1. SOW_Nitro Gen_v2_dated 15 Oct 2025.docx

DOCX document 24 KB Posted

Attached to
NITROGEN GENERATOR
Solicitation number
FA8601NITROGEN1
Issued by

About this file

This is a Statement of Work (SOW) for a Nitrogen Generation System for the Air Force Institute of Technology (AFIT). The system must provide 400 scfh of nitrogen at 99.5% purity with a discharge pressure of 125 +/- 25 psig, utilizing a membrane-type generator with specific technical requirements including flow/purity control, oxygen analyzer, and automatic on/off functionality. The system must fit within maximum dimensions of 10'H x 82"W x 36"D, weigh no more than 1000 lbs, and be compatible with the facility's compressed air capabilities.

Delivery is required within 10 weeks after award, with the delivery address at AFIT/ENY at Wright-Patterson Air Force Base in Ohio. The system must be manufactured in a qualifying country source in accordance with DFARS regulations. The contractor will provide comprehensive documentation including system design, operation manual, and maintenance procedures. The system comes with a one-year warranty covering on-site repairs, and payment will be processed through Wide Area Workflow (WAWF) after final inspection and acceptance. Specific delivery procedures for commercial vehicles entering Wright-Patterson Air Force Base are detailed, including vehicle inspection requirements at the Commercial Vehicle Delivery Gate.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work For Nitrogen Generation System, v2, Dated 15 October 2025

I. Background:

The Air Force Institute of Technology (AFIT) has a requirement for one (1) EA Nitrogen Generation System. The system is required to provide clean and reliable N2 to multiple laboratories. The application of the system includes but is not limited to, supplying N2 to laboratory equipment, back-filling small and large vacuum chambers and dry boxes, and manual nozzle applications.

II. Minimum Technical Requirements:

The system shall be designed, manufactured, and delivered according to the following minimum requirements:

1. Minimum nitrogen flow rate of 400 scfh @ 99.5% purity

2. Nominal nitrogen discharge pressure: 125 +/-25 psig

3. Membrane type nitrogen generator

a. Cabinet design

b. Flow/ purity control valve to maintain purity regardless of downstream pressure

c. Pressure gauges: air & nitrogen

d. Oxygen analyzer

e. Automatic on/ off switch based on demand

4. Nitrogen system is required to meet all technical requirements listed with supplied Customer’s current facility air capabilities:

a. Maximum air flow @ 175 psig is 190 acfm

b. Minimum compressed air supply pressure: 125 psig

c. Air quality: dry air (-40 deg. F pdp)

d. Electrical: Provided power will be US 60Hz. Must comply with this standard

5. System size requirements and weight.

a. Maximum dimensions of the unit may not exceed 10’H, 82”W, 36”D, not greater than 1000 lbs.

b. Must enter the building through a door 8’H x 58” W.

6. Shall provide the following documentation in electronic form

a. General system design

b. Operation manual

c. Routine preventative maintenance procedures and part numbers of consumable parts, i.e. filters.

d. Certification documentation confirming system was built to the agreed upon specifications.

e. Detailed list of items and functions.

The materials and component parts shall be of quality consistent with the performance requirements of industrial nitrogen generation systems.

III. Installation and Training:

Installation and training are not required for this requirement.

IV. Qualifying Country Products:

All products delivered to satisfy this requirement shall be manufactured in a qualifying country source in accordance with Defense Federal Acquisition Regulation Supplement (DFARS) 225.872. Products from other than qualifying countries will not be accepted, and any costs associated with products from other than qualifying countries, including shipping, etc., shall be at the contractor’s expense.

V. Delivery:

Delivery is required by the earliest possible delivery date, not to exceed ten (10) weeks after receipt of Award. All shipping costs to include insurance will be included in contractor’s proposal. Great care using standard, approved packaging methods shall be taken. Full delivery information will be included in the contract.

Delivery Address:

AFIT/ENY

2950 Hobson Way, Bldg 640

WPAFB, OH 45433

VI. Warranty:

All parts must be free from defects in material and workmanship, under normal and proper use in accordance with the user manual, for the period of one (1) calendar year after receipt of delivery. All repairs covered under warranty shall occur on-site at the expense of the Contractor.

VII. Invoice and Payment The contractor shall be paid upon submission of a properly prepared invoice and after final inspection and acceptance have been made. A proper invoice shall cite the contractor’s name and address, invoice number, invoice date, order number, contract line-item number (CLIN), description of the supplies or service, unit of issue, unit price and extended price, terms of any prompt payment discount offered, and who to notify in the event the invoice is defective.

1. The invoice shall be submitted to in Wide Area Workflow (WAWF) in accordance with the terms of the final contract award.

VIII. Delivery Procedures – Commercial Vehicles:

All vehicles larger than a large pick-up truck are required to be inspected by the Wright-Patterson Air Force Base (WPAFB) Commercial Vehicle Delivery Gate (CVDG) prior to entering the installation.

1. Vehicles to be inspected include, but are not limited to, the following:

a. Step van/panel truck

b. Tractor/trailer, box and flatbed containing cargo

c. Tanker trucks

d. Box trucks

e. Tour buses

f. Garbage/recycled waste trucks

g. Concrete trucks/mixers, dump trucks

h. Cranes, recreational vehicles, petroleum tankers

This inspection will be conducted at Gate 26A located off State Route 235.

2. The following are exemptions to vehicles utilizing the CVDG:

a. If the vehicle has the product inside (concrete and asphalt trucks) and timely delivery is necessary due to product deterioration it does not need to enter the CVDG. To bypass the CVDG, the contractor shall submit a list containing drivers’ names, social security numbers and the state in which the driver's license is held for those drivers who will be entering the base. This shall be accomplished 24 hours prior to requested entry time. If entry is requested on Monday, this list must be submitted by Friday at 1630 hours. All lists shall be submitted to the 88th ABW/CE Directorate contract inspector. The only gates that may be used under this exemption shall be 15A, 26A, 38A, and gate 1B. If the driver's name is not on the list, he/she will not be allowed access to the installation through these gates, and the base will not assume liability for denied access.

b. If a delivery vehicle must exit, and then re-enter the base to complete its route, the vehicle shall be resealed upon exiting the base. After initially passing through the commercial vehicle delivery gate, trucks shall be resealed at Gates 15A, 38A and 22B. The resealing of the trucks will allow them to continue to any other area of the installation (Areas A, B, or Kittyhawk) without reprocessing through the CVDG. To receive resealing assistance, the drivers shall physically stop at one of the three authorized gates and request the installation entry controller to reseal their truck and provide the next location of their delivery. The controller will reseal the truck and give the delivery driver a pre-clearance form. The driver shall present the pre-clearance form to the entry controller at the next point of installation entry. This reentry can be through any base gate.

3. Wright-Patterson Integrated Defense Plan, paragraph 3.10.12.9.2.

a. All irregular deliveries will be sent to the CVDG for inspection.

b. All visitors, which include contractors and commercial vendors without proper background checks and contractor passes, will not be allowed on WPFAB unless escorted by the receiving agency.

c. This will take place after the individual(s) are issued a preclearance form at the CVDG. After successful completion of the vehicle inspection, the receiving agency will escort the individual to and from their destination on WPAFB. An inspector at the CVDG will contact the receiving agency, informing them to send an escort to the CVDG.

d. Escorts will always remain with the vehicle while they are on WPAFB. Vehicles may be subject to an inspection at any of installation entry control points during a directed random antiterrorism measure (RAM.) Any commercial vehicle, regardless of size, can be directed to the CVDG at the discretion of the installation entry controller.

File details come from the government source that posted it. Updated .