About this file

Drawings

View the file

Other files

File Type Posted
VPP Safety Health Plan Requirement.doc DOC document
091971 Add 1.doc DOC document
Amendment 2.doc DOC document
Question 1.doc DOC document
Question1 - AFIT SLD.pdf PDF
Site Visit Sign in Sheet - 18 FEB 2010.pdf PDF
NOTICE.docx DOCX document
Wage Decision 2.docx DOCX document
Amendment 1.doc DOC document
Amendment 1.doc DOC document
Wage Decision 2.docx DOCX document
Wage Decision - 091971R.docx DOCX document
Solicitation.doc DOC document
Specifications.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VICINITY PLAN

WPAFB

AREA C

AREA B

WPAFB

F A

IR

F

IE

L

D R

D

ST. RT. 444

ST. R

T. 4

T R

E B

E

IN

R D

I-675

COLONEL GLENN HIGHWAY

DAYTON YELLOW

SPRINGS RD.

N A

T

IO

N A

L R

D

NEW GERMANY TREBEIN RD.

COORDINATOR ENGINEERING CHIEF

DATE REVISION BYNO. DATE NO. REVISION BY

C I

V I

L E N G I N

E E

R

US AF

W PA F B

WRIGHT-PATTERSON AIR FORCE BASE

88TH ABW

OF

DESIGN CHIEF

DATEDRAWNDESIGNED CHECKED

ORTH

WPAFB

AREA A

NOT TO SCALE

PROJECT NUMBER 091971 1 2

GENERAL NOTES

3. ALL OTHER UTILITIES, STRUCTURES AND MISCELLANEOUS ITEMS NOT RELATED

TO THIS PROJECT MUST BE PROTECTED FROM HARM AND DAMAGES. ALL EXISTING

SYSTEMS AND UTILITIES SHALL BE MAINTAINED.

4. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXTENT OF

THE WORK AT THE SITE. ALL DIMENSIONS ARE APPROXIMATE. THE CONTRACTOR

SHALL FIELD VERIFY ALL DIMENSIONS AND LOCATIONS OF EQUIPMENT.

SHEET SHEET TITLE

T-1

E-1

TITLE SHEET

T-1

ROBERT REYNOLDS

10/18/2009

ROBERT REYNOLDS ROBERT REYNOLDS

1. POWER OUTAGES SHALL BE FROM 1800-0600 DAILY OR FROM 1800 FRIDAY TO 0600

MONDAY UNLESS NOTED OTHERWISE. ALL POWER OUTAGES SHALL BE COORDINATED

AND SCHEDULED WITH THE CONTRACT INSPECTOR THREE (3) WEEKS PRIOR TO THE

ANTICIPATED POWER OUTAGE. POWER OUTAGE TIMES AND DURATION SHALL BE

MINIMIZED TO THE EXTENT PRACTICAL,

SOCCER FIE

LDS

TENTH

SUB.

STATIO

N

ELEVENTH

STREET

STREET

G

S

T R

E E

T

TENTH

STREET

D R

IV

E

36B

24B

17B

20B

71B

70B

33B

34B

68B

78B

PARCOURS

P

ATH

69B

89B

20390

THIRTEENTH STREET

B

SKYLINE DRIVE

S K

Y L

IN

E

STREET

TWELFTH

STREET

Q

T R

E E

T

ELEVENTH

70B

80B 81B

28B 82B

83B

88B

85B

84B

86B 87B

85B

88B

H O

B S

O N

W A

Y

37B

83B

AREA

GATE

22B

TRUCK TRAILER

CONNEX BOX

CONNEX BOX

14B

13B

R O

A D

5B75

L O

O P

27B

10B

22B

7B

26B

21B

27B

12B

12B

553 " D

S

T R

E E

T

D

S

T R

E E

T

TWELFTH STREET

T H

IR

T

E E

N T

H S

T R

E E

T

ELEVENTH STREET

"C" S

TREET

C

S

T R

E E

T

N A

T

IO

N A

L R

O A

D

87B

87B

ORTH

LOCATION PLAN-AREA B

SCALE: 1" = 400’

WORK LOCATION

AFIT FACILITIES

REPLACE ELECTRICAL FEED

TO AFIT FACILITIES

20641, 20642 & 20643

WRIGHT PATTERSON AFB

REPLACE ELECTRICAL FEED

AFIT BLDGS 641, 642 & 643

AFIT FACILITIES REMOVAL AND INSTALLATION PLAN

2. AFIT FACILITIES SHALL REMAIN OCCUPIED AND FUNCTIONAL. THE

CONTRACTOR SHALL PROVIDE TEMPORARY FENCING AS NECESSARY.

P2 0-3 350 MCM &1 #2 12470V

BLDG

BLDG

BLDG

BLDG

BLDG

ELEVENTH STREET

TENTH STREET

H O

B S

O N

W

A Y

COORDINATOR ENGINEERING CHIEF

DATE REVISION BYNO. DATE NO. REVISION BY

C I

V I

L E N G I N

E E

R

US AF

W PA F B

WRIGHT-PATTERSON AIR FORCE BASE

88TH ABW

OF

DESIGN CHIEF

DATEDRAWNDESIGNED CHECKED

ELECTRIC

MANHOLE

E445

ELECTRIC

MANHOLE

E439

ELECTRIC

MANHOLE

E437

ELECTRIC

MANHOLE

E507

REPLACE ELECTRICAL FEED

AFIT BLDGS 641, 642 & 643

INSTALLATION AND REMOVAL PLAN OF2 2

E-1

ROBERT REYNOLDS ROBERT REYNOLDS ROBERT REYNOLDS

10/18/2009

CODED ELECTRICAL NOTES

ORTH

LOCATION PLAN-AREA B

SCALE: 1" = 50’

2. REMOVE EXISTING (3) #2, 15KV CONDUCTORS FROM THE 4-WAY

SF-6 SWITCH TO THE 1500 KVA TRANSFORMER AT FACILITY 20641.

1. REMOVE EXISTING (2) SF-6, 4-WAY SECTIONALIZING SWITCHES.

REMOVE ALL TERMINATIONS, ELBOWS, CONDUCTORS AND CONNECTIONS.

REMOVE ALL MOUNTING LUGS AND ALL MOUNTING HARDWARE.

3. REMOVE EXISTING (3) #2, 15KV CONDUCTORS FROM THE 4-WAY

SF-6 SWITCH TO THE 1000 KVA TRANSFORMER AT FACILITY 20643.

4. REMOVE EXISTING (3) #350 KCMIL & (1) #2 GROUND, 15KV CONDUCTORS

FROM THE 4-WAY SF-6 SWITCH TO THE 1500 KVA INDOOR UNIT SUBSTATION

AT FACILITY 20642.

5. PROVIDE (2) 15KV, 4-WAY, AIR BREAK SECTIONALIZING SWITCHES.

PROVIDE ALL TERMINATIONS, ELBOWS, CONNECTIONS, CONDUCTORS

AND ALL MOUNTING HARDWARE.

6. PROVIDE (3) #2 EPR CONDUCTORS: 15KV, 133 PERCENT INSULATION

LEVEL. ROUTE FROM NEW 4-WAY AIR BREAK SWITCH TO EXISTING

1500 KVA TRANSFORMER AT FACILITY 20641. USE EXISTING DUCTS

UNLESS NOTED OTHERWISE.

7. PROVIDE (3) #2 EPR CONDUCTORS: 15KV, 133 PERCENT INSULATION

LEVEL. ROUTE FROM NEW 4-WAY AIR BREAK SWITCH TO EXISTING

1000 KVA TRANSFORMER AT FACILITY 20643. USE EXISTING DUCTS

UNLESS NOTED OTHERWISE.

8. PROVIDE (4) 5 INCH SCHEDULE 40 PVC DUCTS; DIRECT BURIED

AND CONCRETE ENCASED FROM MANHOLE E437 TO MANHOLE E439.

9. PROVIDE (2) 5 INCH SCHEDULE 40 PVC DUCTS; DIRECT BURIED

AND CONCRETE ENCASED FROM MANHOLE E445 TO MANHOLE E507.

10.PROVIDE (3) #1/0 EPR CONDUCTORS; 15KV, 133 PERCENT

INSULATION LEVEL. ROUTE FROM NEW 4-WAY SWITCH TO

EXISTING 1500 KVA UNIT SUBSTATION IN FACILITY 20642.

UTILIZE EXISTING DUCTS AND NEW DUCTS AS DENOTED.

EXISTING

OUTDOOR

1000 KVA

XFMR

EXISTING

OUTDOOR

1500 KVA

XFMR

4 9 10

EXISTING

INDOOR UNIT

SUBSTATION

1500 KVA

afit2
2.pdf
afit

File details come from the government source that posted it. Updated .