CAMP Solicitation Quesdtions and Answers V1 - 9 July 2026.pdf
PDF 34 KB Posted
- Solicitation number
- FA8659-26-R-9001
About this file
This is a Questions and Answers document issued on July 9, 2026, providing clarifications on a federal contract solicitation for a weapon system.
The document addresses four key inquiries regarding proposal submission deadlines and technical requirements. The Pricing Section deadline has been extended to 11:59 PM CDT on August 16, 2026, while the Technical Section remains due on August 3, 2026, per the original solicitation. Vendors are prohibited from proposing design cycles longer than those specified in the Statement of Objectives (SOO), with non-compliant proposals considered ineligible for award. The proposed weapon system must conform to all physical dimension limits in the requirements package, specifically restricting the missile extension to no more than 12 inches beyond the missile pod. Additionally, the document clarifies that dollar values appearing on the draft contract are placeholder figures and do not represent the actual contract value.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date added Question Answer 1 9-Jul-26 Can the proposal deadline be extended? The Pricing Section of the proposal is now due at 11:59PM CDT on 16
August 2026. The Techincal Section of the proposal is still due 3 August 2026 in accordance with the original solicitation.
2 9-Jul-26 Can the missile extend more than 12 inchess beyond the end of the missile pod? No. The proposed weapon system must be within the limits of the provided requirments package.
3 9-Jul-26 Can vendors propose longer design cycles than in the SOO? No. Proposals exceeding the design cycle timelines provided in the SOO will be considered non-compliant and may not be considered for award.
4 9-Jul-26 Are the dollar values on the draft contract correct?
No. The values stated on the draft contract are place holders and not the actually value.
UNCLASSIFIED
UNCLASSIFIED
Sheet1
File details come from the government source that posted it. Updated .