View the file

Other files

File Type Posted
VPP Safety Health Plan Requirement.doc DOC document
091971 Add 1.doc DOC document
Amendment 2.doc DOC document
Question1 - AFIT SLD.pdf PDF
Site Visit Sign in Sheet - 18 FEB 2010.pdf PDF
NOTICE.docx DOCX document
Wage Decision 2.docx DOCX document
Amendment 1.doc DOC document
Amendment 1.doc DOC document
Wage Decision 2.docx DOCX document
Drawings.pdf PDF
Wage Decision - 091971R.docx DOCX document
Solicitation.doc DOC document
Specifications.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question

Can we have a single line diagram provided for this project? The padmount switch manufacturer is requesting one from us.

Answer

Single line diagram attached.

Question Will one (1) or two (2) 15kV, 4-way, air break, sectionalizing padmount switches need to be provided for this project?

Answer

Per Coded Note 5 on Sheet E-1 of contract drawings, "Provide (2) 15kV, 4-way, air break sectionalizing switches." Two switches are required.