RFI Responses for FA857125Q0082 Modular Offices.pdf
PDF 54 KB Posted
- Attached to
- New Modular Offices
- Solicitation number
- FA857125Q0082
About this file
This document is a Request for Information (RFI) response for a modular offices solicitation (FA857125Q0082). The RFI clarifies several key details about the procurement, including that the contractor is not required to anchor the offices, can coordinate with the government for forklift offloading, and must provide stamped drawings for electrical pages. The modular offices consist of two individual units, and the solicitation specifies that installation is not required. Additional clarifications include that the contractor is not responsible for unwrapping the buildings, installing HVAC, or disposing of packaging. The government will potentially provide a forklift and driver for offloading, or the contractor can provide a certified driver. This is a 100% small business set-aside solicitation issued by the Department of the Air Force Materiel Command Air Force Sustainment Center.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 77772 - PD (revised 19 May 25).pdf | ||
| Solicitation Amendment FA857125Q00820001 SF 30.pdf | ||
| Solicitation - FA857125Q0082.pdf | ||
| 77772 - PD.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI Responses for FA857125Q0082 Modular Offices
1) Does the Gov’t require anchoring? No, contractor not required to anchor.
2) Will the Gov’t provide a forklift and a driver to offload? Yes, coordination can occur for Gov’t to provide forklift and a driver to offload or contractor can provide a certified driver to offload.
3) Does the Gov’t require Stamped Drawings and Stamps for Electrical Pages? Yes (this was added to PD Paragraph 1.1).
4) Solicitation says installation is not required. However, does the Gov’t require the contractor to unwrap the buildings? No
5) Solicitation says installation is not required. However, does the Gov’t required the contractor to install the HVAC (there is a process/inspection that happens between the physical offload and anchoring of the booth)? No, PD Paragraph 1.1 states pre-packaged unit with panel prep required.
6) Does the contractor need to dispose of packaging/wrapping? No, contractor not required to dispose of packaging/wrapping.
7) Are the offices connected side-by-side or a 4 walled stand-alone? The offices are 2 individual units.
8) Do you have a rough sketch of the layout request? No