Amendment 0001.pdf

PDF 21 KB Posted

Attached to
Demolish Occupational Health Clinic, FAC 20040
Solicitation number
FA8601-12-B-0005
Issued by

About this file

This is the first amendment to the IFB. It must be printed signed and submitted with bid. Bid opening is 11 June 2012 at the Twin Base Golf Course.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

100003

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

1. To correct the submittal dates on draw ings C100, C200, C300 in DFARS 252.236-7001, CONTRACT DRAWINGS AND SPECIFICATIONS

(AUG 2000)

2. To incorporate new Wage Determination OH 120002 POSTED 05/25/2012 Modif ication 11

3. To update the OMBUDSMAN clause

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 25-May-2012

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA8601-12-B-0005

X 9B. DATED (SEE ITEM 11)

11-May-2012

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item14. The hour and date specified for receipt ofOffer is extended, X is not extended.

Offer must acknowledge receipt ofthis amendment prior to the hour and date specified in the solicitation or as amended by one ofthe following methods:

(a) By completing Items 8 and 15, and returning copies ofthe amendment; (b) By acknowledging receipt of this amendment on each copy ofthe offer submitted;

or (c) By separate letter or telegramwhich includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. Ifby virtue ofthis amendment you desire to change an offer already submitted, such change may be made by telegramor letter, provided each telegramor letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriat ion date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not , is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(Ifapplicable)

6. ISSUED BY

3. EFFECTIVE DATE

25-May-2012

CODE

ASC/PKOC - CONSTRUCTION BRANCH

POC: SUSAN HASHEMI

1940 ALLBROOK DRIVE, ROOM 109

WRIGHT-PATTERSON AFB OH 45433-5309

FA8601 7. ADMINISTERED BY (Ifother than item6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA8601-12-B-0005

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION I - CONTRACT CLAUSES

The following have been modified:

252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)

(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.

(b) The Contractor shall--

(1) Check all drawings furnished immediately upon receipt;

(2) Compare all drawings and verify the figures before laying out the work;

(3) Promptly notify the Contracting Officer of any discrepancies;

(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and

(5) Reproduce and print contract drawings and specifications as needed.

(c) In general--

(1) Large-scale drawings shall govern small-scale drawings; and

(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.

(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.

(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:

Number Sheet Designation Date

1 TS001 TITLE SHEET 03-16-2011

2 C100 DEMOLITION PLAN 03-16-2011

3 C200 GRADING AND EROSION CONTROL PLAN 03-16-2011

4 C300 EROSION CONTROL DETAILS PLAN 03-16-2011

5 D001 SITE DEMOLITION 03-16-2011

6 D002 FOUNDATION DEMOLITION 03-16-2011

7 D100 BASEMENT DEMOLITION 03-16-2011

8 D101 FIRST FLOOR DEMOLITION 03-16-2011

9 D500 BUILDING SECTIONS DEMOLITION 03-16-2011

10 P-0 PLUMBING BASEMENT FLOOR PLAN - DEMO 03-16-2011

11 P-1 PLUMBING FIRST FLOOR PLAN - DEMO 03-16-2011

12 P-2 PLUMBING & ELECTRIC SITE PLAN - DEMO 03-16-2011

13 M-0 HVAC BASEMENT FLOOR PLAN – DEMO 03-16-2011

14 M-1 HVAC FIRST FLOOR PLAN - DEMO 03-16-2011

15 E-0 ELECTRICAL BASEMENT FLOOR PLAN - DEMO 03-16-2011

16 E-1 ELECTRICAL FIRST FLOOR PLAN - DEMO 03-16-2011

(End of clause)

5352.201-9101 Ombudsman

OMBUDSMAN (APR 2010)

(a) An ombudsman has been appointed to hear and facilitate the resolution of concerns from offerors, potential offerors, and others for this acquisition. When requested, the ombudsman will maintain strict confidentiality as to the source of the concern. The existence of the ombudsman does not affect the authority of the program manager, contracting officer, or source selection official. Further, the ombudsman does not participate in the evaluation of proposals, the source selection process, or the adjudication of protests or formal contract disputes. The ombudsman may refer the party to another official who can resolve the concern.

(b) Before consulting with an ombudsman, interested parties must first address their concerns, issues, disagreements, and/or recommendations to the contracting officer for resolution. Consulting an ombudsman does not alter or postpone the timelines for any other processes (e.g., agency level bid protests, GAO bid protests, requests for debriefings, employee-employer actions, contests of OMB Circular A-76 competition performance decisions).

(c) If resolution cannot be made by the contracting officer, concerned parties may contact the Center/MAJCOM ombudsmen, Ms. Cynthia Evoniuk., ASC/AQ, 1755 11th St, Bldg 570, Room 101, Wright-Patteron Air Force Base, OH 45433-7404, Tel 937-255-6005, Fax 937-656-7193, e-mail:

Cynthia.Evoniuk@wpafb.af.mil

Concerns, issues, disagreements, and recommendations that cannot be resolved at the MAJCOM/DRU level, may be brought by the concerned party for further consideration to the Air Force ombudsman, Associate Deputy Assistant Secretary (ADAS) (Contracting), SAF/AQC, 1060 Air Force Pentagon, Washington DC 20330-1060, phone number

(703) 588-7004, facsimile number (703) 588-1067.

(d) The ombudsman has no authority to render a decision that binds the agency.

(e) Do not contact the ombudsman to request copies of the solicitation, verify offer due date, or clarify technical requirements. Such inquiries shall be directed to the Contracting Officer.

(End of clause)

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

EXHIBITS

TABLE OF CONTENTS

DOC TYPE DESCRIPTION PAGES DATE

Attachment 1 Specifications 190 16 March 2011

Attachment 2 Drawings 16 Noted on Each Drawing

Attachment 3 General Decision Number: 19 25 May 2012

OH120002 05/25/2012 OH2

Modification 11

Attachment 4 Addendum #1 w/Atch 21 7 March 2012

(End of Summary of Changes)