Solicitation Amendment FA860421RB0130001 SF 30.pdf
PDF 580 KB Posted
- Attached to
- FA8604 Storage Aids System at Eglin AFB, Florida MMHS Federal contract opportunity
- Solicitation number
- FA860421RB013
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment - FA860421RB0130002.pdf | ||
| Storage Aids System at Eglin AFB Florida.zip | ZIP file | |
| Solicitation Amendment FA860421RB0130002 SF 30.pdf | ||
| Question and Answers Set 3.pdf | ||
| Solicitation Amendment - FA860421RB0130001.pdf | ||
| Storage Aids System at Eglin AFB Florida.zip | ZIP file | |
| Question and Answers Set 2.pdf | ||
| Question and Answers Set 1.pdf | ||
| Storage Aids System at Eglin AFB Florida.zip | ZIP file | |
| Solicitation - FA860421RB013.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Supplies or Services & Prices or Costs
The following CLIN(s) / SLIN(s) were modified:
INFORMATION FROM TO
Description
Design Complete Bldg. 1404
The Contractor shall design the Storage Aids System for project CSN: LEG904 in accordance with all applicable paragraphs of the Cover Purchase Description (PD) dated 15 March 2021 (paragraphs 2. through 2.2., 3. through
3.3.8. and 4. through 4.3.3.), Appendices A through E and all associated drawings as noted in the attachments.
Note: The requirement includes travel to attend a post award conference at Eglin AFB, Florida and is mandatory.
PSC 3990
System Design Complete, Building 1404
The Contractor shall design the Storage Aids System for project CSN: LEG904 in accordance with all applicable paragraphs of the Cover Purchase Description (PD) dated 15 March 2021 (paragraphs 2. through 2.2., 3. through
3.3.8. and 4. through 4.3.3.), Appendices A through E and all associated drawings as noted in the attachments.
Note: The requirement includes travel to attend a post award conference at Eglin AFB, Florida and is mandatory.
Unit of Measure Lot Each
INFORMATION FROM TO
Description
Widespan Shelving Bldg. 1404 (Manufactured and Delivered)
The contractor shall manufacture and deliver Widespan Shelving for project CSN: LEG904 in accordance with the Cover PD paragraph 3.1.1., Appendix "A," and all associated drawings.
All equipment, operation and maintenance manuals and illustrated parts breakdown shall be provided in accordance with Cover PD paragraph 3.4. and Table 1.
PSC 3990
Widespan Shelving System, Building 1404 (Manufactured and Delivered)
The contractor shall manufacture and deliver Widespan Shelving System for project CSN: LEG904 in accordance with the Cover PD paragraph 3.1.1., Appendix "A," and all associated drawings.
All equipment, operation and maintenance manuals and illustrated parts breakdown shall be provided in accordance with Cover PD paragraph 3.4. and Table 1.
Unit of Measure Lot Each
INFORMATION FROM TO
Description
Mezzanine Floor Replacement Bldg. 1404 (Manufactured and Delivered)
The contractor shall manufacture and deliver Mezzanine Floor Replacement for project CSN: LEG904 in accordance with the Cover PD paragraph 3.1.2., Appendix "B," and all associated drawings.
All equipment, operation, and maintenance manuals and illustrated parts breakdown shall be provided in accordance with Cover PD paragraph 3.4. and Table 1.
PSC 3990
Mezzanine Floor Replacement System, Building 1404 (Manufactured and Delivered)
The contractor shall manufacture and deliver Mezzanine Floor Replacement System for project CSN: LEG904 in accordance with the Cover PD paragraph 3.1.2., Appendix "B," and all associated drawings.
All equipment, operation, and maintenance manuals and illustrated parts breakdown shall be provided in accordance with Cover PD paragraph 3.4. and Table 1.
Unit of Measure Lot Each
INFORMATION FROM TO
Cantilever Rack Bldg. 1404 (Manufactured and Delivered) Cantilever Rack System, Building 1404 (Manufactured
FA860421RB0130001
Description
The contractor shall manufacture and deliver Cantilever Rack for project CSN: LEG904 in accordance with the Cover PD paragraph 3.1.3., Appendix "C," and all associated drawings.
All equipment, operation, and maintenance manuals and illustrated parts breakdown shall be provided in accordance with Cover PD paragraph 3.4. and Table 1.
PSC 3990
and Delivered)
The contractor shall manufacture and deliver Cantilever Rack System for project CSN: LEG904 in accordance with the Cover PD paragraph 3.1.3., Appendix "C," and all associated drawings.
All equipment, operation, and maintenance manuals and illustrated parts breakdown shall be provided in accordance with Cover PD paragraph 3.4. and Table 1.
Unit of Measure Lot Each
INFORMATION FROM TO
Description
Modular Cabinets Bldg. 1404 (Manufactured and Delivered)
The contractor shall manufacture and deliver Modular Cabinets for project CSN: LEG904 in accordance with the Cover PD paragraph 3.1.4, Appendix "D," and all associated drawings.
All equipment, operation, and maintenance manuals and illustrated parts breakdown shall be provided in accordance with Cover PD paragraph 3.4. and Table 1.
PSC 3990
Modular Cabinets System, Building 1404 (Manufactured and Delivered)
The contractor shall manufacture and deliver Modular Cabinets System for project CSN: LEG904 in accordance with the Cover PD paragraph 3.1.4, Appendix "D," and all associated drawings.
All equipment, operation, and maintenance manuals and illustrated parts breakdown shall be provided in accordance with Cover PD paragraph 3.4. and Table 1.
Unit of Measure Lot Each
INFORMATION FROM TO
Description
Rider Reach Vehicle Bldg. 1404 (Manufactured and Delivered)
The contractor shall manufacture and deliver Rider Reach Vehicle for project CSN: LEG904 in accordance with the Cover PD paragraph 3.1.5., Appendix "E," and all associated drawings.
All equipment, operation, and maintenance manuals and illustrated parts breakdown shall be provided in accordance with Cover PD paragraph 3.4. and Table 1.
PSC 3990
Rider Reach Vehicle System, Building 1404 (Manufactured and Delivered)
The contractor shall manufacture and deliver Rider Reach Vehicle System for project CSN: LEG904 in accordance with the Cover PD paragraph 3.1.5., Appendix "E," and all associated drawings.
All equipment, operation, and maintenance manuals and illustrated parts breakdown shall be provided in accordance with Cover PD paragraph 3.4. and Table 1.
Unit of Measure Lot Each
INFORMATION FROM TO
Description
System Installation and Integration Bldg. 1404
The Contractor shall install all items in accordance with all applicable paragraphs of the Cover PD, all associated Appendices and drawings pertaining to design and fabrication as well as performance of system checkout and quality conformance testing of the Storage Aids System for project CSN: LEG904.
As part of the CLIN, the contractor must complete the inspections, tests and certifications in accordance with Cover PD paragraphs 3.4.4., 4.3.1. through 4.3.3. and tests identified in applicable Appendices.
At the completion of the System Checkout Test, performed in accordance with the requirements of the Cover PD paragraph 4.2.1., the Contractor shall submit to the Contracting Officer the required equipment certifications and the written certification that the system has passed the requirements of the System Checkout Test. The COTR will schedule the quality conformance
System Installation and Integration, Building 1404
The Contractor shall install all items in accordance with all applicable paragraphs of the Cover PD, all associated Appendices and drawings pertaining to design and fabrication as well as performance of system checkout and quality conformance testing of the Storage Aids System for project CSN: LEG904.
As part of the CLIN, the contractor must complete the inspections, tests and certifications in accordance with Cover PD paragraphs 3.4.4., 4.3.1. through 4.3.3. and tests identified in applicable Appendices.
At the completion of the System Checkout Test, performed in accordance with the requirements of the Cover PD paragraph 4.2.1., the Contractor shall submit to the Contracting Officer the required equipment certifications and the written certification that the system has passed the requirements of the System Checkout test to start within 10 days following receipt of the written certification from the contractor. The Quality Conformance Test shall be performed in accordance with the Cover PD paragraph 4.2.2. The contractor shall perform all orientation prior to the start of the quality conformance test in accordance with Cover PD paragraph 3.5.
PSC: 3990
Test. The COTR will schedule the quality conformance test to start within 10 days following receipt of the written certification from the contractor. The Quality Conformance Test shall be performed in accordance with the Cover PD paragraph 4.2.2. The contractor shall perform all orientation prior to the start of the quality conformance test in accordance with Cover PD paragraph 3.5.
Unit of Measure Lot Each
INFORMATION FROM TO
Description
Reliability Demonstration Test (RDT) and Final Acceptance Bldg. 1404
The contractor shall accomplish reliability demonstration testing, after successful completion of the quality conformance test, in accordance with the specifications set forth in the Cover PD paragraph 4.2.3.
and each of the applicable appendices associated with testing and acceptance (e.
g., paragraphs 4.2 and 4.3 of all appendices.) This includes submission of the as-built drawings identified in paragraph 3.4.5. of the Cover PD and other technical documents as listed in the attachments and includes final acceptance of the system by the Government.
Note: Contractor cannot invoice for this CLIN until ALL data items have been submitted and approved by Government.
See Cover Purchase Description Paragraph 3.4. "Documentation", as listed in Section 'J," Attachment #1 of this RFP/Contract.
PSC: 3990
System Reliability Demonstration Test (RDT) and Final Acceptance Bldg. 1404
The contractor shall accomplish system reliability demonstration testing, after successful completion of the quality conformance test, in accordance with the specifications set forth in the Cover PD paragraph
4.2.3. and each of the applicable appendices associated with testing and acceptance (e. g., paragraphs 4.2 and 4.3 of all appendices.) This includes submission of the as-built drawings identified in paragraph
3.4.5. of the Cover PD and other technical documents as listed in the attachments and includes final acceptance of the system by the Government.
Note: Contractor cannot invoice for this CLIN until ALL data items have been submitted and approved by Government. See Cover Purchase Description Paragraph 3.4. "Documentation", as listed in Section 'J," Attachment #1 of this RFP/Contract.
Unit of Measure Lot Each
INFORMATION FROM TO
Description
Data Bldg. 1404
The Contractor shall deliver all data items in accordance with Cover PD paragraphs 3.4 through 3.4.5., Cover PD Table 1 - Data Requirements, and paragraphs 4.2 and
4.3 of all Appendices.
This CLIN is Not Separately Priced (NSP).
PSC: 3990
System Data, Building 1404
The Contractor shall deliver all system data items in accordance with Cover PD paragraphs 3.4 through 3.4.5., Cover PD Table 1 - Data Requirements, and paragraphs
4.2 and 4.3 of all Appendices.
This CLIN is Not Separately Priced (NSP).
Inspection and Acceptance
The inspection and acceptance locations for the following CLIN(s) / SLIN(s) were modified:
Inspection and Acceptance Location - FB2823 - FB2823 96 LRS LGRDDC
INFORMATION FROM TO
Delivery of the completed designs (i.e., shop drawings) Delivery of the completed system designs (i.e., shop
Instructions shall be in accordance with paragraphs 3.4.2. and Table 1 - Data Requirements of the Cover PD.
drawings) shall be in accordance with paragraphs 3.4.2.
and Table 1 - Data Requirements of the Cover PD.
Inspection and Acceptance Location - FB2823 - FB2823 96 LRS LGRDDC
INFORMATION FROM TO
Instructions
Equipment installation, system checkout and quality conformance testing shall occur at: Building 1404, Eglin AFB, Florida. Certifications submitted as part of the System Checkout Test shall be delivered in accordance with paragraphs 4.2.1. and Table 1 of the Cover PD.
Equipment installation, system checkout, and quality conformance testing shall occur at: Building 1404, Eglin AFB, Florida. Certifications submitted as part of the System Checkout Test shall be delivered in accordance with paragraphs 4.2.1. and Table 1 of the Cover PD.
Inspection and Acceptance Location - FB2823 - FB2823 96 LRS LGRDDC
INFORMATION FROM TO
Instructions
Following completion of the RDT and acceptance of the system by the Government, the Contractor shall submit as-built drawings in accordance with paragraph 3.4.5.
and Table 1 of the Cover PD. Reliability Demonstration Testing and acceptance of the system shall be at:
Building 1404 Eglin AFB, Florida.
Following completion of the system RDT and acceptance of the system by the Government, the Contractor shall submit as-built drawings in accordance with paragraph
3.4.5. and Table 1 of the Cover PD. Reliability Demonstration Testing and acceptance of the system shall be at: Building 1404 Eglin AFB, Florida.
Inspection and Acceptance Location - FB2823 - FB2823 96 LRS LGRDDC
INFORMATION FROM TO
Instructions All data shall be delivered in accordance with paragraphs 3.4. through 3.4.5. and Table 1 of the Cover
PD.
All system data shall be delivered in accordance with paragraphs 3.4. through 3.4.5. and Table 1 of the Cover PD.
| IDCode: |
| Page: 1 |
| Pages: 5 |
| AmendNo: 0001 |
| EffDate: 25 May 2021 |
| ReqNo: |
| ProjNo: |
| IssCode: FA8604 |
| AdmCode: |
| IssuedBy: FA8604 AFLCMC PZI |
CP 937 656 7394
2275 D ST BLDG 16 RM 128
WRIGHT PATTERSON AFB, OH 45433-7228
UNITED STATES
JUSTIN TERNENT-WITTENBACH, Email: justin.ternent-wittenbach@us.af.mil Telephone: 937-656-7519
| AdminBy: |
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: FA860421RB013 |
| SolDate: 22 Apr 2021 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: Off |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: See Section G |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: The following has been changed in this amendment: |
Quantity types on each CLIN have been changed from "Lot" to "Each." Additionally, CLINs have been updated to include the word "System" to clearly delineate the work required on each CLIN.
All other applicable data, due dates, and RFP requirements remain unchanged.
| ContNameTitle: |
| CoNameTitle: MATTHEW P. HEHER |
Email: matthew.heher@us.af.mil Telephone: 937-255-0952
| ContDate: |
| CODate: |
File details come from the government source that posted it. Updated .