ERAM SPIRAL RFP 17 July 2024.pdf
PDF 3 MB Posted
- Attached to
- AFLCMC Armament Directorate Rapid Response (ADRR) Commercial Solutions Opening (CSO) for Innovative Execution Federal contract opportunity
- Solicitation number
- FA8682-24-C-S001
About this file
This document is a Spiral Request for Proposal (RFP) for the Extended Range Attack Munition (ERAM) under the Armament Directorate Rapid Response Commercial Solutions Opening (CSO). The government seeks to procure the initial phases of a new aircraft-launched weapon labeled ERAM, which is pivotal for accelerating Ukraine's capability to meet warfighter needs efficiently and affordably. The RFP solicits full proposals from 16 companies identified through a prior RFI, with the potential to fund and award one or more prototype projects under a 10 U.S.C. 4022 Other Transaction (OT) agreement. Key requirements include electromagnetic interference resistance, affordability targeting $225k per weapon, range of 250nm, and a modular, producible design. The initial 4-month Phase 1 effort involves design prototyping, testing, production planning, and long-lead item identification. The optional 8-month Phase 2 includes developmental/operational testing, integration, and delivery of 10 prototype units. Proposals are due by July 26, 2024 and will be evaluated on criteria such as innovative techniques, technical merit, commercialization path, and price.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ADRR CSO 02 June 2026.pdf | ||
| Attachment 2 - Weapons GRA v5.1 Quick Start Guide.pdf | ||
| ADRR CSO 03 Feb 26.pdf | ||
| ADRR CSO 25 Nov 2025.pdf | ||
| ADRR CSO 30 Sep 2025.pdf | ||
| ADRR CSO 20 May 2025.pdf | ||
| ERAM SPIRAL RFP.pdf | ||
| Attachment 4 - Property and Equipment.pdf | ||
| Attachment 2 - Weapons GRA v4.1 Quick Start Guide v1.pdf | ||
| Attachment 3 - Milestones and Payment.pdf | ||
| ADRR CSO 5 June 2024.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Spiral Request for Proposal (RFP) Supporting Prototyping Efforts for
Extended Range Attack Munition (ERAM)
OT Solicitation Number: FA8682-24-R-0014
Issued by:
AFLCMC/EBJ
PROPOSAL RESPONSE DATE: No Later Than 26 July 2024 @ 5:00 PM (Central)
The Extended Range Attack Munition (ERAM) Acquisition team seeks to enter a 10 U.S.C. 4022 Prototype Other Transaction (OT) agreement on the Armament Directorate Rapid Response Commercial Solutions Opening (CSO), Area of Interest, prototyping.
This RFP, entitled ERAM, seeks to procure the initial phases of a new aircraft launched weapon labeled ERAM. This munition is pivotal for accelerating Ukraine’s capability to meet warfighter needs efficiently and effectively and provides an affordable mass weapon to be produced at scale.
The Government is seeking to prototype and adapt commercial autonomous modular open architecture vehicle that can deliver affordable long-range effects. The resultant prototype will provide a platform that is mass producible and provides capabilities outlined in the attached SOO.
This RFP is soliciting full proposals from the 16 companies identified through the ERAM RFI posted to SAM.gov on 30 Jan 2024. If a company not identified though by the RFI would like to be considered, it must request permission and subsequently be approved via email to Garet Simmons (Robert.simmons.37@us.af.mil). These companies must read this RFP in its entirety and submit a proposal that meets all the requirements detailed herein. Proposals from companies not identified through the RFI, or approved by the POC above, will not be evaluated.
The Government will evaluate each proposal with the potential of entering negotiations for the purposes of funding and awarding one or more project(s) as a standalone OTA. However, the Government is under no obligation to award an OTA and if the Government determines it will not award an OTA to your company, costs incurred by the Company in the development and negotiation of its proposal are not recoverable from the Government.
FULL PROPOSAL SUBMISSION DATE
Full Proposals submitted in response to this RFP must be received no later than 26 July 2024 @ 5:00 PM (Central)
PROPOSAL PREPARATION INSTRUCTIONS
General Instructions The Full Proposal Submission must include both a Technical Volume and a Price Volume. The Technical Section must include an Intellectual Property sub-section that lists and details any data rights assertions. The Price Section must include a milestone payment schedule as shown in the SOO. Proposals shall reference this RFP number FA8682-24-R-0014.
Proposals containing data that is not to be disclosed to the public for any purpose or used by the Government except for evaluation purposes shall be marked accordingly on title page and identified at the page/paragraph level. Proposal pages should be labeled independently with the appropriate proprietary, competition sensitive, or data rights terminology. Acceptable data rights terminology includes “Limited, Unlimited, Government Purpose, or Restricted.”
Proposals shall be clear, concise, and shall include sufficient detail for effective evaluation and for substantiating the validity of state claims. The proposal should not simply rephrase or restate the
Government’s requirements but, rather, shall provide convincing rational to address how the Offeror meets these requirements.
Each Offeror shall submit proposals electronically via a combination of unclassified email, file transfer, or CD ROM format, in a format readable by Microsoft (MS) Word 2016, Adobe Acrobat X Pro, MS Excel 2016, and MS PowerPoint 2016, as applicable to Mr.
Garet Simmons via email at robert.simmons.37@us.af.mil.
Proposals shall be prepared in accordance with the following format:
1) Times New Roman 10 (or larger), single spaced, 8.5 by 11 inches.
2) Smaller type may be used in figures and tables but shall be clearly legible.
3) Margins on all sides (top, bottom, left, and right) shall be at least 1 inch.
Pages shall be numbered consecutively within the proposal. The page limits prescribed are maximum page limits. When both sides of a sheet display printed material, it shall be counted as two (2) pages. Cover pages, tables of contents, cross-reference matrix, tabs, and glossaries shall not be counted against prescribed page limits. Pages submitted in excess of these limits will not be read or considered in the Government’s evaluation of the proposal. Any excess pages will be removed by the Contracting Officer and will not be provided to the evaluation team.
Technical Volume (25 Page Limit)
Title Page Include Company Name, Title of Proposal, Date, Point of Contact Name, E-Mail Address, Phone Number, Address, and any subcontractors or team members. Include an abstract which provides a concise description of the proposal.
Propose a Technical Approach Describe the background and objectives of the proposed work, the approach, deliverables, and the resources needed to execute it. Include the nature and extent of the anticipated results. Include ancillary and operational issues such as certifications, algorithms, and any engineering/software development methodologies to be used. Provide a detailed project schedule that outlines the various phases of work to be accomplished by the proposed delivery date. Please Note: The final Phase 1 deliverable must be received no later than 4 months after date of award for Phase 1, and 12 months after award of Phase 1 for Phase 2. Finally, the proposals must identify any proprietary information or associated intellectual property. The proposal should discuss data rights associated with each item.
Government Support Required and GFP Identify the type of support, if any, the Company requests of the Government in general such as facilities, equipment, data, and information or materials. The proposal shall also include a breakout of any GFP that would be required to complete the proposed solution. At this time the Government does not intend to provide GFP.
Intellectual Property/Data Rights
Provide a good faith representation that you either own or possess appropriate licensing rights to all other intellectual property that will be utilized under your proposal. Additionally, your company shall provide a short summary for each item asserted with less than unlimited rights that describes the nature of the restriction and the intended use of the intellectual property in the conduct of the proposed research.
Price Volume (Excel document: No Page Limit; Narrative: 25 Page Limit)
Any OTA resulting from this RFP will be made on a Fixed Price basis in accordance with the terms and conditions of the CSO. The Company shall provide any other data or supporting information that is necessary for the determination of a fair and reasonable price. This can include commercial price catalog for hardware or software, labor rates, other direct costs (ex. supplies and material cost quotes), proposed travel, etc. as necessary to determine the associated costs. Costs should be aligned by calendar year and the following ALIN structure:
0001: Phase 1 Months 0-4 0002 (Option): Phase 2 Months 5-12
Price information shall include a narrative document that accompanies an Excel document. The Excel document shall have formulas intact and must not be locked.
Long Lead Material Identification/Barriers to Production (No Page Limit) The Government requests the contractor to identify barriers to production and required long lead materials integral to meeting the overall program schedule. This request reelects the requirement in the SOO under Paragraph 4.6, Task 6. This element will not factor into the overall evaluation process but will aid the Government in the planning process for potential future opportunities.
BASIS FOR PROPOSAL REVIEW
Proposals will be evaluated as they are received by Government subject matter experts. Proprietary information will be protected from potential competitors. Proposals will be evaluated using the following equally weighted criteria:
1) To what degree are innovative techniques being utilized to enhance and/or accelerate development contributing towards mission accomplishment.
a. Innovative means: Any technology, process, or method, including research and development that is new as of the date of submission of a proposal. This includes unique applications or adaptations of existing technology, processes, or methods.
2) Technical merit of the proposal with an emphasis on the required characteristics outlined in the SOO to include technical maturity, feasibility, and achievability.
3) The degree to which a defined commercialization path or strategy is demonstrated.
4) Risk of execution of the proposal performance schedule.
5) Price analysis to determine proposed price fair and reasonable.
*The extent GFP is required may impact the Government’s assessment of one, some, or all these evaluation factors.
Technical factors will be rated as follows:
a. Outstanding (3 points): The Offeror’s technical proposal indicates an exceptional approach and understanding of the requirements.
b. Good (2 points): The Offeror’s proposal indicates a thorough approach and understanding of the requirements.
c. Acceptable (1 points): The Offeror’s proposal meets requirements and indicated an adequate approach and understanding of the requirements.
e. Unacceptable (0 points): Proposal does not meet requirements of the solicitation.
Price will be rated as follows:
Price will be rated Reasonable or Unreasonable through the use of price analysis. For a price to be reasonable, it must represent a price that a prudent person would pay in conduct of a competitive business.
AWARDING
The Government will review your proposal using the criteria stated above while also considering overall value to the Government and acceptability of the final negotiated terms and conditions.
Upon review and availability of funds, the Government may choose to make one or more awards of a prototype OTA. No award will be made unless and until the Government can make a final determination that your project meets the statutory requirements for use of a prototype OTA According to 10 U.S.C. 4022 It meets the definition of a prototype project, enhances mission effectiveness and your company is a non-traditional defense contractor, small business, traditional defense contractor with significant participation by non-traditional defense contractors or a traditional defense contractor offering a 1/3 cost share.
ADDITIONAL INFORMATION
Your company shall be registered in the System for Award Management (SAM) at https://www.sam.gov/SAM/. The representations and certifications made by your Company, including those completed electronically via the SAM shall be incorporated by reference into any resulting OTA that is awarded from this RFP.
If you are partnering with another entity to conduct this prototyping effort, ensure you provide a copy of your partnering agreement with your proposal.
FOLLOW-ON PRODUCTION
In accordance with 10 U.S.C. 4022, and upon a determination that the prototype project for this transaction has been ‘successfully completed’, this competitively awarded prototype OTA may result in the award of a follow-on production contract or transaction without the use of competitive procedures.
This is a potential outcome for any prototype project awarded under the CSO process. Please note this will constitute a separate negotiation to ensure the company and government incorporate the outcomes which were ‘successfully completed’.
Successfully Completed: In accordance with DoD Policy the following definition of successfully completed shall be incorporated into the agreement and specified in the SOO: ‘A transaction for a prototype project is complete upon the written determination of the appropriate approving official for the matter in question that efforts conducted under a Prototype OT: (1) met the key technical goals of a project; (2) satisfied success metrics incorporated into the Prototype OT; or (3) accomplished a particularly favorable or unexpected result that justifies the transition to production.
Furthermore, successful completion can occur prior to the conclusion of a prototype project to allow the Government to transition any aspect of the prototype project determined to provide utility into production while other aspects of the prototype project have yet to be completed. Any Prototype OT shall contain a provision that sets forth the conditions under which that prototype agreement must be successfully completed.’
MANDATORY GOVERNMENT TERMS AND CONDITIONS:
This agreement is not governed by the Federal Acquisition Regulations and the government strives to provide flexibility in the use of commercial terms and conditions. However, there are a number non-negotiable terms and conditions that are based on law, process limitations, or other reasons.
These will be specifically annotated in the CSO attachments and articles accompanying this RFP.
Taking exception to any of the terms and conditions annotated as mandatory may jeopardize the Government’s ability to award an agreement.
Questions related to this RFP should be directed to:
Contracting: Garet Simmons; Robert.simmons.37@us.af.mil
Attachments:
Attachment 1: SOO Attachment 2: Draft ADRLs Attachment 3: Draft DD254 Attachment 4: ERAM Articles
Please wait...
If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.
You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.
For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.
Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.
DRAFT
SAMPLE
PREVIOUS EDITION IS OBSOLETE.
Page of
DD FORM 254, APR 2018
NEEDS DD67
DEPARTMENT OF DEFENSE
CONTRACT SECURITY CLASSIFICATION SPECIFICATION
(The requirements of the National Industrial Security Program (NISP) apply to all security aspects of this effort involving classified information.)
OMB No. 0704-0567
OMB approval expires:
June 30, 2025
The public reporting burden for this collection of information, 0704-0567, is estimated to average 70 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Washington Headquarters Services, at whs.mc-alex.esd.mbx.dd-dod-information-collections@mail.mil. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
RETURN COMPLETED FORM AS DIRECTED IN THE INSTRUCTIONS.
1. CLEARANCE AND SAFEGUARDING
2. THIS SPECIFICATION IS FOR: (X and complete as applicable.)
3. THIS SPECIFICATION IS: (X and complete as applicable.)
a. ORIGINAL (Complete date in all cases.)
b. REVISED (Supersedes all previous specifications.)
4. IS THIS A FOLLOW-ON CONTRACT?
If yes, complete the following:
Classified material received or generated under
5. IS THIS A FINAL DD FORM 254?
If yes, complete the following:
6. CONTRACTOR (Include Commercial and Government Entity (CAGE) Code)
7. SUBCONTRACTOR(S) (Click button if you choose to add or list the subcontractors
-- but will still require a separate DD Form 254 issued by a prime contractor to each subcontractor)
8. ACTUAL PERFORMANCE (Click button to add more locations.)
10. CONTRACTOR WILL REQUIRE ACCESS TO: (X all that apply. Provide details in Blocks 13 or 14 as set forth in the instructions.)
e. NATIONAL INTELLIGENCE INFORMATION:
11. IN PERFORMING THIS CONTRACT, THE CONTRACTOR WILL: (X all that apply. See instructions. Provide details in Blocks 13 or 14 as set forth in the instructions.)
12. PUBLIC RELEASE
Any information (classified or unclassified) pertaining to this contract shall not be released for public dissemination except as provided by the National Industrial Security Program Operating Manual (NISPOM) or unless it has been approved for public release by appropriate U.S. Government authority. Proposed public releases shall be submitted for review and approval prior to release to the appropriate government approval authority identified here with at least office and phone contact information and if available, an e-mail address. (See instructions)
13. SECURITY GUIDANCE
The security classification guidance for classified information needed for this effort is identified below. If any difficulty is encountered in applying this guidance or if any other contributing factor indicates a need for changes in this guidance, the contractor is authorized and encouraged to provide recommended changes; to challenge the guidance or the classification assigned to any information or material furnished or generated under this contract; and to submit any questions for interpretation of this guidance to the official identified below. Pending final decision, the information involved shall be handled and protected at the highest level of classification assigned or recommended.
(Fill in as appropriate for the classified effort. Attach, or forward under separate correspondence, any documents/guides/extracts referenced herein. The field will expand as text is added. When removing any expanded text area, use delete key or backspace key, then click out of the text field for it to shrink after the text has been deleted. Also allows for up to 6 internal reviewers to digitally sign. See instructions for additional guidance or use of the fillable PDF.)
List of Attachments (All Files Must be attached Prior to Signing, i.e., for any digital signature on the form)
14. ADDITIONAL SECURITY REQUIREMENTS
Requirements, in addition to NISPOM requirements for classified information, are established for this contract.
If Yes, identify the pertinent contractual clauses in the contract document itself, or provide an appropriate statement which identifies the additional requirements. Provide a copy of the requirements to the CSO. The field will expand as text is added or you can also use item 13. When removing any expanded text area, use delete key or backspace key, then click out of the text field for it to shrink after the text has been deleted. (See instructions for additional guidance or use of the fillable PDF.)
15. INSPECTIONS
Elements of this contract are outside the inspection responsibility of the CSO.
If Yes, explain and identify specific areas and government activity responsible for inspections. The field will expand as text is added or you can also use item 13. When removing any expanded text area, use delete key or backspace key, then click out of the text field for it to shrink after the text has been deleted. (See instructions for additional guidance or use of the fillable PDF.)
16. GOVERNMENT CONTRACTING ACTIVITY (GCA) AND POINT OF CONTACT (POC)
17. CERTIFICATION AND SIGNATURES
Security requirements stated herein are complete and adequate for safeguarding the classified information to be released or generated under this classified effort. All questions shall be referred to the official named below. Upon digitally signing Item 17h, no changes can be made as the form will be locked.
18. REQUIRED DISTRIBUTION BY THE CERTIFYING OFFICIAL
9.0.0.2.20120627.2.874785
DD 254, "DoD Contract Security Classification Specification"
Hide Attachment Bar
CurrentPage:
PageCount:
Select classification from drop-down list.: CUI
Enter serial number.:
a. Facility clearance level. Select one.: 2
b. Level of safeguarding for classified information/material required at contractor facility. Select one.: 2
Select for "original.": 1
Select for "original.": 1
Enter prime contract number.: TBD
Select for "revised.": 0
Select for "revised.": 0
Enter subcontract number.:
Select for "final.": 0
Select for "final.": 0
Enter solicitation or other number.:
Enter due date in format YYYYMMDD.:
Enter date in format YYYYMMDD.:
Enter revision number.:
Enter date in format YYYYMMDD.:
Enter final specification.:
Enter date in format YYYYMMDD.:
Select for "no.": 1
Select for "no.": 1
Select for "no.": 0
Select for "no.": 0
Select for "yes.": 0
Select for "yes.": 0
Select for "yes.": 1
Select for "yes.": 1
Enter preceding contract number.:
Enter contractor's request date in format YYYYMMDD.:
Enter period.:
Enter typed name of certifying official (last, first, middle initial).: Simmons, Robert G.
Enter CAGE code of the prime contractor.: TBD
Enter cognizant security office(s) (Name, Address, ZIP Code, Telephone required; Email Address optional).:
Select to add row to locations.:
Select to remove last row from locations.:
Select to delete all signatures.:
Enter location(s).:
Enter general unclassified description of this procurement.: The United States Department of Defense (DoD) and the United States Air Force (USAF) seek to procure a new aircraft launched weapon labeled the Extended Range Attack Munition (ERAM). This munition is pivotal for accelerating Ukraine’s capability to meet war fighter needs efficiently and effectively and provides an affordable mass weapon to be produced at scale. This ERAM stands to help solve both a critical munitions shortfall and a critical capability to consistently strike targets being held outside of current GMLRS/SDB/and JDAM-ER ranges. The threshold integrated aircraft for ERAM will be the Su-27 and MiG-29 aircraft.
Select for "a. CONTRACTOR.": 1
Select for "a. CONTRACTOR.": 0
Select for "a. CONTRACTOR.": 1
Select for "f. OTHER AS NECESSARY.": 0
Select for "f. OTHER AS NECESSARY.": 0
Select for "f. OTHER AS NECESSARY.": 1
Select for "b. SUBCONTRACTOR.": 0
Select for "b. SUBCONTRACTOR.": 0
Select for "b. SUBCONTRACTOR.": 0
Select for "g. BE AUTHORIZED TO USE THE SERVICES OF DEFENSE TECHNICAL INFORMATION CENTER (DTIC) OR OTHER SECONDARY DISTRIBUTION CENTER.": 1
Select for "g. BE AUTHORIZED TO USE THE SERVICES OF DEFENSE TECHNICAL INFORMATION CENTER (DTIC) OR OTHER SECONDARY DISTRIBUTION CENTER.": 1
Select for "c. COGNIZANT SECURITY OFFICE FOR PRIME AND SUBCONTRACTOR.": 0
Select for "c. COGNIZANT SECURITY OFFICE FOR PRIME AND SUBCONTRACTOR.": 1
Select for "c. COGNIZANT SECURITY OFFICE FOR PRIME AND SUBCONTRACTOR.": 1
Select for "h. REQUIRE A COMSEC ACCOUNT.": 1
Select for "h. REQUIRE A COMSEC ACCOUNT.": 1
Select for "d. U.S. ACTIVITY RESPONSIBLE FOR OVERSEAS SECURITY ADMINISTRATION.": 0
Select for "d. U.S. ACTIVITY RESPONSIBLE FOR OVERSEAS SECURITY ADMINISTRATION.": 1
Select for "d. U.S. ACTIVITY RESPONSIBLE FOR OVERSEAS SECURITY ADMINISTRATION.": 0
Select for "i. HAVE A TEMPEST REQUIREMENT.": 0
Select for "i. HAVE A TEMPEST REQUIREMENT.": 1
Select for "e. NATIONAL INTELLIGENCE INFORMATION: - (1) Sensitive Compartmented Information (SCI).": 0
Select for "e. NATIONAL INTELLIGENCE INFORMATION: - (2) Non-SCI.": 1
Select for "j. HAVE OPERATIONS SECURITY (OPSEC) REQUIREMENTS.": 1
Select for "j. HAVE OPERATIONS SECURITY (OPSEC) REQUIREMENTS.": 1
Select for "k. BE AUTHORIZED TO USE DEFENSE COURIER SERVICE.": 1
Select for "k. BE AUTHORIZED TO USE DEFENSE COURIER SERVICE.": 0
Enter infomration for "other.": SIPRNet, PPP and STINFO, see Block 13.
Enter infomration for "other.": AFLCMC IP 1801 Tenth St, Bldg 8, Room 103 WPAFB, OH 45433 AFLCMC.IPDDForm254.Workflow@us.af.mil
Defense Counterintelligence and Security Agency, 27130 Telegraph Rd, Quantico, VA 22134
Select for "e. ADMINISTRATIVE CONTRACTING OFFICER.": 0
Select for "e. ADMINISTRATIVE CONTRACTING OFFICER.": 1
Select for "l. RECEIVE, STORE, OR GENERATE CONTROLLED UNCLASSIFIED INFORMATION (CUI). .": 1
Select for "m.OTHER.": 1
Select for "direct.": 0
Select for ": 1
Enter specification for "through".: See Block 13.
Enter public release authority.: See Block 13.
Select to add signature.:
Select to remove last signature.:
text: 13.a
(U) The National Industrial Security Program Operating Manual (NISPOM), 32 CFR Part 117 and its supplements apply to all classified contract performance.
Task ordering could require additional security classification guidance. Additional security classification guidance will be provided, maintained, and used by the contractor as required. Security classification guidance on information, hardware, and equipment not included in the security classification guides will be furnished to the contractor through the authorized contracting officer or authorized representative at the time the contractor is tasked with a classified project, furnished information, hardware, equipment, or when classification changes occur. Task ordering requiring additional security classification guidance as indicated above, independent of other changes, will not require updating or revising the DD Form 254.
The Contractor will notify the Program Security Officer (PSO), Government Contracting Activity and the Government Security Manager within 24 hours of any incident involving the actual or suspected compromise/loss of classified information to enable the Government to conduct immediate assessment of potential impact pending formal inquiry/investigation. Actual or suspected compromise of Covered Defense Information will be reported in accordance with DFARS Clause 252.204-7012.
SENSITIVE INFORMATION. Sensitive information is information that if lost, misused, compromised, or accessed by unauthorized persons could adversely affect the United States' national interest, the conduct of DoD programs, or the privacy of DoD personnel. It comes in many forms such as personal data under the Privacy Act, personnel records, privileged data (chaplain and judge advocate records), investigative data, scientific and technical information, export controlled data (critical technologies), proprietary data, or CUI data. Sensitive information meets the criteria for exemption from mandatory public disclosure under the Freedom of Information Act.
Sensitive information must be protected. During working hours, reasonable steps must be taken to minimize risk of access by unauthorized personnel. After working hours, sensitive information can be stored in unlocked containers, desks, or cabinets if Government or Government-contract building security is provided. If Government or Government-contract building security is not provided after working hours, sensitive information shall be stored in locked desks, file cabinets, book cases, locked rooms, or similar items. Storage in a safe designed to secure classified information is not required. Sensitive records may be destroyed by any method that will prevent the disclosure of contents or reconstruction of the document. For paper items, strip shredding is recommended with 3/16" being the maximum strip width.
(U) Ref Items 10.a: COMSEC will only be accessed at Government facility.
(U) Ref Item 10.f: See Special Access Program Addendum (TBD).
(U) Ref Item 10.j: The contractor shall comply with DoDI 5200.48_DAFI 16-1403, Controlled Unclassified Information, DoDM 5200.01, Vol 1_AFMAN 16-1404, Vol 1, Air Force Information Security Program, and DoDM 5400.07-Air Force Manual 33-302, DoD Freedom of Information Act (FOIA) Program. The contractor shall monitor CUI aggregation and compilation based on the potential to generate classified information pursuant to security classification guidance addressing the accumulation of unclassified data or information.
(U) Ref Item 10.k: Program Protection Plan (PPP) will be provided by the Government activity.
(U) Ref Item 10.k: STINFO information/documents required during contracting RFP Solicitation process shall be reviewed by the controlling DoD office of the information under request by contracting officer. The controlling office in conjunction with the contracting officer will determine if the STINFO distribution statement identifying information as unclassified (distribution B-F only) can be changed or removed by the controlling DoD Officer prior to release to contractor through the solicitation process IAW DFARS 204.73; PGI 204.7303-1 General.
(U) Ref 11.i: The use of cellular phones, hand-held radios, beepers/pagers, cordless telephones, cordless microphones, and all wireless electronic devices shall be addressed in the Standard Operating Procedures (SOP) of the Information Security (IS) procedures for each computer facility where classified processing is accomplished.
(U) Ref Item 11.j: OPSEC requirements apply. Consult with the PSO for further guidance.
(U) Ref Item 11.l: The contractor shall comply with DoDI 5200.48_DAFI 16-1403, Controlled Unclassified Information, DoDM 5200.01, Vol 1_AFMAN 16-1404, Vol 1, Air Force Information Security Program, and DoDM 5400.07-Air Force Manual 33-302, DoD Freedom of Information Act (FOIA) Program. The contractor shall monitor CUI aggregation and compilation based on the potential to generate classified information pursuant to security classification guidance addressing the accumulation of unclassified data or information.
(U) Ref Item 11.m: The following FARS and DFARS Clauses apply: FAR Clause 52.204-2, FAR Clause 52.204-21, DFARS Clause 252.204-7012, DFARS 252.204-7000, DFARS 252.204-7008 and DFARS 252.204-7009.
(U) Any transfer or processing of classified or sensitive information via electronic methods (facsimile, telemetry, voice, computer) must be protected by implementing an appropriate combination of countermeasures such as encryption devices and sound practices and procedures. Specific countermeasures used must be coordinated by the project manager for approval through the appropriate communications activity.
(U) The contract can require access to sensitive unclassified Government AIS in Categories IT-I, II, and III. At a minimum, contractor employees must be the subject of a favorable single Scope Background Investigation Tier 5 (T5) investigation if granted access and performing in Category IT-I positions. For Category IT-II positions, at a minimum, contractor employees must be the subject of a favorable National Agency Check and Local Agency Check Tier 3 (T3) investigation. For Category III positions, contractor employees must be the subject of a favorable National Agency Check with Inquiries Tier 1 (T1) investigation. In the event the investigation is not adjudicated favorably, unit commanders are responsible for suitability determinations. Reference DoDM 5200.02_AFMAN 16-1405 can be found aat http://e-publishing.af.mil.
(U) Ref Item 12: Public release of Special Access Program (SAP) related data is NOT authorized without prior coordination through the Office of Special Investigations (OSI), Office of Special Projects (PJ) Security Director and subsequent approval of the Original Classification Authority (OCA) and Air Force Special Access Program Control Office (SAPCO). Submit all proposed public disclosures related to SAP data to the Government Program Manager (GPM) and the Office of Special Investigations (OSI), Office of Special Projects (PJ) Program Security Officer (PSO).
Click on this button to attach a file(s).:
rep:
Enter signature.:
Explain and identify specific areas and government activity responsible for inspections.:
Explain and identify specific areas and government activity responsible for inspections.: (U) Ref. 8.a.: DCSA is relieved of all industrial security review responsibilities for contractor performance on the government installation identified in Item 8.a. The SSA (AFLCMC/EB Collateral Security Office, 207 West D Ave Eglin AFB, FL 32542: aflcmc.eb.collateral.security@us.af.mil) has exclusive oversight responsibilities while operating on the installation.
(U) Ref Item 10.f: Defense Counterintelligence and Security Agency (DCSA) is carved out of all inspection responsibility for SAP performance under this contract. OSI PJ retains security cognizance for all SAP performance as well as all collateral information used in the development of SAP information/materials under this contract.
(U) Ref Item 10.k: Program Protection Plan (PPP) will be provided by the Government activity.
Enter GCA name.:
Enter AAC of the contracting office.:
Enter address (include zip code).: AFLCMC/ERAM 102 D Avenue, Bldg 11 Eglin AFB, FL 32542
Enter POC name.:
Enter telephone number (include area code).: 8508830194
Enter email address.: robert.simmons.37@us.af.mil
Enter title.: Contracting Officer
Enter the datesigned in format YYYYMMDD.:
WARNING: DO NOT SIGN THIS DOCUMENT
This document is intended to facilitate working reviews and collaboration. Users should not sign this document for two reasons. 1. Making updates to individual 1423 Forms after signatures have been applied is cumbersome. 2. The “signature” functionality in Word breaks if you apply signatures to more than one page.DRAFT
Once the time comes to sign the 1423 Forms, users will need to generate 1423 forms one at a time using the “Pick List” option.
NOTE: If issue 1. above is not a concern, then you could work around issue 2. by converting the document to pdf and applying pdf signatures.
TABLE OF CONTENTS
A001 Program Management Analysis Plan, Reports and Reviews 3
A002 System Design and Performance Simulations 5
A003 Domain Implementation Package 7
A004 Data Accession List 9
A001 Program Management Analysis Plan, Reports and Reviews
AGREEMENT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate
(0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Agreement/PR No. listed in Block E.
A. AGREEMENT LINE ITEM NO.
A001
B. EXHIBIT
Exhibit A
C. CATEGORY:
Other
D. SYSTEM/ITEM
ERAM
E. AGREEMENT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
Program Management Analysis Plan, Reports and Reviews
3. SUBTITLE
Program Management Plan
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81797
5. AGREEMENT REFERENCE
See Block 16
6. REQUIRING OFFICE
ERAM PO
7. DD 250 REQ
9. DIST STATEMENT REQUIRED
See BLK 16
10. FREQUENCY
See BLK 16
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
Draft
Final
Reg
Repro
16. REMARKS
Block 5. Agreement Reference(s): SOO_2.1, SOO_2.2, SOO_4, SOO_4.1, SOO 4.1.1, SOO_4.2, SOO_4.3, SOO_4.4, SOO_4.5, SOO 4.6.1, SOO_4.6.2, SOO_4.6.3, SOO_4.7, SOO_5.3
FOR APPROVAL: SOO
Tailored to allow contractor's format, subject to compliance with the
Government Reference Architecture (GRA) and ANSI/NISO Z39.18-2005.
BLK 9. DIST STATEMENT REQUIRED: D: Distribution authorized to
Department of Defense and U.S. DoD contractors only for Administrative or Operational use, (1/20/2023). Other requests for this document shall be referred to AFLCMC/ERAM.
The Contractor shall provide deliverables, artifacts, and documentation via the integrated implementation HUB (iHUB) within the Contractor’s
Implementation Model. Alternate delivery arrangements may be made as mutually agreed upon by the Government and Contractor.
BLK 10, 12, 13: FREQUENCY
4.2. Due 14 days prior to Design Review
4. Due as agreed to by Government at least 14 days prior to the end of the PoP
15. TOTAL
G. PREPARED BY
H. DATE
See Block G
I. APPROVED BY
J. DATE
See Block I
18. ESTIMATED TOTAL PRICE
17. PRICE GROUP
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A. CONTRACT LINE ITEM NO.
A001
B. EXHIBIT
Exhibit A
C. CATEGORY:
Other
D. SYSTEM/ITEM
ERAM
E. CONTRACT/PR NO.
F. CONTRACTOR
16. REMARKS (Continued)
Notification of available deliverable material within the Weapons GRA shall be provided to the Government whenever new data is added.
A002 System Design and Performance Simulations
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate
(0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
A002
B. EXHIBIT
Exhibit A
C. CATEGORY:
TDP
D. SYSTEM/ITEM
ERAM
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
System Design and Performance Simulations
3. SUBTITLE
Computer Software Product End Items
4. AUTHORITY (Data Acquisition Document No.)
DI-AVCS-80700A
5. CONTRACT REFERENCE
See Block 16
6. REQUIRING OFFICE
ERAM PO
See BLK 16
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
Block 5. Contract Reference(s): SOO_2.1, SOO_4.2, SOO_4.2.1, SOO_4.2.2, SOO_4.2.3, SOO_5.2
NON-APPROVAL FOR REVIEW: SOO
Tailored to allow contractor's format, subject to compliance with the Government Reference Architecture (GRA) and ANSI/NISO Z39.18-2005.
BLK 9: D: Distribution authorized to Department of Defense and U.S.
DoD contractors only for Administrative or Operational use, (1/20/2023).
Other requests for this document shall be referred to AFLCMC/ERAM.
The Contractor shall provide deliverables within the contractor implementation of the Weapons GRA. The deliverable shall be released to the Government for continuous draft review at intervals throughout the
Period of Performance and a final delivered product at the end of the
Period of Performance.
Government access to Initial, Updated and Final versions of the GRA and associated models and documentation shall be maintained within the digital environment and available to the Government as required below.
CONTRACT DATA REQUIREMENTS LIST
A. CONTRACT LINE ITEM NO.
A002
B. EXHIBIT
Exhibit A
C. CATEGORY:
TDP
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
16. REMARKS (Continued)
Digital Threads linking the documents and models to other models shall be identified as needed to support program execution. If the digital environment is unavailable for draft or final document delivery, delivery may be made via alternate secure means agreeable to the Government.
BLK 10, 12,13: Delivery due at a minimum 14 days prior to Design Review, Delta Design Review and Production Readiness Review events. Notification of available deliverable material within the Weapons GRA shall be provided to the
Government whenever new data is added.
A003 Domain Implementation Package
(1 Data Item)
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate
(0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
A003
B. EXHIBIT
Exhibit A
C. CATEGORY:
TDP
D. SYSTEM/ITEM
ERAM
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
A003
2. TITLE OF DATA ITEM
Domain Implementation Package
3. SUBTITLE
Computer Software Product End Items
4. AUTHORITY (Data Acquisition Document No.)
DI-AVCS-80700A
5. CONTRACT REFERENCE
See Block 16
6. REQUIRING OFFICE
ERAM PO
See BLK 16
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
Block 5. Contract Reference(s): SOO_2.1.10, SOO_2.1.11, SOO_2.1.12, SOO_2.1.14, SOO, 4.2.1, SOO_4.2.2, SOO_5.1
FOR APPROVAL: SOO
Tailored to allow contractor's format, subject to compliance with the Government Reference Architecture (GRA) and ANSI/NISO Z39.18-2005.
DoD contractors \ only for Administrative or Operational use, (1/20/2023). Other requests for this document shall be referred to AFLCMC/ERAM.
the Government for continuous draft review at intervals throughout the
Period of Performance and a final delivered product at the end of the
Period of Performance.
Government access to Initial, Updated and Final versions of the GRA and associated models and documentation shall be maintained within the digital environment and available to the Government as required below.
Digital Threads linking the documents and models to other models shall be identified as needed to support program execution. If the digital environment is unavailable for draft or final document delivery, delivery may be made via alternate secure means agreeable to the Government.
BLK 10, 12, 13: Delivery due at a minimum 14 days prior to Review events. Notification of available deliverable material within the Weapons GRA shall be provided to the Government whenever new data is added.
CONTRACT DATA REQUIREMENTS LIST
A. CONTRACT LINE ITEM NO.
A003
B. EXHIBIT
Exhibit A
C. CATEGORY:
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
16. REMARKS (Continued)
A004 Data Accession List
(1 Data Item)
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate
(0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
A004
B. EXHIBIT
Exhibit A
C. CATEGORY:
TDP
D. SYSTEM/ITEM
ERAM
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
A004
2. TITLE OF DATA ITEM
Data Accession List
3. SUBTITLE
Data Accession List
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81453B
5. CONTRACT REFERENCE
See Block 16
6. REQUIRING OFFICE
ERAM IPTPO
See BLK 16
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
Block 5. Contract Reference(s): SOO_2.1.10, SOO_5.1
NON-APPROVAL FOR REVIEW: SOO
Tailored to allow contractor's format, subject to compliance with the Government Reference Architecture (GRA) and ANSI/NISO Z39.18-2005.
DoD contractors only for Administrative or Operational use, (1/20/2023).
Other requests for this document shall be referred to AFLCMC/ERAM.
the Government for continuous draft review at intervals throughout the
Period of Performance and a final delivered product at the end of the
Period of Performance.
Government access to Initial, Updated and Final versions of the GRA and associated models and documentation shall be maintained within the digital environment and available to the Government as required below.
Digital Threads linking the documents and models to other models shall be identified as needed to support program execution. If the digital environment is unavailable for draft or final document delivery, delivery may be made via alternate secure means agreeable to the Government.
BLK 10, 12, 13: Initial Delivery due 60 days after contract award. Updates to the DAL due at a minimum 14 days prior to each Review.
Notification of available deliverable material within the Weapons GRA shall be provided to the Government whenever new data is added.
CONTRACT DATA REQUIREMENTS LIST
A. CONTRACT LINE ITEM NO.
A004
B. EXHIBIT
Exhibit A
C. CATEGORY:
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
16. REMARKS (Continued)
DD FORM 1423 01, FEB 2001
PREVIOUS EDITION MAY BE USED.
image1.emf image2.emf
ERAM ARTICLES
Note: Some ar cles require fill-ins to be provided by the offeror.
Ar cle I: Ombudsman
(a) Before consul ng with an ombudsman, interested par es must first address their concerns, issues, disagreements, and/or recommenda ons to the Agreements officer for resolu on. Consul ng an ombudsman does not alter or postpone the melines for any other processes.
(b) If resolu on cannot be made by the Agreements officer, the interested party may contact the ombudsman.
Col(S) Todd C. Dye, AFLCMC/AQ-AZ 1790 Tenth St, Bldg 572, Rm 101, Wright-Pa erson AFB, OH 45433 Phone 937-255-5512 ASCA@us.af.mil
Concerns, issues, disagreements, and recommenda ons that cannot be resolved at the Center/MAJCOM/DRU/SMC ombudsman level, may be brought by the interested party for further considera on to the Department of the Air Force ombudsman, Associate Deputy Assistant Secretary (ADAS) (Contrac ng), SAF/AQC, 1060 Air Force Pentagon, Washington DC 20330-1060, phone number
(571) 256-2395, facsimile number (571) 256-2431.
(c) The ombudsman has no authority to render a decision that binds the agency.
(d) Do not contact the ombudsman to request copies of the solicita on, verify offer due date, or clarify technical requirements. Such inquiries shall be directed to the Agreements Officer.
Ar cle II: Debrief/No fica on of Award
The Government will conduct post-award debriefings upon request only. Debriefings to unsuccessful offerors shall be provided upon request in accordance with provisions and melines of 10 U.S.C. 2305 and Sec on 818 of Na onal Defense Authoriza on Act for 2018.
Ar cle III: Patent Rights
A. Alloca on of Principal Rights
1. Unless the Performer shall have no fied The Department of the Air Force (DAF), in accordance with subparagraph B.2 below, that the Performer does not intend to retain tle, the Performer shall retain the en re right, tle, and interest throughout the world to each Subject Inven on consistent with the provisions of this Ar cle.
2. With respect to any Subject Inven on in which the Performer retains tle, DAF shall have a nonexclusive, nontransferable, irrevocable, paid-up license to prac ce or have prac ced on behalf of the United States the Subject Inven on throughout the world.
B. Inven on Disclosure, Elec on of Title, and Filing of Patent Applica on
1. The Performer shall disclose each Subject Inven on to DAF within four (4) months a er the inventor discloses it in wri ng to his company personnel responsible for patent ma ers. The disclosure to DAF shall be in the form of a wri en report and shall iden fy the Agreement and circumstances under which the Inven on was made and the iden ty of the inventor(s). It shall be sufficiently complete in technical detail to convey a clear understanding, to the extent known at the me of the disclosure, of the nature, purpose, opera on, and the physical, chemical, biological, or electrical characteris cs of the Inven on. The disclosure shall also iden fy any publica on, sale, or public use of the inven on and whether a manuscript describing the Inven on has been submi ed and/or accepted for publica on at the me of disclosure.
2. If the Performer determines that it does not intend to retain tle to any such Inven on, the Performer shall no fy DAF, in wri ng, within eight (8) months of disclosure to DAF.
However, in any case where publica on, sale, or public use has ini ated the one-year statutory period wherein valid patent protec on can s ll be obtained in the United States, the period for such no ce may be shortened by DAF to a date that is no more than sixty
(60) calendar days prior to the end of the statutory period.
3. The Performer shall file its ini al patent applica on on a Subject Inven on to which it elects to retain tle within one (1) year a er elec on of tle or, if earlier, prior to the end of the statutory period wherein valid patent protec on can be obtained in the United States a er a publica on, or sale, or public use. The Performer may elect to file patent applica ons in addi onal countries, including the European Patent Office and the Patent Coopera on Treaty, within either ten (10) months of the corresponding ini al patent applica on or six (6) months a er the date permission is granted by the Commissioner for Patents to file foreign patent applica ons, where such filing had previously been prohibited by a Secrecy Order.
4. The Performer shall no fy DAF of any decisions not to con nue the prosecu on of a patent applica on, pay maintenance fees, or defend in a reexamina on or opposi on proceedings on a patent, in any country, not less than thirty (30) calendar days before the expira on of the response period required by the relevant patent office.
5. Requests for extension of the me for disclosure elec on, and filing under this Ar cle, may be granted at DAF’s discre on a er considering the circumstances of the Performer and the overall…
This is the start of the file's text. The full file is on GovTribe.