VERDI G5 OPTICALLY PUMPED SEMICONDUCTOR LASER – DIODE SYSTEMS Federal contract opportunity
Solicitation number
FA860124Q0015
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Wright Patterson Air Force Base

About this file

This statement of work outlines requirements for two Verdi G5 optically pumped semiconductor laser-diode systems. The Air Force Institute of Technology requires the laser systems to support ongoing research with cleaner signal output than their current seven-laser chain. The laser systems must each provide a power output of over 5W at 532nm, a linewidth of 99%, and a warm up time that is not specified. The related federal contract opportunity is issued by the Department of the Air Force Materiel Command Lifecycle Management Center at Wright Patterson Air Force Base to fulfill this statement of work for the two Verdi G5 systems. The solicitation number is FA860124Q0015 and the opportunity type is a special notice.

View the file

Other files for this federal contract opportunity

Other files attached to VERDI G5 OPTICALLY PUMPED SEMICONDUCTOR LASER – DIODE SYSTEMS, newest first.
File Type Posted
SSJ-Verdi G5_signed.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

FOR

TWO (2) VERDI G5 OPTICALLY PUMPED

SEMICONDUCTOR LASER – DIODE SYSTEMS

31 OCTOBER 2023

I. BACKGROUND: The Air Force Institute of Technology requires a two (2) Verdi G5 Optically Pumped Semiconductor Laser-Diode systems. The current laser system has seven (7) lasers in chain with higher RMS levels and the Verdi G5 Optically Pumped Semiconductor Laser-Diode system will provide a clean RMS signal in order to not further degrade the laser system and support ongoing research. At present time, the AFIT/ENP research activities are performed in collaboration with the Air Force Research Laboratory (AFRL) or outside institutes because the Optically Pumped Semiconductor Laser-Diode systems are not freely available to AFIT/ENP. This requirement will enhance the research program pursued by the ENP faculty programs by providing key sensing capability and supplementing current work that is not achievable with long-duration laser systems.

II. MINIMUM TECHNICAL REQUIREMENTS:

The two (2) Verdi G5 Optically Pumped Semiconductor Laser – Diode systems shall meet the following characteristics:

• Power output of >5W @532nm

• Linewidth <30 GHz at full width half max

• Spectral Purity >99%

• Warm up time <10 minutes

• Operating voltage 100 – 240 VAC @50-60Hz requiring <600W of power

• The laser beam waist diameter should be 2.25 mm (1/e^2) with a beam divergence ,0.5mrad (full angle).

• Pump diodes should be Aluminum-free Active Area (AAA) type CW laser diodes for best reliability and lifetime.

• RMS Noise: < 0.02% rms (10Hz – 100MHz)

• Single transverse mode, TEM00 lowest noise specification

• No thermal lensing or “green noise” issues

• No need for strict control of diode temperature via temp. servo

• PermAlign, no realignment necessary

• Manufactured and sealed in a cleanroom

• Efficient pumping with only one diode module

• Two (2) Genesis CX Water-Cooled Risers

• Compatible with Ti-sapphire mode locked oscillators.

• Diodes inside the laser shall be manufactured by the same company as the laser.

III. QUALIFYING COUNTRY PRODUCTS: All products proposed/delivered to satisfy these requirements shall be either domestic or qualifying country end products in accordance with DFARS 252.225-7001. Buy American and Balance of Payments Program.

IV. DELIVERY: The contractor shall deliver a complete system to the following address:

SHIP TO DODAAC: F4F5AR

POC: Greg Smith Air Force Institute of Technology/ENP 2950 Hobson Way

WPAFB, OH 45433

937-785-3636 gregory.smith.18@us.af.mil ranell.easterday@us.af.mil

V. LEAD TIME: The contractor shall deliver a complete system no later than 12 weeks after contract award.

VI. WARRANTY: The contractor shall provide a warranty free from defects in material and workmanship, under normal and proper use in accordance with the manual, for a period of time of two years after receipt.

VII. DELIVERY PROCEDURES COMMERCIAL VEHICLES: All vehicles larger than a large pick‐up truck is required to be inspected by the Wright‐ Patterson Air Force Base Commercial Vehicle Delivery Gate (CVDG) prior to entering the installation.

7.1 Vehicles to be inspected include, but are not limited to, the following:

7.1.1 Step van/panel truck

7.1.2 Tractor/trailer, box, and flatbed containing cargo

7.1.3 Tanker trucks

7.1.4 Box Trucks

7.1.5 Tour buses

7.1.6 Garbage/recycled waste trucks

7.1.7 Concrete trucks/mixers, dump trucks

7.1.8 Cranes, recreational vehicles, petroleum tanker

7.2 This inspection will be conducted at Gate 16A located off State Route 444. The following are exceptions to vehicles utilizing the CVDG:

7.2.1 If the vehicle has the product inside (concrete and asphalt trucks) and timely delivery is necessary due to product deterioration it does not need to enter the

CVDG. To bypass the CVDG, the contractor shall submit a list containing drivers’ names, social security numbers and the state in which the driver's license is held for those drivers who will be entering the base. This shall be accomplished 24 hours prior to requested entry time. If entry is requested on Monday, this list must be submitted by Friday at 1630 hours. All lists shall be submitted to the 88th ABW/CE Directorate contract inspector. The only gates that may be used under this exemption shall be 15A, 26A, 38A, and gate 1B.

If the driver's name is not on the list, he/she will not be allowed access to the installation through these gates and the base will not assume liability for denied access.

7.2.2 If a delivery vehicle must exit, and then re‐enter the base to complete its route, the vehicle shall be resealed upon exiting the base. After initially passing through the commercial vehicle delivery gate, trucks shall be resealed at Gates 15A, 38A and 22B. The resealing of the trucks will allow them to continue to any other area of the installation (Areas A, B, or Kittyhawk) without reprocessing through the CVDG. To receive resealing assistance, the drivers shall physically stop at one of the three authorized gates and request the installation entry controller to reseal their truck and provide the next location of their delivery. The controller will reseal the truck and give the delivery driver a pre‐clearance form. The driver shall present the pre‐clearance form to the entry controller at the next point of installation entry. This reentry can be at any base gate.

7.2.3 Wright Patterson Integrated Defense Plan, paragraph 3.10.12.9.2. All irregular deliveries will be sent to the CVDG for inspection. All visitors, which include contractors and commercial vendors without proper background checks and contractor passes, will not be allowed on WPAFB unless escorted by the receiving agency. This will take place after the individual(s) are issued a pre‐ clearance form at the CVDG. After successful completion of the vehicle inspection, the receiving agency will escort the individual to and from their destination on WPAFB. An inspector at the CVDG will contact the receiving.

agency, informing them to send an escort to the CVDG. Escorts will remain with the vehicle at all times while it is on WPAFB.

7.3 Vehicles may be subject to an inspection at any of installation entry control points during a directed random antiterrorism measure (RAM). Any commercial vehicle, regardless of size, can be directed to the CVDG at the discretion of the installation entry controller.

II. MINIMUM TECHNICAL REQUIREMENTS:
IV. DELIVERY: The contractor shall deliver a complete system to the following address:
SHIP TO DODAAC: F4F5AR
POC: Greg Smith
Air Force Institute of Technology/ENP
2950 Hobson Way
WPAFB, OH 45433
937-785-3636
gregory.smith.18@us.af.mil
ranell.easterday@us.af.mil

File details come from the government source that posted it. Updated .