FA8552-22-R-0003 0001 RFP Amendment.pdf
PDF 513 KB Posted
- Attached to
- Reliability and Maintainability (R&M) Support Follow On Federal contract opportunity
- Solicitation number
- FA8552-22-R-0003
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 1. FD2060-21-32087 PWS with Appendices_Rev 4c (27 April 22).pdf | ||
| 4. FD2060-21-32087 DD Form 1423.pdf | ||
| 2. FD2060 -21-32087 QASP.pdf | ||
| 3. FD2060-21-32087 DD Form 254.pdf | ||
| FA8552-22-R-0003 RFP.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
SU
2. AMENDMENT/MODIFICATION NO.
FA8552-22-R-0003-0001
3. EFFECTIVE DATE
13 JUN 2022
4. REQUISITION/PURCHASE REQ. NO.
FD20602230277
5. PROJECT NO (If applicable)
6. ISSUED BY CODE
SOF/RW - ROTARY WING, AFLCMC/WIUKB RW
235 BYRON ST STE 19A
BLDG 300 CML PHN 478 926 7227
ROBINS AFB GA 31098-1670
BUYER: Tominica N. Pines tominica.pines@us.af.mil Phone: (478) 926- 7441
7. ADMINISTERED BY (If other than item 6) CODEFA8552
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE
X
9A. AMENDMENT OF SOLICITATION NO.
FA855222R0003
9B. DATED (SEE ITEM 11)
13-JUN-2022
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
ROUTINE RESTRICTED UNDER THE PROVISIONS OF SECTION 8(a) OF THE SMALL BUSINESS ACT
15A. NAME AND TITLE OF SIGNER (Type or print)
15B. CONTRACTOR/OFFEROR
BY ________________________________________________________
(Signature of person authorized to sign)
15C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16B. UNITED STATES OF AMERICA
BY ____________________________________________________
(Signature of Contracting Officer)
16C. DATE SIGNED
FACILITY CODE
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
30-105 STANDARD FORM 30 (REV. 10-83)
PRESCRIBED BY GSA
FAR (48 CFR) 53.243
X
X The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers X is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods. ( a ) By completing Items 8 and 15, and returning copies of the amendment; ( b ) By acknowledging receipt of this amendment on each copy of the offer submitted; or ( c ) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified. 27-JUN-2022 4:30 PM
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
FA8552-22-R-0003-0001
Continuation of block 14. DESCRIPTION OF AMENDMENT/MODIFICATION
The purpose of the solicitation amendment is to incorporate the following CLINs:
A. The following CLINs are hereby established. These were inadvertantly not included in the previous RFP but were a part of the initial requirement;
"X" denote the applicable year (0-4) of the contract period. A detailed CLIN description is provided in Schedule B.
B. All other terms and conditions shall remain unchanged.
X023 CLIN X023 Engineering and Technical Support (HH-60W) AFRC 1 LO X024 CLIN X024 Material (HH-60W) ANG 1 LO X025 CLIN X025 Contractor Travel and Per Diem Travel (HH-60W) AFRC 1 LO X026 CLIN X026 Engineering and Technical Support (HH-60W) ANG 1 LO X027 CLIN X027 Material (HH-60W) ACC 1 LO X028 CLIN X028 Contractor Travel and Per Diem Travel (HH-60W) ACC 1 LO
PART I - THE SCHEDULE
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
Engineering and Technical Support (HH-60W) AFRC
Basic Year Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost
1 LO
R425 Engineering and Technical Support (HH-60W) AFRC Reliability and Maintainability (R&M) support to the USAF Rotary-wing aircraft. In accordance with (IAW) attached Performance-Based Work Statement (PWS).
Associated Document(s) Line Item(s)
FD20602230277 0023
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 14DEC2021
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 15 AUG 2022 14 AUG 2023
Proposed Period of Performance
1 LO
Material (HH-60W) ANG
Basic Year Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
Material (HH-60W) ANG
IAW ATTACHED PWS
Material (HH-60W) ANG
Basic Year Associated Document(s) Line Item(s)
FD20602230277 0024
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 14DEC2021
IUID Required: Yes Class I ODS Substance Application/Use Quantity none Type / Ship To Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Delivery
1 LO 15 AUG 2022 14 AUG 2023
Proposed Delivery
1 LO
Contractor Travel and Per Diem Travel (HH-60W) AFRC
Basic Year Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
Contractor Travel and Per Diem Travel (HH-60W) AFRC IAW Attached PWS paragraph 4.22. Travel shall be approved in advance by the Contracting Officer and reimbursed IAW FAR 31.205-46, Travel Costs.
Associated Document(s) Line Item(s)
FD20602230277 0025
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 14DEC2021
Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 15 AUG 2022 14 AUG 2023
Contractor Travel and Per Diem Travel (HH-60W) AFRC
Basic Year Proposed Period of Performance
1 LO
Engineering and Technical Support (HH-60W) ANG
Basic Year Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost
1 LO
R425 Engineering and Technical Support (HH-60W) ANG Reliability and Maintainability (R&M) support to the USAF Rotary-wing aircraft. In accordance with (IAW) attached Performance-Based Work Statement (PWS).
Associated Document(s) Line Item(s)
FD20602230277 0026
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 14DEC2021
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 15 AUG 2022 14 AUG 2023
Proposed Period of Performance
1 LO
Material (HH-60W) ACC
Basic Year Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
Material (HH-60W) ACC
IAW ATTACHED PWS
Associated Document(s) Line Item(s)
FD20602230277 0027
Material (HH-60W) ACC
Basic Year Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 14DEC2021
IUID Required: Yes Type / Ship To Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Delivery
1 LO 15 AUG 2022 14 AUG 2023
Proposed Delivery
1 LO
Contractor Travel and Per Diem Travel (HH-60W) ACC
Basic Year Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
Contractor Travel and Per Diem Travel (HH-60W) ACC IAW Attached PWS paragraph 4.22. Travel shall be approved in advance by the Contracting Officer and reimbursed IAW FAR 31.205-46, Travel Costs.
Associated Document(s) Line Item(s)
FD20602230277 0028
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 14DEC2021
Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 15 AUG 2022 14 AUG 2023
Proposed Period of
1 LO
Engineering and Technical Support (HH-60W) AFRC
Option Year I Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost
1 LO
R425 Engineering and Technical Support (HH-60W) AFRC Reliability and Maintainability (R&M) support to the USAF Rotary-wing aircraft. In accordance with (IAW) attached Performance-Based Work Statement (PWS).
Associated Document(s) Line Item(s)
FD20602230277 0TBD
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 14DEC2021
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 15 AUG 2023 14 AUG 2024
Proposed Period of Performance
1 LO
Material (HH-60W) ANG
Option Year I Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
Material (HH-60W) ANG
IAW ATTACHED PWS
Associated Document(s) Line Item(s)
FD20602230277 0TBD
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Material (HH-60W) ANG
Option Year I Title Number Date Tailoring
ISO 9001-2008 14DEC2021
IUID Required: Yes Class I ODS Substance Application/Use Quantity none Type / Ship To Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Delivery
1 LO 15 AUG 2023 14 AUG 2024
Proposed Delivery
1 LO
Contractor Travel and Per Diem Travel (HH-60W) AFRC
Option Year I Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
Contractor Travel and Per Diem Travel (HH-60W) AFRC IAW Attached PWS paragraph 4.22. Travel shall be approved in advance by the Contracting Officer and reimbursed IAW FAR 31.205-46, Travel Costs.
Associated Document(s) Line Item(s)
FD20602230277 0TBD
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 14DEC2021
Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 15 AUG 2023 14 AUG 2024
Proposed Period of Performance
1 LO
Engineering and Technical Support (HH-60W) ANG
Option Year I Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost
Engineering and Technical Support (HH-60W) ANG
Option Year I
1 LO
R425 Engineering and Technical Support (HH-60W) ANG Reliability and Maintainability (R&M) support to the USAF Rotary-wing aircraft. In accordance with (IAW) attached Performance-Based Work Statement (PWS).
Associated Document(s) Line Item(s)
FD20602230277 0TBD
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 14DEC2021
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 15 AUG 2023 14 AUG 2024
Proposed Period of Performance
1 LO
Material (HH-60W) ACC
Option Year I Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
Material (HH-60W) ACC
IAW ATTACHED PWS
Associated Document(s) Line Item(s)
FD20602230277 0TBD
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 14DEC2021
IUID Required: Yes Type / Ship To Quantity (U/I) Specified Date Specified Date Req No / Pri
Material (HH-60W) ACC
Option Year I Required Delivery
1 LO 15 AUG 2023 14 AUG 2024
Proposed Delivery
1 LO
Contractor Travel and Per Diem Travel (HH-60W) ACC
Option Year I Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
Contractor Travel and Per Diem Travel (HH-60W) ACC IAW Attached PWS paragraph 4.22. Travel shall be approved in advance by the Contracting Officer and reimbursed IAW FAR 31.205-46, Travel Costs.
Associated Document(s) Line Item(s)
FD20602230277 0TBD
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 14DEC2021
Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 15 AUG 2023 14 AUG 2024
Proposed Period of Performance
1 LO
Engineering and Technical Support (HH-60W) AFRC
Option Year II Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost
1 LO
R425 Engineering and Technical Support (HH-60W) AFRC Reliability and Maintainability (R&M) support to the USAF Rotary-wing aircraft. In accordance with (IAW) attached Performance-Based Work Statement (PWS).
Engineering and Technical Support (HH-60W) AFRC
Option Year II Associated Document(s) Line Item(s)
FD20602230277 0TBD
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 14DEC2021
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 15 AUG 2024 14 AUG 2025
Proposed Period of Performance
1 LO
Material (HH-60W) ANG
Option Year II Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
Material (HH-60W) ANG
IAW ATTACHED PWS
Associated Document(s) Line Item(s)
FD20602230277 0TBD
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 14DEC2021
IUID Required: Yes Class I ODS Substance Application/Use Quantity none Type / Ship To Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Delivery
1 LO 15 AUG 2024 14 AUG 2025
Material (HH-60W) ANG
Option Year II Proposed Delivery
1 LO
Contractor Travel and Per Diem Travel (HH-60W) AFRC
Option Year II Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
Contractor Travel and Per Diem Travel (HH-60W) AFRC IAW Attached PWS paragraph 4.22. Travel shall be approved in advance by the Contracting Officer and reimbursed IAW FAR 31.205-46, Travel Costs.
Associated Document(s) Line Item(s)
FD20602230277 0TBD
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 14DEC2021
Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 15 AUG 2024 14 AUG 2025
Proposed Period of Performance
1 LO
Engineering and Technical Support (HH-60W) ANG
Option Year II Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost
1 LO
R425 Engineering and Technical Support (HH-60W) ANG Reliability and Maintainability (R&M) support to the USAF Rotary-wing aircraft. In accordance with (IAW) attached Performance-Based Work Statement (PWS).
Associated Document(s) Line Item(s)
FD20602230277 0TBD
Priority: R ROUTINE
Engineering and Technical Support (HH-60W) ANG
Option Year II
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 14DEC2021
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 15 AUG 2024 14 AUG 2025
Proposed Period of Performance
1 LO
Material (HH-60W) ACC
Option Year II Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
Material (HH-60W) ACC
IAW ATTACHED PWS
Associated Document(s) Line Item(s)
FD20602230277 0TBD
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 14DEC2021
IUID Required: Yes Type / Ship To Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Delivery
1 LO 15 AUG 2024 14 AUG 2025
Proposed Delivery
1 LO
Contractor Travel and Per Diem Travel (HH-60W) ACC
Option Year II Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
Contractor Travel and Per Diem Travel (HH-60W) ACC IAW Attached PWS paragraph 4.22. Travel shall be approved in advance by the Contracting Officer and reimbursed IAW FAR 31.205-46, Travel Costs.
Associated Document(s) Line Item(s)
FD20602230277 0TBD
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 14DEC2021
Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 15 AUG 2024 14 AUG 2025
Proposed Period of Performance
1 LO
Engineering and Technical Support (HH-60W) AFRC
Option Year III Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost
1 LO
R425 Engineering and Technical Support (HH-60W) AFRC Reliability and Maintainability (R&M) support to the USAF Rotary-wing aircraft. In accordance with (IAW) attached Performance-Based Work Statement (PWS).
Associated Document(s) Line Item(s)
FD20602230277 0TBD
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
Engineering and Technical Support (HH-60W) AFRC
Option Year III
ISO 9001-2008 14DEC2021
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 15 AUG 2025 14 AUG 2026
Proposed Period of Performance
1 LO
Material (HH-60W) ANG
Option Year III Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
Material (HH-60W) ANG
IAW ATTACHED PWS
Associated Document(s) Line Item(s)
FD20602230277 0TBD
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 14DEC2021
IUID Required: Yes Class I ODS Substance Application/Use Quantity none Type / Ship To Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Delivery
1 LO 15 AUG 2025 14 AUG 2026
Proposed Delivery
1 LO
Contractor Travel and Per Diem Travel (HH-60W) AFRC
Option Year III Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
Contractor Travel and Per Diem Travel (HH-60W) AFRC
Option Year III
1 LO
Contractor Travel and Per Diem Travel (HH-60W) AFRC IAW Attached PWS paragraph 4.22. Travel shall be approved in advance by the Contracting Officer and reimbursed IAW FAR 31.205-46, Travel Costs.
Associated Document(s) Line Item(s)
FD20602230277 0TBD
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 14DEC2021
Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 15 AUG 2025 14 AUG 2026
Proposed Period of Performance
1 LO
Engineering and Technical Support (HH-60W) ANG
Option Year III Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost
1 LO
R425 Engineering and Technical Support (HH-60W) ANG Reliability and Maintainability (R&M) support to the USAF Rotary-wing aircraft. In accordance with (IAW) attached Performance-Based Work Statement (PWS).
Associated Document(s) Line Item(s)
FD20602230277 0TBD
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 14DEC2021
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Engineering and Technical Support (HH-60W) ANG
Option Year III Required Period of Performance
1 LO 15 AUG 2025 14 AUG 2026
Proposed Period of Performance
1 LO
Material (HH-60W) ACC
Option Year III Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
Material (HH-60W) ACC
IAW ATTACHED PWS
Associated Document(s) Line Item(s)
FD20602230277 0TBD
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 14DEC2021
IUID Required: Yes Type / Ship To Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Delivery
1 LO 15 AUG 2025 14 AUG 2026
Proposed Delivery
1 LO
Contractor Travel and Per Diem Travel (HH-60W) ACC
Option Year III Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
Contractor Travel and Per Diem Travel (HH-60W) ACC IAW Attached PWS paragraph 4.22. Travel shall be approved in advance by the Contracting Officer and reimbursed IAW FAR 31.205-46, Travel Costs.
Associated Document(s) Line Item(s)
Contractor Travel and Per Diem Travel (HH-60W) ACC
Option Year III
FD20602230277 0TBD
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 14DEC2021
Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 15 AUG 2025 14 AUG 2026
Proposed Period of Performance
1 LO
Engineering and Technical Support (HH-60W) AFRC
Option Year IV Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost
1 LO
R425 Engineering and Technical Support (HH-60W) AFRC Reliability and Maintainability (R&M) support to the USAF Rotary-wing aircraft. In accordance with (IAW) attached Performance-Based Work Statement (PWS).
Associated Document(s) Line Item(s)
FD20602230277 0TBD
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 14DEC2021
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of
1 LO 15 AUG 2026 14 AUG 2027
Engineering and Technical Support (HH-60W) AFRC
Option Year IV Proposed Period of Performance
1 LO
Material (HH-60W) ANG
Option Year IV Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
Material (HH-60W) ANG
IAW ATTACHED PWS
Associated Document(s) Line Item(s)
FD20602230277 0TBD
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 14DEC2021
IUID Required: Yes Class I ODS Substance Application/Use Quantity none Type / Ship To Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Delivery
1 LO 15 AUG 2026 14 AUG 2027
Proposed Delivery
1 LO
Contractor Travel and Per Diem Travel (HH-60W) AFRC
Option Year IV Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
Contractor Travel and Per Diem Travel (HH-60W) AFRC IAW Attached PWS paragraph 4.22. Travel shall be approved in advance by the Contracting Officer and reimbursed IAW FAR 31.205-46, Travel Costs.
Associated Document(s) Line Item(s)
FD20602230277 0TBD
Priority: R ROUTINE
Contractor Travel and Per Diem Travel (HH-60W) AFRC
Option Year IV
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 14DEC2021
Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 15 AUG 2026 14 AUG 2027
Proposed Period of Performance
1 LO
Engineering and Technical Support (HH-60W) ANG
Option Year IV Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost
1 LO
R425 Engineering and Technical Support (HH-60W) ANG Reliability and Maintainability (R&M) support to the USAF Rotary-wing aircraft. In accordance with (IAW) attached Performance-Based Work Statement (PWS).
Associated Document(s) Line Item(s)
FD20602230277 0TBD
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 14DEC2021
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 15 AUG 2026 14 AUG 2027
Proposed Period of
Engineering and Technical Support (HH-60W) ANG
Option Year IV
1 LO
Material (HH-60W) ACC
Option Year IV Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
Material (HH-60W) ACC
IAW ATTACHED PWS
Associated Document(s) Line Item(s)
FD20602230277 0TBD
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 14DEC2021
IUID Required: Yes Type / Ship To Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Delivery
1 LO 15 AUG 2026 14 AUG 2027
Proposed Delivery
1 LO
Contractor Travel and Per Diem Travel (HH-60W) ACC
Option Year IV Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
Contractor Travel and Per Diem Travel (HH-60W) ACC IAW Attached PWS paragraph 4.22. Travel shall be approved in advance by the Contracting Officer and reimbursed IAW FAR 31.205-46, Travel Costs.
Associated Document(s) Line Item(s)
FD20602230277 0TBD
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required
Contractor Travel and Per Diem Travel (HH-60W) ACC
Option Year IV Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 14DEC2021
Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri
Required Period of Performance
1 LO 15 AUG 2026 14 AUG 2027
Proposed Period of Performance
1 LO
SHIP TO / PLACE OF PERFORMANCE
TYPE/CODE: + IAW1423
MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
File details come from the government source that posted it. Updated .