Atch 1 - Drawings for Proj 10-0003.pdf
PDF 3 MB Posted
- Attached to
- Demolish Occupational Health Clinic, FAC 20040
- Solicitation number
- FA8601-12-B-0005
About this file
Attachment 1 DRAWINGS
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R C
P
P
P
36" RCP
21" RCP21" RCP
V
P
P
6" VCP
6" VCP
P
4" VCP
P
6" VCP
6" VCP
P
6" VCP
P
P
13" CCP
P
P
12" CCP
P
6" VCP
P
R C P
P
P
C
V C P
8" VCP
P
8" VCP
V C P
H P R
2" HPS
H
S
1.7
R
H P S
S
R
1.5" CPR
L
R
2.
5" L
PR
.5
L
R
1"
2" HP
0.25"
A B
A N
D O
N E
D
DATE NO REVISION BYBYREVISIONNODATE
DATECHECKEDDRAWNDESIGNED
WRIGHT-PATTERSON AIR FORCE BASE
PLOT
C
IV
IL
ENGINEER
IN
G
88TH ABW
AFUS
CHIEF-ENG. CONST. CHIEF-ENG. SECTION COORDINATOR
PROJECT NUMBER ZHTV 100003
DEMOLISH OCC HEALTH CLINIC, F/20040
10-15-10PSB JAH PSB
100% SUBMITTAL 03-16-11
LJBinc.com
(937) 259-5100 fax
(937) 259-5000 tel
Dayton, OH 45420-0246
P.O. Box 20246
3100 Research Blvd.
LJB Inc.
N
GRAPHIC SCALE
0 20 40
BUILDING 20103
MONAHAN WAY
K S
T R
E E
T
BSMT FL. FIN FL 873.75
FIRST FL. FIN FL 884.25
BUILDING 20040
G A
S
1" GAS
C100
UTILITY DEMOLITION PLAN
DEMOLISHED
AREA TO BE
DEMOLISHED
AREA TO BE
SECTION OF PIPE.
REPLACE WITH A STRAIGHT
MAIN TO BE REMOVED AND
LATERAL CONNECTIONS TO THE
SANITARY, AND NATURAL GAS
1. EXISTING WATER, STORM,
GENERAL NOTES:
TIGHT.
SEAL EXISTING OPENING WATER
SANITARY LINE TO BE REMOVED
SEE NOTE 1
GAS LINE
ABANDON
SEE NOTE 1
WATER LINE
ABANDON
SEE NOTE 1
WATER LINE
ABANDON
SEE NOTE 1
STORM LATERAL
ABANDON
REMOVAL
END SANITARY
SEE NOTE 1
STORM LATERAL
ABANDON
SEE NOTE 1
STORM LATERAL
ABANDON
REMOVAL
SANITARY
BEGIN
SEE NOTE 1
STORM LATERAL
ABANDON
SEE NOTE 1
STORM LATERAL
ABANDON
SEE NOTE 1
STORM LATERAL
ABANDON
DATE NO REVISION BYBYREVISIONNODATE
DATECHECKEDDRAWNDESIGNED
WRIGHT-PATTERSON AIR FORCE BASE
PLOT
C
IV
IL
ENGINEER
IN
G
88TH ABW
AFUS
CHIEF-ENG. CONST. CHIEF-ENG. SECTION COORDINATOR
PROJECT NUMBER ZHTV 100003
DEMOLISH OCC HEALTH CLINIC, F/20040
10-15-10PSB JAH PSB
100% SUBMITTAL 03-16-11
LJBinc.com
(937) 259-5100 fax
(937) 259-5000 tel
Dayton, OH 45420-0246
P.O. Box 20246
3100 Research Blvd.
LJB Inc.
N
GRAPHIC SCALE
0 20 40
B S
M T F
L F
IN
F
L
.7
F
IR
S T F
L F
IN
F
L
.2
B
U
IL
D
IN
G
BUILDING 20103
MONAHAN WAY
K S
T R
E E
T
C200
GRADING PLAN OPTION "B"
IP
IP
SF
IP
IP
IP
IP
SF
IP
IP
NOTES:
ACTIVITIES.
AS NEEDED ON ANY AREAS DISTURBED BY CONSTRUCTION
HILLSIDE AND SHALL PROVIDE EROSION MATTING OR SOD
1. CONTRACTOR SHALL PREVENT EROSION OF EXISTING
DATE NO REVISION BYBYREVISIONNODATE
DATECHECKEDDRAWNDESIGNED
WRIGHT-PATTERSON AIR FORCE BASE
PLOT
C
IV
IL
ENGINEER
IN
G
88TH ABW
AFUS
CHIEF-ENG. CONST. CHIEF-ENG. SECTION COORDINATOR
PROJECT NUMBER ZHTV 100003
DEMOLISH OCC HEALTH CLINIC, F/20040
10-15-10PSB JAH PSB
100% SUBMITTAL 03-16-11
LJBinc.com
(937) 259-5100 fax
(937) 259-5000 tel
Dayton, OH 45420-0246
P.O. Box 20246
3100 Research Blvd.
LJB Inc.
C300
EROSION CONTROL DETAILS
IRON GRATE
WOVEN MONOFILAMENT
IRON GRATE
DANDY BAG
TM
MAINTENANCE:
IP
TM
DANDY BAG
TM
FEDERAL GUIDELINES
30 SIEVE SIZE MEETS
UNIT WITH GRATE
MOVEMENT OF
ALLOW EASY
LIFTING STRAPS
needed.
inside envelope as fine material from point shovel. Remove broom or square needed with stiff surface of unit as sediment from
Remove dried
CATCH BASIN:
TO INSPECT
unit.
basin and replace inspect catch grate inside, Remove unit with
AND CURB APPEAL.
WITH INLET FOR SAFTY
DANDY BAG LAYS FLUSH
OF STORM SEWER AND PRIOR TO PAVING OPERATIONS.
TO BE USED ON ALL STRUCTURES AFTER INSTALLATION
NOT TO SCALE
INLET SEDIMENT FILTER
DANDY BAG DROP
FLO
W 4"
1. SET THE STAKES
4"
FLO
W
2. EXCAVATE A 4" X 4" TRENCH UPSLOPE
ALONG THE LINE OF STAKES.
FLO
W
3. STAPLE FILTER MATERIAL TO STAKES
AND EXTEND IT ITO THE TRENCH.
FLO
W
4. BACKFILL AND COMPACT THE
EXCAVATED SOIL.
CONSTRUCTION OF A
FILTER BARRIER (SILT FENCE)
SF
NOT TO SCALE
| TS001 |
| 5492_C100_Demo Plan |
| 5492_C200_Grading Plan option B |
| 5492_C300_Erosion Control Details |
| D001 |
| D002 |
| D100 |
| D101 |
| D500 |
| P-0 PLUMBING BASEMENT FLOOR PLAN DEMO |
| P-1 PLUMBING FIRST FLOOR PLAN DEMO |
| P-2 PLUMBING & ELECTRIC SITE PLAN DEMO |
| M-0 HVAC BASEMENT FLOOR DEMO |
| M-1 HVAC FIRST FLOOR PLAN DEMO |
| E-0 ELECTRICAL BASEMENT FLOOR PLAN DEMO |
| E-1 ELECTRICAL FIRST FLOOR PLAN DEMO |
File details come from the government source that posted it. Updated .