This document provides responses to questions regarding solicitation number FA860123Q0131 for furniture for building 853 room E142 of the Wright Patterson Air Force Base. The solicitation seeks steelcase brand name furniture including panels with knockouts in the top caps and interior vertical cable routing on each side. The response clarifies that power poles rather than a base power infeed are required, with one technical power pole per every six stations and one house power pole per every nine stations. Dimensions of the space will be provided to the awarded vendor due to security requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

AIR FORCE LIFE CYCLE MANAGEMENT CENTER (AFLCMC) WRIGHT-PATTERSON AIR FORCE BASE OHIO

11 Aug 2023

FROM: AFLCMC/PZIBA

1940 Allbrook Drive, Room 109 Wright-Patterson AFB, OH 45433

SUBJECT: Response to Inquiries regarding FA8601-23-Q-0131

QUESTIONS

We are aware today that the following items are in the existing panels currently installed. #1 and #2.

1-Existing panels have knockouts in the top caps. This is an upcharge. Do you want that? This is not specified anywhere in the statement of work.

ANSWER: Yes, we do need knockouts in the top caps.

2-Existing panels have interior vertical cable routing and are specified for each side of the panel. This is an upcharge. Do you want that? This is not specified anywhere in the statement of work.

ANSWER: Yes, we do need interior vertical cable routing for each side of the panels

Use of Existing Product 3-There is a statement that says Government will supply inventory list of existing products available for use. Where is this list can you provide or is the existing plans the list?

ANSWER: The existing plan should be used as the inventory list

4-Are you able to provide an AutoCad or DWG plan for this space?

ANSWER: Not at this time. Due to security requirements, CAD files will be provided to the awarded vendor. If there are questions about the building conditions, critical dimensions, we can provide answers to those specific questions as needed.

As the Statement of Work reads under Salient Characteristics, it states each station to have min. 2 technical duplexes and 2 house duplexes. Does that mean you want a base power infeed or power pole for every two workstations?

The Statement of Work also does not indicate whether you want a base power in feed or power pole. Please let us know which one is needed.

ANSWER: For E142, we require power poles.

Depending on the circuits available in the furniture, the vendor should determine how many power poles are required to meet the following configuration:

Maximum 6 duplex outlets on 1 house circuit Maximum 4 duplex outlets on 1 tech circuit Each station to have 2 house duplexes and 2 house duplexes.

Scenario:

With a 3 circuit system, you’d need 1 tech power pole for every 6 stations and 1 house power pole for every 9 stations