Evaluation_Factors_PDF.pdf

PDF 66 KB Posted

Attached to
SYSTEMS FURNITURE MAINTENANCE Federal contract opportunity
Solicitation number
FA8601-17-R-0015
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Wright Patterson Air Force Base

View the file

Other files for this federal contract opportunity

Other files attached to SYSTEMS FURNITURE MAINTENANCE, newest first.
File Type Posted
BWFM_PWS__AUG_17_PDF.pdf PDF
Additional_Instructions_to_Offerors_PDF.pdf PDF
Bid_Schedule_Attacment_5.xlsx XLSX spreadsheet
FA8601-17-R-0015.pdf PDF
Wage_Determination.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA8601-17-R-0015

Attachment 2

EVALUATION FACTORS

1. The Government will use FAR 12.602 Streamlined Evaluation of Offers vs. FAR 15.3 Source Selection to evaluate offers submitted in response to the solicitation. The factors that shall be used to evaluate proposals are Technical, Subcontracting Plan and Price, as expounded below. All evaluation factors are equal in importance; however, a proposal is unawardable at any price if, after final evaluation, the Technical or Subcontracting Plan factors receive a rating of “Unacceptable.” The evaluation does not permit tradeoffs between price and non-price factors. Award will be made to the responsible offeror who submits a proposal that (1) conforms to the requirements of the solicitation; (2) that receives a rating of “Acceptable” on the Technical and Subcontracting Plan evaluation factors; and (3) that submits the proposal with the lowest Total Evaluated Price (TEP), provided that the TEP is not unbalanced and is fair and reasonable. The Government reserves the right to award no contract at all depending upon (1) the quality of proposals received and (2) the fair and reasonableness of the pricing of proposals received.

FACTOR 1 - Technical: Pursuant to evaluation of all subfactors and elements hereunder, the Technical factor will receive an overall rating of either “Acceptable,” or “Unacceptable” using the rating and descriptions in the table below:

Rating Description

Acceptable

Proposal clearly meets the minimum requirements of the solicitation.

Unacceptable

Proposal does not clearly meet the minimum requirement of the solicitation.

Subfactor 1 – Quality Control Plan (QCP) (PWS Paragraphs 1.5 and 1.7.3)

Description: This subfactor will evaluate the offeror’s approach for ensuring performance will be in accordance with (IAW) the standards in the PWS throughout the life of the contract.

Measure of Merit: This subfactor is met when the offeror provides a detailed QCP that is likely to ensure that performance will be IAW the standards in the PWS throughout the life of the contract to include:

1. identification of personnel responsible for the quality control plan;

2. a description of the offeror’s inspection system with types and frequencies of inspection to be conducted and personnel responsible for conducting inspections;

3. a clear description of key control procedures;

4. a system for preventing the occurrence or recurrence of deficiencies; and

5. a description of how inspections will be documented with sample inspections records for each type of inspection to be conducted.

Subfactor 2: Computer/Office Support (PWS Paragraph 1.1.1.)

Description: This subfactor will evaluate the offeror’s ability to provide all hardware/software/office equipment requirements IAW the contract.

Measure of Merit: This element is met when the offeror defines and lists all computer and office equipment that will be furnished listed in PWS Paragraph 1.1.1, clearly demonstrating an understanding of and a likelihood of the ability to provide the necessary requirements.

Subfactor 3: Inventory and Design Support (PWS 1.1.2, 1.1.3, 1.2.4)

Description: This subfactor will evaluate the offeror’s ability to deliver up-to-date automated inventory and control, sample reports, and computer-aided design IAW the conditions of the contract.

Element 1: Automated Inventory and Control (PWS Paragraph 1.1.2)

Measure of Merit: This element is met when the offeror provides a sample report that includes all of the information specified in PWS paragraph 1.1.2 and that clearly demonstrates the ability of the contractor's software to accurately track and account for inventory during all phases of design and as assets are moved into and out of the warehouse.

Element 2: Sample Inventory Reports (PWS Paragraph 1.1.3)

Measure of Merit: This element is met when the offeror provides a sample inventory report to include page numbering and date of run; layout requirements, existing product, parts and materials at the task site and returned inventory IAW the PWS.

Subfactor 4: Furniture Task Support (PWS Paragraphs as noted below)

Description: This subfactor will evaluate the offeror’s ability to provide disassembly/assembly/reassembly/movable wall and associated parts installation and parts/products transportation IAW the terms of the PWS.

Element 1: Response Capability/Timeline

Description: This element will evaluate the offeror’s ability to perform routine and emergency repairs IAW the requirements of PWS Paragraph 1.3.2.

Measure of Merit: This element is met when the offeror clearly demonstrates the understanding and capability of the requirement, making it likely they will respond to all repairs within the timeframes stated in the PWS.

Element 2: Certified Electrician

Description: This element will evaluate the offeror’s ability to provide a qualified, certified electrician in accordance with the requirements of PWS Paragraph 1.9.

Measure of Merit: This element is met when the offeror clearly demonstrates the understanding and capability to provide proof of access to MECA certified electricians, per the requirements of the PWS.

Element 3: Certified Plumber

Description: This element will evaluate the offeror’s ability to provide a qualified, certified plumber in accordance with the requirements of the PWS Paragraph 1.9.

Measure of Merit: This element is met when the offeror clearly demonstrates the understanding and capability to provide proof of access to plumbers that are licensed by the state of Ohio and possess documentation of completion of the latest edition of the National Plumbing Code, per the requirements of the PWS.

Element 4: Transportation

Description: This element will evaluate the offeror’s ability to demonstrate they have the necessary equipment to transport products to and from the warehouse and worksite, and have material handling equipment to comply with the requirements of PWS Appendix B.

Measure of Merit: This element is met when the offeror provides a clear explanation as well as a list of vehicles and equipment that is likely to ensure performance will be compliant, when describing how all transportation requirements will be met.

Element 5: Panel/Material Cleaning and General Maintenance

Description: This element will evaluate the offeror’s ability to provide clear information regarding how on-site and off-site (Bldg 20057) panel/material cleaning will be accomplished in accordance with the requirements of PWS Paragraph 1.3.2.; and the type of equipment and supplies that will be used (must be ecologically safe).

Measure of Merit: This element is met when the offeror clearly demonstrates the effective methods of cleaning and general maintenance and environmentally safe products to be used.

Element 6: On-site Management of the Contract Description: This element will evaluate the offeror’s ability to provide an on-site manager and alternate(s) of all facets of contract performance.

Measure of Merit: This element is met when the offeror clearly demonstrates the ability to provide points of contact and alternates who will be responsible for daily operations, after hours and be able to respond within 2 hours IAW PWS Paragraph 1.8.1.

Subfactor 5: Prior Experience

Description: This subfactor will evaluate the offeror’s prior experience for a minimum of two relevant furniture maintenance contracts/jobs performed within five years of the issue date of the solicitation, with the following qualifiers for each job:

a) Design and reconfiguration of 50 existing systems furniture workstations using AutoCAD, or equal.

b) Completion of a phased installation of systems furniture in an occupied building.

c) Experience in maintaining and tracking systems furniture work station inventories using an automated database system(s).

For each relevant furniture contract/job described, provide the following administrative data:

1. Company/Division Name

2. Program Title

3. Contracting Agency

4. Contract Number

5. Type of Contract (Fixed Price)

6. Dates Performed

7. Contract Value (including any option years)

Measure of Merit: This element is met when the offeror clearly demonstrates relative experience in at least two jobs performed within five years of the issue date of the solicitation;

both (or all) job descriptions include the details of all three qualifiers, all administrative data were provided for each job, and the response indicates a thorough understanding of the technical aspects of each job.

FACTOR 2 Subcontracting Plan: For other than Small Business offerors, the subcontracting plan will be evaluated to determine if it includes all of the content prescribed in paragraph (d) of FAR 52.219-9, Small Business Subcontracting Plan (DEVIATION JAN 2017-O0014) and DFARS 252.219-7003, Small Business Subcontracting Plan (DoD Contracts) (Deviation MAR 2016-O0014).

FACTOR 3 Price: Price proposals will be evaluated for (1) completeness, (2) unbalanced pricing, (3) fair and reasonableness, and (4) Total Evaluated Price (TEP).

Completeness: The Government will review the pricing submissions for completeness and compliance with solicitation clause FAR 52.212-1 and Attachment 1—Additional Instructions to Offerors, and the instructions in attachment 5, Pricing Schedule.

Unbalanced Pricing: The Government will analyze each proposal to determine whether they are unbalanced with respect to prices proposed on different Contract Line Items Numbers (CLIN) for the same or similar services and/or supplies in the same or similar quantities and with respect to option pricing. An offer may be rejected if the Contracting Officer (CO) determines that the option prices are significantly unbalanced or that otherwise unbalanced pricing poses an unacceptable risk to the Government.

Fair and Reasonableness: The offeror’s Price proposal will be evaluated using price analysis in accordance with FAR 15.404-1(b) or DFARS 215.371-3 if only one offer is received.

Total Evaluated Price (TEP): The Government will add the total price for all options to the total price for the basic requirement to arrive at a total evaluated price (TEP). The TEP will be calculated as:

(i) The sum of the extended prices taken from the pricing exhibit, attachment 5 for Contract Line

Item Numbers 0001 through 4004 for the base period, option periods I through IV, and the six month extension.

(ii) To account for the maximum six-month extension possible under the clause at FAR 52.217-8, Option to Extend Services, the Government will take the proposed price of the final option period (CLINS 4001 through 4004), prorate it to a six-month value, and add that amount to the sum of CLINS 0001 through 4004 (base performance period and option periods I through IV). The resulting amount will be the TEP. Evaluation of options shall not obligate the Government to exercise the option(s).

The spreadsheet below illustrates calculation of a proposal’s TEP using the methodology described above.

The spreadsheet is provided for illustration purposes only. Prices reflected in the spreadsheet are notional and in no way reflect the actual value of the requirement or an actual evaluation of proposed prices submitted in response to this solicitation or any other solicitation for the same or similar requirements.

PERIOD OF

PERFORMANCE

(POP) POP LENGTH CLINS

PROPOSED

PRICE

BASE YEAR 12 MONTHS 0001-0004 $100,000.00

OPTION YEAR I 12 MONTHS 1001-1004 $103,000.00

OPTION YEAR II 12 MONTHS 2001-2004 $106,090.00

OPTION YEAR III 12 MONTHS 3001-3004 $109,272.70

OPTION YEAR IV 12 MONTHS 4001-4004 $112,550.88

Total Proposed Price for Base Year & Options I-IV $530,913.58 Evaluated Value of Maximum 6 Month Option to Extend services IAW FAR 52.217-8 $56,275.44

Total Evaluated Price (TEP) $587,189.02

2. Evaluation Process:

(a) The Government will initiate concurrent evaluation of all evaluation factors on all proposals. The Government will consider, throughout the evaluation, the "correction potential" of a proposal including whether any proposal deficiency can be rectified and whether any uncertainty can be resolved. The judgment of such "correction potential" is within the sole discretion of the Government.

(b) If pursuant to initial evaluation, the Government rates either the Technical factor as “Unacceptable” or if the Government determines that there is some other deficiency or uncertainty relative to an offeror’s proposal, and in the Government’s judgment, the deficiency is rectifiable or the uncertainty is resolvable; the Contracting Officer (CO) may open discussions and may continue discussions as long as, in the Government’s judgment, the deficiency is rectifiable or the uncertainty is resolvable.

(c) For the purpose of conducting discussions, if the Government rates either the Technical factor as “Unacceptable” or if the Government determines that there is some other deficiency or uncertainty relative to an offeror’s proposal, the entire proposal will be rated “Unacceptable.” At the conclusion of discussions, if either the Technical factor is rated “Unacceptable” or if any deficiency or uncertainty relative to the proposal has not been unresolved, evaluation of that proposal will be considered final. The entire proposal will be rated “Unacceptable” and no further consideration will be given to that proposal for award.

(d) For the purpose of award without discussions, if pursuant to initial evaluation, the Government rates either the Technical factor as “Unacceptable” or if the Government determines that there is some other deficiency or uncertainty relative to an offeror’s proposal, notwithstanding that any deficiency may be rectifiable or any uncertainty may be resolvable, the entire proposal will be rated “Unacceptable,” the initial evaluation will be the final evaluation, and no further consideration will be given to that proposal for award.

3. A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.

File details come from the government source that posted it. Updated .