Drawings_BLDG_93-SHT1.pdf
PDF 234 KB Posted
- Solicitation number
- FA8601-18-R-0016
About this file
Drawings for work Representative of Seed Task.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Call_Sheet_airfiled_IDIQ_BLDG_93.pdf | ||
| RFP_SF30_Addendum_3.docx | DOCX document | |
| Attachment_5.2_Wage_Determination_OH20180002.pdf | ||
| Attachment_5.2_Wage_Determination_OH20180002.pdf | ||
| RFI_preaward_2.docx | DOCX document | |
| Final_SF30_Addendum_2.docx | DOCX document | |
| Attachment_5_update_Wage_Dtermination_OH20170002.pdf | ||
| Addendum_1_Loop_Detectors_to_ZHTV171101_AFP_IDIQ.docx | DOCX document | |
| 171101_bid_schedule_option_1_(Addendum).docx | DOCX document | |
| 171101_bid_schedule_option_2_(Addendum).docx | DOCX document | |
| 171101_bid_schedule_base_year_(addendum).docx | DOCX document | |
| Attachment_6_Drawings.pdf | ||
| RFP_Final.docx | DOCX document | |
| RFP_Draft_v2.docx | DOCX document | |
| Attachment_2_Bid_schedule_option_1.docx | DOCX document | |
| Attachment_1_bid_schedule_base_year.docx | DOCX document | |
| Attachment_5_Wage_Determination_OH20170002.pdf | ||
| Attachment_4_Specifications_Project_171101(IDIQ).docx | DOCX document | |
| Attachment_3_Bid_schedule_option_2.docx | DOCX document |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NTS
ZHTV 182809 REPAIR/ REPAVE PAVEMENT BLDG 93
N
1. PROVIDE 2 INCHES COLD MILLING
2. PROVIDE 3 INCHES ASPHALT OVERLAY
3. LOOP DETECTTOR TO BE REPLACED
GA
GA
5-22-18
ZHTV 182809
REPAIR AND REPAVE ACCESS TO BLDG 93
AREA A
1 1
C
JJL
GENERAL NOTES
CODED SHEET NOTE
1. VERIFY ALL SITE CONDITIONS AND UTILITIES PRIOR TO WORK.
2. VERIFY ALL MEASUREMENTS PRIOR TO WORK
3. REMOVE ALL CONSTRUCTION DEBRIS; DEBRIS SHALL BE REMOVED DAILY.
4. PROVIDE TRAFFIC (PARKING) CONTROL PLAN FOR APPROVAL 45 DAYS
PRIOR TO THE CONSTRUCTION. A WRITTEN APPROVAL IS REQUIRED TO
COMMENCE TRAFFIC CONTROL AND CONSTRUCTION.
5. ALL CONSTRUCTION SHALL COMPLY WITH ALL CURRENT CODES,
STANDARDS AND REQUIREMENTS PROVIDED IN CONTRACT ZHTV161050
6. CLEAN PROJECT SITE PRIOR TO PRE-FINAL INSPECTION.
DRAWING LEGEND