About this file

Amend 0002

View the file

Other files

File Type Posted
CDRLs.pdf PDF
DD254.pdf PDF
PWS_Rev6.pdf PDF
FA857419R00010001.pdf PDF
CDRLs.pdf PDF
CDRLs.pdf PDF
DD254.pdf PDF
FA857419R0001.pdf PDF
PWS.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

JSU

2. AMENDMENT/MODIFICATION NO.

FA8574-19-R-0001-0002

3. EFFECTIVE DATE

4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO (If applicable)

6. ISSUED BY CODE

AVIONICS, AFLCMC/WNKE

235 BYRON ST STE 19A

BLDG 300 CML PHN 478 926 7462

ROBINS AFB GA 31098-1670

BUYER: Lauren M. Griffin lauren.griffin.2@us.af.mil Phone: (478) 926- 7465 No Collect Calls

7. ADMINISTERED BY (If other than item 6) CODEFA8540

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE

X

9A. AMENDMENT OF SOLICITATION NO.

FA857419R0001

9B. DATED (SEE ITEM 11)

16-FEB-2019

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods. ( a ) By completing Items 8 and 15, and returning copies of the amendment; ( b ) By acknowledging receipt of this amendment on each copy of the offer submitted; or ( c ) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

ROUTINE

15A. NAME AND TITLE OF SIGNER (Type or print)

15B. CONTRACTOR/OFFEROR

BY ________________________________________________________

(Signature of person authorized to sign)

15C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16B. UNITED STATES OF AMERICA

BY ____________________________________________________

(Signature of Contracting Officer)

16C. DATE SIGNED

FACILITY CODE

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

30-105 STANDARD FORM 30 (REV. 10-83)

PRESCRIBED BY GSA

FAR (48 CFR) 53.243

X

X

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

Continuation of block 14. DESCRIPTION OF AMENDMENT/MODIFICATION

The purpose of this amendment is as follows:

a. Incorporate CLINs 4006-4012 and CLINs 5001-5012 which were inadvertently left off of Amendment 0001.

b. Replace in its entirety the Attachment - PWS with the most up to date PWS dated 29 Jan 2019.

c. Replace in their entirety the Attachment - CDRLs with the most up to date CDRLs dated 28 Jan 2019.

d. Replace in its entirety the Attachment - DD254 with the most up to date DD254 dated 31 Jan 2019.

e. All other terms and conditions remain unchanged.The proposal due date remains 16 February 2019, NLT 3:30PM.

PART I - THE SCHEDULE

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

B.1 GENERAL: This Request for Proposal (RFP) is issued with the intent to establish an Indefinite Delivery Indefinite Quantity (IDIQ) type contract is in support of software maintenance of the Situation Awareness Data Link (SADL). The Contractor (independently and not as an agent of the Government) shall furnish all necessary personnel, labor, supplies and materials (except as otherwise authorized by the Contracting Officer) as required to provide Program Management, Field Service Support, Software Sustainment, Cybersecurity, Helpdesk, Training, Technical (Lab) Support, Block Cycle Change (BCC), Variable Engineering, Travel, and Data Deliverable requirements identified within the Schedule, Section B, and the Performance‐Based Work Statement (PWS). Performance shall be in accordance with all provisions and specifications as stipulated herein.

B.2 INCORPORATION OF SUBCONTRACTING PLAN (IAW FAR 19.705-5(a)(5)): Will be incorporated at time of award.

B.3 CONTRACT TYPE: This is an Indefinite Delivery Indefinite Quantity type contract as contemplated at FAR 16.504. This contract utilizes a Contract Line (CLINs) types, specifically Firm-Fixed Price (FFP), Cost Reimbursement No Fee (CRNF), and Cost‐Plus Fixed Fee (CPFF). Each CLIN indicates the type used for each particular requirement.

B.4 ORDERING PERIODS: In accordance with the clause in Section I of this contract, DFARS 252.216‐7006 Ordering, orders may be issued hereunder for (5), 12‐month ordering periods with a (6) six‐month priced option to extend services from the effective date of the contract against the contract line item numbers (CLINs) included in the schedule. Orders issued hereunder shall utilize the CLIN representing the period in effect at the time of order award for purposes of pricing. The ordering periods associated with each CLIN series are defined as follows:

Period CLIN Ordering Period Ordering Period 1 000X Contract Award through 365 Calendar Days Ordering Period 2 100X 365 Calendar Days through 730 Calendar Days Ordering Period 3 200X 730 Calendar Days through 1,095 Calendar Days Ordering Period 4 300X 1,095 Calendar Days through 1,460 Calendar Days Ordering Period 5 400X 1,460 Calendar Days through 1,825 Calendar Days

*Note: The extension of services clause (52.217-8) applies and may be exercised if needed (CLINs 500X).

B.5 AUTHORITY TO ISSUE ORDERS: Only the AFLCMC/WNKE Contracting Office may issue orders for this contract.

B.6 PLACE OF PERFORMANCE: Place of performance of orders issued hereunder shall be stipulated within the individual task orders.

B.7 ACRN, Purchase Request, PR Line Item and Period of Performance to be cited on each order issued hereunder.

Program Management

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

Program Management IAW PWS Paragraph 1.0 and 2.0

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ IAW PWS 12 MO TBC

Proposed Period of Performance

+ IAW PWS 12 MO

Field Service Support

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

12 MO

Field Service Support IAW PWS Paragraph 5.1.1.2 Priority: R ROUTINE

Field Service Support

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ IAW PWS 12 MO TBC

Proposed Period of Performance

+ IAW PWS 12 MO

Software Sustainment

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

Software Sustainment IAW PWS Paragraph 5.0 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ IAW PWS 1 LO TBC

Proposed Period of Performance

Software Sustainment

+ IAW PWS 1 LO

Cybersecurity

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

12 MO

Cybersecurity IAW PWS Paragraph 5.2.1.4.5 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ IAW PWS 12 MO TBC

Proposed Period of Performance

+ IAW PWS 12 MO

Helpdesk

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

Helpdesk IAW PWS Paragraph 5.1.1.1

Limitations of Liability: Other Than High Value Item

Helpdesk

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ IAW PWS 12 MO TBC

Proposed Period of Performance

+ IAW PWS 12 MO

Training

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 EA

Training IAW PWS Paragraph 5.1.1.1 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ IAW PWS 1 EA TBC

Proposed Period of

+ IAW PWS 1 EA

Technical (Lab) Support

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

Technical (Lab) Support IAW PWS Paragraph 5.1.1 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ IAW PWS 12 MO TBC

Proposed Period of Performance

+ IAW PWS 12 MO

Block Cycle Change (BCC)

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO To be Negotiated

Block Cycle Change (BCC) IAW PWS Paragraph 5.2.1 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity

Block Cycle Change (BCC)

None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ IAW PWS 1 LO TBC

Proposed Period of Performance

+ IAW PWS 1 LO

Block Cycle Change (BCC)

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Total Estimated Cost 1 LO To be Negotiated

Block Cycle Change (BCC) IAW PWS Paragraph 5.2.1 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ IAW PWS 1 LO TBC

Proposed Period of Performance

+ IAW PWS 1 LO

Variable Engineering

Item No.

Variable Engineering

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost 1 LO To be Negotiated

Variable Engineering IAW PWS Paragraph 5.2.1 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ IAW PWS 1 LO TBC

Proposed Period of Performance

+ IAW PWS 1 LO

Travel

Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

Travel IAW PWS Paragraph 5.2.2 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Travel

Required Period of Performance

+ IAW PWS 1 LO TBC

Proposed Period of Performance

+ IAW PWS 1 LO

Data Deliverables

Item No.

Not Separately Priced Quantity U/I Unit Price Amount 1 LO NSP Not Separately Priced

Data Deliverables Exhibit A

Document Identifier Authority Title

A001 DI-CMAN-81248A Interface Control Document

A002 DI-MGMT-80368A Monthly Status Report

A003 DI-IPSC-81442A Software Version Description

A006 DI-CMAN-80639C Engineering Change Proposal (ECP)

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of

+ IAW PWS 1 LO TBC

Proposed Period of Performance

+ IAW PWS 1 LO

Program Management

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

Program management IAW PWS Paragraph 1.0 and 2.0

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ IAW PWS 12 MO TBC

Proposed Period of Performance

+ IAW PWS 12 MO

Field Service Support

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

12 MO

Field Service Support

Field Service Support

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ IAW PWS 12 MO TBC

Proposed Period of Performance

+ IAW PWS 12 MO

Software Sustainment

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

Software Sustainment IAW PWS Paragraph 5.0 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ IAW PWS 1 LO TBC

Proposed

Software Sustainment

+ IAW PWS 1 LO

Cybersecurity

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

12 MO

Cybersecurity IAW PWS Paragraph 5.2.1.4.5 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ IAW PWS 12 MO TBC

Proposed Period of Performance

+ IAW PWS 12 MO

Helpdesk

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

Helpdesk IAW PWS Paragraph 5.1.1.1

Helpdesk

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ IAW PWS 12 MO TBC

Proposed Period of Performance

+ IAW PWS 12 MO

Training

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 EA

Training IAW PWS Paragraph 5.1.1.1 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ IAW PWS 1 EA TBC

Proposed Period of

Technical (Lab) Support

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

Technical (Lab) Support IAW PWS Paragraph 5.1.1 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ IAW PWS 12 MO TBC

Proposed Period of Performance

+ IAW PWS 12 MO

Block Cycle Change (BCC)

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO To be Negotiated

Block Cycle Change (BCC) IAW PWS Paragraph 5.2.1 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

None

Block Cycle Change (BCC)

Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ IAW PWS 1 LO TBC

Proposed Period of Performance

+ IAW PWS 1 LO

Block Cycle Change

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost 1 LO To be Negotiated

Block Cycle Change (BCC) IAW PWS Paragraph 5.2.1 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ IAW PWS 1 LO TBC

Proposed Period of Performance

+ IAW PWS 1 LO

Variable Engineering

Item No.

Cost Plus Fixed Fee

Variable Engineering

Quantity U/I Estimated Cost Fixed Fee Est Total Cost 1 LO To be Negotiated

Variable Engineering IAW PWS Paragraph 5.2.1 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ IAW PWS 1 LO TBC

Proposed Period of Performance

+ IAW PWS 1 LO

Travel

Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

Travel IAW PWS Paragraph 5.2.2 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued

Travel

Required Period of Performance

+ IAW PWS 1 LO TBC

Proposed Period of Performance

+ IAW PWS 1 LO

Data Deliverables

Item No.

Not Separately Priced Quantity U/I Unit Price Amount 1 LO NSP Not Separately Priced

Data Deliverables Exhibit A

Document Identifier Authority Title

A001 DI-CMAN-81248A Interface Control Document

A002 DI-MGMT-80368A Monthly Status Report

A003 DI-IPSC-81442A Software Version Description

A006 DI-CMAN-80639C Engineering Change Proposal (ECP)

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of

Proposed Period of Performance

+ IAW PWS 1 LO

Program Management

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

Program Management IAW PWS Paragraph 1.0 and 2.0

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ IAW PWS 12 MO TBC

Proposed Period of Performance

+ IAW PWS 12 MO

Field Service Support

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

12 MO

Field Service Support

Field Service Support

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ IAW PWS 12 MO TBC

Proposed Period of Performance

+ IAW PWS 12 MO

Software Sustainment

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

Software Sustainment IAW PWS Paragraph 5.0 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ IAW PWS 1 LO TBC

Proposed

Software Sustainment

+ IAW PWS 1 LO

Cybersecurity

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

12 MO

Cybersecurity IAW PWS Paragraph 5.2.1.4.5 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ IAW PWS 12 MO TBC

Proposed Period of Performance

+ IAW PWS 12 MO

Helpdesk

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

Helpdesk IAW PWS Paragraph 5.1.1.1

Helpdesk

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ IAW PWS 12 MO TBC

Proposed Period of Performance

+ IAW PWS 12 MO

Training

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 EA

Training IAW PWS Paragraph 5.1.1.1 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ IAW PWS 1 EA TBC

Proposed Period of

Technical (Lab) Support

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

Technical (Lab) Support IAW PWS Paragraph 5.1.1 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ IAW PWS 12 MO TBC

Proposed Period of Performance

+ IAW PWS 12 MO

Block Cycle Change (BCC)

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO To be Negotiated

Block Cycle Change (BCC) IAW PWS Paragraph 5.2.1 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

Block Cycle Change (BCC)

Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ IAW PWS 1 LO TBC

Proposed Period of Performance

+ IAW PWS 1 LO

Block Cycle Change

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost 1 LO To be Negotiated

Block Cycle Change IAW PWS Paragraph 5.2.1 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ IAW PWS 1 LO TBC

Proposed Period of Performance

+ IAW PWS 1 LO

Variable Engineering

Item No.

Variable Engineering

Quantity U/I Estimated Cost Fixed Fee Est Total Cost 1 LO To be Negotiated

Variable Engineering IAW PWS Paragraph 5.2.1 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ IAW PWS 1 LO TBC

Proposed Period of Performance

+ IAW PWS 1 LO

Travel

Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

Travel IAW PWS Paragraph 5.2.2 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued

Travel

Required Period of Performance

+ IAW PWS 1 LO TBC

Proposed Period of Performance

+ IAW PWS 1 LO

Data Deliverables

Item No.

Not Separately Priced Quantity U/I Unit Price Amount 1 LO NSP Not Separately Priced

Data Deliverables Exhibit A

Document Identifier Authority Title

A001 DI-CMAN-81248A Interface Control Document

A002 DI-MGMT-80368A Monthly Status Report

A003 DI-IPSC-81442A Software Version Description

A006 DI-CMAN-80639C Engineering Change Proposal (ECP)

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of

Proposed Period of Performance

+ IAW PWS 1 LO

Program Management

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

Program Management IAW PWS Paragraph 1.0 and 2.0

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ IAW PWS 12 MO TBC

Proposed Period of Performance

+ IAW PWS 12 MO

Field Service Support

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

12 MO

Field Service Support

Field Service Support

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ IAW PWS 12 MO TBC

Proposed Period of Performance

+ IAW PWS 12 MO

Software Sustainment

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

Software Sustainment IAW PWS Paragraph 5.0 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ IAW PWS 1 LO TBC

Proposed

Software Sustainment

+ IAW PWS 1 LO

Cybersecurity

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

12 MO

Cybersecurity IAW PWS Paragraph 5.2.1.4.5 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ IAW PWS 12 MO TBC

Proposed Period of Performance

+ IAW PWS 12 MO

Helpdesk

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

Helpdesk IAW PWS Paragraph 5.1.1.1

Helpdesk

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ IAW PWS 12 MO TBC

Proposed Period of Performance

+ IAW PWS 12 MO

Training

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 EA

Training IAW PWS Paragraph 5.1.1.1 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ IAW PWS 1 EA TBC

Proposed Period of

Technical (Lab) Support

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

Technical (Lab) Support IAW PWS Paragraph 5.1.1 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ IAW PWS 12 MO TBC

Proposed Period of Performance

+ IAW PWS 12 MO

Block Cycle Change (BCC)

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO To be Negotiated

Block Cycle Change (BCC) IAW PWS Paragraph 5.2.1 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

Block Cycle Change (BCC)

Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ IAW PWS 1 LO TBC

Proposed Period of Performance

+ IAW PWS 1 LO

Block Cycle Change

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost 1 LO To be Negotiated

Block Cycle Change (BCC) IAW PWS Paragraph 5.2.1 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ IAW PWS 1 LO TBC

Proposed Period of Performance

+ IAW PWS 1 LO

Variable Engineering

Item No.

Variable Engineering

Quantity U/I Estimated Cost Fixed Fee Est Total Cost 1 LO To be Negotiated

Variable Engineering IAW PWS Paragraph 5.2.1 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ IAW PWS 1 LO TBC

Proposed Period of Performance

+ IAW PWS 1 LO

Travel

Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

Travel IAW PWS Paragraph 5.2.2 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued

Travel

Required Period of Performance

+ IAW PWS 1 LO TBC

Proposed Period of Performance

+ IAW PWS 1 LO

Data Deliverables

Item No.

Not Separately Priced Quantity U/I Unit Price Amount 1 LO NSP Not Separately Priced

Data Deliverables Exhibit A

Document Identifier Authority Title

A001 DI-CMAN-81248A Interface Control Document

A002 DI-MGMT-80368A Monthly Status Report

A003 DI-IPSC-81442A Software Version Description

A006 DI-CMAN-80639C Engineering Change Proposal (ECP)

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of

Proposed Period of Performance

+ IAW PWS 1 LO

Program Management

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

Program Management IAW PWS Paragraph 1.0 and 2.0

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ IAW PWS 12 MO TBC

Proposed Period of Performance

+ IAW PWS 12 MO

Field Service Support

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

12 MO

Field Service Support

Field Service Support

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ IAW PWS 12 MO TBC

Proposed Period of Performance

+ IAW PWS 12 MO

Software Sustainment

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

Software Sustainment IAW PWS Paragraph 5.0 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ IAW PWS 1 LO TBC

Proposed

Software Sustainment

+ IAW PWS 1 LO

Item No.

Cybersecurity IAW PWS Paragraph 5.2.1.4.5 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

Helpdesk

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

Helpdesk IAW PWS Paragraph 5.1.1.1 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ IAW PWS 12 MO TBC

Proposed Period of

+ IAW PWS 12 MO

Training

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 EA

Training IAW PWS Paragraph 5.1.1.1 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ IAW PWS 1 EA TBC

Proposed Period of Performance

+ IAW PWS 1 EA

Technical (Lab) Support

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

Technical (Lab) Support IAW PWS Paragraph 5.1.1 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

Technical (Lab) Support

Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ IAW PWS 12 MO TBC

Proposed Period of Performance

+ IAW PWS 12 MO

Block Cycle Change (BCC)

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO To be Negotiated

Block Cycle Change (BCC) IAW PWS Paragraph 5.2.1 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ IAW PWS 1 LO TBC

Proposed Period of Performance

+ IAW PWS 1 LO

Block Cycle Change

Item No.

Block Cycle Change

Quantity U/I Estimated Cost Fixed Fee Est Total Cost 1 LO To be Negotiated

Block Cycle Change (BCC) IAW PWS Paragraph 5.2.1 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ IAW PWS 1 LO TBC

Proposed Period of Performance

+ IAW PWS 1 LO

Variable Engineering

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost 1 LO To be Negotiated

Variable Engineering IAW PWS Paragraph 5.2.1 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued

Variable Engineering

Required Period of Performance

+ IAW PWS 1 LO TBC

Proposed Period of Performance

+ IAW PWS 1 LO

Travel

Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

Travel IAW PWS Paragraph 5.2.2 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ IAW PWS 1 LO TBC

Proposed Period of Performance

+ IAW PWS 1 LO

Data Deliverables

Item No.

Not Separately Priced Quantity U/I Unit Price Amount 1 LO NSP Not Separately Priced

Data Deliverables

Data Deliverables Exhibit A

Document Identifier Authority Title

A001 DI-CMAN-81248A Interface Control Document

A002 DI-MGMT-80368A Monthly Status Report

A003 DI-IPSC-81442A Software Version Description

A006 DI-CMAN-80639C Engineering Change Proposal (ECP)

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ IAW PWS 1 LO TBC

Proposed Period of Performance

+ IAW PWS 1 LO

Program Management

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

6 MO

Program Management IAW PWS Paragraph 1.0 and 2.0

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ IAW PWS 6 MO TBC

Proposed Period of Performance

+ IAW PWS 6 MO

Field Service Support

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

6 MO

Field Service Support IAW PWS Paragraph 5.1.1.2 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ IAW PWS 6 MO TBC

Proposed Period of

+ IAW PWS 6 MO

Software Sustainment

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

Software Sustainment IAW PWS Paragraph 5.0 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ IAW PWS 1 LO TBC

Proposed Period of Performance

+ IAW PWS 1 LO

Cybersecurity

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

6 MO

Cybersecurity IAW PWS Paragraph 5.2.1.4.5 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

Cybersecurity

Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ IAW PWS 6 MO TBC

Proposed Period of Performance

+ IAW PWS 6 MO

Helpdesk

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

6 MO

Helpdesk IAW PWS Paragraph 5.1.1.1 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ IAW PWS 6 MO TBC

Proposed Period of Performance

+ IAW PWS 6 MO

Training

Item No.

Firm Fixed Price

Training

Quantity U/I Unit Price Amount

1 EA

Training IAW PWS Paragraph 5.1.1.1 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ IAW PWS 1 EA TBC

Proposed Period of Performance

+ IAW PWS 1 EA

Technical (Lab) Support

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

6 MO

Technical (Lab) Support IAW PWS Paragraph 5.1.1 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued

Technical (Lab) Support

Required Period of Performance

+ IAW PWS 6 MO TBC

Proposed Period of Performance

+ IAW PWS 6 MO

Block Cycle Change (BCC)

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO To be Negotiated

Block Cycle Change (BCC) IAW PWS Paragraph 5.2.1 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ IAW PWS 1 LO TBC

Proposed Period of Performance

+ IAW PWS 1 LO

Block Cycle Change

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost 1 LO To be Negotiated

Block Cycle Change

Block Cycle Change (BCC) IAW PWS Paragraph 5.2.1 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ IAW PWS 1 LO TBC

Proposed Period of Performance

+ IAW PWS 1 LO

Variable Engineering

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost 1 LO To be Negotiated

Variable Engineering IAW PWS Paragraph 5.2.1 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of

Variable Engineering

Proposed Period of Performance

+ IAW PWS 1 LO

Travel

Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

Travel IAW PWS Paragraph 5.2.2 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ IAW PWS 1 LO TBC

Proposed Period of Performance

+ IAW PWS 1 LO

Data Deliverables

Item No.

Not Separately Priced Quantity U/I Unit Price Amount 1 LO NSP Not Separately Priced

Data Deliverables Exhibit A

Document Identifier Authority Title

A001 DI-CMAN-81248A Interface Control Document

A002 DI-MGMT-80368A Monthly Status Report

A003 DI-IPSC-81442A Software Version Description

A006 DI-CMAN-80639C Engineering Change Proposal (ECP)

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ IAW PWS 1 LO TBC

Proposed Period of Performance

+ IAW PWS 1 LO

SHIP TO / PLACE OF PERFORMANCE

TYPE/CODE: + IAW PWS

MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)

AWARD NUMBER:

PART I - THE SCHEDULE

SECTION G

CONTRACT ADMINISTRATION DATA

PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

SECTION J

LIST OF ATTACHMENTS

Form Number Description/File Name Date Number of Pages

DD254.pdf 31JAN2019

CDRLs.pdf 28JAN2019

PWS_Rev6.pdf 29JAN2019

File details come from the government source that posted it.