FA8650-19-S-5009_-_BAA__Attach_3_-_CDRLs.pdf
PDF 672 KB Posted
- Attached to
- Research in Nondestructive Evaluation Methods for Materials State Awareness Federal contract opportunity
- Solicitation number
- FA8650-19-S-5009
About this file
Atch 3 - Contract Data Requirements List (CDRL), DD Form 1423-1
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA8650-19-S-5009_-_Amend_01_Q&As_and_Lab_Tour.pdf | ||
| FA8650-19-S-5009_-_BAA__Attach_8_-_Section_L.pdf | ||
| FA8650-19-S-5009_-_BAA__Attach_5_-_SOW_Attachment.pdf | ||
| FA8650-19-S-5009_-_BAA_-_28_Feb_19.pdf | ||
| FA8650-19-S-5009_-_BAA__Attach_4_-_Base_Support.pdf | ||
| FA8650-19-S-5009_-_BAA__Attach_2_-_TO_0001_SOO_-_26_Feb_19.pdf | ||
| FA8650-19-S-5009_-_BAA__Attach_1_-_Basic__SOO_-_26_Feb_19.pdf | ||
| FA8650-19-S-5009_-_BAA__Attach_7_-_Section_K.pdf | ||
| FA8650-19-S-5009_-_BAA__Attach_6_-_Model_Contract.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DAT A REQUIREMENTS LIST Form Approved (1 Data Item} 0MB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Exec·utive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it. does not display a currently valid 0MB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
0001 A TDP
TM
OTHER
I
I
I
I
D. SYSTEM/ITEM
I
E. CONTRACT/PR NO. F. CONTRACTOR
FA8650-19-S-5009
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
I
I 17. PRICE GROUP
A001 SCIENTIF IC AND TECHNICAL REPORTS Final Report
I
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
D1-MISC-80711A/T csow I
18. ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION xx REQUIRED ONE/R See Block 16* b. COPIES I
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT a. ADDRESSEE Final D SUBMISSION Draft
A End of Tech Effort See Block 16* Reg Repro I
16. REMARKS AFRL/RXCA 1 1 0
Blk 4:Tailored to allow for attached ANSI based AFRL AFRL/RXOP 1 1 0 I Format Guidelines including Standard Form 298. Also to include, if the Final Report contains data that is being delivered with less than unlimited rights, the data with less-than-unlimited rights shall be delivered in an appropriately marked appendix to the Final
Report.Block 10, is clarified so that, "Pursuant to
DFARS 252.235-7011, the Government will forward the
I
I
I
I approved report to the Defense Technical Information
Center (DTIC)." I
I BLOCK 9: D: Distribution authorized to DoD and us DoD contractors only. Other requests for this I document shall be referred to AFRL/RXCA.
I Block 11: End of Technical Effort.
I Block 12: 30 days from Block 11.
I Approval/Disapproval by letter from the Air Force
Program Manager within 30 days after receipt. I
Disapproval requires correction/resubmission within 30 I days after receipt of Air Force comments.
I Block 13: End of Contract, ·go days from Block 11.
I Blocks 12 & 13: Contractor shall deliver the Final
Report within 30 calendar days after completion of the technical effort. The AFRL Program Manager will take no
I
I more than 30 calendar days to review, edit, and return to the contractor. Upon receipt of the combined I Technical and STINFO comments, the contractor shall take I no ... (continued on next page)
I
15.TOTAL 2 2 0
G. PREPARED BY H.DATE I. APPROVED BY J. DATE
John N. Wertz
05-FEB-2019
AFRL/RXCA (937) 255-2718
I
I DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page -2±_ of 10 Pages
FA8650-19-S-5009
Attachment 3
FA8650-19-S5009
File details come from the government source that posted it.