- Blood Transfusion Lab Furniutre
- Solicitation number
- FA8601-13-T-0198
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Answers_to_Contractor_Questions.docx | DOCX document | |
| Transfusion_Lab_Furniture_Requirements_8-12.docx | DOCX document | |
| Transfusion_Lab_Drawing.pdf | ||
| DFARS_252.209-7995.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. Demolition of the existing casework - contractor is responsible for demolition
2. Providing a dumpster for construction debris- the government has a dumpster on site available for use for construction and demolition debris
3. Flooring & ceiling repairs - the government will be doing flooring and ceiling repairs
4. Any electrical connections required - the only electrical work required by the contractor is connecting to existing electric
5. Answer to the question about student storage - clarification of our question: The specification reads 84" and 90" of work surface (174" total) and 260" of overhead cabinetry. Then, the cabinetry specification reads must be 24"H and 17"D (5-CG328 or like (2-48" wide & 1-36" wide). These components total 132". The lineal inches aren't compatible. Please clarify storage requirements.
The inches should match up so there is storage along the whole of the counter top.
Please confirm whether the following is required:
1. Task lighting - No
2. Tackboards - No
3. Work tools (paper management) - No
4. Wire Chase Rail (for electric and/or data) - No
5. 2H storage in office areas –No
6. Electric for panels in the office area- plug into existing electric