DRAFT

SOLICITATION, OFFER AND AWARD

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 350)

RATING

DO-A7

PAGE OF PAGES

1 34

2. CONTRACT NO. 3. SOLICITATION NO. 4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

5. DATE ISSUED

6. REQUISITION/PURCHASE NO.

FA8750-13-R-0001

7. ISSUED BY AFRL/RIKE CODE FA8750 8. ADDRESS OFFER TO (If other than Item 7)

USAF, AFMC

AIR FORCE RESEARCH LABORATORY

26 ELECTRONIC PARKWAY

ROME NY 13441-4514

AMBER M. BUCKLEY 315-330-3605

AMBER.BUCKLEY@RL.AF.MIL

NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder”.

SOLICITATION

9. Title of the program: Research, Enhancement, and Deployment of the Enterprise Cross Domain Solution (REDE-CDS)

Sealed offers in original and * copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 7, or, if handcarried, in the Lobby of Bldg. 106 until 3:00 pm local time on TBD.

* See Section L, Proposal Preparation Instructions.

10. FOR

INFORMATION

CALL:

A. NAME

See Block 7

B. TELEPHONE (Include area code)

(NO COLLECT CALLS)

C. E-MAIL ADDRESS

11. TABLE OF CONTENTS

() SEC. DESCRIPTION PAGE(S) () SEC DESCRIPTION PAGE(S)

PART I - THE SCHEDULE PART II - CONTRACT CLAUSES

A SOLICITATION/CONTRACT FORM 1 I CONTRACT CLAUSES 24

B SUPPLIES OR SERVICES AND PRICES/COSTS 2 PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACH.

C DESCRIPTION/SPECS./WORK STATEMENT 4 J LIST OF ATTACHMENTS 34

D PACKAGING AND MARKING 5 PART IV - REPRESENTATIONS AND INSTRUCTIONS

E INSPECTION AND ACCEPTANCE 6 K REPRESENTATIONS, CERTIFICATIONS, K - 1

F DELIVERIES OR PERFORMANCE 7 AND OTHER STATEMENTS OF OFFERORS

G CONTRACT ADMINISTRATION DATA 8 L INSTRS, CONDS, AND NOTICES TO OFFERORS L - 1

H SPECIAL CONTRACT REQUIREMENTS 11 M EVALUATION FACTORS FOR AWARD M - 1

OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

12. In compliance with the above, the undersigned agrees, if this offer is accepted within ____180____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date of receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

10 CALENDAR DAYS

20 CALENDAR DAYS

30 CALENDAR DAYS

CALENDAR DAYS

14. ACKNOWLEDGEMENTS OF AMENDMENTS

(The offeror acknowledges receipt of amend-

AMENDMENT NO. DATE AMENDMENT NO. DATE

ments to the SOLICITATION for offerors and related documents numbered and dated:

15A. NAME

AND

CODE FACILITY 16. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

ADDRESS

OF

OFFEROR

15B. TELEPHONE NO. (Include area code)

15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

17. SIGNATURE 18. OFFER DATE

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETI-

TION: 23. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM

10 U.S.C. 2304(c) ( ) 41 U.S.C. 253(c) ( )

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

28. AWARD DATE

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 33 (REV. 9-97)

PREVIOUS EDITION IS UNUSABLE Prescribed by GSA ConWrite Version 6.13.3 FAR (48 CFR) 53.21(c) Created 30 Aug 2012 11:45 AM

PART I - THE SCHEDULE

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

SECTION B FA8750-13-R-0001

NOTICE: The following contract clauses pertinent to this section are hereby incorporated in full text:

OTHER CONTRACT CLAUSES IN FULL TEXT

B039 INDEFINITE QUANTITY (DEC 2005) (TAILORED)

This is an Indefinite Quantity contract as contemplated by FAR 16.504. The total scope of the technical tasks for which orders may be issued is set forth in Attachment No. 1, Statement of Work entitled " Research, Enhancement, and Deployment of the Enterprise Cross Domain Solution (REDE-CDS)" dated 15 August 2012. The maximum dollar amount the Government may order under this contract is $49,900,000.00; the minimum amount is $100,000.00.

B040 ORDERING PROCEDURES (DEC 2005)

(a) Orders will be issued by a Procuring Contracting Officer in accordance with the Ordering clause of this contract. However, the following procedures shall be used for negotiation of orders.

(1) The Contracting Officer will provide the Contractor with a copy of the notification of each proposed Order which will include a description of work to be performed, description of expertise required, and desired completion date.

(2) The Contractor shall then: (i) submit to the Contracting Officer a brief technical discussion describing how the work will be performed; (ii) submit a cost proposal identifying labor categories and number of hours within each category required for the performance of the proposed work;

(iii) identify and provide rationale for all non-labor cost elements required for performance; and (iv) identify any Government property required for performance.

(3) Upon receipt of the proposal, the Contracting Officer will analyze the proposal and, if acceptable, issue an Order directing the Contractor to commence performance, or if the proposal is not fully acceptable as offered, negotiations shall be conducted prior to issuance of any Order . In the event issues pertaining to a proposed work cannot be resolved to the satisfaction of the Contracting Officer, the Contracting Officer reserves the right to withdraw and cancel the proposed work. In such event, the Contractor shall be notified, via letter, of the Contracting Officer's decision. This decision shall be final and conclusive and shall not be subject to the Disputes clause or the Contract Disputes Act.

(b) The Contractor is not authorized to commence performance prior to issuance of the Order by the Contracting Officer.

B058 CONTRACT TYPE: COST-PLUS-FIXED-FEE (DEC 2005)

The estimated cost and fee for this contract are shown below. The applicable fixed fee set forth below may be increased or decreased only by negotiation and modification of the contract for added or deleted work. As determined by the contracting officer, it shall be paid as it accrues, in regular installments based upon the percentage of completion of work (or the expiration of the agreed-upon period(s) for term contracts).

Estimated Cost (to be specified in each order) Fixed Fee (to be specified in each order)

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

SECTION B FA8750-13-R-0001

RIK-B001 IMPLEMENTATION OF LIMITATION OF FUNDS (JUN 2012)

(a) The sum allotted to this contract and available for payment of costs under CLINs (contract line items to be specified in each Order) through (date to be specified in each Order) in accordance wiht the clause in Section I entitled "Limitation of Funds" is (amount to be specified in each Order).

(b) In addition to the amount allotted under the "Limitation of Funds" clause, the additional amount of (amount to be specified in each Order) is obligated for payment of fee for work completed under CLINs (contract line items to be specified in each Order).

(Applies to orders that are incrementally funded.)

RIK-B002 INDEFINITE-DELIVERY, INDEFINITE-QUANTITY CLIN STRUCTURE (JUN 2012)

Contract Line Item Numbers (CLINs) and specific requirements will be assigned in each individual Order.

The related payment instructions will be included in Section G of each Order.

SECTION C - DESCRIPTION/SPECS./WORK STATEMENT

SECTION C FA8750-13-R-0001

NOTICE: The following contract clauses pertinent to this section are hereby incorporated in full text:

C004 INCORPORATED DOCUMENTS/REQUIREMENTS - ALTERNATE (FEB 2006) (TAILORED)

The following documents, as they may be amended below, are a part of this contract:

Attachment No. 1, Statement of Work entitled "Research, Enhancement, and Deployment of the Enterprise Cross Domain Solution (REDE-CDS) dated 15 August 2012.

Attachment No. 2 entitled "Anticipated Contract Data Requirements List" dated 15 August 2012.

SECTION D - PACKAGING AND MARKING

SECTION D FA8750-13-R-0001

NOTICE: The following contract clauses pertinent to this section are hereby incorporated in full text:

RIK-D001 SPECIFICATION COMMERCIAL PACKAGING (JUL 2012)

(a) Items shall be packaged in accordance with American Society for Testing and Materials (ASTM) Specification D3951-98, Standard Practice for Commercial Packaging. Individual shipments exceeding 150 pounds, 108 inches in length, or 130 inches in girth plus length shall be packaged on skidded crates or palletized to allow handling by forklift.

(b) The exterior container shall be marked (readable from 24 inches): "ASTM D3951 - NOT FOR

OUTSIDE STORAGE."

(Applicable to all orders unless CONTRACTOR COMMERCIAL PACKAGING applies.)

RIK-D002 CONTRACTOR COMMERCIAL PACKAGING (JUL 2012)

(a) Items shall be packaged in accordance with the Contractor's commercial best practice to ensure undamaged arrival at destination. Individual shipments exceeding 150 pounds, 108 inches in length, or 130 inches in girth plus length shall be packaged on skidded crates or palletized to allow handling by forklift.

(b) The exterior container shall be marked (readable from 24 inches): "NOT FOR OUTSIDE

STORAGE."

(Applicable to orders where the only deliverable items are reports or software.)

SECTION E - INSPECTION AND ACCEPTANCE

SECTION E FA8750-13-R-0001

I. NOTICE: The following contract clauses pertinent to this section are hereby incorporated by reference:

A. FEDERAL ACQUISITION REGULATION CONTRACT CLAUSES

52.246-08 INSPECTION OF RESEARCH AND DEVELOPMENT -- COST-REIMBURSEMENT

(MAY 2001)

B. DEFENSE FEDERAL ACQUISITION REGULATION SUPPLEMENT CONTRACT CLAUSES

252.246-7000 MATERIAL INSPECTION AND RECEIVING REPORT (MAR 2008)

II. NOTICE: The following contract clauses pertinent to this section are hereby incorporated in full text:

E007 INSPECTION AND ACCEPTANCE AUTHORITY (APR 1998)

Inspection and acceptance for all Contract and Exhibit Lines or Subline Items shall be accomplished by the Program Manager, Air Force Research Laboratory, Rome, NY .

SECTION F - DELIVERIES OR PERFORMANCE

SECTION F FA8750-13-R-0001

I. NOTICE: The following contract clauses pertinent to this section are hereby incorporated by reference:

FEDERAL ACQUISITION REGULATION CONTRACT CLAUSES

52.242-15 STOP-WORK ORDER (AUG 1989) - ALTERNATE I (APR 1984)

II. NOTICE: The following contract clauses pertinent to this section are hereby incorporated in full text:

F005 DELIVERY OF REPORTS (OCT 1998)

(a) All data shall be delivered in accordance with the delivery schedule shown on the Contract Data Requirements List, attachments, or as incorporated by reference.

(b) All reports and correspondence submitted under this contract shall include the contract number and project number, if applicable, and be forwarded prepaid. A copy of the letters of transmittal shall be delivered to the Procuring Contracting Officer (PCO) and Administrative Contracting Officer (ACO). The addresses are set forth on the contract award cover page. All other address(es) and code(s) for consignee(s) are as set forth in the contract or incorporated by reference.

RIK-F001 INDEFINITE-DELIVERY, INDEFINITE-QUANTITY SCHEDULE INFORMATION (JUL 2012)

The effective ordering period for the total contract will be forty-eight (48) months from the contract effective date. Period of Performance or "Completion Date" information will be specified on each individual order. Delivery or "Ship To" information will be specified in each individual order.

SECTION G - CONTRACT ADMINISTRATION DATA

SECTION G FA8750-13-R-0001

NOTICE: The following contract clauses pertinent to this section are hereby incorporated in full text:

A. DEFENSE FAR SUPP CONTRACT CLAUSES IN FULL TEXT

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JUN 2012)

(a) Definitions. As used in this clause-

“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.

“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.

(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall—

(1) Have a designated electronic business point of contact in the Central Contractor Registration at https://www.acquisition.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web- Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/

(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:

(1) Document type. The Contractor shall use the following document type(s).

(i) Use "Cost Voucher" to submit a payment request. DO NOT SUBMIT A FINAL COST VOUCHER AT THE TIME OF DELIVERY OF THE FINAL TECHNICAL REPORT. Reference FAR 52.216-7 for final voucher submission.

(ii) Use "Receiving Report" to submit a receiving report in accordance with DFARS 252.246-7000, Material Inspection and Receiving Report..

Note: If a “Combo” document type is identified but not supportable by the Contractor’s business systems, an “Invoice” (stand-alone) and “Receiving Report” (stand-alone) document type may be used instead.)

(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.

Destination

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table* Field Name in WAWF Data to be entered in WAWF

Pay Official DoDAAC (Insert Code From Block 12 of SF26) Issue By DoDAAC FA8750 Admin DoDAAC (Insert Code From Block 6 of SF26) Inspect By DoDAAC FA8750 Ship To Code FA8750 Ship From Code N/A Mark For Code FA8750 Service Approver (DoDAAC) (Insert Code From Block 6 of SF26) Service Acceptor (DoDAAC) FA8750 Accept at Other DoDAAC N/A LPO DoDAAC N/A DCAA Auditor DoDAAC N/A Other DoDAAC(s) N/A

(*Contracting Officer: Insert applicable DoDAAC information or “See schedule” if multiple ship to/acceptance locations apply, or “Not applicable.”)

(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.

(5) WAWF email notifications. The Contractor shall enter the e-mail address identified below in the “Send Additional Email Notifications” field of WAWF once a document is submitted in the system.

Please add the following email addresses of the AFRL Contracting Officer's Technical Representative (COTR) Ray.Galavotti@rl.af.mil and Technical Division Business Office AFRL.RIEM@rl.af.mil for processing documents created in WAWF: These are email addresses of persons who need to see or record information.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.

David Fiorini, Email; david.fiorini@rl.af.mil, Phone 315-330-4395

(i) CONCURRENT WITH OR SUBSEQUENT TO THE DELIVERY OF THE FINAL UPDATED TECHNICAL REPORT the FINAL Receiving Report may be submitted to WAWF.

(ii) DO NOT ATTACH TECHNICAL REPORTS TO WAWF DOCUMENTS. However, you may attach financial information supporting your voucher or documents supporting inspection and acceptance.

(iii) Payment information may be accessed using the DFAS website at http://www.dod.mil/dfas under MyInvoice. Your contract number or invoice will be required to check status of your payment.

(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.

B. OTHER CONTRACT CLAUSES IN FULL TEXT

G006 INVOICE AND PAYMENT - COST REIMBURSEMENT (FEB 2006)

Invoices (or public vouchers), supported by a statement of cost for performance under this contract, shall be submitted to the cognizant Defense Contract Audit Agency (DCAA) office. Under the provisions of DFARS 242.803(b), the DCAA auditor, is designated as the authorized representative of the contracting officer (CO) for examining vouchers received directly from the contractor.

RIK-G002 INDEFINITE-DELIVERY, INDEFINITE-QUANTITY ACCOUNTING INFORMATION (JUL

2012)

Accounting information, descriptive data and payment instructions will be specified in each individual order.

RIK-G003 INDEFINITE-DELIVERY, INDEFINITE-QUANTITY ACCOUNTING INFORMATION (AUG

2012)

Accounting information, descriptive data and payment instructions will be specified in each individual order.

SECTION H - SPECIAL CONTRACT REQUIREMENTS

SECTION H FA8750-13-R-0001

NOTICE: The following contract clauses pertinent to this section are hereby incorporated in full text:

H001 OPTIONS (MAY 1997) (TAILORED)

The Government reserves the right to exercise the option CLIN(s) set forth in Section B of individual orders, as applicable. In the event an option is exercised, the affected sections of the order, e.g., Section B, Section F, Section G, etc., will be modified as appropriate.

(Applicable to orders with options)

H011 GUARANTEED FINAL REPORT (FEB 1997) (TAILORED)

If this contract is terminated prior to completion, the Contractor agrees to provide a final report in accordance with Exhibit A, Data Item DI-MISC-80711A, Scientific and Technical Reports (insert data item number) . During the life of the contract, the contractor shall continuously reserve sufficient funds from the amount allotted to guarantee the preparation and delivery of said final report.

(Applicable to Orders requiring Final Technical Reports.)

H015 IMPLEMENTATION OF PATENT RIGHTS CLAUSE (IDIQ) (NOV 2011) (TAILORED)

(a) Interim or final Invention Reports (1) listing subject invention(s) and stating that all subject inventions have been disclosed, or (2) stating that there are no such inventions, shall be submitted FOR EACH ORDER to both the Administrative Contracting Officer at the address located on the face of the contract and to the patent administrator at email: Judith.Decker@rl.af.mil. The AFRL/RIJ patent administrator can be reached at Area Code (315) 330-2087 or DSN 587-2087, with a courtesy copy (cc:) to the Contracting Officer Technical Representative (COTR), within the time frames specified in the clause. Please include in the subject line of the e-mail the contract number followed by the words "Invention Reporting." Also include in the body of the e-mail the names of the COTR and his/her office symbol. Contractors are highly encouraged to use DD Form 882, Report of Invention and Subcontracts to submit these reports.

The DD Form 882 may also be used for the notification of an award of any subcontract(s) for experimental, developmental or research work which contain a "Patent Rights" clause.

(b) All other notifications (e.g., disclosure of each subject invention to the Contracting Officer within 2 months after the inventor discloses it) shall also be sent to the e-mail address above, with a courtesy copy (cc:) to the COTR.

(c) This provision also constitutes the request for the following information for any subject invention for which the Contractor has retained ownership, (1) the filing date, (2) serial number and title, (3) a copy of the patent application and (4) patent number and issue date. Submittal shall be to the Patent Administrator e-mail address listed above, with a courtesy copy (cc:) to the COTR.

H025 INCORPORATION OF SECTION K (OCT 1998)

Section K of the solicitation is hereby incorporated by reference.

H063 CONTRACTOR IDENTIFICATION (FEB 2003)

(a) Contractor personnel and their subcontractors must identify themselves as Contractors or subcontractors during meetings, telephone conversations, in electronic messages, or correspondence related to this contract.

(b) Contractor-occupied facilities (on AFMC or other Government installations) such as offices, separate rooms, or cubicles must be clearly identified with Contractor supplied signs, name plates or other identification, showing that these are work areas for Contractor or subcontractor personnel.

H097 ACKNOWLEDGEMENT OF SPONSORSHIP (APR 2006) (TAILORED)

(a) The contractor agrees that in the release of information relating to this contract such release shall include a statement to the effect that the project or effort depicted was or is sponsored by the Air Force Research Laboratory (AFRL) and/or other agencies set forth in each individual order, as applicable.

(b) For the purpose of this clause, "information" includes but is not limited to material presented in news releases, articles, manuscripts, brochures, advertisements, still and motion pictures, speeches, presentations, meetings, conferences, symposia, etc.

(c) Nothing in the foregoing shall affect compliance with the requirements of the clause (if applicable) of this contract entitled "Security Requirements".

(d) The contractor further agrees to include this provision in any subcontracts awarded as a result of this contract.

RIK-H001 BASE SUPPORT - ALTERNATE I (JUL 2012)

Base support shall be provided by the Government to the Contractor in accordance with this special contract requirement (SCR). Failure by the Contractor to comply with the requirements of this SCR shall release the Government, without prejudice, from its obligation to provide base support by the date(s) required. If warranted, and if the Contractor has complied with the requirements of this SCR, an equitable adjustment shall be made if the Government fails to provide base support by the date(s) required.

(a) Base support includes Government-controlled working space, material, equipment, services (including automatic data processing), or other support (excluding use of the Defense Switched Network (DSN)) which the Government determines can be made available at, or through, any Air Force installation where this contract shall be performed. All Government property in the possession of the Contractor, provided through this base support SCR, shall be used and managed in accordance with the Government Property clauses.

(b) The Air Force installations providing the support shall be listed in subparagraph (e), and the Government support to be furnished by each installation under this contract shall be listed in subparagraph (f)

(c) Unless otherwise stipulated in the contract schedule, support shall be provided on a no-charge-for-use basis and the value shall be a part of the Government's contract consideration.

(d) The Contractor agrees to immediately report (with a copy to the cognizant CAO) inadequacies, defective Government-Furnished Property (GFP), or nonavailability of support stipulated by the contract schedule, together with a recommended plan for obtaining the required support. The Government agrees to determine (within 10 workdays) the validity and extent of the involved requirement and the method by which it shall be fulfilled (e.g., purchase, rental, lease, GFP, etc.). Facilities shall not be purchased under this SCR. Additionally, the Contractor (or authorized representative) shall not purchase, or otherwise furnish any base support requirement provided by this SCR (or authorize others to do so), without prior written approval of the Contracting Officer regarding the price, terms, and conditions of the proposed purchase, or approval of other arrangements.

(e) Following are installations where base support will be provided:

(i) Air Force Research Laboratory, Rome Research Site, Building 3, Independent Test and Evaluation Center (ITEC), Corporate Collateral Facility (CCF), Special Security Office (SSO) and Integrated Intelligence Innovation Facility (I3F), 525 Brooks Road, Rome, NY.

(ii) Additional base support at various mission sites will be determined on an order by order basis.

(f) The Government support to be furnished under this contract is as follows:

Access to software and documentation for the REDE-CDS suite of applications otherwise known as ISSE Guard to include: ISSE User Agent (IUA), Multi-level Data Base Replication (MLDBR), Secure Trusted Automated Routing (STAR) Guard, ISSE Web Clietn (IWC), ISSE Web Server (IWS), Parallel Audit Review and Analysis Toolkit (PARAT), and other applications as developed/required.

(g) Parking for personal vehicles. Access will be provided during normal duty hours (0700-1630), Monday through Friday, excluding Federal holidays (New Year's Day, Dr. Martin Luther King, Jr. Day, Presidents Day, Memorial Day, Independence Day, Labor Day, Colombus Day, Veteran's Day, Thanksgiving, Christmas). Other times and days are available only upon coordination and approval by the cognizant Program Manager, Christopher Stepanick, AFRL/RIEBB. Contractor personnel working within the facility are required to have Common Access Cards (CAC).

(h) In addition to the federal holidays identified above, the AFRL Site Director may limit access due to other circumstances. These events may include such things as inclement weather conditions, power outages, unscheduled federal closures and/or other unexpected emergency situations.

(i) In the event of an emergency situation the Director will announce through public channels either delayed reporting or closure of RRS facilities due to emergency conditions. This announcement is made solely for safety and security purposes and to inform all personnel (Government and Contractor) of site closure/delayed reporting. The Director is not authorizing time off for contractor employees and is not authorizing payment for work not performed. Contractor's shall take all appropriate actions to notify their employee's of closure/delayed reporting and make alternate work/schedule arrangements, if necessary.

(j) Facilities may remain open for contractor personnel during unscheduled federal closures (e.g., National Day of Mourning) or other instances where Government employees are granted administrative leave in non-emergency situations.

(k) Compliance with Air Force Instruction (AFI) 33-119 and (AFI) 33-200 is mandatory. It should be noted that such access requires, at a minimum, a National Agency Check or Entrance National Agency Check in accordance with DoD 5200.2-R, Personal Security Program. Contractors should make themselves familiar with local procedures for processing such requirements, and be prepared to be in compliance on the first day of contract performance. Failure to comply with this requirement may be considered a failure to perform.

(l) Because of the nature and location(s) of the work performed, the value of such equipment is undeterminable. The Contractor shall not incur any cost resulting from nonsupport prior to Contracting Officer concurrence in accordance with this SCR.

(m) When this contract is a cost, cost-reimbursement, time-and-materials, or labor hour contract, the Contractor agrees that in the performance of this contract or any major subcontract no direct or indirect costs for property will be incurred if the Government determines that property is available at, or through any Air Force installation where this contract shall be performed. Only the prior written approval of the Contracting Officer can relieve the Contractor from this restriction.

RIK-H002 GOVERNMENT-FURNISHED PROPERTY (GFP) (JUL 2012)

Pursuant to the Government Property clause herein, the Government shall furnish the item(s) of property listed below as Government-Furnished Property (GFP) to the Contractor, f.o.b. (destination), for use in performance of this contract. Upon completion of the contract, the Contractor shall obtain disposition instructions from the Government Property Administrator of the activity having responsibility for administration of the contract.

Reference Attachment No. 10 for a list of Government Furnished Property (GFP).

RIK-H003 GOVERNMENT-FURNISHED INFORMATION (JUL 2012)

The Government will provide the items listed below to the Contractor within 30 days after contract award.

Reference Attachment No. 12 for a list of Government Furnished Information (GFI).

RIK-H004 GOVERNMENT FURNISHED SOFTWARE (JUL 2012)

(a) The Government will provide to the Contractor, for use in performance of this contract, the following listed software, by the date shown:

Reference Attachment No. 11 for a list of Government Furnished Software (GFS).

(b) The Contractor agrees:

(1) that the software will not be used for any purpose, whether Governmental or commercial, that is not specifically required for performance of this contract;

(2) the software or modified version will not be provided to anyone without prior written approval of the Contracting Officer;

(3) except as specifically required for performance of this contract, no copies of the software will be made;

(4) to observe and honor any and all markings on the software concerning national defense security classification and limited or proprietary rights;

(5) to return all copies of the software to the Government upon completion of this contract.

(c) The software is provided "as is"; the Government is not liable nor responsible for maintenance, updating or correction of any errors contained in the software unless specified in this contract.

RIK-H005 RECEIVING REPORT MAILING ADDRESS (JUL 2012)

(a) At the time of each delivery of supplies (hardware, software) or services under this contract, submit a Receiving Report (formerly DD Form 250) in WAWF for each deliverable item under the contract (e.g. hardware, software, services) and for those data items that are coded "DD" in Block 7 of the DD Form 1423-1, Contract Data Requirements List (CDRL). Submit the Receiving Report printed from WAWF to the following address:

Air Force Research Laboratory/RIEM FURTHER MARKED FOR: Ray Galavotti/RIEBA 525 Brooks Road Rome NY 13441-4505

(b) In addition, a copy of the Receiving Report printed from WAWF shall accompany each shipment for all deliverable items that require a Receiving Report. Shipment addresses are specified in Section F of the schedule and/or on the CDRL.

(c) PROCESSING STATUS. Any inquiry as to the processing status of a Receiving Report should be made to the following office:

Air Force Research Laboratory/RIEM 525 Brooks Road Rome NY 13441-4505 Telephone: (315) 330-2978

RIK-H006 INCORPORATION OF SUBCONTRACTING PLAN (JUL 2012)

In accordance with FAR 52.219-9, Small Business Subcontracting Plan, the subcontracting plan contained in Attachment No. TBD is hereby incorporated into the contract.

RIK-H007 INSURANCE CLAUSE IMPLEMENTATION (JUL 2012)

The Contractor shall obtain and maintain the minimum kinds and amounts of insurance during performance of this contract as specified by FAR 28.307-2, Liability, and contemplated by FAR 52.228-5, Insurance--Work on a Government Installation, and/or 52.228-7, Insurance--Liability to Third Persons.

RIK-H008 VISIT REQUESTS (JUL 2012)

All requests for Government certification of contractor employees' need-to-know and visit authorizations to other Government installations or contractor facilities shall be forwarded for approval to the Laboratory Program Manager, whose mailing address is:

Attn: Ray Galavotti Air Force Research Laboratory/RIEBA 525 Brooks Road Rome NY 13441-4505

RIK-H009 INVITED CONTRACTOR OR TECHNICAL REPRESENTITIVE STATUS-REPUBLIC OF

KOREA (JUL 2012)

Invited Contractor (IC) and Technical Representative (TR) status shall be governed by the U.S.-ROK Status of Forces Agreement (SOFA) as implemented by United States Forces Korea (USFK) Reg 700-19, which can be found under the "publications" tab on the US Forces Korea homepage <http://www.usfk.mil>.

(a) Definitions. As used in this clause-

"U.S. - ROK Status of Forces Agreement" (SOFA) means the Mutual Defense Treaty between the Republic of Korea and the U.S. of America, Regarding Facilities and Areas and the Status of U.S. Armed Forces in the Republic of Korea, as amended.

"Combatant Commander" means the commander of a unified or specified combatant command established in accordance with 10 U.S.C. 161. In Korea, the Combatant Commander is the Commander, United States Pacific Command.

"United States Forces Korea" (USFK) means the subordinate unified command through which US forces would be sent to the Combined Forces Command fighting components.

"Commander, United States Forces Korea" (COMUSK) means the commander of all U.S. forces present in Korea. In the Republic of Korea, COMUSK also serves as Commander, Combined Forces Command (CDR CFC) and Commander, United Nations Command (CDR UNC).

"USFK, Assistant Chief of Staff, Acquisition Management" (USFK/FKAQ) means the principal staff office to USFK for all acquisition matters and administrator of the U.S.-ROK SOFA as applied to US and Third Country contractors under the Invited Contractor (IC) and Technical Representative (TR) Program (USFK Reg 700-19).

"Responsible Officer" (RO) means a senior DOD employee (such as a military E5 and above or civilian GS-7 and above), appointed by the USFK Sponsoring Agency (SA), who is directly responsible for determining and administering appropriate logistics support for IC/TRs during contract performance in the

ROK.

(b) IC or TR status under the SOFA is subject to the written approval of USFK, Assistant Chief of Staff, Acquisition Management (FKAQ), Unit #15237, APO AP 96205-5237.

(c) The contracting officer will coordinate with HQ USFK/FKAQ, IAW FAR 25.8, and USFK Reg 700-19.

FKAQ will determine the appropriate contractor status under the SOFA and notify the contracting officer of that determination.

(d) Subject to the above determination, the contractor, including its employees and lawful dependents, may be accorded such privileges and exemptions under conditions and limitations as specified in the SOFA and USFK Reg 700-19. These privileges and exemptions may be furnished during the performance period of the contract, subject to their availability and continued SOFA status. Logistics support privileges are provided on an as-available basis to properly authorized individuals. Some logistics support may be issued as Government Furnished Property or transferred on a reimbursable basis.

(e) The contractor warrants and shall ensure that collectively, and individually, its officials and employees performing under this contract will not perform any contract, service, or other business activity in the ROK, except under U.S. Government contracts and that performance is IAW the SOFA.

(f) The contractor's direct employment of any Korean-National labor for performance of this contract shall be governed by ROK labor law and USFK regulation(s) pertaining to the direct employment and personnel administration of Korean National personnel.

(g) The authorities of the ROK have the right to exercise jurisdiction over invited contractors and technical representatives, including contractor officials, employees and their dependents, for offenses committed in the ROK and punishable by the laws of the ROK. In recognition of the role of such persons in the defense of the ROK, they will be subject to the provisions of Article XXII, SOFA, related Agreed Minutes and Understandings. In those cases in which the authorities of the ROK decide not to exercise jurisdiction, they shall notify the U.S. military authorities as soon as possible. Upon such notification, the military authorities will have the right to exercise jurisdiction as is conferred by the laws of the U.S.

(h) Invited contractors and technical representatives agree to cooperate fully with the USFK Sponsoring Agency (SA) and Responsible Officer (RO) on all matters pertaining to logistics support and theater training requirements. Contractors will provide the assigned SA prompt and accurate reports of changes in employee status as required by USFK Reg 700-19.

(i) Theater Specific Training. Training Requirements for IC/TR personnel shall be conducted in accordance with USFK Reg 350-2 Theater Specific Required Training for all Arriving Personnel and Units Assigned to, Rotating to, or in Temporary Duty Status to USFK. IC/TR personnel shall comply with requirements of USFK Reg 350-2.

(j) Except for contractor air crews flying Air Mobility Command missions, all U.S. contractors performing work on USAF classified contracts will report to the nearest Security Forces Information Security Section for the geographical area where the contract is to be performed to receive information concerning local security requirements.

(k) Invited Contractor and Technical Representative status may be withdrawn by USFK/FKAQ upon:

(1) Completion or termination of the contract.

(2) Determination that the contractor or its employees are engaged in business activities in the ROK other than those pertaining to U.S. armed forces.

(3) Determination that the contractor or its employees are engaged in practices in contravention to Korean law or USFK regulations.

(l) It is agreed that the withdrawal of invited contractor or technical representative status, or the withdrawal of, or failure to provide any of the privileges associated therewith by the U.S. and USFK, shall not constitute grounds for excusable delay by the contractor in the performance of the contract and will not justify or excuse the contractor defaulting in the performance of this contract. Furthermore, it is agreed that withdrawal of SOFA status for reasons outlined in USFK Reg 700-19, Section II, paragraph 6 shall not serve as a basis for the contractor filing any claims against the U.S. or USFK. Under no circumstance shall the withdrawal of SOFA Status or privileges be considered or construed as a breach of contract by the U.S. Government.

(m) Support.

(1) Unless the terms and conditions of this contract place the responsibility with another party, the COMUSK will develop a security plan to provide protection, through military means, of Contractor personnel engaged in the theater of operations when sufficient or legitimate civilian authority does not exist.

(2) All Contractor personnel engaged in the theater of operations are authorized resuscitative care, stabilization, hospitalization at level III military treatment facilities, and assistance with patient movement in emergencies where loss of life, limb, or eyesight could occur. Hospitalization will be limited to stabilization and short-term medical treatment with an emphasis on return to duty or placement in the patient movement system.

(i) When the Government provides medical or emergency dental treatment or transportation of Contractor personnel to a selected civilian facility, the Contractor shall ensure that the Government is reimbursed for any costs associated with such treatment or transportation.

(ii) Medical or dental care beyond this standard is not authorized unless specified elsewhere in this contract.

(3) Unless specified elsewhere in this contract, the Contractor is responsible for all other support required for its personnel engaged in the theater of operations under this contract.

(n) Compliance with laws and regulations. The Contractor shall comply with, and shall ensure that its personnel supporting U.S Armed Forces in the Republic of Korea are familiar with and comply with, all applicable-

(1) United States, host country, and third country national laws;

(2) Treaties and international agreements;

(3) United States regulations, directives, instructions, policies, and procedures; and

(4) Orders, directives, and instructions issued by the COMUSK relating to force protection, security, health, safety, or relations and interaction with local nationals. Included in this list are force protection advisories, health advisories, area (i.e. "off-limits"), prostitution and human trafficking and curfew restrictions.

(o) Vehicle or equipment licenses. IAW USFK Regulation 190-1, Contractor personnel shall possess the required licenses to operate all vehicles or equipment necessary to perform the contract in the theater of operations. All contractor employees/dependents must have either a Korean driver's license or a valid international driver's license to legally drive on Korean roads, and must have a USFK driver's license to legally drive on USFK installations. Contractor employees/dependents will first obtain a Korean driver's license or a valid international driver's license then obtain a USFK driver's license.

(p) Evacuation.

(1) If the COMUSK orders a non-mandatory or mandatory evacuation of some or all personnel, the Government will provide assistance, to the extent available, to United States and third country national contractor personnel.

(2) Non-combatant Evacuation Operations (NEO).

(i) The contractor shall designate a representative to provide contractor personnel and dependents information to the servicing NEO warden as required by direction of the Responsible Officer.

(ii) If contract period of performance in the Republic of Korea is greater than six months, non emergency essential contractor personnel and all IC/TR dependents shall participate in at least one USFK sponsored NEO exercise per year.

(q) Next of kin notification and personnel recovery.

(1) The Contractor shall be responsible for notification of the employee-designated next of kin in the event an employee dies, requires evacuation due to an injury, or is missing, captured, or abducted.

(2) In the case of missing, captured, or abducted contractor personnel, the Government will assist in personnel recovery actions in accordance with DOD Directive 2310.2, Personnel Recovery.

(3) IC/TR personnel shall accomplish Personnel Recovery/Survival, Evasion, Resistance and Escape (PR/SERE) training in accordance with USFK Reg 525-40, Personnel Recovery. Procedures and USFK Reg 350-2 Theater Specific Required Training for all Arriving Personnel and Units Assigned to, Rotating to, or in Temporary Duty Status to USFK.

(r) Mortuary affairs. Mortuary affairs for contractor personnel who die while providing support in the theater of operations to U.S. Armed Forces will be handled in accordance with DOD Directive 1300.22, Mortuary Affairs Policy and Army Regulation 638-2, Care and Disposition of Remains and Disposition of Personal Effects.

(s) USFK Responsible Officer (RO). The USFK appointed RO will ensure all IC/TR personnel complete all applicable training as outlined in this clause.

RIK-H010 CONTINUANCE OF PERFORMANCE DURING ANY STATE OF EMERGENCY IN THE

REPUBLIC OF KOREA (ROK) (JUL 2012)

Invited Contractor (IC) and Technical Representative (TR) status shall be governed by the U.S.-ROK Status of Forces Agreement (SOFA) as implemented by United States Forces Korea (USFK) Reg 700-19, which can be found under the "publications" tab on the US Forces Korea homepage <http://www.usfk.mil>

(a) Definitions. As used in this clause-

"U.S. - ROK Status of Forces Agreement" (SOFA) means the Mutual Defense Treaty between the Republic of Korea and the U.S. of America, Regarding Facilities and Areas and the Status of U.S. Armed Forces in the Republic of Korea, as amended.

"Combatant Commander" means the commander of a unified or specified combatant command established in accordance with 10 U.S.C. 161. In Korea, the Combatant Commander is the Commander, United States Pacific Command.

"United States Forces Korea" (USFK) means the subordinate unified command through which US forces would be sent to the Combined Forces Command fighting components.

"COMUSK" means the commander of all U.S. forces present in Korea. In the Republic of Korea, COMUSK also serves as Commander, Combined Forces Command (CDR CFC) and Commander, United Nations Command (CDR UNC).

"USFK, Assistant Chief of Staff, Acquisition Management" (USFK/FKAQ) means the principal staff office to USFK for all acquisition matters and administrator of the U.S.-ROK SOFA as applied to US and Third Country contractors under the Invited Contractor (IC) and Technical Representative (TR) Program (USFK Reg 700-19).

"Responsible Officer" (RO) means a senior DOD employee (such as a military E5 and above or civilian GS-7 and above), appointed by the USFK Sponsoring Agency (SA), who is directly responsible for determining and administering appropriate logistics support for IC/TRs during contract performance in the

ROK.

"Theater of Operations" means an area defined by the combatant commander for the conduct or support of specified operations.

"Uniform Code of Military Justice" means 10 U.S.C. Chapter 47.

(b) General.

(1) This clause applies when contractor personnel deploy with or otherwise provide support in the theater of operations (specifically, the Korean Theater of Operations) to U.S. military forces deployed/located outside the United States in-

(i) Contingency operations;

(ii) Humanitarian or peacekeeping operations; or

(iii) Other military operations or exercises designated by the Combatant Commander.

(2) Contract performance in support of U.S. military forces may require work in dangerous or austere conditions. The Contractor accepts the risks associated with required contract performance in such operations. The contractor will require all its employees to acknowledge in writing that they understand the danger, stress, physical hardships and field living conditions that are possible if the employee deploys in support of military operations.

(3) Contractor personnel are not combatants and shall not undertake any role that would jeopardize their status. Contractor personnel shall not use force or otherwise directly participate in acts likely to cause actual harm to enemy armed forces.

(c) Support.

(1) Unless the terms and conditions of this contract place the responsibility with another party, the COMUSK will develop a security plan to provide protection, through military means, of Contractor personnel engaged in the theater of operations when sufficient or legitimate civilian authority does not exist.

(2) All Contractor personnel engaged in the theater of operations are authorized resuscitative care, stabilization, hospitalization at level III military treatment facilities, and assistance with patient movement in emergencies where loss of life, limb, or eyesight could occur. Hospitalization will be limited to stabilization and short-term medical treatment with an emphasis on return to duty or placement in the patient movement system.

(i) When the Government provides medical treatment or transportation of Contractor personnel to a selected civilian facility, the Contractor shall ensure that the Government is reimbursed for any costs associated with such treatment or transportation.

(ii) Medical or dental care beyond this standard is not authorized unless specified elsewhere in this contract.

(1) Unless specified elsewhere in this contract, the Contractor is responsible for all other support required for its personnel engaged in the theater of operations under this contract.

(d) Compliance with laws and regulations. The Contractor shall comply with, and shall ensure that its personnel supporting U.S Armed Forces in the Republic of Korea as specified in paragraph (b)(1) of this clause are familiar with and comply with, all applicable-

(1) United States, host country, and third country national laws;

(i) The Military Extraterritorial Jurisdiction Act may apply to contractor personnel if contractor personnel commit crimes outside the United States.

(ii) Under the War Crimes Act, United States citizens (including contractor personnel) who commit war crimes may be subject to federal criminal jurisdiction.

(iii) When Congress formally declares war, contractor personnel authorized to accompany the force may be subject to the Uniform Code of Military Justice.

(2) Treaties and international agreements;

(3) United States regulations, directives, instructions, policies, and procedures; and

(4) Orders, directives, and instructions issued by the COMUSK relating to force protection, security, health, safety, or relations and interaction with local nationals. Included in this list are force protection advisories, health advisories, area (i.e. "off-limits"), prostitution and human trafficking and curfew restrictions.

(e) Pre-deployment/departure requirements. The Contractor shall ensure that the following requirements are met prior to deploying/locating personnel in support of U.S. military forces in the Republic of Korea.

Specific requirements for each category may be specified in the statement of work or elsewhere in the contract.

(1) All required security and background checks are complete and acceptable.

(2) All contractor personnel meet the minimum medical screening requirements and have received all required immunizations. In the Republic of Korea, all contractor employees subject to this clause shall comply with the same DoD immunization requirements applicable to Emergency Essential DoD civilians- INCLUDING ANTHRAX IMMUNIZATION. The Government will provide, at no cost to the Contractor, any Korean theater-specific immunizations and/or medications not available to the general public.

(3) Contractor personnel have all necessary passports, visas, and other documents…