Fall Arrest Protection System Question and Answer.pdf
PDF 124 KB Posted
- Attached to
- Fall Arrest Protection System - Aircraft Wings – B89 Federal contract opportunity
- Solicitation number
- FA8571-24-Q-0005
About this file
This document contains questions and answers related to solicitation number FA8571-24-Q-0005 for a fall arrest protection system for aircraft wings at building B89. The questions and answers provide additional details for the required fall protection system, which must be a rigid rail installed either overhead on the building roof structure or ground-mounted. The contractor will be responsible for analyzing if the existing building can structurally support an overhead rigid rail system, and if not, designing an alternative ground-based inverted L system. A single C130 aircraft located in the center of the hangar requires fall protection along its wings, with a rigid rail already in place over the fuselage. No preference is stated on rail manufacturer.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 72880_CDRL_A003_Repairable Item Inspection Report.pdf | ||
| 72880_B-89 layout.pdf | ||
| Solicitation - FA857124Q0005.pdf | ||
| 72880_CDRL_A005_Maintenance Service Report.pdf | ||
| B89 Drawings_72880.pdf | ||
| 72880_CDRL_A002_Work Completion Certification.pdf | ||
| 72880_CDRL_A006_Manuals.pdf | ||
| 72880_CDRL_A007_Contractor_s Safety Plan.pdf | ||
| 72880_CDRL_A008_ Accident Incident Report.pdf | ||
| 72880_CDRL A001_System Safety Program Plan.pdf | ||
| 72880_CDRL_A004_Certification Data Report.pdf | ||
| 72880_Appendix C.pdf | ||
| 72880_PD (23 AUG 2023).pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Fall Arrest Protec�on System - Aircra� Wings – B89 Solicita�on FA8571-24-Q-0005
Ques�on and Answer 30 October 2023
This one can only handle a rigid rail with the six users on the rail.
1. Do you have any pictures of the area where this new fall protec�on system is to be installed? can you please share? Not at the current �me, drawings will be provided upon award.
2. Is the fall protec�on system only for one (1) C130 in the center of the hangar as shown in the layout atached? Yes, this is correct.
3. The descrip�on of work only calls for fall protec�on along the wings of the C130. Would it be beneficial or necessary to provide fall protec�on along the fuselage of the plain as well? This would allow any user to have fall protec�on no mater where they are working on the plane at any given �me. A rigid rail is already in place over the fuselage.
4. The preferred fall protec�on system is a rigid rail track. Do you have a preferred manufacturer for this track? For this applica�on we would most likely want to u�lize a bridge monorail system, is this acceptable? No, a rigid rail is necessary for this applica�on. No preference on manufacturer.
5. Is the intent that our company provide an analysis of the structural load capacity of the roof itself or is it the requirement for our company to resolve the loads imposed on the structure from the fall protec�on system we supply and install? The contractor is to analyze if the building can support their designed overhead rigid rail system. If the building cannot support it, the contractor is to design a ground-based system like an inverted L system that can support a rigid rail.