View the file

Other files

File Type Posted
RFI.docx DOCX document
Amendment 4.doc DOC document
Amendment 3.doc DOC document
Addendum 2.doc DOC document
Wage Decision —
Amendment 2.doc DOC document
Replacement Drawing A005 - Attachment 8 Section J.pdf PDF
Site Visit Sign in Sheet - 25 MAR 2010.pdf PDF
FFPAddendum_1.pdf PDF
Specifications.pdf PDF
Drawings.pdf PDF
Solicitation.doc DOC document
Wage Decision.doc DOC document
VPP Safety Health Plan Requirement.doc DOC document
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION I - CONTRACT CLAUSES

The following have been modified:

252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)

(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.

(b) The Contractor shall--

(1) Check all drawings furnished immediately upon receipt;

(2) Compare all drawings and verify the figures before laying out the work;

(3) Promptly notify the Contracting Officer of any discrepancies;

(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and

(5) Reproduce and print contract drawings and specifications as needed.

(c) In general--

(1) Large-scale drawings shall govern small-scale drawings; and

(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.

(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.

(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:

DRAWING

SHEET

TITLE NUMBER

DATE

T001

Title Sheet

FEB 2010

A001

Buildings 14 & 15 Sequence of Construction

A002

Option #1, Bldg.14 W Stairs Pilaster Option

A003

Buildings 14 & 15 Site Plan

A004

Bldg 14 & 15, Main Stairs Plan & Elevation

A005

Bldg. 14 & 15, Main Stairs Construction Details

MAR 2010

A006

Buildings 14 & 15 Planter Details

A007

Building 14 West Stair Details

(End of clause)

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

DOCUMENTS, EXHIBITS AND OTHER

Documents, Exhibits and Other Attachments Table of Contents

Attachment

Description

Pages

Date

Drawings Project #0818251/2

Specifications Project #0818251/2

Wage Decision

19 MAR 2010

OH100029, Mod 1

VPP Safety & Health Plan Requirement

Addendum 1, Project #0818251/2

Addendum 2, Project #0818251/2

Replacement Drawing A005

Project#0818251/2

(End of Summary of Changes)