Q&A_30_Jan_2018.pdf
PDF 171 KB Posted
- Attached to
- Access Control System (ACS) Federal contract opportunity
- Solicitation number
- FA8601-18-Q-0038
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Q&A_31_Jan_2018.pdf | ||
| SOW_Badging_for_Trolley_Stop_v6.docx | DOCX document | |
| Q&A_29_Jan_2018.pdf | ||
| Clauses.pdf | ||
| Attachment_2.pdf | ||
| SOW_Badging_for_Trolley_Stop_v5.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
AIR FORCE LIFE CYCLE MANAGEMENT CENTER (AFMC)
WRIGHT-PATTERSON AIR FORCE BASE OHIO
30 January 2018
FROM: AFLCMC/PZIBC (Kimberly Conley)
1940 Allbrook Drive, Room 109
Wright-Patterson AFB, OH 45433
SUBJECT: Response to Inquiries regarding Solicitation FA8601-18-Q-0038, Access Control
System
QUESTIONS
1. Are Scaled Drawings available?
2. Are Ceilings Suspended? Or Hard Lid?
3. Are there existing Cable Trays for wiring above ceilings?
4. Can Existing Wiring be utilized?
5. Is a "UPS" required? If so, What Time/Power Duration is required?
6. Are "Or Equal" Equipment substitutions allowed?
7. Is "Plenum Wire" acceptable?
8. Is "After Hours Access" for said work, available to contractor at no add'l cost to the
Gov't?
9. Could we do a walkthrough of the site?
10. Please provide a BILL OF MATERIALS.
11. Is a bid bond required? If so, what percentage?
ANSWERS
1. If required, this may be possible; however, this job is a relatively simple install for 3 readers in 3 doors and wiring through existing conduit. The wiring will connect the 3 new readers to an existing system through the PDS.
2. Suspended.
3. Based on the simple scope of this ACS project (path) trays should not be needed. The distance from start point, through the existing PDS, to new readers is approximately 15-
20 feet.
4. No, you will need to run wire for the new points added.
5. The 3 new points will tie back to the panel in the starting point (comm room). This panel will provide the UPS protection/time and no additional protection is required.
6. As long as it is compatible with the existing DSX system.
7. Yes
8. No, work will occur during normal business hours, 0800-1700 M-F with observation of normal GOV holidays.
9. If required; however, this job is a relatively simple install for 3 readers in 3 doors and wiring through existing conduit. If you would like to do a walkthrough, please contact
Kimberly Conley at kimberly.conley.3@us.af.mil
10. BOM
1 pin reader
2 non-pin readers
3 mag locks
3 exit buttons
1 (DSX 1042 or compatible) Two Reader Board
Wire (approximately 25 ft) and conduit (approximately 10 ft of conduit as needed)
Installation service
11. A bid bond is not required.