FA8552-22-R-0003 0001 RFP Amendment.pdf

PDF 513 KB Posted

Attached to
Reliability and Maintainability (R&M) Support Follow On Federal contract opportunity
Solicitation number
FA8552-22-R-0003
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

View the file

Other files for this federal contract opportunity

Other files attached to Reliability and Maintainability (R&M) Support Follow On, newest first.
File Type Posted
1. FD2060-21-32087 PWS with Appendices_Rev 4c (27 April 22).pdf PDF
4. FD2060-21-32087 DD Form 1423.pdf PDF
2. FD2060 -21-32087 QASP.pdf PDF
3. FD2060-21-32087 DD Form 254.pdf PDF
FA8552-22-R-0003 RFP.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

SU

2. AMENDMENT/MODIFICATION NO.

FA8552-22-R-0003-0001

3. EFFECTIVE DATE

13 JUN 2022

4. REQUISITION/PURCHASE REQ. NO.

FD20602230277

5. PROJECT NO (If applicable)

6. ISSUED BY CODE

SOF/RW - ROTARY WING, AFLCMC/WIUKB RW

235 BYRON ST STE 19A

BLDG 300 CML PHN 478 926 7227

ROBINS AFB GA 31098-1670

BUYER: Tominica N. Pines tominica.pines@us.af.mil Phone: (478) 926- 7441

7. ADMINISTERED BY (If other than item 6) CODEFA8552

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE

X

9A. AMENDMENT OF SOLICITATION NO.

FA855222R0003

9B. DATED (SEE ITEM 11)

13-JUN-2022

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

ROUTINE RESTRICTED UNDER THE PROVISIONS OF SECTION 8(a) OF THE SMALL BUSINESS ACT

15A. NAME AND TITLE OF SIGNER (Type or print)

15B. CONTRACTOR/OFFEROR

BY ________________________________________________________

(Signature of person authorized to sign)

15C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16B. UNITED STATES OF AMERICA

BY ____________________________________________________

(Signature of Contracting Officer)

16C. DATE SIGNED

FACILITY CODE

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

30-105 STANDARD FORM 30 (REV. 10-83)

PRESCRIBED BY GSA

FAR (48 CFR) 53.243

X

X The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers X is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods. ( a ) By completing Items 8 and 15, and returning copies of the amendment; ( b ) By acknowledging receipt of this amendment on each copy of the offer submitted; or ( c ) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified. 27-JUN-2022 4:30 PM

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

FA8552-22-R-0003-0001

Continuation of block 14. DESCRIPTION OF AMENDMENT/MODIFICATION

The purpose of the solicitation amendment is to incorporate the following CLINs:

A. The following CLINs are hereby established. These were inadvertantly not included in the previous RFP but were a part of the initial requirement;

"X" denote the applicable year (0-4) of the contract period. A detailed CLIN description is provided in Schedule B.

B. All other terms and conditions shall remain unchanged.

X023 CLIN X023 Engineering and Technical Support (HH-60W) AFRC 1 LO X024 CLIN X024 Material (HH-60W) ANG 1 LO X025 CLIN X025 Contractor Travel and Per Diem Travel (HH-60W) AFRC 1 LO X026 CLIN X026 Engineering and Technical Support (HH-60W) ANG 1 LO X027 CLIN X027 Material (HH-60W) ACC 1 LO X028 CLIN X028 Contractor Travel and Per Diem Travel (HH-60W) ACC 1 LO

PART I - THE SCHEDULE

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

Engineering and Technical Support (HH-60W) AFRC

Basic Year Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

R425 Engineering and Technical Support (HH-60W) AFRC Reliability and Maintainability (R&M) support to the USAF Rotary-wing aircraft. In accordance with (IAW) attached Performance-Based Work Statement (PWS).

Associated Document(s) Line Item(s)

FD20602230277 0023

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 14DEC2021

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of Performance

1 LO 15 AUG 2022 14 AUG 2023

Proposed Period of Performance

1 LO

Material (HH-60W) ANG

Basic Year Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

Material (HH-60W) ANG

IAW ATTACHED PWS

Material (HH-60W) ANG

Basic Year Associated Document(s) Line Item(s)

FD20602230277 0024

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 14DEC2021

IUID Required: Yes Class I ODS Substance Application/Use Quantity none Type / Ship To Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Delivery

1 LO 15 AUG 2022 14 AUG 2023

Proposed Delivery

1 LO

Contractor Travel and Per Diem Travel (HH-60W) AFRC

Basic Year Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

Contractor Travel and Per Diem Travel (HH-60W) AFRC IAW Attached PWS paragraph 4.22. Travel shall be approved in advance by the Contracting Officer and reimbursed IAW FAR 31.205-46, Travel Costs.

Associated Document(s) Line Item(s)

FD20602230277 0025

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 14DEC2021

Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of Performance

1 LO 15 AUG 2022 14 AUG 2023

Contractor Travel and Per Diem Travel (HH-60W) AFRC

Basic Year Proposed Period of Performance

1 LO

Engineering and Technical Support (HH-60W) ANG

Basic Year Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

R425 Engineering and Technical Support (HH-60W) ANG Reliability and Maintainability (R&M) support to the USAF Rotary-wing aircraft. In accordance with (IAW) attached Performance-Based Work Statement (PWS).

Associated Document(s) Line Item(s)

FD20602230277 0026

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 14DEC2021

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of Performance

1 LO 15 AUG 2022 14 AUG 2023

Proposed Period of Performance

1 LO

Material (HH-60W) ACC

Basic Year Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

Material (HH-60W) ACC

IAW ATTACHED PWS

Associated Document(s) Line Item(s)

FD20602230277 0027

Material (HH-60W) ACC

Basic Year Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 14DEC2021

IUID Required: Yes Type / Ship To Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Delivery

1 LO 15 AUG 2022 14 AUG 2023

Proposed Delivery

1 LO

Contractor Travel and Per Diem Travel (HH-60W) ACC

Basic Year Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

Contractor Travel and Per Diem Travel (HH-60W) ACC IAW Attached PWS paragraph 4.22. Travel shall be approved in advance by the Contracting Officer and reimbursed IAW FAR 31.205-46, Travel Costs.

Associated Document(s) Line Item(s)

FD20602230277 0028

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 14DEC2021

Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of Performance

1 LO 15 AUG 2022 14 AUG 2023

Proposed Period of

1 LO

Engineering and Technical Support (HH-60W) AFRC

Option Year I Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

R425 Engineering and Technical Support (HH-60W) AFRC Reliability and Maintainability (R&M) support to the USAF Rotary-wing aircraft. In accordance with (IAW) attached Performance-Based Work Statement (PWS).

Associated Document(s) Line Item(s)

FD20602230277 0TBD

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 14DEC2021

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of Performance

1 LO 15 AUG 2023 14 AUG 2024

Proposed Period of Performance

1 LO

Material (HH-60W) ANG

Option Year I Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

Material (HH-60W) ANG

IAW ATTACHED PWS

Associated Document(s) Line Item(s)

FD20602230277 0TBD

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Material (HH-60W) ANG

Option Year I Title Number Date Tailoring

ISO 9001-2008 14DEC2021

IUID Required: Yes Class I ODS Substance Application/Use Quantity none Type / Ship To Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Delivery

1 LO 15 AUG 2023 14 AUG 2024

Proposed Delivery

1 LO

Contractor Travel and Per Diem Travel (HH-60W) AFRC

Option Year I Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

Contractor Travel and Per Diem Travel (HH-60W) AFRC IAW Attached PWS paragraph 4.22. Travel shall be approved in advance by the Contracting Officer and reimbursed IAW FAR 31.205-46, Travel Costs.

Associated Document(s) Line Item(s)

FD20602230277 0TBD

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 14DEC2021

Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of Performance

1 LO 15 AUG 2023 14 AUG 2024

Proposed Period of Performance

1 LO

Engineering and Technical Support (HH-60W) ANG

Option Year I Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

Engineering and Technical Support (HH-60W) ANG

Option Year I

1 LO

R425 Engineering and Technical Support (HH-60W) ANG Reliability and Maintainability (R&M) support to the USAF Rotary-wing aircraft. In accordance with (IAW) attached Performance-Based Work Statement (PWS).

Associated Document(s) Line Item(s)

FD20602230277 0TBD

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 14DEC2021

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of Performance

1 LO 15 AUG 2023 14 AUG 2024

Proposed Period of Performance

1 LO

Material (HH-60W) ACC

Option Year I Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

Material (HH-60W) ACC

IAW ATTACHED PWS

Associated Document(s) Line Item(s)

FD20602230277 0TBD

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 14DEC2021

IUID Required: Yes Type / Ship To Quantity (U/I) Specified Date Specified Date Req No / Pri

Material (HH-60W) ACC

Option Year I Required Delivery

1 LO 15 AUG 2023 14 AUG 2024

Proposed Delivery

1 LO

Contractor Travel and Per Diem Travel (HH-60W) ACC

Option Year I Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

Contractor Travel and Per Diem Travel (HH-60W) ACC IAW Attached PWS paragraph 4.22. Travel shall be approved in advance by the Contracting Officer and reimbursed IAW FAR 31.205-46, Travel Costs.

Associated Document(s) Line Item(s)

FD20602230277 0TBD

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 14DEC2021

Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of Performance

1 LO 15 AUG 2023 14 AUG 2024

Proposed Period of Performance

1 LO

Engineering and Technical Support (HH-60W) AFRC

Option Year II Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

R425 Engineering and Technical Support (HH-60W) AFRC Reliability and Maintainability (R&M) support to the USAF Rotary-wing aircraft. In accordance with (IAW) attached Performance-Based Work Statement (PWS).

Engineering and Technical Support (HH-60W) AFRC

Option Year II Associated Document(s) Line Item(s)

FD20602230277 0TBD

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 14DEC2021

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of Performance

1 LO 15 AUG 2024 14 AUG 2025

Proposed Period of Performance

1 LO

Material (HH-60W) ANG

Option Year II Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

Material (HH-60W) ANG

IAW ATTACHED PWS

Associated Document(s) Line Item(s)

FD20602230277 0TBD

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 14DEC2021

IUID Required: Yes Class I ODS Substance Application/Use Quantity none Type / Ship To Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Delivery

1 LO 15 AUG 2024 14 AUG 2025

Material (HH-60W) ANG

Option Year II Proposed Delivery

1 LO

Contractor Travel and Per Diem Travel (HH-60W) AFRC

Option Year II Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

Contractor Travel and Per Diem Travel (HH-60W) AFRC IAW Attached PWS paragraph 4.22. Travel shall be approved in advance by the Contracting Officer and reimbursed IAW FAR 31.205-46, Travel Costs.

Associated Document(s) Line Item(s)

FD20602230277 0TBD

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 14DEC2021

Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of Performance

1 LO 15 AUG 2024 14 AUG 2025

Proposed Period of Performance

1 LO

Engineering and Technical Support (HH-60W) ANG

Option Year II Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

R425 Engineering and Technical Support (HH-60W) ANG Reliability and Maintainability (R&M) support to the USAF Rotary-wing aircraft. In accordance with (IAW) attached Performance-Based Work Statement (PWS).

Associated Document(s) Line Item(s)

FD20602230277 0TBD

Priority: R ROUTINE

Engineering and Technical Support (HH-60W) ANG

Option Year II

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 14DEC2021

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of Performance

1 LO 15 AUG 2024 14 AUG 2025

Proposed Period of Performance

1 LO

Material (HH-60W) ACC

Option Year II Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

Material (HH-60W) ACC

IAW ATTACHED PWS

Associated Document(s) Line Item(s)

FD20602230277 0TBD

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 14DEC2021

IUID Required: Yes Type / Ship To Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Delivery

1 LO 15 AUG 2024 14 AUG 2025

Proposed Delivery

1 LO

Contractor Travel and Per Diem Travel (HH-60W) ACC

Option Year II Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

Contractor Travel and Per Diem Travel (HH-60W) ACC IAW Attached PWS paragraph 4.22. Travel shall be approved in advance by the Contracting Officer and reimbursed IAW FAR 31.205-46, Travel Costs.

Associated Document(s) Line Item(s)

FD20602230277 0TBD

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 14DEC2021

Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of Performance

1 LO 15 AUG 2024 14 AUG 2025

Proposed Period of Performance

1 LO

Engineering and Technical Support (HH-60W) AFRC

Option Year III Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

R425 Engineering and Technical Support (HH-60W) AFRC Reliability and Maintainability (R&M) support to the USAF Rotary-wing aircraft. In accordance with (IAW) attached Performance-Based Work Statement (PWS).

Associated Document(s) Line Item(s)

FD20602230277 0TBD

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

Engineering and Technical Support (HH-60W) AFRC

Option Year III

ISO 9001-2008 14DEC2021

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of Performance

1 LO 15 AUG 2025 14 AUG 2026

Proposed Period of Performance

1 LO

Material (HH-60W) ANG

Option Year III Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

Material (HH-60W) ANG

IAW ATTACHED PWS

Associated Document(s) Line Item(s)

FD20602230277 0TBD

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 14DEC2021

IUID Required: Yes Class I ODS Substance Application/Use Quantity none Type / Ship To Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Delivery

1 LO 15 AUG 2025 14 AUG 2026

Proposed Delivery

1 LO

Contractor Travel and Per Diem Travel (HH-60W) AFRC

Option Year III Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

Contractor Travel and Per Diem Travel (HH-60W) AFRC

Option Year III

1 LO

Contractor Travel and Per Diem Travel (HH-60W) AFRC IAW Attached PWS paragraph 4.22. Travel shall be approved in advance by the Contracting Officer and reimbursed IAW FAR 31.205-46, Travel Costs.

Associated Document(s) Line Item(s)

FD20602230277 0TBD

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 14DEC2021

Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of Performance

1 LO 15 AUG 2025 14 AUG 2026

Proposed Period of Performance

1 LO

Engineering and Technical Support (HH-60W) ANG

Option Year III Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

R425 Engineering and Technical Support (HH-60W) ANG Reliability and Maintainability (R&M) support to the USAF Rotary-wing aircraft. In accordance with (IAW) attached Performance-Based Work Statement (PWS).

Associated Document(s) Line Item(s)

FD20602230277 0TBD

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 14DEC2021

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Engineering and Technical Support (HH-60W) ANG

Option Year III Required Period of Performance

1 LO 15 AUG 2025 14 AUG 2026

Proposed Period of Performance

1 LO

Material (HH-60W) ACC

Option Year III Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

Material (HH-60W) ACC

IAW ATTACHED PWS

Associated Document(s) Line Item(s)

FD20602230277 0TBD

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 14DEC2021

IUID Required: Yes Type / Ship To Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Delivery

1 LO 15 AUG 2025 14 AUG 2026

Proposed Delivery

1 LO

Contractor Travel and Per Diem Travel (HH-60W) ACC

Option Year III Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

Contractor Travel and Per Diem Travel (HH-60W) ACC IAW Attached PWS paragraph 4.22. Travel shall be approved in advance by the Contracting Officer and reimbursed IAW FAR 31.205-46, Travel Costs.

Associated Document(s) Line Item(s)

Contractor Travel and Per Diem Travel (HH-60W) ACC

Option Year III

FD20602230277 0TBD

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 14DEC2021

Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of Performance

1 LO 15 AUG 2025 14 AUG 2026

Proposed Period of Performance

1 LO

Engineering and Technical Support (HH-60W) AFRC

Option Year IV Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

R425 Engineering and Technical Support (HH-60W) AFRC Reliability and Maintainability (R&M) support to the USAF Rotary-wing aircraft. In accordance with (IAW) attached Performance-Based Work Statement (PWS).

Associated Document(s) Line Item(s)

FD20602230277 0TBD

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 14DEC2021

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of

1 LO 15 AUG 2026 14 AUG 2027

Engineering and Technical Support (HH-60W) AFRC

Option Year IV Proposed Period of Performance

1 LO

Material (HH-60W) ANG

Option Year IV Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

Material (HH-60W) ANG

IAW ATTACHED PWS

Associated Document(s) Line Item(s)

FD20602230277 0TBD

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 14DEC2021

IUID Required: Yes Class I ODS Substance Application/Use Quantity none Type / Ship To Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Delivery

1 LO 15 AUG 2026 14 AUG 2027

Proposed Delivery

1 LO

Contractor Travel and Per Diem Travel (HH-60W) AFRC

Option Year IV Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

Contractor Travel and Per Diem Travel (HH-60W) AFRC IAW Attached PWS paragraph 4.22. Travel shall be approved in advance by the Contracting Officer and reimbursed IAW FAR 31.205-46, Travel Costs.

Associated Document(s) Line Item(s)

FD20602230277 0TBD

Priority: R ROUTINE

Contractor Travel and Per Diem Travel (HH-60W) AFRC

Option Year IV

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 14DEC2021

Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of Performance

1 LO 15 AUG 2026 14 AUG 2027

Proposed Period of Performance

1 LO

Engineering and Technical Support (HH-60W) ANG

Option Year IV Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

R425 Engineering and Technical Support (HH-60W) ANG Reliability and Maintainability (R&M) support to the USAF Rotary-wing aircraft. In accordance with (IAW) attached Performance-Based Work Statement (PWS).

Associated Document(s) Line Item(s)

FD20602230277 0TBD

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 14DEC2021

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of Performance

1 LO 15 AUG 2026 14 AUG 2027

Proposed Period of

Engineering and Technical Support (HH-60W) ANG

Option Year IV

1 LO

Material (HH-60W) ACC

Option Year IV Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

Material (HH-60W) ACC

IAW ATTACHED PWS

Associated Document(s) Line Item(s)

FD20602230277 0TBD

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 14DEC2021

IUID Required: Yes Type / Ship To Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Delivery

1 LO 15 AUG 2026 14 AUG 2027

Proposed Delivery

1 LO

Contractor Travel and Per Diem Travel (HH-60W) ACC

Option Year IV Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

Contractor Travel and Per Diem Travel (HH-60W) ACC IAW Attached PWS paragraph 4.22. Travel shall be approved in advance by the Contracting Officer and reimbursed IAW FAR 31.205-46, Travel Costs.

Associated Document(s) Line Item(s)

FD20602230277 0TBD

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required

Contractor Travel and Per Diem Travel (HH-60W) ACC

Option Year IV Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 14DEC2021

Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of Performance

1 LO 15 AUG 2026 14 AUG 2027

Proposed Period of Performance

1 LO

SHIP TO / PLACE OF PERFORMANCE

TYPE/CODE: + IAW1423

MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)

AWARD NUMBER:

File details come from the government source that posted it. Updated .