FA8650-18-S-2001-Atch4.pdf

PDF 351 KB Posted

Attached to
Structures Engineering Research Program (SERP) Federal contract opportunity
Solicitation number
FA8650-18-S-2001
Issued by
Department of the Air Force Materiel Command Research Laboratory

About this file

Basic IDIQ Statement of Work Supplemental Requirements

View the file

Other files for this federal contract opportunity

Other files attached to Structures Engineering Research Program (SERP), newest first.
File Type Posted
BAA-FA8650-18-S-2001_Amendment_1.pdf PDF
FA8650-18-S-2001-Atch9.pdf PDF
FA8650-18-S-2001-Atch10.pdf PDF
FA8650-18-S-2001-Atch3.pdf PDF
FA8650-18-S-2001-Atch1.pdf PDF
FA8650-18-S-2001-Atch6.pdf PDF
FA8650-18-S-2001-Atch5.pdf PDF
FA8650-18-S-2001-Atch7.pdf PDF
FA8650-18-S-2001-Atch2.pdf PDF
FA8650-18-S-2001-BAA.pdf PDF
FA8650-18-S-2001-Atch8.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work (SOW)

Supplemental Requirements

Version 2.7

The following paragraphs are also considered be a part of the SOW requirements and the Contractor is responsible for compliance to the same extent as the rest of the SOW.

1. Packaging and Marking –

(a) All hardware deliverable contract items shall be packaged in accordance with established commercial practices.

(b) When special delivery and/or handling instructions are required, all boxes and/or crates must contain the following statement in plain sight and in bold letters: INSTRUCTION TO RECEIVING OFFICE -

DO NOT OPEN; CONTENTS ARE SENSITIVE TO DAMAGE WHEN IMPROPERLY OPENED OR HANDLED.

CONTACT THE RESPONSIBLE TECHNICAL PROJECT OFFICER IMMEDIATELY UPON RECEIPT. CONTACT:

TBD on individual Task Orders.

2. Program Manager – The Government Program Manager for this effort is TBD on individual Task

Orders.

3. Program Focal Points - The individuals listed below are identified as focal points for this contract.

Principal Investigator: TBD on individual Task Orders; Technical Contract Manager: TBD; Alternate:

TBD.

4. Base Support - Base support may be provided by the Government to the Contractor in accordance with this SOW.

(a) The Contractor will require use of base support on a rent-free, non-interference basis to include

Government-controlled working space, material, equipment, services (including automatic data processing), or other support (excluding use of the Defense Switched Network (DSN)) which the Government determines can be made available at, or through, any Air Force installation where this contract shall be performed.

(b) Unless otherwise stipulated in the contract schedule, the Contractor will use base support on a no-charge-for-use basis and the value shall be a part of the Government's contract consideration.

(c) The Contractor will immediately report (with a copy to the cognizant CAO) inadequacies, defective base support, or nonavailability of support stipulated by the contract schedule, together with a recommended plan for obtaining the required support. Facilities are not be purchased under this contract by the Contractor. Additionally, the Contractor (or authorized representative) will not purchase, or otherwise furnish any base support requirement provided by the SOW/PWS (or authorize others to do so), without prior written approval of the

Contracting Officer regarding the price, terms, and conditions of the proposed purchase, or approval of other arrangements.

(d) Following are installations where base support may be provided: AFRL/RQV laboratory facilities, to include office space at Wright-Patterson Air Force Base, Area B, Buildings 18, 65, 146, and 24C.

(e) The base support to be furnished under this contract is (insert list of support items). Because of the nature and location(s) of the work performed, the value of such support is undeterminable.

The Contractor is not authorized to incur any costs resulting from nonsupport prior to Contracting Officer direction.

(f) In the performance of this contract or any major subcontract, no direct or indirect costs for support will be incurred if the Government determines that support is available at, or through any Air Force installation where this contract shall be performed.

5. Implementation of Patent Rights Clause –

(a) “Interim or Final Invention Reports 1) listing the subject invention(s) and stating that all subject inventions have been disclosed, or 2) stating that there are no such inventions, shall be sent to both the Administrative Contracting Officer at the address located on the face of the contract and to Patent Administrator at det1.afrl.pk.patents@us.af.mil within the timeframes specified in the Patent Rights clause of this contract.

(b) Contractors are highly encouraged to use DD Form 882, Report of Invention and Subcontracts, to submit these reports. The DD Form 882 may also be used for the notification of an award of any subcontract(s) for experimental, developmental or research work which contain a “Patent Rights” clause.

(c) All other notifications required by the contract shall also be sent to the addresses in paragraph (a). This provision also constitutes the request for the following information for any subject invention for which the contractor has retained ownership (1) the filing date, (2) serial number and title, (3) a copy of the patent application, and (4) patent number and issue date. Submittal shall be to (insert contact information for person(s) at the procuring contract office who will handle patent administration, e.g., name and/or position, email, phone numbers, etc.).

6. Information Regarding Non-US Citizens Assigned to this Project –

(a) Contractor employees requiring access to USAF bases, AFRL facilities, and/or access to U.S.

Government Information Technology (IT) networks in connection with the work on this contract must be U.S. citizens. For the purpose of base and network access, possession of a permanent resident card (“Green Card”) does not equate to U.S. citizenship. This requirement does not apply to foreign nationals approved by the U.S. Department of Defense or U.S. State Department under international personnel exchange agreements with foreign governments.

Any waivers to this requirement must be granted in writing by the Contracting Officer prior to providing access. The above requirements are in addition to any other contract requirements related to obtaining a Common Access Card (CAC).

(b) For purposes of paragraph (a) above, if an IT network/system does not require AFRL to endorse a contractor’s application to said network/system in order to gain access, the organization operating the IT network/system is responsible for controlling access to its system. If an IT network/system requires an U.S. Government sponsor to endorse the application in order for access to the IT network/system; AFRL will only endorse the following types of applications;

consistent with the requirements above:

mailto:det1.afrl.pk.patents@us.af.mil

(1) Contractor employees who are U.S. citizens performing work under this contract.

(2) Contractor employees who are non-U.S. citizens and who have been granted a waiver.

Any additional access restrictions established by the IT network/system owner apply.

File details come from the government source that posted it.