS FACILITY B-2 PHASE 5 & 6>>

PREPARED BY AFRL/RIOC

AIR FORCE RESEARCH LABORATORY

ROME RESEARCH SITE

ROME, NEW YORK

PROJECT NR: ULDF 05-0004P5&6 DATED: 30 Mar 2009

1.01 SCOPE

A. The work covered under this Contract consists of furnishing all labor, equipment, devices, and materials and performing all work required to replace the roof at Building 2 Phases 5 and 6. Provide twenty year no dollar limit warranty to include all details and metal work.

1.02 ITEMS OF WORK

A. Remove and Replace Roof: Approximately 21,173 square feet for Phase 5 and 13,963 square feet for Phase 6.

1.1 Remove existing BUR system to the roof deck. Existing roof system is 4-ply asphalt built-up roof with gravel surface, two layers of 1 5/16" fiberglass insulation, one ply of asphalt-impregnated glass mat over rosin paper. Remove all flashings and edge metal. The roof deck is 2" wood.

1.2 Replace roof with Firestone UltraPly TPO system, or approved equal to include thermal barrier, FB MB Base SA with SA Primer vapor barrier, two layers of two inch polyisocyanurate insulation, and gray .060" single-ply TPO roofing fully adhered.

B. Relocate Roof Drains: Remove nine existing roof drains along the exterior dock and provide fifteen new roof drains and piping located inside the exterior wall of the building. Follow applicable Unified Facilities Guide Specifications (UFGS) for piping and earth work.

1.1 Remove nine roof drains and down spouts, cap piping below dock.

1.2 Reconfigure lower roof edge slope to pitch water to new drain locations.

1.3 Provide fifteen new roof drains and interior drain piping.

1.4 Provide two new underground storm lines to tie-in new interior roof drain piping to catch basins.

1.04 SUBMITTALS

A. Firestone Roof products, see Schedule of Material Submittals.

B. PVC piping products, see Schedule of Material Submittals.

File details come from the government source that posted it. Updated .