Question and Answer Set 4_B011.pdf

PDF 312 KB Posted

Attached to
FA8604 Storage Aid System at Luke AFB, AZ and Kirtland AFB, NM MMHS
Solicitation number
FA860424RB011
Issued by

About this file

This document is a set of questions and answers related to Solicitation FA8604-24-R-B011 for the FA8604 Storage Aid System at Luke AFB, AZ and Kirtland AFB, NM.

The key details are:

  • Offerors are permitted to conduct site visits to inspect existing building conditions where the new modular office structure will be installed, including the fire alarm and suppression systems.
  • Specific decking style for the sheet metal racking is not specified, but must meet all other requirements of the specification.
  • Vinyl-covered gypsum board is acceptable as an alternative to the specified 5/8" gypsum board for the modular office.
  • The interior height of the modular office must be a minimum of 8 feet, and the overall height can be greater than 9 feet but not exceed 12 feet.
  • The government has revised the drawings in Amendment 0004 to reflect the height requirement.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA8604-24-R-B011

Luke AFB, AZ & Kirtland AFB, NM Question Set 4 05 August 2024

Question/Answer Response:

1. In reference to solicitation FA860424RB0110001, CLIN item 0002, In-Checking Modular Office, Appendix A, 3.2.15 Fire detection System & 3.2.16 Fire Suppression System:

a. Are we able to send a building representative to the site to check out the existing building the new structure will be going into? Specifically, to see where we could tie into the fire alarm system, as well as water pipe sizes, pipe elevation, and where those services are in relation to the new modular building.

Site visits are allowed per the base POC.

2. What decking would be accepted for the sheet metal racking?

Specific style of decking is not specified but must meet all other requirements of the specification.

3. For the modular office on the Luke project of this bid can you ask the following please?

a. 5/8” gypsum board has been specified. Would ½” vinyl covered gypsum board be acceptable like the below?

Yes, that is acceptable.

4. Because the roof needs to be load bearing for the HVAC unit, a 10” beam will be required. What is the maximum height the modular office can be? We ask because a 9’H office with a 10” beam will result in less than 8’ of clear height.

The interior height must be at minimum 8’ so the overall height can be greater than 9’ but not exceed 12’H. Drawing has been revised in Amendment 0004 to reflect this change.