Question 1.doc
DOC document 22 KB Posted
- Solicitation number
- FA8601-10-R-0028
View the file
Other files
| File | Type | Posted |
|---|---|---|
| VPP Safety Health Plan Requirement.doc | DOC document | |
| 091971 Add 1.doc | DOC document | |
| Amendment 2.doc | DOC document | |
| Question1 - AFIT SLD.pdf | ||
| Site Visit Sign in Sheet - 18 FEB 2010.pdf | ||
| NOTICE.docx | DOCX document | |
| Wage Decision 2.docx | DOCX document | |
| Amendment 1.doc | DOC document | |
| Amendment 1.doc | DOC document | |
| Wage Decision 2.docx | DOCX document | |
| Drawings.pdf | ||
| Wage Decision - 091971R.docx | DOCX document | |
| Solicitation.doc | DOC document | |
| Specifications.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question
Can we have a single line diagram provided for this project? The padmount switch manufacturer is requesting one from us.
Answer
Single line diagram attached.
Question Will one (1) or two (2) 15kV, 4-way, air break, sectionalizing padmount switches need to be provided for this project?
Answer
Per Coded Note 5 on Sheet E-1 of contract drawings, "Provide (2) 15kV, 4-way, air break sectionalizing switches." Two switches are required.