Site Visit Questions and Answers.pdf

PDF 105 KB Posted

Attached to
NMUSAF - Theatrical Lighting Systems Upgrade Federal contract opportunity
Solicitation number
FA860122Q0084
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Wright Patterson Air Force Base

About this file

This document provides questions and answers from a site visit related to a federal solicitation for a theatrical lighting systems upgrade at the National Museum of the United States Air Force. The solicitation seeks bids to remove 12 lighting pods from each of two galleries and install new lighting systems. Work must take place Monday through Friday from 6:30 am to 5:30 pm, though sections of galleries can be cordoned off. Existing man doors are 7'10" wide by 10' high and hangar doors are available occasionally. Common lifts previously used on site include Genie Z60/34, JLG450 and NiftyLift SP85 models. Lighting pods are approximately 40 feet high and can be rigged up to a maximum ceiling height of 80 feet, though only 110/120V power outlets are installed on site. Removed lighting pods and trussing will be palletized for the museum, while other material will be recycled. Bids are due by August 19, 2022 at 5:00 pm EST. Questions may be submitted throughout the solicitation period.

View the file

Other files for this federal contract opportunity

Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation # FA8601-22-Q-0084

Site Visit Questions and Answers

1) What days of the week and times of the day would you like the work to be done on these galleries? M-F 630-1730.

2) Are the galleries open to the public during any of those times? Yes. Sections can be stanchioned off to limit access. The goal is to not close an entire gallery.

3) Are there any restrictions to late night work times? Case-by-case basis, for instance if a scheduled power-outage would conflict with daily operations. Contractor should plan ahead IAW the Statement of Work.

4) What are the dimensions of the doors exiting the galleries to the suggested adjacent staging areas? Man-doors are 7'10" W x 10'0" H. Hangar doors are available for *occasional* use to support aerial equipment movement, etc.

5) What lift do you own/have you used in the past with success in those spaces? We currently use, or have used the following: Genie Z60/34, JLG450, NiftyLift SP85, Genie S80/S85, JLG800 series, JLG Ultra Series. Larger lifts have been used, but they typically have extensible axels that require removal of handrails and exhibits.

6) How many lighting pods are being removed in each gallery? EYG: 12 pods

7) What is the height of the lighting pods? Approx. 40’0”

8) What is the height of the rigging points for the lighting pods? Variable, max ceiling height is 80’0”.

9) Is there any power available in the spaces to use rigging motors? Capacity exists, however only 110/120v outlets are installed. Contractor to tie-in to dimmer disconnects if motor distro is to be used.

10) Is 80’ the highest point for potential rigging in each of the galleries? Yes, at peak of arch.

11) What is to be done with the lighting pods and their gear? Amendment will appear in the Statement of Work, lighting fixtures and truss to be palletized and given to NMUSAF---all other pods, wiring/electric boxes, and rigging to be recycled/disposed of by contractor.

12) Is there a ground plan available showing all the lighting positions to be struck from each gallery, dimmer rack locations, and new positions to be installed? No drawing for lighting pods, drawings for new install is included in Statement of Work.

13) Can you confirm that bids are due August 15th, 2022 by 1pm EST? The current offer due date and time is 19 August 2022 at 5:00 PM EST.

14) Do you anticipate there being another round of questions before the bids are due? Questions may be submitted throughout the duration of the solicitation. All questions must be submitted in the format called out within the solicitation posting. Once the questions have been answered, they will be posted to the solicitation for all potential offerors to view.

15) Will the existing EMT leaving the current dimmer panels be required to be removed if not removed? EMT that is no longer in-use should be removed. If EMT can be reutilized for the new install, that is up to the Contractor to deem appropriate.

16) Will new EMT be required to be painted black or gray? EMT should be painted black or dark gray.