Continued Q&A responses for the IWT Solicitation FA8601-16-R-0031
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SiteVisitMinutes9Feb17.pdf | ||
| SiteVisitQuestions_IWT.pdf | ||
| IWT_Amendment_1.pdf | ||
| PWS_Water_Treatment__9Jun16.pdf | ||
| Additional_Instructions_to_Offerors.pdf | ||
| Evaluation_Factors_IWT.pdf | ||
| IWT_Solicitation_19-Jan-17.pdf | ||
| WD-15-2419.txt | TXT text file |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q. What is the Lbs. per hour of steam?
A. For Building 20770 Equipment
Boilers:
a. Two gas fired, 120,000 pound per hour, water tube, 400 PSIG
b. Two gas fired, 80,000 pound per hour, water tube, 125 PSIG
Q. What is the percentage of condensate return?
A. Percentage is based on the testing results usually measured in TDS (total dissolved solids).
Q. It has been stated that the IWT Contract FA8601-12-C-0062 was awarded in the amount of $1,945,000.00. What was the period of performance for this contract and for how many months was the contract awarded?
A. The Period of Performances for the IWT Contract FA8601-12-C-0062 are as follows:
CLINs POP 0001-0009 (base) 01-Jul-12 to 30-Sep-12 1001-1009 (Option I) 01-Oct-12 to 30 Sep-13 2001-2009 (Option II) 01-Oct-13 to 30-Sep-14 3001-3009 (Option III) 01-Oct-14 to 30-Sep-15 4001-4009 (Option IV) 01-Oct-15 to 30-Sep-16 5001-5009 (6 month ext. awarded IWA FAR 52.219-8) 01-Oct-16 to 31-Mar-17
Q. How much did WPAFB spend on the IWT Contract FA8601-12-C-0062 for the twelve (12) months ending
30 SEP 2016?
A. The total obligated amount for Option Year IV is $495,342.00
Q. The following were requested on a spreadsheet per site as it applies:
a. System Volume
b. Closed Loop Est Water Loss Per Year
c. Tower Water Use Per Year
d. pH Target Run
e. Cycles of Concentration Target
f. % Load
g. Loop Estimated Water Use Per Year
h. Estimated Water Use Per Year
A. The cycles of concentration and pH will be at the discretion of the contractor, as long as they meet the LSI standards we have listed in the PWS under 1.2.4 Standards.
Closed loop estimated water loss per year should be “0.”
CE currently does not have volumes, water usage rates, and percent load for each individual system.