Attatchment 3 - RFI Responses.pdf
PDF 415 KB Posted
- Attached to
- AFIT 3D Metal Printer Federal contract opportunity
- Solicitation number
- FA860121R0061
About this file
This document is a combined synopsis and solicitation from the Department of the Air Force Materiel Command Lifecycle Management Center seeking proposals for an additive metal 3D printer. The solicitation requests one 500 watt laser and one 1000 watt laser that can each independently build parts. Proposals are due by October 14, 2021 and the anticipated award is a firm-fixed price contract. The contractor will be responsible for delivery, set up, installation and connection of electrical and gas lines at Wright Patterson Air Force Base by the delivery deadline of three months after award. Evaluation criteria include technical capability to meet requirements, price reasonableness, and additional benefits. Proposals must include company information, point of contact, itemized pricing, and documentation demonstrating compliance with requirements.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 3 - RFI Responses.pdf | ||
| Attachment 1 - Solicitation - FA860121R0061.pdf | ||
| Attatchment 3 - RFI Response.pdf | ||
| Attatchment 3 - RFI Responses.pdf | ||
| Attachment 3 - RFI Responses.pdf | ||
| Attachment 2 - FAR 52.204-24.pdf | ||
| Attachment 1 - Solicitation - FA860121R0061.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 3: RFI Responses
1. The solicitation calls for one 500 watt laser and one 1000 watt laser. Is there a preference to have two different laser wattages or can both lasers be 1000 watts?
a. No preference, both lasers may be 1000 Watts and they may deliver a 500 Watt & 1000
Watt pair.
2. Regarding the dual laser configuration, can you clarify how you would like the two lasers to operate? For example, two lasers building the same part or two lasers building two separate parts. Or one laser for testing?
a. Both lasers should be able to build the same part or act independently building different parts.
3. What types of material are you looking to print with?
a. Tungsten and molybdenum alloys
4. Offloading the machine from the delivery truck and setting the machine into place – Contractor Responsibility or Wright Patterson Responsibility?
a. Contractor Responsibility.
5. Creating the properly fused electrical connections to the machine – Contractor Responsibility or
Wright Patterson Responsibility?
a. Fused electrical connections are available in the room and the room is set-up with electrical connections for multiple metal 3D printers. Contractor would be responsible for making final connection from electrical boxes to machines
6. Any sort of gas connections (nitrogen or argon) – Contractor Responsibility or Wright Patterson Responsibility?
a. Argon and nitrogen gas connections are available at the wall near where the printer will sit. Contractor will be responsible for making final connection from wall to printer.