FA8552-22-R-0003 RFP.pdf

PDF 1 MB Posted

Attached to
Reliability and Maintainability (R&M) Support Follow On Federal contract opportunity
Solicitation number
FA8552-22-R-0003
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

View the file

Other files for this federal contract opportunity

Other files attached to Reliability and Maintainability (R&M) Support Follow On, newest first.
File Type Posted
FA8552-22-R-0003 0001 RFP Amendment.pdf PDF
3. FD2060-21-32087 DD Form 254.pdf PDF
1. FD2060-21-32087 PWS with Appendices_Rev 4c (27 April 22).pdf PDF
4. FD2060-21-32087 DD Form 1423.pdf PDF
2. FD2060 -21-32087 QASP.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 1447 (REV. 8/2016)

PREVIOUS EDITION NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.214(d)

23. ACCOUNTING AND APPROPRIATION DATA

SEE SCHEDULE

24. TOTAL AWARD AMOUNT (For Government Use Only)

TELEPHONE NUMBER

UNIQUE ENTITY

IDENTIFIER

CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER

NO COLLECT CALLS

4. SOLICITATION NUMBER

FA8552-22-R-0003

X

6.SOLICITATION ISSUE DATE

8. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR

SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOSB PROGRAM

HUBZONE SMALL

BUSINESS EDWOSB

SERVICE-DISABLED VETERAN-

OWNED SMALL BUSINESS NAICS: 541330

8(A) Non Competitive SIZE STANDARD: $41.50

DATE SIGNED

28. UNITED STATES OF AMERICA (Signature of Contracting Officer)

26. AWARD OF CONTRACT: YOUR OFFER ON SOLICITATION NUMBER

SHOWN IN BLOCK 4 INCLUDING ANY ADDITIONS OR CHANGES WHICH

ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

ROUTINE

RESTRICTED UNDER THE PROVISIONS OF SECTION 8(a) OF THE SMALL BUSINESS

ACT

Subject to the terms and conditions stated herein, the Contractor agrees to hold its offered prices firm for 120 days.

SEE LINE ITEM SCHEDULE

22.

AMOUNT

16. AUTHORITY FOR USING OTHER THAN 10 USC 2304 41 USC 253

FULL AND OPEN COMPETITION (c) (5 ) (c) ( )

DATE SIGNED

27. SIGNATURE OF OFFEROR/CONTRACTOR

20.

UNIT

21.

UNIT PRICE

19.

QUANTITY

13. CONTRACTOR OFFEROR CODE FACILITY CODE

11. IF OFFER IS ACCEPTED BY THE GOVERNMENT WITHIN * ___ CALENDAR DAYS (60 CALENDAR

DAYS UNLESS OFFEROR INSERTS A DIFFERENT PERIOD) FROM THE DATE SET FORTH IN BLOCK 9

ABOVE, THE CONTRACTOR AGREES TO HOLD ITS OFFERED PRICES FIRM FOR THE ITEMS

SOLICITED HEREIN AND TO ACCEPT ANY RESULTING CONTRACT SUBJECT TO THE TERMS AND

CONDITIONS STATED HEREIN. *120

RATING

DO: A1

3. AWARD/EFFECTIVE DATE

FA8552

2. CONTRACT NUMBER

X

17.

ITEM NUMBER

12. ADMINISTERED BY CODE

Estimated

SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK: 14

SCD:B

NAME AND TITLE OF SIGNER (Type or Print) NAME OF CONTRACTING OFFICER

5. SOLICITATION TYPE

SEALED BIDS NEGOTIATED

(IFB) (RFP)

15. PROMPT PAYMENT DISCOUNT

25. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 1

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SETFORTH

OR OTHERWISE IDENTIFIED ABOVE AND ON ANY CONTINUATION SHEETS SUBJECT

THE TERMS AND CONDITIONS SPECIFIED HEREIN.

10. ITEMS TO BE PURCHASED (Brief Description)

SUPPLIES SERVICES Engineering Services

9. (Agency Use)

Offers will be received at the issuing office until the date and time specified below. Late offers are subject to late proposal provisions incorporated herein. All offers are subject to provisions, representations, certifications, and specifications as are attached or incorporated by reference.

31-MAY-2022 4:00PM

X

18.

SCHEDULE OF SUPPLIES/SERVICES

14. PAYMENT WILL BE MADE BY CODE

(SEE ESP CLAUSE 252.232-7003.)

X

7. ISSUED BY CODE

SOF/RW - ROTARY WING, AFLCMC/WIUKB RW

235 BYRON ST STE 19A

BLDG 300 CML PHN 478 926 7227

ROBINS AFB GA 31098-1670

BUYER: Tominica N. Pines/WIUKB tominica.pines@us.af.mil Phone: (478) 926- 7441

X

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)SOLICITATION/CONTRACT

BIDDER/OFFEROR TO COMPLETE BLOCKS 11, 13, 15, 21, 22, & 27.

SU

28 April 2022

STANDARD FORM 1447 (REV. 8/2016) BACK

NO RESPONSE FOR REASONS CHECKED

TYPE OR PRINT NAME AND TITLE OF SIGNER

SIGNATURENAME AND ADDRESS OF FIRM (Include Zip Code)

WE DO NOT DESIRE TO BE RETAINED ON THE MAILING LIST FOR FUTURE PROCUREMENT OF THE TYPE OF

ITEMS INVOLVED

WE DO

OTHER (Specify)

UNABLE TO IDENTIFY THE ITEM(S)

CANNOT COMPLY WITH SPECIFICATIONS CANNOT MEET DELIVERY REQUIREMENT

DO NOT REGULARILY MANUFACTURE OR SELL THE TYPE

OF ITEMS INVOLVED

DATE AND LOCAL TIME 31 MAY 2022 4:00 PM

SOLICITATION NUMBER FA855222R0003

FROM: AFFIX

STAMP

HERE

TO:

ATTN: Tominica N Pines/WIUKB

SOF/RW - ROTARY WING, AFLCMC/WIUKB RW

235 BYRON ST STE 19A

BLDG 300 CML PHN 478 926 7227

ROBINS AFB GA 31098-1670

FA8552-22-R-0003

PART I - THE SCHEDULE

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

Notice to Offeror(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs.

The contract shall be a Single Award Indefinite Delivery Indefinite Quantity (IDIQ) Contract for a period of 5 years.

IAW FAR 52.217-9, this contract will contain four annual options.

Maximum Contract Value: Not to exceed $7,500,000.

BASIC CONTRACT PERIOD: The 12 month period effective from the date of contract award.

Engineering and Technical Support (TH-1H) AETC

Basic Year Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

R425 Engineering and Technical Support (TH-1H) AETC Reliability and Maintainability (R&M) support to the USAF Rotary-wing aircraft. In accordance with (IAW) attached Performance-Based Work Statement (PWS).

Associated Document(s) Line Item(s)

FD20602230277 0001

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 14DEC2021

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of Performance

1 LO 15 AUG 2022 14 AUG 2023

Engineering and Technical Support (TH-1H) AETC

Basic Year Proposed Period of Performance

1 LO

Material (TH-1H) AETC

Basic Year Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

Material (TH-1H) AETC

IAW ATTACHED PWS

Associated Document(s) Line Item(s)

FD20602230277 0002

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 14DEC2021

IUID Required: Yes Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of Performance

1 LO 15 AUG 2022 14 AUG 2023

Proposed Period of Performance

1 LO

Contractor Travel and Per Diem Travel (TH-1H) AETC

Basic Year Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

Contractor Travel and Per Diem Travel (TH-1H) AETC IAW Attached PWS paragraph 4.22. Travel shall be approved in advance by the Contracting Officer and reimbursed IAW FAR 31.205-46, Travel Costs.

Associated Document(s) Line Item(s)

FD20602230277 0003

Contractor Travel and Per Diem Travel (TH-1H) AETC

Basic Year Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 14DEC2021

Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of Performance

1 LO 15 AUG 2022 14 AUG 2023

Proposed Period of Performance

1 LO

DATA

Basic Year Item No.

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

DATA IAW Contract Data Requirements List DD FORM 1423-1. See Exhibit A

Associated Document(s) Line Item(s)

FD20602230277 0004

Priority: R ROUTINE Exhibit: A Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of Performance

1 LO 15 AUG 2022 14 AUG 2023

Proposed Period of Performance

1 LO

All ELINs shall be submitted IAW DD Form 1423-1.

Inspection: IAW DD Form 1423-1 Acceptance: IAW DD Form 1423-1 Inspection/Acceptance Report: IAW DD Form 1423-1 Quality Assurance: IAW DD Form 1423-1

Engineering and Technical Support (UH-1N) AFGSC

Basic Year Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

ELIN

Exhibit A

Description DID Qty U/I

Pricing Arrangement

A001 Reliability-Centered Maintenance (RCM) Analysis Report

DI-PSSS-82114 1 LO NSP

A002 Technical Report - Study/Services DI-MISC-80508B/T 1 LO NSP A003 Product Engineering Design Data and

Associated Lists

DI-SESS-81000F/T 1 LO NSP

A004 Status Report DI-MGMT-80368A 1 LO NSP A005 Funds and Man-Hours Expenditure Report DI-FNCL-80331A 1 LO NSP A006 Conference Agenda DI-ADMN-81249C 1 LO NSP A007 Conference Minutes DI-ADMN-81250C 1 LO NSP A008 Presentation Material DI-ADMN-81373 1 LO NSP A009 Trip/Travel Report DI-MISC-81943 1 LO NSP A00A Engineering and Technical Services

Accomplishment Report

DI-MGMT-80061A/T 1 LO NSP

A00B Failure Modes, Effects, and Criticality Analysis Report

DI-SESS-81495A 1 LO NSP

A00C Data Item Description Airworthiness Specification

DI-SESS-81766 1 LO NSP

A00D Airworthiness Certification Criteria Report DI-SESS-81768 1 LO NSP A00E Programmatic Environmental Safety and

Health Evaluation (PESHE) Plan

DI-ENVR-81840 1 LO NSP

Engineering and Technical Support (UH-1N) AFGSC

Basic Year

1 LO

R425 Engineering and Technical Support (UH-1N) AFGSC Reliability and Maintainability (R&M) support to the USAF Rotary-wing aircraft. In accordance with (IAW) attached Performance-Based Work Statement (PWS).

Associated Document(s) Line Item(s)

FD20602230277 0005

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 14DEC2021

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of Performance

1 LO 15 AUG 2022 14 AUG 2023

Proposed Period of Performance

1 LO

Material (UH-1N) AFGSC

Basic Year Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

Material (UH-1N) AFGSC IAW Attached PWS Associated Document(s) Line Item(s)

FD20602230277 0006

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 14DEC2021

Material (UH-1N) AFGSC

Basic Year

IUID Required: Yes Type / Ship To Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Delivery

1 LO 15 AUG 2022 14 AUG 2023

Proposed Delivery

1 LO

Contractor Travel and Per Diem Travel (UH-1N) AFGSC

Basic Year Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

Contractor Travel and Per Diem Travel (UH-1N) AFGSC IAW Attached PWS paragraph 4.22. Travel shall be approved in advance by the Contracting Officer and reimbursed IAW FAR 31.205-46, Travel Costs.

Associated Document(s) Line Item(s)

FD20602230277 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 14DEC2021

Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of Performance

1 LO 15 AUG 2022 14 AUG 2023

Proposed Period of Performance

1 LO

Engineering and Technical Support (HH-60G) ACC

Basic Year Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

Engineering and Technical Support (HH-60G) ACC

Basic Year

1 LO

R425 Engineering and Technical Support (HH-60G) ACC Reliability and Maintainability (R&M) support to the USAF Rotary-wing aircraft. In accordance with (IAW) attached Performance-Based Work Statement (PWS).

Associated Document(s) Line Item(s)

FD20602230277 0008

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 14DEC2021

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of Performance

1 LO 15 AUG 2022 14 AUG 2023

Proposed Period of Performance

1 LO

Material (HH-60G) ACC

Basic Year Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

Material (HH-60G) ACC IAW Attached PWS Associated Document(s) Line Item(s)

FD20602230277 0009

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Material (HH-60G) ACC

Basic Year

IUID Required: Yes Type / Ship To Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Delivery

1 LO 15 AUG 2022 14 AUG 2023

Proposed Delivery

1 LO

Contractor Travel and Per Diem Travel (HH-60G) ACC

Basic Year Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

Contractor Travel and Per Diem Travel (HH-60G) ACC IAW Attached PWS paragraph 4.22. Travel shall be approved in advance by the Contracting Officer and reimbursed IAW FAR 31.205-46, Travel Costs.

Associated Document(s) Line Item(s)

FD20602230277 0010

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 14DEC2021

Type / Ship To Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Delivery

1 LO 15 AUG 2022 14 AUG 2023

Proposed Delivery

1 LO

Engineering and Technical Support (HH-60G) ANG

Basic Year Item No.

Cost Plus Fixed Fee

1 LO

Engineering and Technical Support (HH-60G) ANG

Basic Year R425 Engineering and Technical Support (HH-60G) ANG Reliability and Maintainability (R&M) support to the USAF Rotary-wing aircraft. In accordance with (IAW) attached Performance-Based Work Statement (PWS).

Associated Document(s) Line Item(s)

FD20602230277 0011

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 14DEC2021

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of Performance

1 LO 15 AUG 2022 14 AUG 2023

Proposed Period of Performance

1 LO

Material (HH-60G) ANG

Basic Year Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

Material (HH-60G) ANG IAW Attached PWS Associated Document(s) Line Item(s)

FD20602230277 0012

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

Material (HH-60G) ANG

Basic Year IUID Required: Yes Type / Ship To Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Delivery

1 LO 15 AUG 2022 14 AUG 2023

Proposed Delivery

1 LO

Contractor Travel and Per Diem Travel (HH-60G) ANG

Basic Year Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

Contractor Travel and Per Diem Travel (HH-60G) ANG IAW Attached PWS paragraph 4.22. Travel shall be approved in advance by the Contracting Officer and reimbursed IAW FAR 31.205-46, Travel Costs.

Associated Document(s) Line Item(s)

FD20602230277 0013

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 14DEC2021

Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of Performance

1 LO 15 AUG 2022 14 AUG 2023

Proposed Period of Performance

1 LO

Engineering and Technical Support (HH-60G) AFRC

Basic Year Item No.

Cost Plus Fixed Fee

Engineering and Technical Support (HH-60G) AFRC

Basic Year R425 Engineering and Technical Support (HH-60G) AFRC Reliability and Maintainability (R&M) support to the USAF Rotary-wing aircraft. In accordance with (IAW) attached Performance-Based Work Statement (PWS).

Associated Document(s) Line Item(s)

FD20602230277 0014

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 14DEC2021

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of Performance

1 LO 15 AUG 2022 14 AUG 2023

Proposed Period of Performance

1 LO

Material (HH-60G) AFRC

Basic Year Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

Material (HH-60G) AFRC

IAW ATTACHED PWS

Associated Document(s) Line Item(s)

FD20602230277 0015

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

Material (HH-60G) AFRC

Basic Year IUID Required: Yes Class I ODS Substance Application/Use Quantity none Type / Ship To Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Delivery

1 LO 15 AUG 2022 14 AUG 2023

Proposed Delivery

1 LO

Contractor Travel and Per Diem Travel (HH-60G) AFRC

Basic Year Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

Contractor Travel and Per Diem Travel (HH-60G) AFRC IAW Attached PWS paragraph 4.22. Travel shall be approved in advance by the Contracting Officer and reimbursed IAW FAR 31.205-46, Travel Costs.

Associated Document(s) Line Item(s)

FD20602230277 0016

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 14DEC2021

Type / Ship To Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Delivery

1 LO 15 AUG 2022 14 AUG 2023

Proposed Delivery

1 LO

Engineering and Technical Support (HH-60W) ACC

Basic Year Item No.

Cost Plus Fixed Fee

Engineering and Technical Support (HH-60W) ACC

Basic Year R425 Engineering and Technical Support (HH-60W) ACC Reliability and Maintainability (R&M) support to the USAF Rotary-wing aircraft. In accordance with (IAW) attached Performance-Based Work Statement (PWS).

Associated Document(s) Line Item(s)

FD20602230277 0017

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 14DEC2021

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of Performance

1 LO 15 AUG 2022 14 AUG 2023

Proposed Period of Performance

1 LO

Material (HH-60W) AFRC

Basic Year Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

Material (HH-60W) AFRC

IAW ATTACHED PWS

Associated Document(s) Line Item(s)

FD20602230277 0018

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

Material (HH-60W) AFRC

Basic Year IUID Required: Yes Class I ODS Substance Application/Use Quantity none Type / Ship To Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Delivery

1 LO 15 AUG 2022 14 AUG 2023

Proposed Delivery

1 LO

Contractor Travel and Per Diem Travel (HH-60W) ANG

Basic Year Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

Contractor Travel and Per Diem Travel (HH-60W) ANG IAW Attached PWS paragraph 4.22. Travel shall be approved in advance by the Contracting Officer and reimbursed IAW FAR 31.205-46, Travel Costs.

Associated Document(s) Line Item(s)

FD20602230277 0019

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 14DEC2021

Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of Performance

1 LO 15 AUG 2022 14 AUG 2023

Proposed Period of Performance

1 LO

Engineering and Technical Support (MH-139) AFGSC

Basic Year Item No.

Engineering and Technical Support (MH-139) AFGSC

Basic Year

1 LO

R425 Engineering and Technical Support (MH-139) AFGSC Reliability and Maintainability (R&M) support to the USAF Rotary-wing aircraft. In accordance with (IAW) attached Performance-Based Work Statement (PWS).

Associated Document(s) Line Item(s)

FD20602230277 0020

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 14DEC2021

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of Performance

1 LO 15 AUG 2022 14 AUG 2023

Proposed Period of Performance

1 LO

Material (MH-139) AFGSC

Basic Year Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

Material (MH-139) AFGSC

IAW ATTACHED PWS

Associated Document(s) Line Item(s)

FD20602230277 0021

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Material (MH-139) AFGSC

Basic Year

IUID Required: Yes Type / Ship To Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Delivery

1 LO 15 AUG 2022 14 AUG 2023

Proposed Delivery

1 LO

Contractor Travel and Per Diem Travel (MH-139) AFGSC

Basic Year Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

Contractor Travel and Per Diem Travel (MH-139) AFGSC IAW Attached PWS paragraph 4.22. Travel shall be approved in advance by the Contracting Officer and reimbursed IAW FAR 31.205-46, Travel Costs.

Associated Document(s) Line Item(s)

FD20602230277 0022

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 14DEC2021

Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of Performance

1 LO 15 AUG 2022 14 AUG 2023

Proposed Period of Performance

1 LO

OPTION YEAR I: The 12 month period immediately following the basic contract period. The Option may be exercised on or before the last day of the contract period. An Option is determined to be exercised at time of the written notification to the contractor via email.

Engineering and Technical Support (TH-1H) AETC

Option Year I Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

R425 Engineering and Technical Support (TH-1H) AETC Reliability and Maintainability (R&M) support to the USAF Rotary-wing aircraft. In accordance with (IAW) attached Performance-Based Work Statement (PWS).

Associated Document(s) Line Item(s)

FD20602230277 1001

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 14DEC2021

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of Performance

1 LO 15 AUG 2023 14 AUG 2024

Proposed Period of Performance

1 LO

Material (TH-1H) AETC

Option Year I Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

Material (TH-1H) AETC

IAW ATTACHED PWS

Associated Document(s) Line Item(s)

FD20602230277 1002

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Material (TH-1H) AETC

Option Year I

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 14DEC2021

IUID Required: Yes Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of Performance

1 LO 15 AUG 2023 14 AUG 2024

Proposed Period of Performance

1 LO

Contractor Travel and Per Diem Travel (TH-1H) AETC

Option Year I Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

Contractor Travel and Per Diem Travel (TH-1H) AETC IAW Attached PWS paragraph 4.22. Travel shall be approved in advance by the Contracting Officer and reimbursed IAW FAR 31.205-46, Travel Costs.

Associated Document(s) Line Item(s)

FD20602230277 1003

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 14DEC2021

Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of

Contractor Travel and Per Diem Travel (TH-1H) AETC

Option Year I

1 LO 15 AUG 2023 14 AUG 2024

Proposed Period of Performance

1 LO

DATA

Option Year I Item No.

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

DATA IAW Contract Data Requirements List DD FORM 1423-1.The Exhibit will be incorporated prior to the exercise of the option.

Associated Document(s) Line Item(s)

FD20602230277 1004

Priority: R ROUTINE Exhibit: B Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of Performance

1 LO 15 AUG 2023 14 AUG 2024

Proposed Period of Performance

1 LO

All ELINs shall be submitted IAW DD Form 1423-1.

Inspection: IAW DD Form 1423-1 Acceptance: IAW DD Form 1423-1 Inspection/Acceptance Report: IAW DD Form 1423-1 Quality Assurance: IAW DD Form 1423-1

Engineering and Technical Support (AFGSC)

Option Year I Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

R425 Engineeering and Technical Support-(AFGSC) Reliability and Maintainability (R&M) support to the USAF Rotary-wing aircraft. In accordance with (IAW) attached Performance-Based Work Statement (PWS).

Associated Document(s) Line Item(s)

FD20602230277 1005

Priority: R ROUTINE

Engineering and Technical Support (AFGSC)

Option Year I

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 14DEC2021

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of Performance

1 LO 15 AUG 2023 14 AUG 2024

Proposed Period of Performance

1 LO

Material (UH-1N) AFGSC

Option Year I Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

Material (UH-1N) AFGSC

IAW ATTACHED PWS

Associated Document(s) Line Item(s)

FD20602230277 1006

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 14DEC2021

IUID Required: Yes Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of

1 LO 15 AUG 2023 14 AUG 2024

Material (UH-1N) AFGSC

Option Year I Proposed Period of Performance

1 LO

Contractor Travel and Per Diem Travel (UH-1N) AFGSC

Option Year I Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

Contractor Travel and Per Diem Travel (UH-1N) AFGSC IAW Attached PWS paragraph 4.22. Travel shall be approved in advance by the Contracting Officer and reimbursed IAW FAR 31.205-46, Travel Costs.

Associated Document(s) Line Item(s)

FD20602230277 1007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 14DEC2021

Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of Performance

1 LO 15 AUG 2023 14 AUG 2024

Proposed Period of Performance

1 LO

Engineering and Technical Support (HH-60G) ACC

Option Year I Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

R425 Engineering and Technical Support (HH-60G) ACC Reliability and Maintainability (R&M) support to the USAF Rotary-wing aircraft. In accordance with (IAW) attached Performance-Based Work Statement (PWS).

Engineering and Technical Support (HH-60G) ACC

Option Year I

FD20602230277 1008

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 14DEC2021

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of Performance

1 LO 15 AUG 2023 14 AUG 2024

Proposed Period of Performance

1 LO

Material (HH-60G) ACC

Option Year I Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

Material (HH-60G) ACC

IAW ATTACHED PWS

Associated Document(s) Line Item(s)

FD20602230277 1009

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 14DEC2021

IUID Required: Yes Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of

Material (HH-60G) ACC

Option Year I

1 LO 15 AUG 2023 14 AUG 2024

Proposed Period of Performance

1 LO

Contractor Travel and Per Diem Travel (HH-60G) ACC

Option Year I Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

Contractor Travel and Per Diem Travel (HH-60G) ACC IAW Attached PWS paragraph 4.22. Travel shall be approved in advance by the Contracting Officer and reimbursed IAW FAR 31.205-46, Travel Costs.

Associated Document(s) Line Item(s)

FD20602230277 1010

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 14DEC2021

Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of Performance

1 LO 15 AUG 2023 14 AUG 2024

Proposed Period of Performance

1 LO

Engineering and Technical Support (HH-60G) ANG

Option Year I Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

R425 Engineering and Technical Support (HH-60G) ANG

Engineering and Technical Support (HH-60G) ANG

Option Year I Reliability and Maintainability (R&M) support to the USAF Rotary-wing aircraft. In accordance with (IAW) attached Performance-Based Work Statement (PWS).

Associated Document(s) Line Item(s)

FD20602230277 1011

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 14DEC2021

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of Performance

1 LO 15 AUG 2023 14 AUG 2024

Proposed Period of Performance

1 LO

Material (HH-60G) ANG

Option Year I Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

Material (HH-60G) ANG

IAW ATTACHED PWS

Associated Document(s) Line Item(s)

FD20602230277 1012

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 14DEC2021

IUID Required: Yes Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Material (HH-60G) ANG

Option Year I Required Period of Performance

1 LO 15 AUG 2023 14 AUG 2024

Proposed Period of Performance

1 LO

Contractor Travel and Per Diem Travel (HH-60G) ANG

Option Year I Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

Contractor Travel and Per Diem Travel (HH-60G) ANG IAW Attached PWS paragraph 4.22. Travel shall be approved in advance by the Contracting Officer and reimbursed IAW FAR 31.205-46, Travel Costs.

Associated Document(s) Line Item(s)

FD20602230277 1013

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 14DEC2021

Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of Performance

1 LO 15 AUG 2023 14 AUG 2024

Proposed Period of Performance

1 LO

Engineering and Technical Support (HH-60G) AFRC

Option Year I Item No.

Cost Plus Fixed Fee

Engineering and Technical Support (HH-60G) AFRC

Option Year I R425 Engineering and Technical Support (HH-60G) AFRC Reliability and Maintainability (R&M) support to the USAF Rotary-wing aircraft. In accordance with (IAW) attached Performance-Based Work Statement (PWS).

Associated Document(s) Line Item(s)

FD20602230277 1014

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 14DEC2021

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of Performance

1 LO 15 AUG 2023 14 AUG 2024

Proposed Period of Performance

1 LO

Material (HH-60G) AFRC

Option Year I Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

Material (HH-60G) AFRC

IAW ATTACHED PWS

Associated Document(s) Line Item(s)

FD20602230277 1015

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

Material (HH-60G) AFRC

Option Year I IUID Required: Yes Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of Performance

1 LO 15 AUG 2023 14 AUG 2024

Proposed Period of Performance

1 LO

Contractor Travel and Per Diem Travel (HH-60G) AFRC

Option Year I Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

Contractor Travel and Per Diem Travel (HH-60G) AFRC IAW Attached PWS paragraph 4.22. Travel shall be approved in advance by the Contracting Officer and reimbursed IAW FAR 31.205-46, Travel Costs.

Associated Document(s) Line Item(s)

FD20602230277 1016

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 14DEC2021

Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of Performance

1 LO 15 AUG 2023 14 AUG 2024

Proposed Period of Performance

1 LO

Engineering and Technical Support (HH-60W) ACC

Option Year I Item No.

Engineering and Technical Support (HH-60W) ACC

Option Year I

1 LO

R425 Engineering and Technical Support (HH-60W) ACC Reliability and Maintainability (R&M) support to the USAF Rotary-wing aircraft. In accordance with (IAW) attached Performance-Based Work Statement (PWS).

Associated Document(s) Line Item(s)

FD20602230277 1017

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 14DEC2021

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of Performance

1 LO 15 AUG 2023 14 AUG 2024

Proposed Period of Performance

1 LO

Material (HH-60W) AFRC

Option Year I Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

Material (HH-60W) AFRC

IAW ATTACHED PWS

Associated Document(s) Line Item(s)

FD20602230277 1018

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Material (HH-60W) AFRC

Option Year I

IUID Required: Yes Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of Performance

1 LO 15 AUG 2023 14 AUG 2024

Proposed Period of Performance

1 LO

Contractor Travel and Per Diem Travel (HH-60W) ANG

Option Year I Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

Contractor Travel and Per Diem Travel (HH-60W) ANG IAW Attached PWS paragraph 4.22. Travel shall be approved in advance by the Contracting Officer and reimbursed IAW FAR 31.205-46, Travel Costs.

Associated Document(s) Line Item(s)

FD20602230277 1019

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 14DEC2021

Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of Performance

1 LO 15 AUG 2023 14 AUG 2024

Proposed Period of Performance

1 LO

Engineering and Technical Support (MH-139) AFGSC

Option Year I Item No.

Engineering and Technical Support (MH-139) AFGSC

Option Year I Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

R425 Engineering and Technical Support (MH-139) AFGSC Reliability and Maintainability (R&M) support to the USAF Rotary-wing aircraft. In accordance with (IAW) attached Performance-Based Work Statement (PWS).

Associated Document(s) Line Item(s)

FD20602230277 1020

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 14DEC2021

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of Performance

1 LO 15 AUG 2023 14 AUG 2024

Proposed Period of Performance

1 LO

Material (AFGSC)

Option Year I Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

Material (MH-139) AFGSC

IAW ATTACHED PWS

Associated Document(s) Line Item(s)

FD20602230277 1021

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Material (AFGSC)

Option Year I Title Number Date Tailoring

ISO 9001-2008 14DEC2021

IUID Required: Yes Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of Performance

1 LO 15 AUG 2023 14 AUG 2024

Proposed Period of Performance

1 LO

Contractor Travel and Per Diem Travel (MH-139) AFGSC

Option Year I Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

Contractor Travel and Per Diem Travel (MH-139) AFGSC IAW Attached PWS paragraph 4.22. Travel shall be approved in advance by the Contracting Officer and reimbursed IAW FAR 31.205-46, Travel Costs.

Associated Document(s) Line Item(s)

FD20602230277 1022

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 14DEC2021

Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of Performance

1 LO 15 AUG 2023 14 AUG 2024

Proposed Period of

OPTION YEAR II: The 12 month period immediately following Option Period I. The option may be exercised on or before the last day of the contract period. An option is determined to be exercised at time of written notification to the contractor via email.

Engineering and Technical Support (TH-1H) AETC

Option Year II Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

R425 Engineering and Technical Support (TH-1H) AETC Reliability and Maintainability (R&M) support to the USAF Rotary-wing aircraft. In accordance with (IAW) attached Performance-Based Work Statement (PWS).

Associated Document(s) Line Item(s)

FD20602230277 2001

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 14DEC2021

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of Performance

1 LO 15 AUG 2024 14 AUG 2025

Proposed Period of Performance

1 LO

Material (TH-1H) AETC

Option Year II Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

Material (TH-1H) AETC

IAW ATTACHED PWS

Material (TH-1H) AETC

Option Year II

FD20602230277 2002

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 14DEC2021

IUID Required: Yes Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of Performance

1 LO 15 AUG 2024 14 AUG 2025

Proposed Period of Performance

1 LO

Contractor Travel and Per Diem Travel (TH-1H) AETC

Option Year II Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

Contractor Travel and Per Diem Travel (TH-1H) AETC IAW Attached PWS paragraph 4.22. Travel shall be approved in advance by the Contracting Officer and reimbursed IAW FAR 31.205-46, Travel Costs.

Associated Document(s) Line Item(s)

FD20602230277 2003

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 14DEC2021

Contractor Travel and Per Diem Travel (TH-1H) AETC

Option Year II Required Period of Performance

1 LO 15 AUG 2024 14 AUG 2025

Proposed Period of Performance

1 LO

DATA

Option Year II Item No.

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

DATA IAW Contract Data Requirements List DD FORM 1423-1.The Exhibit will be incorporated prior to the exercise of the option.

Associated Document(s) Line Item(s)

FD20602230277 2004

Priority: R ROUTINE Exhibit: C Place of Perf Quantity (U/I) Specified Date Specified Date Req No / Pri

Required Period of Performance

1 LO 15 AUG 2024 14 AUG 2025

Proposed Period of Performance

1 LO

All ELINs shall be submitted IAW DD Form 1423-1.

Inspection: IAW DD Form 1423-1 Acceptance: IAW DD Form…