This document is a set of questions and answers related to a federal contract opportunity for upgrading the In-Transit Munitions Facility at Travis Air Force Base in California. The key details are:

The solicitation number is FA8604-24-R-B004, and the NAICS code is 333922. The performance, design, fabrication, installation, and testing requirements are for upgrading the existing facility, including replacing turntables, conveyor systems, and control consoles. A pre-proposal meeting will be held on April 17, 2024, and proposals are due by 4:00 PM EDT on May 20, 2024. The contract completion is required within 360 days of award. The evaluation will be based on Lowest Price Technically Acceptable (LPTA). The government reserves the right to not make an award. The document also includes a series of questions and answers related to the technical specifications and requirements.

View the file

Other files for this federal contract opportunity

Other files attached to FA8604 In-Transit Munitions Facility Upgrade at Travis AFB, CA MMHS, newest first.
File Type Posted
Travis AFB question set 2 answers.pdf PDF
Solicitation Amendment - FA860424RB0040001.pdf PDF
InTransit Munitions Facility Upgrade at Travis Air Force BaseCalifornia.zip ZIP file
Solicitation Amendment FA860424RB0040001 SF 30.pdf PDF
Solicitation - FA860424RB004.pdf PDF
InTransit Munitions Facility Upgrade at Travis Air Force Base California.zip ZIP file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA8604-24-R-B004

Travis AFB, California Ques�ons/Answers Set #1 17 April 2024

Pre-Proposal Atendees:

Name Company or Organiza�on Andrew Petersen AFLCMC/PZIEB Megan Blackwell AFLCMC/EZPAE Robert Cox Lӧdige Edward Perko Webb-S�les Tad Bartlet Webb-S�les

1. Q: Are there turntables in the new system or only in the demoli�on?

A: There are 2 turntables to be demolished. The new system does not have any turntables.

2. Q: Since there is a concrete dock, what type of ram protec�on is expected?

A: No ram protec�on is required. There are rubber bumpers on the concrete at the k-loader/forkli� interface loca�ons that will remain in place.

3. Q: Will the Transfer Vehicle rails be replaced, just shorter for the new system?

A: Yes, the exis�ng crane rails shall be removed and replaced new crane rails.

Reference Appendix A, paragraph 3.2.9.1.

4. Q: Are the new Transfer Vehicles intended to be closed like the exis�ng ones?

A: No, the new Transfer Vehicles will have operator pla�orms rather than cabs.

Reference Appendix A, paragraph 3.2.11.

5. Q: Do the Transfer Vehicles require a step to access the operator pla�orm?

A: Yes, the specifica�ons have been modified to clarify. Reference Appendix A, paragraph 3.2.11.1.

6. Q: Do stairs/step-ups need to be provided for personnel to travel over the pass-through conveyors?

A: Yes, the specifica�ons have been revised to include this for both the pass-through conveyors and short staging dock conveyors. Reference Appendix B, paragraphs 3.2.4.2.

and 3.2.5.3. and AF Drawing BTR303-02.

7. Q: Is the exis�ng conveyor where the pass-through conveyor is to be re-used?

A: The exis�ng conveyor shall be removed and disposed of. Reference Appendix B, paragraph 3.2.4.

8. Q: Are the pass-through conveyors driven by a single drive or separate drives?

A: Pass-through conveyors shall move as a single conveyor that can only be operated by one Transfer Vehicle at a �me. The specifica�ons have been revised to clarify. Reference Appendix B, paragraph 3.2.4.1.

9. Q: Without a cabin on the Transfer Vehicles, it will be difficult to have the power feed rail at the ceiling level. Will it be acceptable to have the power feed rail at ground level?

A: At ceiling level or at ground level is acceptable. The specifica�ons have been revised to clarify. Reference Appendix A, paragraph 3.3.2.

10. Q: When transferring a large pallet on the Transfer Vehicle in the new system, you create a pinch point and blind spot between the vehicle and the sta�onary conveyor it interfaces with. What is expected to be provided to mi�gate this risk and ensure the system is safe?

A: A requirement for aisle obstruc�on detec�on on that side of each transfer vehicle has been added. Reference Appendix A, paragraphs 3.3.9., 3.3.9.1., and 3.3.9.2.

11. Q: Are the power panels from the exis�ng turntables and conveyor to be removed?

A: Yes, the specifica�ons have been revised to clarify. Reference Cover PD, paragraph 3.1.3.

12. Q: Are the control consoles inside of 961 to be reused? What about the control consoles at the end of the conveyor lanes outside of 961?

A: The control consoles inside of 961 are to remain. The control consoles outside of 961 at the end of the conveyor lanes are to be removed and replaced. Reference AF Drawings BTR303-03 and BTR303-04.

13. Q: The motors on the conveyor to be replaced outside of Building 961 show they operate on 480V. Is this correct?

A: To our knowledge, this informa�on is accurate.

Picture of the exis�ng motor informa�on for reference:

14. Q: Are any parts from the conveyor to be demolished outside of Building 961 to be kept for use as spares for the conveyor remaining inside?

A: The specifica�ons have been revised to clarify. Any parts that will be kept for spares will be removed by the user prior to the contractor accessing the site to begin the removal. Reference Cover PD, paragraph 3.1.3.

Note that the staircase shown on AF Drawings BTR303-04 has been revised as it is part of the concrete dock, and a separate metal staircase does not need to be provided.