Vermont_Questions_Set_1.docx

DOCX document 13 KB Posted

Attached to
MMHS Storage Aids System Vermont Air National Guard, Vermont
Solicitation number
FA8604-19-R-8103
Issued by

About this file

Response to Questions Set 1

View the file

Other files

File Type Posted
FA8604-19-R-8103-001.pdf PDF
FAR_Clause_Fill_Ins.docx DOCX document
Proposal_Checklist.Pricing_Summary_Sheet.docx DOCX document
RFP_FA8604-19-R-8103.pdf PDF
NBR720.dwg DWG drawing

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA8604-19-R-8103

Vermont ANGB Questions/Responses: Set 1 Date: 20 December 2018

Question 1: Appendix A Mobile Aisle Paragraph 3.2.7 states the “The carriages shall move over minimum 3-4” high, steel rail assemblies”. I believe what was meant to be written was ¾” instead of 3-4” high rail. Can you please confirm?

Response to Question 1: The rails are to be ¾” high, not 3-4”. (See revised Appendix A)

Question 2: The drawing shows two levels in building 150. What is the method we are able to use to transport the widespan shelving to the second floor? Is the lift shown available to the contractor? Or is there another way that must be done.

Response to Question 2: The lift is available to transport the shelving to second floor.