Drawings.pdf
PDF 3 MB Posted
- Attached to
- Project# 07-0013 Replace Steam/Condensate Lines Federal contract opportunity
- Solicitation number
- FA8601-10-R-0078
About this file
Attachment 2 Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| VPPspec.pdf | ||
| FA8601-10-R-0078.pdf | ||
| Blank Cost Estimate.xlsx | XLSX spreadsheet | |
| Specifications.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COORDINATOR ENGINEERING CHIEF
DATE REVISION BYNO. DATE NO. REVISION BY
C I
V
IL
ENGI
N
E E
R
US AF
W PAFB
WRIGHT-PATTERSON AIR FORCE BASE
88TH ABW
OF
DESIGN CHIEF
DATEDRAWNDESIGNED CHECKED
YELLOW
SPRINGS
M A D
R
IV
E R
S T
IL
L W
A T E R
R
IV
E R
TROTWOOD
DAYTON
WRIGHT-
PATTERSON
AIR FORCE
BASE
G
REAT
M
IA
M I
R
IV
E R
75p
OAKWOOD
BEAVERCREEK
TO SPRINGFIELD
HUBER
HEIGHTS
VANDALIA
SITE PLAN
SCALE: 1" = 100’
VICINITY MAP
NO SCALE
NO SCALE
WORK LOCATION MAP
EXISTING STEAM/CONDENSATE RETURN LINES
STEAM/CONDENSATE RETURN LINES
TO BE REPLACED
0’25’50’ 100’ 200’ 400’
SCALE: 1" = 100’
NORTH
G-1
NORTH
C
GOLF
C
OURSE
P E
R S
O N
N E
L
G A
T E
T
AX
IW
AY
D
T A
X
IW
A Y
I (
C L
O S
E D
Deck
C
11C
C
ALLBRO
O
K
DRIV
E
R O
A D
S K E E L
P E
A R S
O N
V
AN PATTO
N DRIV
E
19C
GATE
3F 56
GATE
5G
2A
R O
A D
0 21
REDMAN
BOYD
STREET
THOMAS
STREET
FAIRCHILD
STREET
C
A
L A
Y M
O N
S
R E
E T
S K
E E L
A V
E
D
C O
Y
C
FORBES
STREET
WRIG
HT
MIL
LER
ROAD
C
C 35
C
TREET
CHASE
C
R
A D
J A
R V
IS
PARKIN
G
T
AX
B
APRON
C
C
C
C
C
C
C
C
C j
C
19C
C
C
C
6C
8C
9C
P E
A R
S
A D
SUBSTATION
J
GATE
7C
1 33
RIVE
B R E
IV
E
B R E E
IV
E
0G
9G
1G
3G
5G
9G
1G
9G
1G
4G
1G42
3G
3G
7G
1G
1G
9G
HICKORY STREET
S T
A
U
THURLOW
STREET
COOPER
STREET
C
C
GATE
5C
A L
L B
R O
O K
R
M
P
IV
E
W
R O
A D
C
IR
C L
E
B U
C K
E Y
E C
IR
C L
E
0G
ILLOW COURT
OAK
STREET
POPLAR
L E
M
R E
E T
C H
E S
T N
U T
GATE
8C
GATE
C
1C
C
S T
R E E T
S C
H U
S T
A D
T A L B
O
A D
C
C
C
C
C
C
P E
A R
S
A D
S K
E
E N
U E
0G
6 15
M E T Z
G
IV
EJ
O
H N S
C H
A N
L A
H M
C
IR
C L E
9A
7G
4G
5G
0G
8G
1G
2G
7G
G
G
2G
4G
5G
6G
4G
6G
R
IV
E
D L
IV
E
D R
IV
E
C H
ID
L A
W
1 G
9G
1G
3G
5G
9G
0G
1 G
0G
4G
3G
G505
P A
S S
A G
E W
Y
U
N N
T W
E
’C
L
D G
Y
M
A
A
A
A
A
P E A R S
O N
R O
A D
WASH
EQUIPMENT
PESTICIDE
STORAGE
COVERED
WASHBAY
COVERED
STORAGE
ROAD
R
IT
C H
IE
A D
E D
W A
R
IV
E T
R E E
W
IC
K
S
T R
E E T
7C
4C
S U
N D
O R P
H
D R
IV
E
PEARSON
C
5C
GATE
C
GATE
C
R O
A D
B U C
K N E R
R O
A
AVENUE
HARNESS
ROAD
GATE
2C
GATE
3C
GATE
4C
MAIN
GATE
1C
C 20
C
4C
4C
C
B U
C K
N E
R
S P
R
IN
G E
R
R O
A D
C
C
C
C
OHIO AVE
CITY OF FAIRBORN
EDWOOD STREET
BIRCH STREET
S T
R E
E T
EDWOOD STREET
GATE
C
3C
SYCAMORE STREET
P E
R E
E T
P L
R E
E T
CATALPA STREET
C
Q U
IN
R E
E T
3C
C
R
C H
E S
T N
U T
PINE STREET
LOCUST
S T R E E T
L O
C U S T
GATE
8H
Gate 1C
REPLACE STEAM/CONDENSATE LINES
NEAR 30091
PROJECT NO. 070013
F/30091
P E
R S
O N
N E
L
G A
T E
T
AX
BOYD
S K
E
E
C
19C
S-
0.2
C P
R
.5
H P S
S-
0.2
0" C
PR
S-
1.6
S-
9A
3.3
S-
1.7
5" H
PS
2" H
PR
H P S
V
R
H P
R
H P S
V
R
.5
H P
R
H P S
V
R
.5
H P
R
H P S
4" L
PR
H P S
L P
R .5
H P
R
0" H
PS
4" V
R
UNK
SHEET DESCRIPTIONPLATE
GENERAL NOTES
TITLE SHEET & SITE/LOCATION PLANSG-1
G-2
CME-1
INDEX
M-1
REMOVAL PLAN & PROFILE
M-4
M-2
M-3
JP HJ JT DEC 09
REPLACE STEAM/COND. LINES NEAR 30091
PROJECT #070013
TITLE SHEET & SITE/LOCATION PLANS
CME-2 NEW WORK PLAN & PROFILE
STEAM PIT S-220 REMOVALS/NEW WORK
C-1
DIRECT BURIED PIPING DETAILS
MECHANICAL DETAILS
F/30091 NEW WORK PLAN
E-1
E-2
ELECTRIC CIRCUIT F/30093
ELECTRIC CIRCUIT F/30091
CIVIL DETAILS
1 11
SAW CUT ALL CONCRETE PRIOR TO REMOVAL.
GENERAL NOTES
1.
THIS PROJECT SHALL BE CONSTRUCTED IN ACCORDANCE WITH
THE CONTRACT PLANS AND SPECIFICATIONS AND ANY RULES,
REGULATIONS, STANDARDS, OR SPECIFICATIONS REFERENCED
THEREIN.
2.
3. THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS
REQUIRED FOR THE PERFORMANCE OF THIS CONTRACT.
IT SHALL BE THE CONTRACTOR’S RESPONSIBILITY TO PAY
ALL PERMIT FEES. COSTS FOR PERMITS SHALL BE
CONSIDERED INCIDENTAL TO THE PROJECT.
4. THE CONTRACTOR MUST OBTAIN PROPER PERMITS FOR
DELIVERY OF MATERIALS AND EQUIPMENT TO THE SITE.
ANY DAMAGE TO THE BASE AND OFF-SITE ROADS SHALL
BE THE COMPLETE RESPONSIBILITY OF THE CONTRACTOR.
5. AN AREA WILL BE MADE AVAILABLE FOR THE CONTRACTOR’S
MOBILIZATION AND STORAGE. THIS AREA SHALL BE RESTORED
TO THE ORIGINAL CONDITION UPON COMPLETION OF THE
PROJECT AT THE CONTRACTOR’S EXPENSE. ON-SITE EMPLOYEE
PARKING SHALL BE PERMITTED IN THE DESIGNATED STORAGE
AREA. THE LOCATION OF THIS AREA SHALL BE COORDINATED
WITH THE CONTRACTING OFFICER, WPAFB. CONTRACTOR TO
MAINTAIN A FIELD OFFICE AT THE STORAGE AREA FOR THE
DURATION OF THE PROJECT. CONTRACTOR TO COORDINATE
WITH THE CONTRACTING OFFICER FOR ESTABLISHMENT AND
MAINTENANCE OF UTILITY SERVICE FOR THE FIELD OFFICE.
6. PRIOR TO STARTING ANY WORK, THE CONTRACTOR SHALL
SUBMIT TO THE CONTRACTING OFFICER A WRITTEN PROJECTED
PROGRESS WORK SCHEDULE FOR REVIEW AND APPROVAL. THE
WORK SCHEDULE SHALL INDICATE THE WORK ITEMS AND
TIMING SEQUENCE ANTICIPATED TO COMPLETE ALL REQUIRED
WORK. NO WORK SHALL COMMENCE WITHOUT WRITTEN
APPROVAL OF THE WORK SCHEDULE.
7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DEWATERING
ALL EXCAVATED AREAS AS NECESSARY FOR PROJECT
COMPLETION.
8.
9. ALL EXISTING UNDERGROUND UTILITIES (CATV, TELEPHONE,
STEAM, COMPRESSED AIR, ELECTRIC, STORM, WATER,
SANITARY, GAS, ETC.) AS SHOWN IN THESE CONTRACT
DRAWINGS ARE DRAWN FROM FIELD SURVEY AND AS-BUILT
DRAWINGS. FINAL VERIFICATION OF EXISTING UTILITY
LOCATIONS AND ELEVATIONS AS WELL AS FIELD DIMENSIONS
SHALL BE THE CONTRACTOR’S RESPONSIBILITY. THE
CONTRACTOR SHALL EXCAVATE TO VERIFY ALL UTILITY
LOCATIONS AND ELEVATIONS PRIOR TO ANY UNDERGROUND
INSTALLATIONS. ANY DISCREPANCIES BETWEEN PLANS AND
EXISTING FIELD CONDITIONS SHALL BE BROUGHT TO THE
ATTENTION OF THE CONTRACTING OFFICER.
10.
19. THE CONTRACTOR SHALL KEEP THE SITE CLEAN AT ALL TIMES.
NO STOCK PILES, WEEDS, OR GROWTH AROUND EQUIPMENT
SHALL BE PERMITTED. TRAVELED PORTIONS OF ROADWAYS
AFFECTED BY THE WORK SHALL BE SWEPT CLEAN OF MUD AND
DEBRIS AT ALL TIMES.
20. TRAFFIC SIGNS SHALL REMAIN IN PLACE AND VISIBLE FOR THE
DURATION OF CONSTRUCTION. DO NOT DAMAGE SIGNS OR
POSTS. REPLACE DAMAGED SIGNS OR POSTS IN KIND.
21. WHERE PAVEMENTS OR DRIVES ARE DISTURBED, THE PAVEMENT
SHALL BE SAW CUT TO FULL DEPTH AND IN NEAT STRAIGHT
LINES. IF DURING CONSTRUCTION, THE PAVEMENT IS DAMAGED
BY THE CONTRACTOR BEYOND THE ORIGINAL SAW CUT, THE
PAVEMENT SHALL BE RECUT TO NEAT LINES. ALL COSTS
ASSOCIATED WITH PAVEMENT REMOVAL AND RESTORATION
SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
CONTRACTOR SHALL VERIFY PAVEMENT THICKNESS AND
MATERIAL.
22.
23.
24. IF CURBS AND/OR GUTTERS, SIDEWALKS, OR CONCRETE PADS
MUST BE REMOVED FOR PROJECT COMPLETION, REPLACE THEM
IN KIND UNLESS OTHERWISE DIRECTED BY THE CONTRACTING
OFFICER.
25. WHEN BACKFILLING AND REPLACING SURFACE FEATURES,
MATCH EXISTING GRADE UNLESS NOTED OTHERWISE.
26. SEED ALL AREAS DISTURBED BY CONSTRUCTION OPERATIONS.
REPLACE TREES AND SHRUBS IN KIND OR AS DIRECTED BY THE
CONTRACTING OFFICER.
29.
BENCHMARK INFORMATION AT WPAFB MAY BE AVAILABLE FROM
THE RECORDS DEPARTMENT IN BUILDING 30011. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING ALL
PERMANENT AND TEMPORARY BENCHMARKS, AND RESTORING
TO ORIGINAL LOCATION AND ELEVATION ALL PERMANENT
BENCHMARKS AND MONUMENTS THAT MAY BE DISTURBED
OR DAMAGED BY THE WORK.
STEAM PIT (MANHOLE)
GENERAL NOTES
1.
3. FLANGES USED WITH SPIRAL WOUND METALLIC GASKETS AND
PTFE ISOLATING GASKETS SHALL HAVE CONCENTRIC GROOVES
MACHINED INTO THE FLANGE’S FACE TO FACILITATE SEATING OF
GASKET AND TO PREVENT GASKET "CREEP" RELAXATION FROM
RADIAL FORCES.
4.
5.
6.
NOT ALL APPURTENANCES AND FITTINGS ARE SHOWN/LABELED
ON BOTH PLAN AND SECTION VIEWS OF STEAM PITS. THE
CONTRACTOR SHALL PROVIDE ALL APPURTENANCES AND
FITTINGS AS SHOWN ON BOTH OR ONE VIEW, AND ANY
APPURTENANCES, FITTINGS, AND DEVICES REQUIRED TO COMPLY
WITH THE NOTES ON THIS SHEET, SPECIFICATIONS, AND
DRAWINGS.
1.
GENERAL ENVIRONMENTAL NOTES
2.
3. THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS
REQUIRED FOR THE PERFORMANCE OF THIS CONTRACT.
IT SHALL BE THE CONTRACTOR’S RESPONSIBILITY TO PAY
ALL PERMIT FEES. COSTS FOR PERMITS SHALL BE
CONSIDERED INCIDENTAL TO THE PROJECT.
4. A PLANS APPROVAL MUST BE SUBMITTED IF A WATER MAIN IS
TO BE INSTALLED, INCLUDING TAPPING INTO OR REROUTING AN
EXISTING LINE. THE NEW WATER MAIN MUST BE INSTALLED A
MINIMUM OF 10 FEET HORIZONTAL FROM A STORM OR SANITARY
LINE, AND 18 INCHES VERTICAL DISTANCE FOR CROSSOVER.
ADDITIONALLY THE ELECTRIC MUST BE A MINIMUM OF 5 FEET
FROM THE WATER MAIN.
5.
7.
8.
1. THE CONTRACTOR SHALL SUBMIT A TRAFFIC MAINTENANCE PLAN
PER SPECIFICATION SECTION 01015. THIS PLAN SHALL SHOW ALL
PROPOSED SIGNS, SIGN LOCATIONS, BARRICADES, AND DETOURS
ON ALL MAJOR STREETS. ALL ROAD CLOSURES AND DETOURS
SHALL COMPLY WITH FHWA AND ODOT MUTCD. SUBMITTAL OF
PLANS FOR ONLY MAJOR STREETS DOES NOT RELIEVE THE
OBLIGATION OF THE CONTRACTOR TO FOLLOW THESE
REQUIREMENTS ON NON-MAJOR STREETS.
TRAFFIC MAINTENANCE NOTES
2. MAINTAIN ACCESS FOR EMERGENCY VEHICLES TO ALL FACILITIES
AT ALL TIMES.
3. ALL PAVEMENT MARKINGS AFFECTED BY THIS WORK SHALL BE
REPLACED AS PART OF THIS CONTRACT.
MANHOLEMH
VACUUM CONDENSATE RETURN
VITRIFIED CLAY PIPE
PUMPED RETURN
REINFORCED CONCRETE PIPE
PUMPED CONDENSATE RETURN
VCR
VCP
UNK
TRANS
TELE
VR
TYP
PCR
SAN
RCP
STM
STA
STL
PR
UNKNOWN
TYPICAL
TRANSFORMER
TELEPHONE
SANITARY
STATION
STORM
STEEL
ABOVE FINISHED FLOOR
CORRUGATED METAL PIPE
CONCRETE CULVERT PIPE
CAST IRON PIPE
FINISHED FLOOR ELEVATION
EXPANSION JOINT
HIGH PRESSURE RETURN
GALVANIZED IRON PIPE
LOW PRESSURE RETURN
HIGH PRESSURE STEAM
GND
HPR
LPR
HPS
MIN
INV
F.F.EL.
ELEV
FLR
GIP
EJ
GROUND
INVERT
MINIMUM
ELEVATION
ELECTRIC
FLOOR
GAS
CCP
CMP
CONC
DIA
ACM
AFF
BOTTOM
DIAMETER
CONCRETE
DRAWING
CREOSOTED WOOD DUCTCWD
FIBER DUCTFD
MULTIPLE CLAY DUCTMCD
BD
BDV
BLOWDOWN
BLOWDOWN VALVE
CONDENSATE PUMPED RETURNCPR
DWG/DRWG
CI/CIP
LN LINE
BTM/BOT
ST STEAM TRAP
GAL GALLON
m mm
METERS
MILLIMETERS
APPROX APPROXIMATELY
INCHESIN
SPEC SPECIFICATION
ABBREVIATION LEGEND
DETAILS PERTAINING TO DIRECT BURIED CONDUIT DESIGN OR
INSTALLATION ARE PROVIDED FOR REFERENCE ONLY. THE
CONTRACTOR SHALL VERIFY CONDUIT DETAILS WITH THE
MANUFACTURER (SUCH AS CONDUIT SIZE AT EXPANSION
ELBOWS, EXPANSION LOOP SIZES, EXPANSION TYPE PIPE
SUPPORT DISTANCES, LOCATION OF ANCHORS, ETC.) AND
SUBMIT SHOP DRAWINGS WITH ANY REVISIONS OR ADDITIONAL
INFORMATION AS REQUIRED.
ON DIRECT BURIED CONDUITS, END SEALS SHALL BE USED
WHEREVER ANCHOR IS SHOWN WITHIN 3’ OUTSIDE THE WALL OF
STEAM PITS.
18. THE CONTRACTOR SHALL FURNISH ALL LABOR AND MATERIAL
REQUIRED TO RESTORE WORK LOCATIONS TO ORIGINAL
CONDITIONS, INCLUDING RESTORING DAMAGED TURF.
30.
31.
32.
VACUUM CONDENSATE RETURN
11. THE CONTRACTOR SHALL MAINTAIN AT THE JOB SITE FOR THE
GOVERNMENT ONE RECORD COPY OF DRAWINGS, SPECIFICATIONS,
CHANGE ORDERS, AND FIELD CHANGES DUE TO LATENT
CONDITIONS. THE CONTRACTOR SHALL NOT USE RECORD
DOCUMENTS FOR CONSTRUCTION PURPOSES. RECORD
DOCUMENTS SHALL SHOW REVISED STEAM/CONDENSATE LINE
LOCATIONS AND ANY DISCREPANCIES BETWEEN ACTUAL
CONDITIONS AND THAT SHOWN ON THE PLANS.
12. THE CONTRACTOR SHALL RECORD INFORMATION CONCURRENTLY
WITH THE CONSTRUCTION PROGRESS. NO WORK SHALL BE
CONCEALED UNTIL REQUIRED INFORMATION IS RECORDED. ALL
INFORMATION SHALL BE RECORDED WITH RED MARKING PENS.
DETAILED AS-BUILT DRAWINGS SHALL BE TURNED OVER TO
THE CONTRACTING OFFICER PRIOR TO FINAL INSPECTION.
13. NON-RUBBER TIRED VEHICLES SHALL NOT BE MOVED ON
STREETS OR ROADS. EXCEPTIONS MAY BE GRANTED BY THE
CONTRACTING OFFICER WHERE SHORT DISTANCES AND SPECIAL
CIRCUMSTANCES ARE INVOLVED. GRANTING OF EXCEPTIONS
MUST BE IN WRITING AND ANY RESULTING DAMAGE MUST BE
REPAIRED TO THE SATISFACTION OF THE CONTRACTING OFFICER
AT THE CONTRACTOR’S EXPENSE.
14. THE CONTRACTOR AND ALL SUB-CONTRACTORS SHALL BE
SOLELY RESPONSIBLE FOR COMPLYING WITH THE
OCCUPATIONAL SAFETY AND HEALTH ACT AND ALL
AMENDMENTS THERETO DURING THE PERFORMANCE OF THIS
PROJECT.
15. ALL DIMENSIONS ARE APPROXIMATE. CONTRACTOR SHALL FIELD
VERIFY ALL REQUIRED DIMENSIONS PRIOR TO ORDERING THE
MATERIALS.
16.
CONTRACTOR SHALL REPLACE ALL ASPHALT PAVEMENT
REMOVED/DISTURBED FOR STEAM LINE REPLACEMENT. AFTER
REPLACING PAVEMENT, CONTRACTOR SHALL REPAINT TO MATCH
ANY PREVIOUSLY EXISTING PAVEMENT MARKINGS IN KIND.
COORDINATOR ENGINEERING CHIEF
DATE REVISION BYNO. DATE NO. REVISION BY
C I
V
IL
ENGI
N
E E
R
US AF
W PAFB
WRIGHT-PATTERSON AIR FORCE BASE
88TH ABW
OF
DESIGN CHIEF
DATEDRAWNDESIGNED CHECKED
REFER TO PLAN AND PROFILE SHEETS FOR ANCHOR LOCATIONS.
UNLESS OTHERWISE INDICATED, ANCHOR LOCATIONS SHALL BE
3’ FROM WALLS.
G-2
DEC 09
GAS LINE INTERFERENCES TO THE PROPOSED DIRECT BURIED
STEAM SYSTEM ARE NOT ANTICIPATED ON THIS PROJECT.
HOWEVER, ANY RELOCATED GAS LINE MATERIALS AND
INSTALLATION SHALL COMPLY WITH LOCAL GAS COMPANY
REQUIREMENTS. THE CONTRACTOR IS RESPONSIBLE FOR
COORDINATION WITH THE GAS COMPANY AND CONTRACTING
OFFICER.
PIPE SUPPORTS SHALL BE PROVIDED IN NEW AND REUSED PITS
WHERE REQUIRED TO ASSURE ADEQUATE STRUCTURAL SUPPORT
FOR PIPING AND FITTINGS. SEE SHT. M-3 FOR TYPICAL SUPPORT
DETAILS.
9.
G
2 11
ALL ENVIRONMENTAL WORK SHALL BE CONDUCTED IN
ACCORDANCE WITH WPAFB SPECIFICATION SECTION 01 02 20 AND
ALL OTHER APPLICABLE SPECIFICATION SECTIONS AS WELL AS
ALL FEDERAL, STATE AND LOCAL REGULATIONS IN EFFECT AT THE
TIME THE WORK IS TO BE ACCOMPLISHED.
SUBMIT A SEDIMENT EROSION PROTECTION PLAN AND STORM
WATER POLLUTION PREVENTION PLAN TO THE 88 ABW/CEV
(THROUGH THE CONTRACTING OFFICER) FOR APPROVAL PRIOR TO
THE DISTURBANCE OF ANY SOIL. EROSION CONTROL MEASURES
MUST BE IMPLEMENTED FOR PROJECTS THAT ALSO DISTURB
LESS THAN ONE ACRE. FOR PROJECTS DISTURBING GREATER
THAN ONE ACRE, A NOTICE OF INTENT (NOI) MUST BE APPROVED
BY THE OHIO EPA PRIOR TO THE DISTURBANCE OF ANY SOIL PER
SPECIFICATION SECTION 01 02 20 PARAGRAPH 3.04.C.
A PERMIT TO INSTALL (PTI) IS REQUIRED WHEN A SANITARY LINE
IS DISTURBED OR A NEW ONE INSTALLED, PER SPECIFICATION
SECTION 01 02 20 PARAGRAPH 3.04.D.
ALL PAINTED SURFACES CONTAIN LEAD. ANY WORK PERTAINING
TO DISTURBING LEAD CONTAINING PAINT, REMEDIATION OR
ABATEMENT SHALL BE PERFORMED IN ACCORDANCE WITH
SPECIFICATION SECTION 02 09 00.
9.
ANY WATER PUMPED OUT OF TRENCH AS PART OF DEWATERING,
OR PUMPED OUT OF STEAM MANHOLES SHALL BE DISCHARGED TO
A SANITARY SEWER. IF A SANITARY SEWER IS NOT IN THE
IMMEDIATE AREA, THE WATER SHOULD BE DISCHARGED TO A
GRASSY AREA AND NOT DIRECTLY INTO A STORM SEWER.
6.
IF ADDITIONAL SUSPECT ASBESTOS CONTAINING MATERIALS NOT
IDENTIFIED ON DRAWINGS ARE ENCOUNTERED, THE CONTRACTOR
SHALL IMMEDIATELY STOP WORK IN THAT AREA AND NOTIFY
THE CONTRACTING OFFICER.
ANY CONSTRUCTION WORK ON THIS PROJECT WHERE THE
EXISTING ACTIVE STEAM LINES ARE DISTURBED SHALL BE
ACCOMPLISHED BETWEEN 1 MAY AND 1 OCTOBER OR WHEN
THE HEATING SEASON IS COMPLETED. ALL STEAM &
CONDENSATE RETURN LINES SHALL BE OPERATIONAL BY
1 OCTOBER.
17. ALL EXISTING STEAM AND CONDENSATE RETURN LINES
INSIDE STEAM PITS (MANHOLES) ARE PRESUMED TO CONTAIN
ASBESTOS CONTAINING MATERIALS (ACM) UNLESS OTHERWISE
INDICATED ON PROJECT DRAWINGS, AND SHALL BE TREATED IN
ACCORDANCE WITH SPECIFICATION SECTION 02 08 10.
PIPE INSULATION IS NOT SHOWN INSIDE PITS. HOWEVER,
INSULATION AND JACKET SHALL BE PROVIDED ON ALL NEW
STEAM AND CONDENSATE RETURN PIPING INSIDE PITS PER
PROJECT SPECIFICATIONS.
ASBESTOS ABATEMENT SHALL BE PERFORMED IN ACCORDANCE
WITH THE APPLICABLE REQUIREMENTS OF SPECIFICATION 02 08 50
AND 02 08 10. REFER TO GENERAL NOTES #16, #17 & #18 THIS SHT.
FOR DIRECT BURIED STEAM & CONDENSATE RETURN PIPING,
PROVIDE STEEL CASING WITH FUSION BONDED EPOXY TYPE,
OR STEEL CASING SURROUNDED BY POLYURETHANE FOAM
INSULATION WITH FRP JACKET. REFER TO SPECIFICATION
SECTION 33 61 13 AND DRAWING DETAILS. ALL OTHER TYPES
AND CASING COATINGS ARE UNNACCEPTABLE.
THE CONTRACTOR SHALL REMOVE AND REPLACE OR RELOCATE
ALL UTILITIES INCLUDING PIPING, VALVES, FITTINGS, SUPPORTS,
CONDUITS, ECT., WHICH WILL INTERFERE WITH INSTALLATION
OF THE NEW DIRECT BURIED CONDUITS. EXCAVATION SHALL BE
BY HAND AROUND UTILITIES WHOSE LOCATIONS ARE KNOWN OR
WHERE NECESSARY DUE TO CLOSE CLEARANCE. WHERE
POTENTIAL GRADE CONFLICTS MIGHT OCCUR WITH EXISTING
UTILITIES NOTIFY THE CONTRACTING OFFICER SUFFICIENTLY IN
ADVANCE OF LAYING PIPE IN ORDER THAT THE ENGINEER MAY
DETERMINE THE EXACT ELEVATION OF THE UTILITY AND MAKE
ANY NECESSARY ADJUSTMENTS. ALL UTILITY OUTAGES
REQUIRED SHALL BE COORDINATED WITH AND APPROVED BY
THE CONTRACTING OFFICER. THE CONTRACTOR SHALL PROVIDE
TEMPORARY SUPPORT OF ELECTRICAL AND COMM DUCT BANKS,
WATER, STORM, SANITARY, AND GAS UTILITY LINES THAT ARE
EXPOSED AND UNDERMINED DURING CONSTRUCTION.
27.
28.
2.
THE DIRECT BURIED CONDUIT SYSTEM SUPPLIER SHALL PROVIDE
THE DESIGN DETAILS OF THE CONDUIT SYSTEM BETWEEN STEAM
PITS, INCLUDING SYSTEM WALL PENETRATIONS (END SEALS /
GLAND SEALS), AND EXPANSION COMPENSATION AS DESCRIBED
IN HIS APPROVED PRODUCT BROCHURE.
1-1/2" BYPASS LINES WITH GLOBE VALVES SHALL BE INSTALLED
AROUND ALL NEW HPS BUTTERFLY VALVES 4" AND LARGER
WITH UNIONS (NOT SHOWN ON STEAM PIT DETAILS).
1-1/2" BLOW DOWN (MANUAL DRAIN) LINES WITH GATE VALVES
SHALL BE PROVIDED ON HPS LINES, AND 1" DRAIN LINES WITH
GATE VALVES SHALL BE PROVIDED ON LPR & HPR LINES AS
INDICATED ON STEAM PIT PLANS AND PER DETAIL ON SHT. M-9.
BLOW DOWN LINES AND DRAIN VALVES SHALL BE LOCATED AT
THE LOWEST PIPING POINTS IN STEAM PITS. BLOW DOWN LINES
SHALL BE ROUTED TO DISCHARGE TO AN APPROPRIATE CORNER
AWAY FROM THE SUMP PIT (IN ORDER TO GIVE THE CONDENSATE
A CHANCE TO COOL BEFORE ENTERING THE SUMP PUMP. ALL
PIPING AND FITTINGS (EXCEPT FOR BLOW DOWN LINE) SHALL BE
INSTALLED A MINIMUM OF 8" FROM PIT/TRENCH FLOOR.
7. REFER TO SHT. M-3 FOR STEAM TRAP STATION DETAIL AND
STEAM TRAP SCHEDULE.
8. SUMP PITS AND PUMPS SHALL BE PROVIDED IN ALL NEW STEAM
MANHOLES, AND IN ALL EXISTING MANHOLES WHERE INDICATED.
SUMP PUMPS SHALL DISCHARGE INTO THE NEAREST SANITARY
LINE OR MANHOLE. SEE CIVIL DRAWINGS FOR DISCHARGE PIPE
ROUTING.
CA COMPRESSED AIR
ELEC; E
REPLACE STEAM/COND. LINES NEAR 30091
PROJECT #070013
GENERAL NOTES & LEGEND
JP HJ JT
33.
10.
ASBESTOS CONTAINING MATERIALS
NO ASBESTOS CONTAINING MATERIALS (ACM) MAY BE INSTALLED
DURING THIS PROJECT.
PROVIDE CATHODIC PROTECTION FOR ALL STEEL CASING,
FUSION BONDED EPOXY SYSTEMS ACCORDING TO SPECIFICATION
SECTION 26 42 14.00 10. CATHODIC PROTECTION IS NOT REQUIED
ON STEEL CASINGS SURROUNDED BY POLYURETHANE FOAM, FRP
JACKETED SYSTEMS.
CONTRACTOR SHALL CLEAN AND FLUSH PIPING PRIOR TO
PERFORMING OPERATIONAL TEST ACCORIDNG TO SPECIFICATIONS.
ALL EXISTING DIRECT BURIED STEAM AND CONDENSATE RETURN
LINES ARE PRESUMED TO CONTAIN ASBESTOS CONTAINING
MATERIALS (ACM), AND SHALL BE TREATED IN ACCORDANC
WITH SPECIFICATION SECTION 02 08 50.
P
IV
G
IP
6" C
IP
6" PVC
U N
K
P
V C
3x 3-
P2 -0
&1
0V x x S-220
810.2
S-221
810.2 5"
HPS
4"
LPR
FUEL PUMPS
DIESEL JP-4
MOGAS
REMOVE CONC. WALK.
REMOVE 8" VCP STORM.
REMOVE 4" CIP WATER.
812 812
S T
A
X I S
T
S T
A
N D
S T
A
C T
S T
A
G E
D R I V
E
S T
A
G E
D R I V
E
S T
A
N D
S T
A
M M
S T
A
F
N C
E
S T
A
N D
S T
A
M M
S T
A
M M
S T
A
C
O M
M
S T
A
G I
W
T E
R
S T
A
T S I D
E
W A
D G
S T
A
O P
M H
S T
A
S T
O R
M
P R
O V I
N T
R O
L
N S I T
Y
F I
M M
M H
P R
O T
E
R I
R K
COORDINATOR ENGINEERING CHIEF
DATE REVISION BYNO. DATE NO. REVISION BY
C I
V
IL
ENGI
N
E E
R
US AF
W PAFB
WRIGHT-PATTERSON AIR FORCE BASE
88TH ABW
OF
DESIGN CHIEF
DATEDRAWNDESIGNED CHECKED
0’
1’
REPLACE STEAM/COND. LINES NEAR 30091
PROJECT # 070013 CME-1
EXISTING SITE PLAN/REMOVALS
2’
3’
4’
5’
10’
SCALE 1’= 20’
CODED NOTES
VERITCAL SCALE: 1" - 5’
PROFILE
HORIZONTAL SCALE: 1" - 20’
PLAN
0 10 20 40 60 80
REMOVE CATHODIC PROTECTION INCLUDING
TEST STATIONS.
X
X
X
X
ABANDON CATHODIC PROTECTION IN PLACE.8
C P R
.5
H P S
C P
" C
P R
" C
P R
.5 " H
P S
.5 " H
P S
.5
H P S
C P R
2.5" HPS
2" CPR
" C
P R
.5 " H
P S
REINSTALL SECTION OF 7’ GALVANIZED FENCE W/WIRE FOR EXCAVATION.
CENTERLINE OF 2�" HPS AND 2" CPR
DIRECT BURIED PIPING TO BE REMOVED.
CONTRACTOR SHALL ASSUME DIRECT BURIED
PIPING CONTAINS ASBESTOS CONTAINING
MATERIALS (ACM) IN THE INSULATION AND
STEEL CONDUIT COATING.
9 REMOVE CONCRETE ANCHOR ASSUMED TO EXIST.
APPROX. LOCATION
APPROX DEPTH
APPROX. LOCATION
APPROX DEPTH
: JT
3 11
DEC 09: CJV/JP: CJV/JP
ASSUME 8" CONCRETE WITH3"
ASPHALT OVERLAY AND 10"
AGGRAGATE BASE.
REMOVE 2�" HPS AND 2" CPR UP TO THIS
APPROX. LOCATION. CAP ENDS AND ABANDON
REMAINING PIPING IN PLACE.
8" UNK
C I
V
IL
ENGI
N
E E
R
US AF
W PAFB
WRIGHT-PATTERSON AIR FORCE BASE
88TH ABW
OF
DESIGN CHIEF
DATEDRAWNDESIGNED CHECKED
812 812
N
0’
5’
10’
1’
2’
3’
4’800
IV
G
IP
6" C
IP
6" PVC
U N
K
P
V C
3x 3-
P2
-0
&1
0V x x S-220
810.2
C P R
.5
H P S
S-221
810.2 5"
HPS
4"
LPR
FUEL PUMPS
DIESEL JP-4
MOGAS
REPLACE STEAM/COND. LINES NEAR 30091
PROJECT # 070013 CME-2
PROPOSED SITE PLAN
1+
0+82
2+33
3+65
3+90
S T
A
X I S
T
S T
A
N D
S T
A
C T
S T
A
G E
D R I V
E
S T
A
G E
D R I V
E
S T
A
N D
S T
A
M M
S T
A
N C
E
S T
A
N D
S T
A
M M
S T
A
M M
S T
A
C
O M
M
S T
A
G I
T E
R
S T
A
T S I D
E
W A
D G
X
X
X
X
S T
A
O P
M H
S T
A
S T
O R
M
S T
A
O P
S T
O R
M
S T
A
O P
W A
T E
R
P R
O V I
N T
R O
L
N S I T
Y
F I
M M
M H
P R
O T
E
R I
R K
PROP. GRADE TO MATCH EXISTING TYPICAL
NOTE: EXISTING STORM AT 0+15 AND WATER AT 0+17
TO BE REMOVED AND RELOCATED.
0 10 20 40 60 80
SCALE 1’= 20’
PLAN
VERITCAL SCALE: 1" - 5’
PROFILE
HORIZONTAL SCALE: 1" - 20’
7 PROVIDE SHEETING AT BUILDING WALL FOR MANHOLE
INSTALLATION. INSURE COMPLETE COMPACTION OF BACKFILL
AROUND MANHOLE PRIOR TO REMOVING SHEETING, OR LEAVE
SHEETING IN PLACE.
PROVIDE 2.5" HPS AND 2" CPR DIRECT BURIED
PIPING IN INDIVIDUAL CONDUITS.
CODED NOTES
8 PROVIDE PIPE ANCHOR TYPICAL FOR HPS AND CPR
PROVIDE 2" SUMP PUMP DISCHARGE. CONNECT TO EXISTING
.5
H P S
.5
H P S
.5
H P S
.5
H P S
C P R
C P R
C P R
C P
R
4 11
DEC 09JT: CJV/JP : CJV/JP
PROVIDE CONC. WALK WHERE EXISTING WALK WAS REMOVED.
PROVIDE NEW MANHOLE S-220A. SEE SHT.
M-2 FOR SIZE AND SHT. C-1 FOR CONSTRUCTION
DETAILS.
PROVIDE 4" DIP WATER. ROUTE AROUND NEW
MANHOLE S-220A AS SHOWN.
PROVIDE 8" VCP OR RCP STORM. ROUTE AROUND NEW
MANHOLE S-220A AS SHOWN.
10 PROVIDE 2" SUMP PUMP DISCHARGE. CONNECT TO EXISTING
11 REPLACE FENCE. SEE SHT. CME-1
10" SANITARY WITH NEW WYE CONNECTION. DEPTH APPROX. 4’.
MAINTAIN MINIMUM 30" COVER.
8" SANITARY WITH NEW WYE CONNECTION. DEPTH IS APPROX.
4’. MAINTAIN MINIMUM 30" COVER.
8"
PROVIDE NEW CONCRETE SHALLOW TRENCH FROM NEW
MANHOLE S-220A TO EXISTING PIT INSIDE F/30091. SEE SHT.
M-2 FOR SIZE AND SHT. C-1 FOR CONSTRUCTION DETAILS.
C I
V
IL
ENGI
N
E E
R
US AF
W PAFB
WRIGHT-PATTERSON AIR FORCE BASE
88TH ABW
OF
DESIGN CHIEF
DATEDRAWNDESIGNED CHECKED
LEGEND
EXISTING PIPING TO REMAIN
EXISTING PIPING TO BE REPLACED
HIGH PRESSURE STEAM
LOW PRESSURE RETURN
CONDENSATE PUMP RETURN
GATE VALVE
CHECK VALVE
STRAINER
STEAM TRAP
HPS
LPR
CPR
FT
NO SCALE
NORTH
T
LPR
TO
FLOOR
DRAI
N
FROM CP
FROM CP
TO FT
TO CP
TO
FT
TO
PRV
TO PRV
FLASH TANK
2�
" HPS
2" CPR
5.
GENERAL NOTES
6.
1.
2.
4.
3.
EXISTING PIPING TO BE REMOVED
T
T
NO SCALE
2�
" HPS
2" CPR
5"
HPS
4" L
PR
2" C
PR
2�
HPS
1�
UNK
STEAM PIT S-220
ISOMETRIC REPLACEMENT DIAGRAM
S
R
1"
SCALE: �" = 1’-0"
0 4’ 8’2’ 12’1’ 3’
REMOVE PIPING, VALVES, AND FITTINGS AS SHOWN.
JP JP
REPLACE STEAM/COND. LINES NEAR 30091
PROJECT #070013
MECHANICAL DETAILS
DEC 09
PROVIDE NEW PIPING, VALVES, AND FITTINGS AS SHOWN.
M-1
JT
CONTRACTOR SHALL ASSUME THAT THE DIRECT BURIED PIPING
TO BE REMOVED CONTAINS ASBESTOS CONTAINING MATERIALS
(ACM) IN THE INSULATION AND THE STEEL CONDUIT COATING.
7. CLEAN STEAM PIT S-220 FLOOR OF ALL DIRT, MUD, AND DEBRIS.
STEAM PIT F/30091
ISOMETRIC REMOVAL DIAGRAM
S
R
PROVIDE SUMP AND SUMP PUMP INSIDE STEAM PIT S-220.
SEE DETAIL SHT. M-3.
REMOVE 2�" HPS DIRECT
BURIED PIPING WHERE IT IS
EXPOSED BY EXCAVATION
FOR NEW TRENCH. ABANDON
2" CPR DIRECT BURIED PIPING
UNDER SLAB IN PLACE.
SAW CUT AND REMOVE FLOOR
SLAB (ASSUME 6" CONCRETE)
IN PREPARATION ON NEW
TRENCH (SEE SHT. M-2)
EXISTING CONDENSATE
PUMP/EQUIPMENT PAD
TO REMAIN.
EXISTING PIT INSIDE DEMENSIONS ARE
36"X36"X54" DEEP. REFER TO ISOMETRIC
DIAGRAM THIS SHT. FOR CON’T OF PIPING.
NO ASBESTOS DETECTED INSIDE PIT OR
IN MECHANICAL ROOM.
TO FACILITY 30091
TO MANHOLE S-220
F/30091 MECHANICAL ROOM REMOVAL
SCALE: �" = 1’-0"
CAP
CAP
TO FACILITY 30093
TO FACILITY 30090
CONCRETE SHALLOW TRENCH
WALL PENETRATION (TYP.).
PIT WALL PENETRATION
(TYP.).
TO MANHOLE S-219A
EXISTING CONCRETE
SHALLOW TRENCH.
EXISTING CONCRETE
SHALLOW TRENCH.
EXISTING CONCRETE
SHALLOW TRENCH.
EXISTING FLASH TANK
TO REMAIN.
LPR FROM FT
REMOVE 2"
CPR UP TO
THIS POINT.
REMOVE �"
HPR UP TO
THIS POINT.C
P
R
2"
H P
R
H P
S
2�"
REMOVE 2�"
HPS UP TO
THIS POINT.
STEAM MANHOLE S-220 INSIDE DEMENSIONS ARE 75"X86"X75" DEEP.
NO ASBESTOS DETECTED INSIDE S-220.
CP
PRV PRESSURE REDUCING VALVE
CONDENSATE PUMP
CONNECTION POINT
NEW TO EXISTING
8.
5 11
REMOVE EXISTING PIPE INSULATION INSIDE MANHOLE S-220.
INSULATE ALL EXSISTING AND NEW STEAM AND CONDENSATE
RETURN PIPING INSIDE MANHOLE S-220 ACCORDING TO SPECIFICATIONS.
PROVIDE LABELS AND DIRECTIONAL ARROWS ON CPR, LPR, AND HPS PIPING.
EXSISTING MANHOLE ACESS FOR S-220 IS THROUGH AN APPROX. 84"x75�"
OPENING WITH STEEL PLATE COVER. REPLACE STEEL PLATE WITH SAME
SIZE DOUBLE LEAF ACCESS DOOR. ENSURE DOOR IS FLUSH WITH TOP OF
MANHOLE AND SIDEWALK. MODIFY MANHOLE TOP AS REQUIRED. SEE SHT.
C-1 FOR TYPE.
C I
V
IL
ENGI
N
E E
R
US AF
W PAFB
WRIGHT-PATTERSON AIR FORCE BASE
88TH ABW
OF
DESIGN CHIEF
DATEDRAWNDESIGNED CHECKED
LEGEND
EXISTING PIPING TO REMAIN
HIGH PRESSURE STEAM
LOW PRESSURE RETURN
CONDENSATE PUMP RETURN
GATE VALVE
CHECK VALVE
STRAINER
STEAM TRAP
HPS
LPR
CPR
FT
NO SCALE
NORTH
FLASH TANK
5.
GENERAL NOTES
1.
2.
4.
3.
EXISTING PIPING TO BE REMOVED
SCALE: �" = 1’-0"
0 4’ 8’2’ 12’1’ 3’
JP JP DEC 09
M-2
JT
2�
" HPS
NEW PIPING TO BE INSTALLED
2" CPR
REPLACE STEAM/COND. LINES NEAR 30091
PROJECT #070013
F/30091 NEW WORK PLAN
PROVIDE NEW PIPING, VALVES, AND FITTINGS AS SHOWN.
SEE SHEET M-3 FOR STEAM TRAP DETAILS.
CONNECTION POINT
NEW TO EXISTING
FROM CP
TO CP
FROM CP
LPR
LPR
T
TO
FT
EXST.
STEAM
PIT
CP
PAD
SCALE: �" = 1’-0"
0 8’4’2’1’
D
S
R
BLDG 30091
FOUNDATION
WALL
2�
" HPS
2" CPR
T
SEE SHT. CME-2
FOR CON’T OF SUMP
PUMP DISCHARGE.
DIRECT BURIED CONDUIT
WALL PENETRATION
(TYP.)
PROVIDE LADDER
PROVIDE 30"x30" SINGLE
LEAF ACCESS DOOR.
2�
" HPS
2" CPR
TO MANHOLE
S-220
TO BLDG 30091
TO MANHOLE S-220
PROVIDE SUMP & SUMP
PUMP. SEE DETAIL SHT M-3.
NO SCALE
NORTH
SCALE: �" = 1’-0"
SCALE: �" = 1’-0"
TO PRV
TO FT
1 �"
SEE ISOMETRIC DIAGRAMS ON THIS SHEET FOR ADDITIONAL
VALVES, FITTINGS, AND SMALL PIPING NOT SHOWN ON PLAN
VIEWS.
6.
EXST.
STEAM
PIT
CP
PAD
" HPR
" HPR
SAW CUT OR CORE DRILL FOUNDATION
WALL. IF CORE DRILLING, PROVIDE
ADDITIONAL HOLES FOR DRAINAGE.
PROVIDE STEEL GRATE ACCESS COVER FOR NEW TRENCH
F/30091.
PROVIDE CONCRETE TRENCH.
SEE DETAIL SHT. M-3
F/30091 MECHANICAL ROOM
ISOMETRIC NEW WORK DIAGRAM
MANHOLE S-220A
ISOMETRIC NEW WORK DIAGRAM
MANHOLE S-220A AND MECHANICAL ROOM
NEW WORK PLAN
F/30091 MECHANICAL ROOM PLAN
NEW CONCRETE
SHALLOW TRENCH
TO MANHOLE S-220A
T
T
TO FT
TO
PRV
TO PRV
1"
2�"
2�"
2�"
H P
S
TRENCH LID
PENETRATION.
HPR
CPR
2"
PROVIDE NEW MANHOLE S-220A. INSIDE DIMENSIONS TO BE
APPROX. 5’x5’x8’DEEP. SEE DETAIL SHT C-1.
PROVIDE CONCRETE
TRENCH. SEE DETAIL SHT. M-3
REFER TO ENLARGED PLAN
THIS SHT. FOR PIPING.
A A
M-3 M-3
A A
M-3 M-3
CP CONDENSATE PUMP
HPR HIGH PRESSURE RETURN
PRV PRESSURE REDUCING VALVE
A
M-3
DETAIL A SHT. M-3
PROVIDE CONCRETE SHALLOW
TRENCH. SEE DETAIL SHT. M-3
PROVIDE NEW CONCRETE SHALLOW TRENCH FROM MANHOLE S-220A
TO F/30091. SEE DETAIL SHT M-3.
6 11
ALL NEW STEAM AND CONDENSATE RETURN PIPING SHALL
BE INSULATED ACCORDING TO SPECIFICATIONS. PROVIDE
LABELS AND DIRECTIONAL ARROWS ON ALL NEW CPR, HPR,
AND HPS PIPING.
�" HPR
2�" HPS
2" CPR
STRUCTURAL TEE
PIPE
INSULATION AND JACKET
PIPE SUPPORT
STEEL ROLLED PLATE
120^
NOTE.
APPROVED PRE-FABRICATED PIPE SADDLE SUPPORTS
N.T.S.
FREE SUPPORT IN PITS DETAIL
�" X 8" A36M
MAY BE USED IN LIEU OF ROLLER TYPE SUPPORTS
INSIDE STEAM PITS, UPON APPROVAL OF SHOP DRAWINGS.
OF
DEC 09
COORDINATOR ENGINEERING CHIEF
DATE REVISION BYNO. DATE NO. REVISION BY
C I
V
IL
ENGI
N
E E
R
US AF
W PAFB
WRIGHT-PATTERSON AIR FORCE BASE
88TH ABW
DESIGN CHIEF
DATEDRAWNDESIGNED CHECKED
M-3
REPLACE STEAM/COND. LINES NEAR 30091
PROJECT #070013
MECHANICAL DETAILS
JP HJ JT
TYPE
INVERTED
BUCKET
PRESSURE
DIFF.
(PSI)
PIPE CONN.
SIZE
(IN)
TRAP
LOCATION
MIN. LOAD
(LB/HR)
STEAM TRAP SCHEDULE
SPECIFICATIONS
TO MANUFACTURER’S
DIAMETER ACCORDING
N.T.S.
TYPICAL ROLLER
SUPPORT DETAIL
ROLLER SUPPORTS SHALL BE ADJUSTABLE,
SUCH AS ANVIL FIG. 177 OR APPROVED EQUAL.
N.T.S.
SUMP PIT DETAIL
1-1/2" GALV. STEEL
INSTALL GRATE TO FIT
BELL END OF PIPE
30"
4" CONCRETE BASE
24" DIA. CONCRETE
PIPE SET IN CONCRETE
PEA GRAVEL WRAP WITH FILTER
FABRIC ODOT 712.09 TYPE A.
OVERLAP FABRIC MIN. 6".
SUMP
PUMP
CHECK VALVE
SHUT-OFF VALVE
EXISTING PIT FLOOR.
PATCH FLOOR AROUND
NEW CONCRETE PIPE
TO MATCH EXIST. FLOOR.
NOTE: PROVIDE WHERE INDICATED IN STEAM
PITS. LOCATION OF SUMP SHALL BE SUCH
AS TO INSURE FREE ACCESS TO SUMP FROM
THE SURFACE (PIT TOP) OR AS DIRECTED BY
THE CONTRACTING OFFICER. PROVIDE SUMP
PUMPS PER SPECIFICATION SECTION 33 60 01.
SUPPORT PUMP PIPING AS REQUIRED.
ASSUME 8" THK.
REINFORCED CONCRETE
THREAD-O-LET
STEAM TRAP
STEAM LINE (HPS)-STEAM MAIN
ISOLATION GATE
VALVE (TYPICAL)
HIGH PRESSURE
INVERTED BUCKET
THREADED CAP
STRAINER WITH
BLOWOFF VALVE
VALVE
CHECK
LOW POINT
REDUCER, IF NEEDED
(TYPICAL)
SIZE BASED ON
TRAP CAPACITY
REFER TO STEAM TRAP
SCHEDULE
SEE BLOWDOWN DETAIL
N.T.S.
STEAM TRAP DETAIL
IN
DRIP LEG (SAME
SIZE AS HPS LINE,
OR AS SHOWN ON
STEAM PIT DWG.)
TEST INSPECTION VALVE
(LINE SIZE)
NOTES: 1. TRAP SIZE: SEE STEAM TRAP SCHEDULE.
2. PROVIDE WELD-O-LET FITTING ON HPS
MAIN FOR DRIP LEG.
1/4" R
COMPACTED SUBGRADE
MATCH EXIST. WIDTH
N.T.S.
4"1" SLOPE TO DRAIN �": 1’ - 0"
X X X X
6 X 6- W1.4 X W1.4 WWF
BROOM FINISH
CONCRETE SIDEWALK DETAIL
FINISHED GRADE, SLOPE
AWAY FROM SIDEWALK (TYP.)
TO FLASH TANK
(FT)
N.T.S.
TYP.
PIPE SLIDE BASE
4 BOLT HOLES (TYP.).
BOLT TO PIPE SUPPORT
CHANNEL.
SUPPORT CHANNEL
IN TRENCH (TYP.)
WELD TO STEAM AND
CONDENSATE RETURN PIPING
PIPE SLIDE
PIPE SLIDE WITH
BONDED PTFE
CARBON STEEL SLIDE SUPPORT
FOR PIPING LESS THAN 12" IN
DIAMETER. ANVIL FIG. 436,
TYPE 4 SLIDE OR EQUAL.
DETAIL
SCALE: 1�" = 1’-0"
CONC.
SHALLOW
TRENCH
WALL
L4x4x�x 8" LONG (TYP.)
PLACE BELOW CHANNEL WEB
(2) �" 0 HILTI EXPANSION
ANCHORS AT 6" O.C. TYP.
(3" EMBED)
C12x20.7
(2) �" 0 A325 BOLTS IN
SLOTTED HOLES (TYP.)
PIPE SUPPORT AT SLIDES/GUIDES
AND IN STEAM MANHOLES
N.T.S.
2" MIN
CPR
4" MIN
L OF HPS LINEC
HPR
30"
SCALE: 1�" = 1’-0"
0" 1’ 2’ 3’3" 6" 9"
NOTE:
SEE SHT. C-1 FOR CONSTRUCTION DETAILS AND NOTES.
CARBON STEEL SLIDE
BASE WITH BONDED PTFE. ANVIL
TYPE 4 OR EQUAL.
PIPE NON-GUIDE ASSEMBLY -
CONCRETE SHALLOW TRENCH
NOTE:
NON-GUIDED PIPE SUPPORT DETAILS DEPICTED ABOVE SHALL
BE INSTALLED AT ALL LOCATIONS IN CONCRETE SHALLOW TRENCH.
INVERTED
BUCKET
65 �5
HPS
DETAIL
1�" 1�" 1�" 1�"
NEW MANHOLE
S-220A
MECHANICAL
ROOM
A
TYPICAL SPACING INSIDE TRENCH
NOTE:
SLOPE
SOCKET WELD LOW POINT
1. PROVIDE AT LOW POINTS IN ALL PIPING TO BE
DRAINED IN STEAM PITS OR BUILDINGS. WHERE
CAP ONLY
CONDENSATE
LINES
N.T.S.
STEAM BLOWDOWN/CONDENSATE DRAIN DETAIL
1�" GATE VALVE
TWO (2) FOR HPS BLOWDOWN
NEXT TO
DRIP LEG
AT SUMP
2. PROVIDE AT THE BOTTOM OF DRIP LEG ON
HPS MAIN. FOR HPS STEAM BLOWDOWN
PROVIDE A DOUBLE GATE VALVE. VALVES
ACCESSABLE WITH REACH ROD FROM PIT
ACCESS (WHERE POSSIBLE).
1�" DIA. FOR HPS;
1" DIA. FOR LPR, HPR
POSSIBLE, ROUTE PIPING TO THE FLOOR IN A
CORNER AWAY FROM THE SUMP.
CONNECT TO NEAREST SANITARY LINE.
SEE SHT. CME-2 FOR CONTINUATION
NOTE: GALVANIZED STEEL SHALL BE USED
FOR SUMP PUMP DISCHARGE PIPING INSIDE
THE STEAM MANHOLE.
36"
7 11
C STEEL CARRIER PIPE
INSULATION
DRAIN
AIR VENT
CONTINUOUSLY WELDED
CARRIER PIPE
SEAL WALL PENETRATION
W/3 COATS OF BITUMINOUS
MASTIC OR ONE COAT OF
CHEMICALLY BONDED
URETHANE
3’ MAX.
4"
6"
WALL SLEEVE WITH LEAK
PLATE, CAST INTO THE WALL.
HEAVY WALL PIPE WITH A
COATING OF RED PRIMER
(LINK-SEAL MODEL WS OR
EQUAL).
END SEAL CONTINUOUSLY
WELDED TO PIPE AND CONDUIT
MODULAR, MECHANICAL TYPE
WALL SEAL (LINK-SEAL OR
APPROVED EQUAL)
ANCHOR AND CONCRETE BLOCKING
(PER PIPE MANUFACTURER’S
SPECIFICATIONS)
N.T.S.
STEEL
CONDUIT
OF
N.T.S.
TYPICAL ANCHOR DETAIL
CONCRETE BLOCK
CARRIER PIPE
INSULATION
STEEL CONDUIT
36"
DRAIN AND VENT HOLES
THROUGH ANCHOR PLATE
ON INSIDE OF CONDUIT
4-HOLES, MIN. 2.5 SQ. IN.
EACH (TYP.)
CARRIER PIPE
INSULATION
2"
5"
ANCHOR PLATES ARE �" STEEL CENTERED
ON CONDUIT WITH DIMENSIONS 5" LARGER
HORIZONTALLY AND 2" LARGER VERTICALLY
THAN NOMINAL CONDUIT DIAMETER. CONCRETE
ANCHOR BLOCK EXTENDS MINIMUM OF 12"
OUTSIDE ANCHOR PLATE AND IS MINIMUM
OF 36" IN LENGTH.
STANDARD PIPE
SUPPORT
EXPANSION SINGLE
PIPE SUPPORT
REDUCING PLATE
TYPICAL CONDUIT
W (LESS THAN 9’)
H
2’
MIN
6"
EXPANSION SINGLE
PIPE SUPPORT
M A
X
Y
X9’
2’
A
A
TRANSITION
CONDUIT
WELD
INSULATION
SECTION A-A
ELLIPTICAL
SECTION A-A
CIRCULAR
TRANSITION
CONDUIT
WELD
INSULATION
EXPANSION SINGLE PIPE SUPPORT
REQ’D WHEN X+Y EXCEEDS 9’
OVERSIZED CONDUIT (CIRCULAR
OR ELLIPTICAL) TO BE DESIGNED
& UTILIZED TO ENSURE CARRIER
PIPE INSULATION WILL NOT CONTACT
THE INTERIOR OF THE CASING PIPE
DUE TO THERMAL EXPANSION OR
CONTRACTION FORCES.
N.T.S.
TYPICAL SINGLE PIPE
EXPANSION LOOP DETAIL
INSULATION
AIR SPACE
CARRIER PIPE
N.T.S.
TYPICAL SINGLE PIPE IN CONDUIT
(CATHODIC PROTECTION REQUIRED)
INSULATION
AIR SPACE
CARRIER PIPE
N.T.S.
TYPICAL SINGLE PIPE IN CONDUIT
(CATHODIC PROTECTION NOT REQUIRED)
POLYURETHANE
FOAM INSULATION
STEEL CONDUIT
AIR SPACE
STEEL CONDUIT
INSULATION
CARRIER PIPE
POLYURETHANE
FOAM INSULATION
N.T.S.
PARTIAL ANCHOR PLATE DETAIL
WHEN USED WITH FRP JACKETED CONDUIT
NOTE: IN GRASSY AREAS, RESEED
(OR RESOD) DISTURBED AND/OR
BACKFILLED AREAS IN ACCORDANCE
WITH THE PROJECT SPECIFICATIONS.
SEED MIXTURE:
10% KENTUCKY BLUEGRASS
10% PERENNIAL RYEGRASS
4"
N.T.S.
TRENCH AND REPLACE GRASS
TYPICAL DETAIL
REMOVE AND REPLACE
LOOSENED SUBGRADE IN KIND
IN GRASSY AREAS REMOVE
AND REPLACE TOPSOIL IN KIND
SAW CUT (TYP.)
12" TYP.
NOTE:
M
IN
1. EXISTING PAVEMENT ASSUMED
2. REPAINT ALL PAVEMENT
MARKINGS TO EXISTING CONDITIONS
V A
R
IE
S
SEALANT
R
E F
O F
IL
E S
6"
UNDISTURBED SOIL OR
APPROVED COMPACTED FILL
D E
P
R
IE
S
TO BE 8" CONCRETE WITH 3"
N.T.S.
*TRENCH AND REPLACE PAVEMENT
TYPICAL DETAIL
WARNING TAPE APPROX.
12" BELOW GRADE
S E
L E
C T
B A
C K
F
IL
L
S A
T
IS
F A
C T
O R
Y
B A
C K
F
IL
8" AGGREGATE
BASE (ODOT 304)
6" LIFTS MAXIMUM
100% COMPACTION
4" ASPHALT CONCRETE
(ODOT 404)
TWO LIFTS
95% COMPACTION
PRIME COAT
(ODOT 408, MC-30)
0.25 GAL PER S.Y.
COMPACTED (85%) SATISFACTORY
BACKFILL IN 6" MAX. LIFTS FROM
12" ABOVE CONDUIT
V A
R
IE
E F
O F
IL
E
6"
6"
UNDISTURBED SOIL OR
APPROVED COMPACTED FILL
D E
P
R
IE
S
WARNING TAPE APPROX.
12" BELOW GRADE6" 6"
S E
L E
C T
B A
C K
F
IL
L
S A
T
IS
F A
C T
O R
Y
B A
C K
F
IL
COMPACTED (85%) SATISFACTORY
BACKFILL IN 6" MAX. LIFTS FROM
12" ABOVE CONDUIT
COORDINATOR ENGINEERING CHIEF
DATE REVISION BYNO. DATE NO. REVISION BY
C I
V
IL
ENGI
N
E E
R
US AF
W PAFB
WRIGHT-PATTERSON AIR FORCE BASE
88TH ABW
DESIGN CHIEF
DATEDRAWNDESIGNED CHECKED
M-4
INSULATION
AIR SPACE
POLYURETHANE
FOAM INSULATION
STEEL CONDUIT
CARRIER PIPE
WALL
HEAT SHRINK MATERIAL
TO SEAL RING TO JACKET
ANCHOR PLATE
HIGH TEMPERATURE MASTIC
CORROSION COATING
WATER SHED RING
WELDED CONTINUOUSLY
TO STEEL ANCHOR
AND CORROSION COATED
(TYP. BOTH SIDES)
ASPHALT CONCRETE OVERLAY
FRP JACKET
FRP JACKET
10 GAUGE (MINIMUM) STEEL CONDUIT &
FUSION BONDED EPOXY CORROSION COATING
NOTE: FUSION BONDED EPOXY COATING SYSTEM SHOWN.
POLYURETHANE/FRP JACKETED SYSTEM SIMILAR.
8" (TYP.)
PIT WALL
TYPICAL CONDUIT ENTRY THROUGH
PIT WALL (END SEAL)
FRP JACKET
REPLACE STEAM/COND. LINES NEAR 30091
PROJECT #070013
DIRECT BURIED PIPING DETAILS
90^ RETURN BEND
(TYP.)
12"
MANHOLE WALL
STRAP & ANCHOR
TO WALL (TYP.)
1" CASING VENT RISER
PIPE CASING
CARRIER PIPE
1" CASING DRAIN
BRASS PLUG
(LEAVE PLUG IN
PLACE)
CASING VENT
BRASS FITTING
(TYP.)
GRADE
OFFSET APPROX. 3’ FOR MANHOLE
TOPS AT GRADE (TO AVOID DAMAGE
FROM LAWN MOWERS)
N.T.S.
TYPICAL CASING, VENT, AND DRAIN DETAIL
JP HJ JT DEC 09
10" AGGREGATE BASE.
80% TURF TYPE TALL FESCUES
COMPACT SELECT FILL BACKFILL
6" MAXIMUM LIFTS TO 95 % (MIN.)
OF MODIFIED PROCTOR DRY
DENSITY FROM BOTTOM OF TRENCH
INVERT TO 12" ABOVE THE CROWN
OF CONDUITS
COMPACT SELECT FILL BACKFILL
6" MAXIMUM LIFTS TO 95 % (MIN.)
OF MODIFIED PROCTOR DRY
DENSITY FROM BOTTOM OF TRENCH
INVERT TO 12" ABOVE THE CROWN
OF CONDUITS
HPS & CPR IN
SEPERATE CONDIUTS
HPS & CPR IN
SEPERATE CONDIUTS
6" 6" 6"
8 11
C I
V
IL
ENGI
N
E E
R
US AF
W PAFB
WRIGHT-PATTERSON AIR FORCE BASE
88TH ABW
DESIGN CHIEF
DATEDRAWNDESIGNED CHECKED
GENERAL NOTES
TOP SLAB LIVE LOAD: AASHTO MS18.
CONCRETE: 4000 PSI (MINIMUM).
1. CONSTRUCTION MATERIALS SHALL BE AS FOLLOWS :
CONCRETE - 4000 PSI (MINIMUM) AT 28 DAYS WITH 5-7% AIR CONTENT
FOR SAFELY SHORING UP THE REMAINING PORTIONS OF THE STRUCTURE.
2. DURING ALL WORK INVOLVING STRUCTURAL REMOVALS, THE CONTRACTOR IS RESPONSIBLE
MAY BE USED. PRECAST MUST BE APPROVED BY THE CONTRACTING OFFICER. THE
CONTRACTOR SHALL SUBMIT STRUCTURAL CALCULATIONS SEALED BY A PROFESSIONAL
ENGINEER, REGISTERED IN THE STATE OF OHIO. CALCULATIONS SHALL DEMONSTRATE
THAT THE PRECAST DESIGNED FOR THE FOLLOWING CRITERIA:
REINFORCING STEEL - Fy = 60,000 PSI (MINIMUM)
STRUCTURAL STEEL - ASTM A36M; Fy = 36,000 PSI (MINIMUM)
EQUIVALENT FLUID PRESSURE ON WALLS: 0.415 PSI/FT
LATERAL PRESSURE ON WALLS FROM SURCHARGE OF 1.392 PSI
REINFORCING STEEL: Fy = 60,000 PSI (MINIMUM).
4. PROVIDE HOT DIPPED GALVANIZED ANCHOR BOLTS.
OF
C-1
JT DEC 09
3. IN LIEU OF CAST-IN-PLACE MANHOLES, PRECAST
HOT DIPPED GALVANIZED.
EXP. ANCHOR
SECTION "A-1"
�" DIA. X 5" LONG
BRACKET
THICK STEEL
STEAM PIT
BOTTOM OF
M A
X
(TYP.)
NEW OR EXISTING
X
T
Y P
(TYP.)
WALL
BAR (TYP.)
ANCHOR BOLTS (TYP.)
S T
E
IT
P
R
IE
S
A-1
TOP OF PIT
NOTE: ALL MEMBERS SHALL BE
1’-4"
�" DIA. RUNG
8" X 4" X 3"
WIDE X �"
�" DIA. EXPANSION
7"
2�" X �" STEEL
7"
C-1
�" DIA. RUNG
@ 12" C/C
ACCESS LADDER DETAIL
NOT TO SCALE
REPLACE STEAM/COND. LINES NEAR 30091
PROJECT 070013
CIVIL DETAILS
3" CLR.
SECTION
PIT WALL
A
8" (TYP.)
8" 8"
T
Y P
12" (TYP.)
#4 BENT BARS
@ 12" C/C (TYP.)
1�" CLR.
(TYP.)
2" CLR.
(TYP.)
2" CLR.
#4 BARS @ 12" O.C. (TYP.)
#4 BARS @ 12" O.C. EACH WAY,
INTERIOR FACE OF WALL (TYP.)
#4 BARS @ 12" O.C EACH WAY,
EXTERIOR FACE OF WALL (TYP.)
#4 BARS @ 12" O.C.
EACH WAY INTERIOR
FACE OF WALL (TYP.)
#4 BARS @ 12" O.C.
EACH WAY EXTERIOR
FACE OF WALL (TYP.)
12"
WATER STOP
(TYP.)
NEW STEAM MANHOLE
#4 BARS @ 12" O.C. (TYP.)
#4 BENT BARS
@ 12" C/C (TYP.) 2
24"
MANHOLE FRAME AND SOLID LID
LADDER EXTENDS TO FLOOR
NOT SHOWN FOR CLARITY
PROVIDE DIAMOND TREAD �" ALUMINUM PLATE
COVER FOR EXTERIOR TRENCH. BOLT PLATE TO
TRENCH WITH �" DIA BY 2" LONG ALUMINUM
BOLTS EVERY 3’. PROVIDE RUBBER GASKET UNDER
PLATE AND PROVIDE TOP COVER AT ENDS.
PROVIDE LIFTING HANDLE ON EACH REMOVABLE
SECTION OF PLATE.
PROVIDE SERRATED (NON-SLIP) GALVANIZED
STEEL BAR GRATING RATED AT MIN. 320 LBS. PER
SF FOR (3 FOOT SPAN) FOR INTERIOR COVER.
# 4 BARS @ 12" O.C.
# 4 BARS 3 EACH WALLS/FLOOR
AS SHOWN
6" WALLS/FLOOR
24" X 24" INSIDE
DIMENSION
NO SCALE
5’ 0" X 5’ 0"
1’ 2"
1’ 10"
6" CONC. SLAB ON GRADE
WITH W6X6 W2.9/W2.9
WIRE FABRIC
EXPANSION JOINT
CMU WITH FACING
BUILDING FOUNDATION WALL DETAIL
NO SCALE
NOTE: INTERIOR WALL IS
SIMILAR, WITH 1’ 4" DEPTH
TO TOP/FOOTER IN LIEU
OF 2’ 8" DEPTH.
PROVIDE EXPANSION JOINT
REPLACE 6" CONC. SLAB WITH WWF IN KIND
NEW SHALLOW TRENCH DETAIL
(BILCO TYPE JD, U.S. FOUNDRY
TYPE TPD OR APPOVED EQUAL)
300 PSF LOADING.
JP/CJVJP/CJV
9 11
NO SCALE
5. PROVIDE DOUBLE LEAF MANHOLE FRAME AND SOLID LID
(BILCO TYPE JD, U.S. FOUNDRY TYPE TPD OR APPROVED EQUAL)
FOR STEAM MANHOLE S-220.
ELECTRICAL NOTES
ATTACH THE � INCH RIGID STEEL CONDUIT TO THE EXTERIOR WALL
AND PROVIDE A TRANSITION FROM � INCH RIGID STEEL CONDUIT
TO 2 INCH SCHEDULE 40 PVC DIRECT BURIED, CONCRETE ENCASED
TO MANHOLE S-220.
PROVIDE AND INSTALL � INCH RIGID STEEL CONDUIT FROM THE
SCHEDULE 40 PVC CONDUIT TO THE SAFETY SWITCH AND DUPLEX
RECEPTACLE.
PROVDE A 20 AMP DUPLEX RECEPTACLE IN MOISTURE PROOF ENCLOSURE
FOR THE SUMP PUMP.
PROVIDE PLYWOOD BACKBOARD TREATED WITH WEATHER RESISTANT
EPOXY PAINT AND PROVIDE STEEL CHANNEL SUPPORTS. MOUNT THE
BACKBOARD TO THE STEEL SUPPORTS AND MOUNT THE FUSED SAFETY
SWITCH AND DUPLEX RECEPTACLE TO THE PLYWOOD BACKBOARD.
PROVIDE AND INSTALL (1) SINGLE POLE, 20 AMP CIRCUIT
BREAKER IN PANELBOARD LPA FOR THE NEW SUMP PUMP.
ELECTRICAL PLAN
FACILITY 30093
SCALE:�" = 1’ 0"
SUMP PUMP
LOCATION
MANHOLE S-220
SAFETY SWITCH
DUPLEX RECEPTACLE
2 3
2 3
2 3
6 7
PANELBOARD LPA
COORDINATOR: ENGINEERING CHIEF:
C I
V I L
ENGI
N
E E
R
US AF
W PAFB
WRIGHT-PATTERSON AIR FORCE BASE
88TH ABW
OF
DRAWN: CHECKED:
DATE NO. REVISION BY
DESIGN CHIEF:
DESIGNED: DATE:
0 1"
FACILITY 30093
PANELBOARD LPA
PROVIDE AND INSTALL (2) #12 XHHW CONDUCTORS, (1) #12
GROUND CONDUCTOR TO MANHOLE S-220 TO SAFETY SWITCH
AND DUPLEX RECEPTACLE FROM PANELBOARD LPA.
PROVIDE HEAVY DUTY NONFUSED SAFETY SWITCH: 120 VOLT,
2 POLE, 20 AMP IN NEMA TYPE 4X ENCLOSURE.
BUILDING 93
E-1
CJF CJF
REPLACE STEAM/COND. LINES NEAR 30091
PROJECT #070013
ELECTRICAL PLAN FOR FACILITY 30093
DEC 09
10 11
JP
PROVIDE AND INSTALL (1) � INCH RIGID STEEL CONDUIT FOR
THE ELECTRICAL FEED FROM PANELBOARD LPA. INSTALL ABOVE SUSP.
CEILING WHERE APPLICABLE.
COORDINATOR: ENGINEERING CHIEF:
I
V I L
ENGI
N
E E
R
US AF
W PAFB
WRIGHT-PATTERSON AIR FORCE BASE
88TH ABW
OF
DRAWN: CHECKED:
DESIGN CHIEF:
DESIGNED: DATE:
0 1"
ELECTRICAL ROOM
FACILITY 30091
PANELBOARD RP1
ELECTRICAL NOTES
PROVIDE AND INSTALL (1) � INCH RIGID STEEL CONDUIT FOR
THE ELECTRICAL FEED FROM PANELBOARD RP1.
ATTACH THE � INCH RIGID STEEL CONDUIT TO THE EXTERIOR WALL
AND PROVIDE A TRANSITION FROM � INCH RIGID STEEL CONDUIT
TO 2 INCH SCHEDULE 40 PVC DIRECT BURIED, CONCRETE ENCASED
TO MANHOLE S-220A.
PROVIDE AND INSTALL � INCH RIGID STEEL CONDUIT FROM THE
SCHEDULE 40 PVC CONDUIT TO THE SAFETY SWITCH AND DUPLEX
RECEPTACLE.
PROVIDE PLYWOOD BACKBOARD TREATED WITH WEATHER RESISTANT
EPOXY PAINT AND PROVIDE STEEL CHANNEL SUPPORTS. MOUNT THE
BACKBOARD TO THE STEEL SUPPORTS AND MOUNT THE FUSED SAFETY
SWITCH AND DUPLEX RECEPTACLE TO THE PLYWOOD BACKBOARD.
PROVDE A 20 AMP DUPLEX RECEPTACLE IN MOISTURE PROOF
ENCLOSURE FOR THE SUMP PUMP.
5 6
PROVIDE AND INSTALL (2) #12 XHHW CONDUCTORS, (1) #12
GROUND CONDUCTOR TO MANHOLE S-220A TO SAFETY SWITCH
AND DUPLEX RECEPTACLE FROM THE SUPPLIED SINGLE POLE
20 AMP CIRCUIT BREAKER IN PANELBOARD RP1.
SUMP PUMP LOCATION
PROPOSE MANHOLE
S-220A
ELECTRICAL PLAN
FACILITY 30091
SCALE:�" = 1’ 0"
PROVIDE HEAVY DUTY NONFUSED SAFETY SWITCH: 120 VOLT,
2 POLE, 20 AMP IN NEMA TYPE 4X ENCLOSURE.
SAFETY SWITCH
DUPLEX RECEPTACLE
BUILDING 91
CJF CJF
E-2
REPLACE STEAM/COND. LINES NEAR 30091
PROJECT #070013
ELECTRICAL PLAN FOR FACILITY 30091
DEC 09JP
11 11
| G-1 |
| G-2.pdf |
| G-2 |
| CME-2.pdf |
| CME-2 |
| CME-1.pdf |
| CME-1 |
| M-4.pdf |
| M-4 |
| M-3.pdf |
| M-3 |
| M-2.pdf |
| M-2 |
| M-1.pdf |
| M-1 |
| C-1.pdf |
| C-1 |
| E-2 - Building 91 Site.pdf |
| E-2 - Building 91 Site |
| E-1 - Building 93 Site.pdf |
| E-1 - Building 93 Site |