RFI.docx
DOCX document 10 KB Posted
- Attached to
- RECOVERY--PROJECT NUMBER ZHTV0818251/ZHTV0818252, Repair Entrance Steps Bldgs. 20014 and 20015
- Solicitation number
- FA8601-10-R-0031
About this file
Question Answer
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 4.doc | DOC document | |
| Amendment 3.doc | DOC document | |
| Amendment 1.doc | DOC document | |
| Addendum 2.doc | DOC document | |
| Wage Decision | — | |
| Amendment 2.doc | DOC document | |
| Replacement Drawing A005 - Attachment 8 Section J.pdf | ||
| Site Visit Sign in Sheet - 25 MAR 2010.pdf | ||
| FFPAddendum_1.pdf | ||
| Specifications.pdf | ||
| Drawings.pdf | ||
| Solicitation.doc | DOC document | |
| Wage Decision.doc | DOC document | |
| VPP Safety Health Plan Requirement.doc | DOC document |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question We need to know if the membrane coating system is installed beneath the precast treads and risers. Also, is the 701W sealer applied directly to new precast substrates.
Answer On the main stairs for bldg 14 & 15 after the repairs have been made to the existing stairs the SikaRoof MTC 25 System shall be applied followed by the grout build up and the placement of the precast units in thin-set.
On the west stairs for building 14 the MTC 25 will be applied as the top or finish coating.
All precast units shall be pretreated with Sikagard 701W prior to installation as noted on A001 of the construction plans.
File details come from the government source that posted it. Updated .