SABER_Source_Selection_RFIs_2.pdf

PDF 62 KB Posted

Attached to
Simplified Acquisition of Base Engineering Requirements (SABER)
Solicitation number
FA8601-16-R-0010
Issued by

View the file

Other files

File Type Posted
101954NC.01V.DGN —
926001NE.27R.tiff TIFF file
739838NN.01R.tiff TIFF file
926001NM.12R.tiff TIFF file
579969NN.02R.tiff TIFF file
0195_SH4_V8.dgn —
0195_SH6_V8.dgn —
699981NC.03R.tiff TIFF file
0399591A.02R.tiff TIFF file
926001NE.26R.tiff TIFF file
639976NM.03R.tiff TIFF file
926001NN.11R.tiff TIFF file
H-004_CONTROLS.dgn —
H-001_LEGEND_AND_SCHEDULES.dgn —
926001NE.25R.tiff TIFF file
H-002_DETAILS.dgn —
699981NM.06R.tiff TIFF file
A100.DWG DWG drawing
579969NA.01R.tiff TIFF file
A400.dwg DWG drawing
926001NN.10R.tiff TIFF file
-_0616_-_15-2025_page_1_of_2.dwg DWG drawing
H-005_CONTROLS.dgn —
039959NC.01R.tiff TIFF file
926001NC.01R.tiff TIFF file
926001NM.20R.tiff TIFF file
926001NM.18R.tiff TIFF file
699981NM.05R.tiff TIFF file
926001NE.21R.tiff TIFF file
926001NM.17R.tiff TIFF file
1019541E.04V.DGN —
639976NM.02R.tiff TIFF file
529954NE.02R.tiff TIFF file
H-101_HVAC_FLOOR_PLAN.dgn —
926001NM.13R.tiff TIFF file
-_0616_-_15-2025_page_2_of_2.dwg DWG drawing
579969NM.03R.tiff TIFF file
699981NS.04R.tiff TIFF file
926001NN.32R.tiff TIFF file
A600.dwg DWG drawing
Ceiling_and_Sprinkler_work_plan.pdf PDF
A601.dwg DWG drawing
599951RA.01R.tiff TIFF file
6999811N.02R.tiff TIFF file
H-003_SCHEDULES.dgn —
926001NA.09R.tiff TIFF file
0399591A.03R.tiff TIFF file
699981NN.01R.tiff TIFF file
926001NA.02R.tiff TIFF file
0195_SH1_V8.dgn —
Show 40 more

Latest 50 of 106 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Is it possible to convert the DGN files to DWG files? Without Micro Station we cannot open them.

I've coordinated with CE. The format of the files provided, for information purposes only, are all that's available. They verified that Microstation drawings (DGNs) are CADD files and it is possible for the contractor to convert DGN files to DWG files through AutoCAD.

I apologize if I have missed this information elsewhere, but I was wondering if you have provided a task order history chart for previous SABER contracts? Even a sample task order history would be helpful. Is this something you have, or would be willing to provide?

The current SABER contract currently sits at task order number 0598, with a cumulative total of $70,593,106.52. This does not mean that the follow-on contract will have the same numbers for the same time frame.

File details come from the government source that posted it. Updated .